CN217087280U - Temporary power protection device for constructional engineering - Google Patents
Temporary power protection device for constructional engineering Download PDFInfo
- Publication number
- CN217087280U CN217087280U CN202220639532.XU CN202220639532U CN217087280U CN 217087280 U CN217087280 U CN 217087280U CN 202220639532 U CN202220639532 U CN 202220639532U CN 217087280 U CN217087280 U CN 217087280U
- Authority
- CN
- China
- Prior art keywords
- brace table
- protection device
- power protection
- buffering
- base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000003139 buffering effect Effects 0.000 claims abstract description 42
- 230000007246 mechanism Effects 0.000 claims abstract description 10
- 235000017166 Bambusa arundinacea Nutrition 0.000 claims description 15
- 235000017491 Bambusa tulda Nutrition 0.000 claims description 15
- 241001330002 Bambuseae Species 0.000 claims description 15
- 235000015334 Phyllostachys viridis Nutrition 0.000 claims description 15
- 239000011425 bamboo Substances 0.000 claims description 15
- 238000010276 construction Methods 0.000 claims description 14
- 230000000694 effects Effects 0.000 claims description 14
- 230000000149 penetrating effect Effects 0.000 claims description 6
- 239000007787 solid Substances 0.000 claims description 6
- 239000000463 material Substances 0.000 claims description 4
- 238000003825 pressing Methods 0.000 claims description 4
- 230000006978 adaptation Effects 0.000 claims description 3
- 230000002349 favourable effect Effects 0.000 abstract description 2
- 230000001737 promoting effect Effects 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 4
- 230000008569 process Effects 0.000 description 4
- 230000035939 shock Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 230000000903 blocking effect Effects 0.000 description 2
- 238000009435 building construction Methods 0.000 description 2
- 238000013016 damping Methods 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Images
Landscapes
- Vibration Dampers (AREA)
Abstract
The utility model provides a temporary power protection device for building engineering, decide the board including brace table and clamp, be equipped with the drive disk assembly that pushes down that is used for adjusting the interval of clamp deciding the board and brace table between brace table and the clamp deciding the board, the bottom of brace table is equipped with buffering protection mechanism, buffering protection mechanism includes the lower base, be provided with first buffer gear between the four corners department of lower base and the brace table respectively, be provided with second buffer gear between the middle part of lower base and the brace table. The utility model discloses structural design is ingenious, and on the way in the transportation of the power equipment who uses in the building work progress, can cushion the protection processing to power equipment to greatly reduced produces the vibrations of jolting on the way in the transportation, ensures power equipment not damage because of jolting and strikeing on the way in the transportation, simultaneously, also is favorable to promoting power equipment's life.
Description
Technical Field
The utility model relates to a building engineering technical field specifically is a power protection device is used temporarily to building engineering.
Background
The building engineering refers to an engineering entity formed by the construction of various building constructions and their auxiliary facilities and the installation of lines, pipelines and equipment matched with them. The house building is characterized by comprising a top cover, a beam column, a wall, a foundation and a project which can form an internal space and meet the requirements of people on production, living, study and public activities. The building engineering is an engineering entity which performs various technical works and completions such as planning, surveying, designing, constructing, completing and the like for newly building, reconstructing or extending building buildings and affiliated structures and installation engineering of lines, pipelines and equipment matched with the engineering entity. Also refers to the construction of various houses and buildings, also known as the construction workload. The investment amount of the part can be realized only by the construction activities with the need of carrying out the work and the material movement. The electric power equipment such as a power distribution cabinet and the like are often transported and moved to an installation place by a transport vehicle in the building construction process, however, the electric power equipment cannot be buffered and protected in the current transportation and moving process, so that the electric power equipment is extremely easy to be damaged by impact force generated by road bumping and shaking in the transportation process, the normal use of the electric power equipment is influenced, and the service life of the electric power equipment is also shortened.
SUMMERY OF THE UTILITY MODEL
The utility model provides a not enough to above-mentioned prior art, the utility model provides a power protection device is used temporarily to building engineering can carry out height-adjusting according to the power equipment size, and rethread two-stage buffering cushions the protection to equipment, simple operation, convenient to use.
The utility model provides a technical scheme: the utility model provides a building engineering uses electric protection device temporarily, includes brace table and clamping plate, be equipped with the drive disk assembly that pushes down that is used for adjusting the interval of clamping plate and brace table between brace table and the clamping plate, the bottom of brace table is equipped with buffering protection mechanism, buffering protection mechanism includes lower base, be provided with first buffer gear between the four corners department of lower base and the brace table respectively, be provided with second buffer gear between the middle part of lower base and the brace table.
Further, two shaft holes are symmetrically formed in the supporting table in a penetrating mode, the bottom face of the clamping plate and the bottom face of the clamping plate are connected with the corresponding positions of the shaft holes in a penetrating mode, the pressing driving part comprises two adjusting screw rods, a bearing seat matched with the shaft holes is fixedly connected to the periphery of the bottom end of each adjusting screw rod in a sleeved mode, and the top end of each adjusting screw rod is connected with a twisting handle.
Furthermore, be used for placing the power equipment body between two adjusting screw, adjusting screw's periphery still cup joints and is fixed with connecting hole assorted nut, the nut is in the top of bearing frame, every the bearing frame is fixed connection respectively in the shaft hole that corresponds separately, every the nut is fixed connection respectively in the connecting hole that corresponds separately.
Further, evenly be connected with a plurality of solid fixed rings on the periphery lateral wall of clamp plate, on the lateral wall of brace table periphery with every gu fixed ring position corresponds department all is connected with spacing and inserts a section of thick bamboo, every gu all insert between fixed ring and the spacing section of thick bamboo and be equipped with the crash bar.
Furthermore, the opposite surfaces of the supporting platform and the clamping plate are connected with anti-skid pads.
Further, the equal fixedly connected with area of four corners department of base bottom surface is stopped the universal wheel down, first buffer gear is including setting up the last fixed base section of thick bamboo of base top surface down, every the opening part on fixed base section of thick bamboo top all is inserted and is equipped with the guide bar, the first buffering post of fixedly connected with on the diapire of fixed base section of thick bamboo inner chamber.
Furthermore, the second buffer gear is including setting up the driven post in the middle part top of base down, the symmetry is provided with two second grade buffer assembly between the bottom surface of driven post and brace table.
Further, second grade buffering subassembly includes the mounting bracket, the inner chamber activity of mounting bracket is provided with the base, the one end of base is connected with the wedge and blocks the piece, the other end of base is connected with flexible female pole, the inner chamber of flexible female pole is inserted and is equipped with flexible sub-pole, be connected with second buffering post on the diapire of flexible female pole inner chamber, the one end that flexible female pole was kept away from to flexible sub-pole is connected with the inner wall of mounting bracket.
Further, first buffering post and second buffering post all adopt to make with elastic rubber material, the periphery cover of flexible sub-pole is equipped with expanding spring, symmetrical connection has two flank boards on the outer wall of mounting bracket, all be connected with the direction sliding block on the lateral wall around the base, the lateral wall and two of mounting bracket inner chamber the direction sliding block position department of correspondence all transversely sets up the direction sliding chamber rather than the looks adaptation, and every the direction sliding block activity respectively sets up in the direction sliding chamber that corresponds separately.
Further, expanding spring's one end fixed connection is on the inner wall of mounting bracket, expanding spring's the other end is connected with the outer wall of flexible female pole, the flank board all is through screw fixed connection on the bottom surface of propping up supporting bench, it is protruding to be connected with the location on the top surface of flank board, the bottom surface of propping up supporting bench corresponds the department with the protruding position in location and has seted up rather than assorted constant head tank, and every the location is protruding to be inserted respectively in the constant head tank that corresponds separately.
The utility model has the advantages that:
(1) the utility model discloses can carry out the buffering protection processing to power equipment, the produced jolt impact of transportation is absorbed the buffering through four first buffer posts and second grade buffer assembly simultaneously to the impulsive force, realized the multistage buffering shock attenuation processing to jolt vibrations, buffering shock attenuation effect is good, can effectively promote the buffering protection effect to power equipment, thereby greatly reduced the produced jolt vibrations of transportation, guarantee that power equipment does not damage because of jolt impact on the transportation, simultaneously, also be favorable to promoting power equipment's life;
(2) the utility model discloses the size of the power equipment that can transport as required, the interval between board and the brace table is decided to the regulation clamp, and after the altitude mixture control is suitable, decide the board through the clamp and carry on spacingly to power equipment, satisfy the not transportation requirement of the power equipment of co-altitude, be provided with the fender rod around the brace table simultaneously, protect power equipment, the security is high, and application scope is wide, has higher practical value.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
FIG. 2 is a schematic structural diagram of a secondary buffer assembly of the present invention;
FIG. 3 is a schematic structural view of the mounting bracket and the wedge-shaped stopper of the present invention;
fig. 4 is a schematic structural diagram of the base of the present invention;
FIG. 5 is a schematic structural view of the telescopic sub-rod and the second buffer post of the present invention;
in the figure: 1. a support table; 2. clamping a plate; 3. a non-slip mat; 4. a power equipment body; 5. adjusting the screw rod; 6. a nut; 7. screwing a handle; 8. a fixing ring; 9. limiting the inserting cylinder; 10. an anti-collision bar; 11. a mounting frame; 12. a driven column; 13. a guide bar; 14. fixing the bottom cylinder; 15. a lower base; 16. universal wheels with brakes; 17. a telescopic sub-rod; 18. a telescopic female rod; 19. a tension spring; 20. a side wing panel; 21. positioning the projection; 22. a base; 23. a wedge-shaped stopper; 24. guiding the sliding block; 25. and a second buffer column 26 which is guided to the slide cavity.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "top/bottom", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "sleeved/connected", "connected", and the like are to be understood in a broad sense, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The temporary electric power protection device for the building engineering shown in fig. 1-5 comprises a supporting table 1 and a clamping plate 2, wherein a downward pressing driving component for adjusting the distance between the clamping plate 2 and the supporting table 1 is arranged between the supporting table 1 and the clamping plate 2, a buffer protection mechanism is arranged at the bottom of the supporting table 1, the buffer protection mechanism comprises a lower base 15, first buffer mechanisms are respectively arranged between the four corners of the lower base 15 and the supporting table 1, and a second buffer mechanism is arranged between the middle of the lower base 15 and the supporting table 1.
The supporting table 1 and the clamping plate 2 are arranged up and down symmetrically, and the clamping plate 2 is arranged above the supporting table 1.
Two shaft holes are symmetrically formed in the supporting table 1 in a penetrating mode, the bottom face of the clamping and fixing plate 2 is in penetrating connection with the corresponding positions of the shaft holes, the pressing driving part comprises two adjusting screw rods 5, a bearing seat matched with the shaft holes is fixedly connected to the periphery of the bottom end of each adjusting screw rod 5 in a sleeved mode, and the top end of each adjusting screw rod 5 is connected with a twisting handle 7.
Two be used for placing power equipment body 4 between adjusting screw 5, adjusting screw 5's periphery still cup joints fixedly and is fixed with connecting hole assorted nut 6, nut 6 is in the top of bearing frame, every the bearing frame is fixed connection respectively in the axle hole that corresponds separately, every nut 6 is fixed connection respectively in the connecting hole that corresponds separately.
Evenly be connected with a plurality of solid fixed rings 8 on the periphery lateral wall of clamp plate 2, prop up on the lateral wall of 1 periphery of supporting bench with every gu fixed ring 8 position department of correspondence all is connected with spacing section of thick bamboo 9, every gu fixed ring 8 and spacing section of thick bamboo 9 between all insert and be equipped with crash bar 10. The bottom end of the limiting inserting cylinder 9 is provided with a seal. And the opposite surfaces of the supporting platform 1 and the clamping plate 2 are both connected with anti-skid pads 3.
The equal fixedly connected with area of four corners department of lower base 15 bottom surface universal wheel 16 of stopping, first buffer gear is including setting up the fixed base section of thick bamboo 14 on the 15 top surfaces of lower base, every the opening part on fixed base section of thick bamboo 14 top all is inserted and is equipped with guide bar 13, the first buffering post of fixedly connected with on the diapire of the 14 inner chambers of fixed base section of thick bamboo.
The second buffer gear is including setting up the driven post 12 in the middle part top of lower base 15, two second grade buffer assembly are provided with between the bottom surface of driven post 12 and brace table symmetrically. Produced jolting impact absorbs the buffering through four first buffering posts and second grade buffering subassembly simultaneously to the impulsive force on the way in the transportation, has realized handling the multistage buffering shock attenuation of jolting vibrations, and buffering shock attenuation is effectual, can effectively promote the buffering protection effect to power equipment.
Second grade buffering subassembly includes mounting bracket 11, the inner chamber activity of mounting bracket 11 is provided with base 22, base 22's one end is connected with wedge stopper 23, base 22's the other end is connected with flexible female pole 18, flexible female pole 18's inner chamber is inserted and is equipped with flexible son pole 17, be connected with second buffering post 25 on the diapire of flexible female pole 18 inner chamber, flexible son pole 17 keeps away from the one end of flexible female pole 18 and is connected with mounting bracket 11's inner wall, and flexible son pole 17 stretches into the inside one end of flexible female pole 18 and is connected with second buffering post 25.
First buffering post and second buffering post 25 all adopt to make with elastic rubber material, the periphery cover of flexible sub-pole 17 is equipped with expanding spring 19, symmetrical connection has two flank boards 20 on the outer wall of mounting bracket 11, all be connected with direction sliding block 24 on the lateral wall around the base 22, the lateral wall and two of mounting bracket 11 inner chamber direction sliding block 24 position department of correspondence all transversely set up with the direction sliding chamber 26 of its looks adaptation, and every direction sliding block 24 activity respectively sets up in the direction sliding chamber 26 that corresponds separately. One end of the telescopic spring 19 is fixedly connected to the inner wall of the mounting frame 11, and the other end of the telescopic spring 19 is connected with the outer wall of the telescopic female rod 18; two second grade buffer unit's that the symmetry set up wedge block 23 is in same horizontal plane jointly, and two wedge blocks 23 all are in the top of driven post 12, when vibrations make driven post 12 upward movement and push up two wedge blocks 23 simultaneously, the effort is absorbed and is cushioned through expanding spring 19 and second cushion column 25, and simultaneously, two wedge blocks 23 can restrain driven post 12 and continue the upward movement under expanding spring 19 and second cushion column 25's effect.
The side wing plate 20 is fixedly connected to the bottom surface of the supporting table 1 through screws, the top surface of the side wing plate 20 is connected with positioning protrusions 21, positioning grooves matched with the positioning protrusions are formed in the positions, corresponding to the positions of the positioning protrusions 21, of the bottom surface of the supporting table 1, and each positioning protrusion 21 is inserted into the corresponding positioning groove.
When the utility model is used, the power equipment body 4 is placed on the supporting platform 1, the distance between the clamping plate 2 and the supporting platform 1 is adjusted to limit the power equipment body 4, then the crash bar 10 is inserted between the fixing ring 8 and the limiting inserting barrel 9, the bumping impact generated in the transportation process is firstly transmitted to the driven column 12 and the four fixing bottom barrels 14 through the lower base 15, the impact force is absorbed and buffered through the four first buffering columns, simultaneously, when the driven column 12 moves upwards and simultaneously pushes the two wedge-shaped blocking blocks 23 by the vibration, the acting force is absorbed and buffered through the expansion spring 19 and the second buffering column 25, simultaneously, the two wedge-shaped blocking blocks 23 can inhibit the driven column 12 from continuing to move upwards under the action of the expansion spring 19 and the second buffering column 25, the impact force is absorbed and buffered through the four first buffering columns and the second buffering components simultaneously, the multistage buffering and damping treatment of jolting vibration is realized, the buffering and damping effect is good, and the buffering protection effect on the power equipment can be effectively improved.
The above description is only a detailed description of the specific embodiments of the present invention, and the present invention is not limited thereto, and any modifications, equivalent replacements, improvements, etc. made on the design concept of the present invention should be included in the protection scope of the present invention.
Claims (10)
1. A temporary power protection device for construction engineering is characterized in that: including brace table (1) and clamping plate (2), be equipped with the drive disk assembly that pushes down that is used for adjusting the interval of clamping plate (2) and brace table (1) between brace table (1) and the clamping plate (2), the bottom of brace table (1) is equipped with buffering protection mechanism, buffering protection mechanism includes lower base (15), be provided with first buffer gear between the four corners department of lower base (15) and brace table (1) respectively, be provided with second buffer gear between the middle part of lower base (15) and brace table (1).
2. The temporary power protection device for construction works according to claim 1, wherein: two shaft holes are symmetrically formed in the supporting table (1) in a penetrating mode, the bottom face and the two clamping and fixing plates (2) are connected with the corresponding positions of the shaft holes in a penetrating mode, the pressing driving part comprises two adjusting screw rods (5), a bearing seat matched with the shaft holes is fixedly connected to the periphery of the bottom end of each adjusting screw rod (5) in a sleeved mode, and the top end of each adjusting screw rod (5) is connected with a twisting handle (7).
3. The temporary power protection device for construction works according to claim 2, wherein: two be used for placing power equipment body (4) between adjusting screw (5), the periphery of adjusting screw (5) still cup joints and is fixed with and connecting hole assorted nut (6), nut (6) are in the top of bearing frame, every the bearing frame is fixed connection respectively in the shaft hole that corresponds separately, every nut (6) are fixed connection in the connecting hole that corresponds separately respectively.
4. The temporary power protection device for construction works according to claim 1, wherein: evenly be connected with a plurality of solid fixed rings (8) on the periphery lateral wall of clamp plate (2), with every on the lateral wall of brace table (1) periphery gu fixed ring (8) position corresponds the department and all is connected with spacing section of thick bamboo (9), every gu fixed ring (8) and spacing section of thick bamboo are inserted and are all inserted and are equipped with crash bar (10).
5. The temporary power protection device for construction works according to claim 1, wherein: and the opposite surfaces of the supporting platform (1) and the clamping plate (2) are connected with anti-slip pads (3).
6. The temporary power protection device for construction works according to claim 1, wherein: lower base (15) bottom surface's equal fixedly connected with area of four corners department universal wheel (16) of stopping, a buffer gear is including setting up solid fixed base section of thick bamboo (14), every on base (15) top surface down the opening part on solid fixed base section of thick bamboo (14) top all is inserted and is equipped with guide bar (13), the first buffering post of fixedly connected with on the diapire of solid fixed base section of thick bamboo (14) inner chamber.
7. The temporary electric power protection device for construction work according to claim 1, characterized in that: the second buffer gear is including setting up driven post (12) in the middle part top of lower base (15), the symmetry is provided with two second grade buffer assembly between the bottom surface of driven post (12) and brace table.
8. The temporary power protection device for construction works according to claim 7, wherein: the second grade buffering subassembly includes mounting bracket (11), the inner chamber activity of mounting bracket (11) is provided with base (22), the one end of base (22) is connected with wedge stopper piece (23), the other end of base (22) is connected with flexible female pole (18), the inner chamber of flexible female pole (18) is inserted and is equipped with flexible sub-pole (17), be connected with second buffering post (25) on the diapire of flexible female pole (18) inner chamber, the one end that flexible female pole (18) were kept away from to flexible sub-pole (17) is connected with the inner wall of mounting bracket (11).
9. The temporary power protection device for construction works according to claim 8, wherein: first buffering post and second buffering post (25) all adopt elastic rubber material to make, the periphery cover of flexible sub-pole (17) is equipped with expanding spring (19), symmetrical connection has two flank boards (20) on the outer wall of mounting bracket (11), all be connected with direction sliding block (24) on the lateral wall around base (22), the lateral wall and two of mounting bracket (11) inner chamber direction sliding block (24) position department of correspondence all transversely set up with direction sliding chamber (26) of its looks adaptation, and every direction sliding block (24) activity respectively sets up in the direction sliding chamber (26) that correspond separately.
10. The temporary power protection device for construction works according to claim 9, wherein: one end of the telescopic spring (19) is fixedly connected to the inner wall of the mounting frame (11), and the other end of the telescopic spring (19) is connected with the outer wall of the telescopic female rod (18); the side wing board (20) all through screw fixed connection on the bottom surface of brace table (1), be connected with location arch (21) on the top surface of side wing board (20), the bottom surface of brace table (1) corresponds the department with location arch (21) position and offers rather than assorted constant head tank, and every location arch (21) insert respectively to in the constant head tank that corresponds separately.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202220639532.XU CN217087280U (en) | 2022-03-23 | 2022-03-23 | Temporary power protection device for constructional engineering |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202220639532.XU CN217087280U (en) | 2022-03-23 | 2022-03-23 | Temporary power protection device for constructional engineering |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN217087280U true CN217087280U (en) | 2022-07-29 |
Family
ID=82550902
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202220639532.XU Active CN217087280U (en) | 2022-03-23 | 2022-03-23 | Temporary power protection device for constructional engineering |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN217087280U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114784671A (en) * | 2022-03-23 | 2022-07-22 | 中铁建电气化局集团南方工程有限公司 | Temporary power protection device for constructional engineering |
-
2022
- 2022-03-23 CN CN202220639532.XU patent/CN217087280U/en active Active
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114784671A (en) * | 2022-03-23 | 2022-07-22 | 中铁建电气化局集团南方工程有限公司 | Temporary power protection device for constructional engineering |
| CN114784671B (en) * | 2022-03-23 | 2024-10-18 | 中铁建电气化局集团南方工程有限公司 | Temporary power protection device for building engineering |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN217087280U (en) | Temporary power protection device for constructional engineering | |
| CN214329383U (en) | Assembled building shock-absorbing structure | |
| CN206307875U (en) | One kind straight trip elevator car bottom damped junction device | |
| CN111828780A (en) | Anti-seismic electromechanical equipment mounting base | |
| CN217079108U (en) | Vertical adjustable shock attenuation steel construction | |
| CN211040187U (en) | Damping device for civil engineering | |
| CN114784671A (en) | Temporary power protection device for constructional engineering | |
| CN219281211U (en) | A construction safety construction support device | |
| CN110671581A (en) | Construction machinery damping platform | |
| CN213898390U (en) | Road bed edge protector for highway construction | |
| CN212407428U (en) | Self-return shock insulation platform | |
| CN212001992U (en) | Shock insulation assembled building stair | |
| CN211143678U (en) | Steel structure engineering support | |
| CN211897839U (en) | Anti-collision protection fence for municipal road bridge | |
| CN213259362U (en) | Effectual operation panel of shock attenuation | |
| CN215825282U (en) | Geotechnical engineering reconnaissance is with high buffering platform of stability | |
| CN219826257U (en) | Portable protection canopy of shock attenuation of making an uproar falls | |
| CN216617085U (en) | Damping base of power tower | |
| CN217001255U (en) | Protective structure for highway construction | |
| CN214739807U (en) | Scaffold with buffering shock-absorbing function | |
| CN220888332U (en) | Steel structure fixing device for bridge construction | |
| CN217517872U (en) | Shock attenuation wall body | |
| CN220668825U (en) | Damping device for electromechanical equipment | |
| CN220504211U (en) | Shock-absorbing steel structure | |
| CN121216344B (en) | Underground cable trench installing support with antidetonation function |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |