CN217000766U - Pole climbing device for electric power engineering construction - Google Patents
Pole climbing device for electric power engineering construction Download PDFInfo
- Publication number
- CN217000766U CN217000766U CN202123350757.8U CN202123350757U CN217000766U CN 217000766 U CN217000766 U CN 217000766U CN 202123350757 U CN202123350757 U CN 202123350757U CN 217000766 U CN217000766 U CN 217000766U
- Authority
- CN
- China
- Prior art keywords
- threaded
- rod
- fixed
- lifting
- connecting rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及电力工程施工设备技术领域,特别是涉及一种电力工程施工用登杆装置。The utility model relates to the technical field of electric power engineering construction equipment, in particular to a pole climbing device for electric power engineering construction.
背景技术Background technique
电力工程,即与电能的生产、输送、分配有关的工程,广义上还包括把电作为动力和能源在多种领域中应用的工程。同时可理解到送变电业扩工程。如果把我国的经济发展比作是“身体”,那么,电力工程建设无疑就是支撑身体灵活运动的“筋骨”。电力工程建设的不断推进就像是为筋骨提供了无限的能量,充沛的能量供应是身体各项机能有效运作的有力保障。Electric power engineering, that is, engineering related to the production, transmission, and distribution of electrical energy, in a broad sense, also includes engineering that uses electricity as power and energy in various fields. At the same time, it can be understood that the power transmission and transformation industry expansion project. If my country's economic development is compared to the "body", then the power engineering construction is undoubtedly the "muscles and bones" that support the flexible movement of the body. The continuous advancement of power engineering construction is like providing unlimited energy for the muscles and bones, and the abundant energy supply is a powerful guarantee for the effective operation of various functions of the body.
电力工程施工时需要用到登杆装置,现有的登杆装置存在如下问题亟待解决:The pole-mounting device needs to be used in the construction of electric power projects. The existing pole-mounting device has the following problems that need to be solved urgently:
1、装置运行时的稳定性较差,施工人员的安全无法得到保障;1. The stability of the device during operation is poor, and the safety of construction workers cannot be guaranteed;
2、安装电线时需要施工人员用手将电线一端拉起,如此会对施工人员的体力造成严重的损耗。2. When installing the wire, the construction personnel need to pull up one end of the wire by hand, which will cause serious loss of physical strength of the construction personnel.
实用新型内容Utility model content
本实用新型的目的就在于为了解决上述问题而提供一种电力工程施工用登杆装置。The purpose of the present utility model is to provide a pole climbing device for electric power engineering construction in order to solve the above problems.
本实用新型通过以下技术方案来实现上述目的:The utility model realizes the above-mentioned purpose through the following technical solutions:
一种电力工程施工用登杆装置,包括用于对施工人员的高度进行调节的升降机构,还包括用于将装置与电线杆固定在一起的固定机构、用于对施工人员进行防护的防护机构,所述固定机构安装在所述升降机构下方,所述防护机构安装在所述升降机构上方;A pole-mounting device for electric power engineering construction, comprising a lifting mechanism for adjusting the height of construction workers, a fixing mechanism for fixing the device and a utility pole together, and a protection mechanism for protecting the construction workers , the fixing mechanism is installed below the lifting mechanism, and the protective mechanism is installed above the lifting mechanism;
所述升降机构包括固定壳、安装台、电动升降架,所述固定壳内部固定有所述安装台,所述安装台上方安装有所述电动升降架;The lifting mechanism includes a fixed shell, an installation table, and an electric lifting frame, the installation table is fixed inside the fixed shell, and the electric lifting frame is installed above the installation table;
所述固定机构包括底座、双头螺杆、第一旋钮、移动套、第一连接杆、滑套、滑杆、第二连接杆、圆弧杆、移动轮,所述底座上安装有所述双头螺杆,所述双头螺杆前部固定有所述第一旋钮,所述双头螺杆外侧设置有所述移动套,所述移动套侧面固定有所述第一连接杆,所述第一连接杆远离所述移动套的一端固定有所述滑套,所述滑套内侧安装有所述滑杆,所述滑套远离所述第一连接杆的一侧固定有所述第二连接杆,所述第二连接杆远离所述滑套的一端固定有所述圆弧杆,所述底座下方安装有所述移动轮;The fixing mechanism includes a base, a double-ended screw, a first knob, a moving sleeve, a first connecting rod, a sliding sleeve, a sliding rod, a second connecting rod, a circular arc rod, and a moving wheel, and the double-ended screw is installed on the base. head screw, the first knob is fixed at the front of the double-head screw, the moving sleeve is arranged on the outside of the double-headed screw, the first connecting rod is fixed on the side of the moving sleeve, and the first connection The sliding sleeve is fixed on one end of the rod away from the moving sleeve, the sliding rod is installed on the inner side of the sliding sleeve, and the second connecting rod is fixed on the side of the sliding sleeve away from the first connecting rod, The arc rod is fixed at one end of the second connecting rod away from the sliding sleeve, and the moving wheel is installed under the base;
所述防护机构包括底板、护栏、拆装组件、固定框、导向槽、升降杆、升降座、转动座、螺纹杆、第二旋钮、固定座,所述底板上方固定有所述护栏,所述护栏上方安装有所述拆装组件,所述拆装组件上方安装有所述固定框,所述固定框上设置有所述导向槽,所述导向槽上安装有所述升降杆,所述升降杆上固定有所述升降座,所述升降座上方安装有所述转动座,所述转动座上方安装有所述螺纹杆,所述螺纹杆上方固定有所述第二旋钮,所述升降座下方设置有所述固定座。The protection mechanism includes a bottom plate, a guardrail, a disassembly and assembly component, a fixed frame, a guide groove, a lifting rod, a lifting seat, a rotating seat, a threaded rod, a second knob, and a fixing seat, and the guardrail is fixed above the bottom plate. The disassembly assembly is installed above the guardrail, the fixing frame is installed above the disassembly assembly, the guide groove is arranged on the fixing frame, the lifting rod is installed on the guide groove, and the lifting rod is installed on the guide groove. The lifting seat is fixed on the rod, the rotating seat is installed above the lifting seat, the threaded rod is installed above the rotating seat, the second knob is fixed above the threaded rod, and the lifting seat is The fixing seat is arranged below.
优选的,所述拆装组件包括螺纹筒、螺纹柱,所述螺纹筒内侧安装有所述螺纹柱;所述螺纹柱与所述螺纹筒通过螺纹连接。Preferably, the dismounting assembly includes a threaded barrel and a threaded column, the threaded column is installed inside the threaded barrel; the threaded column is connected with the threaded barrel through threads.
如此设置,需要对不同尺寸的电线进行固定时,转动所述固定框,所述固定框带动所述螺纹柱转动,所述螺纹柱转动与所述螺纹筒分离,两者完全分离后即可更换新的所述升降座和所述固定座,如此使得装置能够对不同尺寸的电线进行固定,有效提高了装置的使用效果。In this way, when the wires of different sizes need to be fixed, the fixing frame is rotated, and the fixing frame drives the threaded column to rotate, and the rotation of the threaded column is separated from the threaded barrel, and can be replaced after the two are completely separated. The new lifting seat and the fixing seat enable the device to fix wires of different sizes, which effectively improves the use effect of the device.
优选的,所述拆装组件包括螺纹套、第一螺纹头、第二螺纹头,所述螺纹套内侧设置有所述第一螺纹头,所述第一螺纹头上方安装有所述第二螺纹头;所述第一螺纹头与所述螺纹套通过螺纹连接,所述第二螺纹头与所述螺纹套通过螺纹连接。Preferably, the dismounting assembly includes a threaded sleeve, a first threaded head, and a second threaded head, the first threaded head is provided inside the threaded sleeve, and the second threaded head is installed above the first threaded head The first threaded head and the threaded sleeve are threadedly connected, and the second threaded head and the threaded sleeve are threadedly connected.
如此设置,需要对不同尺寸的电线进行固定时,转动所述螺纹套,所述螺纹套沿所述第一螺纹头下降,所述螺纹套与所述第二螺纹头完全分离后即可更换新的所述升降座和所述固定座,如此使得装置能够对不同尺寸的电线进行固定,有效提高了装置的使用效果。In this way, when the wires of different sizes need to be fixed, the threaded sleeve is rotated, the threaded sleeve descends along the first threaded head, and the threaded sleeve can be replaced with a new one after the second threaded head is completely separated. The lifting seat and the fixing seat are provided, so that the device can fix wires of different sizes, which effectively improves the use effect of the device.
优选的,所述安装台与所述固定壳焊接,所述安装台的材质为不锈钢。Preferably, the mounting table is welded with the fixing shell, and the material of the mounting table is stainless steel.
如此设置,不锈钢价格低廉且耐腐蚀,使用效果好。In this way, stainless steel is inexpensive and corrosion-resistant, and the use effect is good.
优选的,所述第一旋钮与所述双头螺杆焊接,所述第一连接杆与所述移动套焊接,所述滑套与所述第一连接杆焊接,所述滑杆与所述底座焊接,所述滑杆与所述滑套的材质为耐磨钢,所述第二连接杆与所述滑套焊接,所述圆弧杆与所述第二连接杆焊接。Preferably, the first knob is welded with the double-ended screw, the first connecting rod is welded with the moving sleeve, the sliding sleeve is welded with the first connecting rod, and the sliding rod is welded with the base For welding, the sliding rod and the sliding sleeve are made of wear-resistant steel, the second connecting rod is welded with the sliding sleeve, and the arc rod is welded with the second connecting rod.
如此设置,将装置移动到相应位置,转动所述第一旋钮,所述第一旋钮带动所述双头螺杆转动,两个所述移动套相向移动,所述移动套通过所述第一连接杆带动所述滑套移动,两个所述滑套也随之相向移动,所述滑套通过所述第二连接杆带动所述圆弧杆移动,两个所述圆弧杆也随之相向移动,所述圆弧杆移动与电线杆接触,两个所述圆弧杆共同协作将装置与电线杆牢牢固定在一起,如此有效提高了装置运行过程中的稳定性,从而对施工人员的安全进行保障。In this way, the device is moved to the corresponding position, the first knob is rotated, the first knob drives the double-ended screw to rotate, and the two moving sleeves move toward each other, and the moving sleeves pass through the first connecting rod. The sliding sleeve is driven to move, and the two sliding sleeves also move towards each other. The sliding sleeve drives the arc rod to move through the second connecting rod, and the two arc rods also move towards each other. , the circular arc rod moves in contact with the utility pole, and the two circular arc rods work together to firmly fix the device and the utility pole together, which effectively improves the stability of the device during operation, thereby ensuring the safety of construction workers. Guarantee.
优选的,所述护栏与所述底板焊接,所述升降座与所述升降杆焊接,所述螺纹杆与所述固定框通过螺纹连接,所述第二旋钮与所述螺纹杆焊接,所述固定座与所述固定框焊接。Preferably, the guardrail is welded with the bottom plate, the lifting seat is welded with the lifting rod, the threaded rod is connected with the fixing frame by threads, the second knob is welded with the threaded rod, and the threaded rod is welded with the threaded rod. The fixing seat is welded with the fixing frame.
如此设置,需要安装电线时,将电线一端放置在所述固定座上,转动所述第二旋钮,所述第二旋钮带动所述螺纹杆转动,所述螺纹杆在所述固定框的作用下下降,所述螺纹杆通过所述转动座带动所述升降座和所述升降杆沿所述导向槽下降,所述升降座下降从而将电线牢牢固定在所述固定座上,如此对电线进行固定,施工人员的体力不会受到严重影响,从而保证后续施工的顺利进行。In this way, when the wire needs to be installed, place one end of the wire on the fixing seat, turn the second knob, and the second knob drives the threaded rod to rotate, and the threaded rod is under the action of the fixing frame. down, the threaded rod drives the lifting seat and the lifting rod to descend along the guide groove through the rotating seat, and the lifting seat descends to firmly fix the wire on the fixing seat, and the wire is carried out in this way. Fixed, the physical strength of construction workers will not be seriously affected, so as to ensure the smooth progress of subsequent construction.
与现有技术相比,本实用新型的有益效果如下:Compared with the prior art, the beneficial effects of the present utility model are as follows:
1、通过设置固定机构,两个圆弧杆共同协作将装置与电线杆牢牢固定在一起,如此有效提高了装置运行过程中的稳定性,从而对施工人员的安全进行保障;1. By setting the fixing mechanism, the two arc rods work together to firmly fix the device and the telephone pole together, which effectively improves the stability of the device during operation, thereby ensuring the safety of construction personnel;
2、通过设置防护机构,需要安装电线时,将电线一端放置在固定座上,转动第二旋钮,第二旋钮带动螺纹杆转动,螺纹杆在固定框的作用下下降,螺纹杆通过转动座带动升降座和升降杆沿导向槽下降,升降座下降从而将电线牢牢固定在固定座上,如此对电线进行固定,施工人员的体力不会受到严重影响,从而保证后续施工的顺利进行。2. By setting the protective mechanism, when the wire needs to be installed, place one end of the wire on the fixed seat, turn the second knob, the second knob drives the threaded rod to rotate, the threaded rod descends under the action of the fixed frame, and the threaded rod is driven by the rotating seat. The lifting seat and the lifting rod are lowered along the guide groove, and the lifting seat is lowered to firmly fix the wire on the fixed seat. In this way, the wire is fixed, and the physical strength of the construction personnel will not be seriously affected, thereby ensuring the smooth progress of the subsequent construction.
附图说明Description of drawings
为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the following briefly introduces the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description These are only some embodiments of the present invention, and for those of ordinary skill in the art, other drawings can also be obtained from these drawings without any creative effort.
图1是本实用新型所述一种电力工程施工用登杆装置的第一结构示意图;Fig. 1 is the first structure schematic diagram of a kind of pole climbing device for electric power engineering construction according to the present utility model;
图2是本实用新型所述一种电力工程施工用登杆装置的第二结构示意图;Fig. 2 is the second structural schematic diagram of a kind of pole climbing device for electric power engineering construction according to the present utility model;
图3是本实用新型所述一种电力工程施工用登杆装置的第一主视内部结构示意图;3 is a schematic diagram of the first front view of the internal structure of a pole-mounting device for electric power engineering construction according to the present utility model;
图4是本实用新型所述一种电力工程施工用登杆装置的第二主视内部结构示意图;4 is a schematic diagram of the second front view of the internal structure of a pole-mounting device for electric power engineering construction according to the present utility model;
图5是本实用新型所述一种电力工程施工用登杆装置实施例一中拆装组件的放大左视内部结构示意图;Fig. 5 is the enlarged left view internal structure schematic diagram of the disassembly and assembly components in the first embodiment of a pole-mounting device for electric power engineering construction according to the present invention;
图6是本实用新型所述一种电力工程施工用登杆装置实施例二中拆装组件的放大左视内部结构示意图;FIG. 6 is an enlarged left view internal structure schematic diagram of the disassembly and assembly components in the second embodiment of a pole-mounting device for electric power engineering construction according to the present invention;
图7是本实用新型所述一种电力工程施工用登杆装置中底座的俯视内部结构示意图。7 is a schematic top view of the internal structure of a base in a pole climbing device for electric power engineering construction according to the present invention.
附图标记说明如下:The reference numerals are explained as follows:
1、升降机构;101、固定壳;102、安装台;103、电动升降架;2、固定机构;201、底座;202、双头螺杆;203、第一旋钮;204、移动套;205、第一连接杆;206、滑套;207、滑杆;208、第二连接杆;209、圆弧杆;210、移动轮;3、防护机构;301、底板;302、护栏;303、拆装组件;3031、螺纹筒;3032、螺纹柱;3033、螺纹套;3034、第一螺纹头;3035、第二螺纹头;304、固定框;305、导向槽;306、升降杆;307、升降座;308、转动座;309、螺纹杆;310、第二旋钮;311、固定座。1. Lifting mechanism; 101. Fixed shell; 102. Mounting table; 103. Electric lifting frame; 2. Fixing mechanism; 201. Base; 202. Double-ended screw; 203. First knob; 1. connecting rod; 206, sliding sleeve; 207, sliding rod; 208, second connecting rod; 209, arc rod; 210, moving wheel; 3, protective mechanism; 301, bottom plate; 302, guardrail; 303, disassembly and
具体实施方式Detailed ways
在本实用新型的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。此外,术语“第一”、“第二”等仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”等的特征可以明示或者隐含地包括一个或者更多个该特征。在本实用新型的描述中,除非另有说明,“多个”的含义是两个或两个以上。In the description of the present invention, it should be understood that the terms "center", "longitudinal", "horizontal", "upper", "lower", "front", "rear", "left", "right", The orientations or positional relationships indicated by "vertical", "horizontal", "top", "bottom", "inside", "outside", etc. are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present utility. The novel and simplified description does not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operate in a particular orientation, and therefore should not be construed as limiting the invention. In addition, the terms "first", "second", etc. are used for descriptive purposes only, and should not be construed as indicating or implying relative importance or implying the number of indicated technical features. Thus, a feature defined as "first", "second", etc., may expressly or implicitly include one or more of that feature. In the description of the present invention, unless otherwise specified, "plurality" means two or more.
在本实用新型的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以通过具体情况理解上述术语在本实用新型中的具体含义。In the description of the present invention, it should be noted that, unless otherwise expressly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it may be a fixed connection or a connectable connection. Detachable connection, or integral connection; may be mechanical connection or electrical connection; may be direct connection, or indirect connection through an intermediate medium, or internal communication between two components. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood through specific situations.
下面结合附图对本实用新型作进一步说明:Below in conjunction with accompanying drawing, the utility model is further described:
实施例1Example 1
如图1、图3、图5、图7所示,一种电力工程施工用登杆装置,包括用于对施工人员的高度进行调节的升降机构1,还包括用于将装置与电线杆固定在一起的固定机构2、用于对施工人员进行防护的防护机构3,固定机构2安装在升降机构1下方,防护机构3安装在升降机构1上方;As shown in Figure 1, Figure 3, Figure 5, Figure 7, a pole climbing device for electric power engineering construction includes a lifting mechanism 1 for adjusting the height of construction workers, and also includes a device for fixing the device and the utility pole. The fixed mechanism 2 together, the
升降机构1包括固定壳101、安装台102、电动升降架103,固定壳101内部固定有安装台102,安装台102上方安装有电动升降架103;The lifting mechanism 1 includes a fixed
固定机构2包括底座201、双头螺杆202、第一旋钮203、移动套204、第一连接杆205、滑套206、滑杆207、第二连接杆208、圆弧杆209、移动轮210,底座201上安装有双头螺杆202,双头螺杆202前部固定有第一旋钮203,双头螺杆202外侧设置有移动套204,移动套204侧面固定有第一连接杆205,第一连接杆205远离移动套204的一端固定有滑套206,滑套206内侧安装有滑杆207,滑套206远离第一连接杆205的一侧固定有第二连接杆208,第二连接杆208远离滑套206的一端固定有圆弧杆209,底座201下方安装有移动轮210;The fixing mechanism 2 includes a
防护机构3包括底板301、护栏302、拆装组件303、固定框304、导向槽305、升降杆306、升降座307、转动座308、螺纹杆309、第二旋钮310、固定座311,底板301上方固定有护栏302,护栏302上方安装有拆装组件303,拆装组件303上方安装有固定框304,固定框304上设置有导向槽305,导向槽305上安装有升降杆306,升降杆306上固定有升降座307,升降座307上方安装有转动座308,转动座308上方安装有螺纹杆309,螺纹杆309上方固定有第二旋钮310,升降座307下方设置有固定座311。The
拆装组件303包括螺纹筒3031、螺纹柱3032,螺纹筒3031内侧安装有螺纹柱3032;螺纹柱3032与螺纹筒3031通过螺纹连接;需要对不同尺寸的电线进行固定时,转动固定框304,固定框304带动螺纹柱3032转动,螺纹柱3032转动与螺纹筒3031分离,两者完全分离后即可更换新的升降座307和固定座311,如此使得装置能够对不同尺寸的电线进行固定,有效提高了装置的使用效果。安装台102与固定壳101焊接,安装台102的材质为不锈钢;不锈钢价格低廉且耐腐蚀,使用效果好。第一旋钮203与双头螺杆202焊接,第一连接杆205与移动套204焊接,滑套206与第一连接杆205焊接,滑杆207与底座201焊接,滑杆207与滑套206的材质为耐磨钢,第二连接杆208与滑套206焊接,圆弧杆209与第二连接杆208焊接;将装置移动到相应位置,转动第一旋钮203,第一旋钮203带动双头螺杆202转动,两个移动套204相向移动,移动套204通过第一连接杆205带动滑套206移动,两个滑套206也随之相向移动,滑套206通过第二连接杆208带动圆弧杆209移动,两个圆弧杆209也随之相向移动,圆弧杆209移动与电线杆接触,两个圆弧杆209共同协作将装置与电线杆牢牢固定在一起,如此有效提高了装置运行过程中的稳定性,从而对施工人员的安全进行保障。护栏302与底板301焊接,升降座307与升降杆306焊接,螺纹杆309与固定框304通过螺纹连接,第二旋钮310与螺纹杆309焊接,固定座311与固定框304焊接;需要安装电线时,将电线一端放置在固定座311上,转动第二旋钮310,第二旋钮310带动螺纹杆309转动,螺纹杆309在固定框304的作用下下降,螺纹杆309通过转动座308带动升降座307和升降杆306沿导向槽305下降,升降座307下降从而将电线牢牢固定在固定座311上,如此对电线进行固定,施工人员的体力不会受到严重影响,从而保证后续施工的顺利进行。The disassembly and
上述结构中:将装置移动到相应位置,转动第一旋钮203,第一旋钮203带动双头螺杆202转动,两个移动套204相向移动,移动套204通过第一连接杆205带动滑套206移动,两个滑套206也随之相向移动,滑套206通过第二连接杆208带动圆弧杆209移动,两个圆弧杆209也随之相向移动,圆弧杆209移动与电线杆接触,两个圆弧杆209共同协作将装置与电线杆牢牢固定在一起,施工人员进入到护栏302中,需要安装电线时,将电线一端放置在固定座311上,转动第二旋钮310,第二旋钮310带动螺纹杆309转动,螺纹杆309在固定框304的作用下下降,螺纹杆309通过转动座308带动升降座307和升降杆306沿导向槽305下降,升降座307下降从而将电线牢牢固定在固定座311上,如此对电线进行固定,电线固定完毕后,电动升降架103伸长带动施工人员和电线上升到相应的施工高度,即可进行施工,需要对不同尺寸的电线进行固定时,转动固定框304,固定框304带动螺纹柱3032转动,螺纹柱3032转动与螺纹筒3031分离,两者完全分离后即可更换新的升降座307和固定座311。In the above structure: move the device to the corresponding position, turn the
实施例2Example 2
如图2、图4、图6、图7所示,实施例2和实施例1的区别在于,将螺纹筒3031、螺纹柱3032替换为螺纹套3033、第一螺纹头3034、第二螺纹头3035,需要对不同尺寸的电线进行固定时,转动螺纹套3033,螺纹套3033沿第一螺纹头3034下降,螺纹套3033与第二螺纹头3035完全分离后即可更换新的升降座307和固定座311。As shown in Figure 2, Figure 4, Figure 6, Figure 7, the difference between Embodiment 2 and Embodiment 1 is that the threaded
以上显示和描述了本实用新型的基本原理、主要特征和优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是说明本实用新型的原理,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。The basic principles, main features and advantages of the present invention have been shown and described above. It should be understood by those skilled in the art that the present invention is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions only illustrate the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention There will also be various changes and improvements in the new model, which all fall within the scope of the claimed invention.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202123350757.8U CN217000766U (en) | 2021-12-29 | 2021-12-29 | Pole climbing device for electric power engineering construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202123350757.8U CN217000766U (en) | 2021-12-29 | 2021-12-29 | Pole climbing device for electric power engineering construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN217000766U true CN217000766U (en) | 2022-07-19 |
Family
ID=82386263
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202123350757.8U Expired - Fee Related CN217000766U (en) | 2021-12-29 | 2021-12-29 | Pole climbing device for electric power engineering construction |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN217000766U (en) |
-
2021
- 2021-12-29 CN CN202123350757.8U patent/CN217000766U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN216426499U (en) | A multi-directional platform adjustment device based on electrical automation | |
| CN217000766U (en) | Pole climbing device for electric power engineering construction | |
| CN217417429U (en) | Suction and discharge crown block with environment-friendly roasting suction pipe | |
| CN108002249A (en) | Substation equipment maintenance and repair small space boom hoisting | |
| CN216712726U (en) | A liftable bridge pier maintenance device | |
| CN202447799U (en) | Device for welding refined-welding arc striking-extinguishing plate | |
| CN214570290U (en) | Concrete column hangs gets device for building engineering | |
| CN213566392U (en) | Multifunctional water area rescue rod | |
| CN108252219A (en) | Bridge hogging moment tensioning vehicle | |
| CN208830070U (en) | Tool for carrying rails and rail carry device | |
| CN222672550U (en) | Outdoor electronic display screen with rain shielding mechanism | |
| CN208401377U (en) | A kind of inspection platform for power station high voltage switchyard | |
| CN210378748U (en) | Coil winding device for transformer production | |
| CN213505736U (en) | High-tension transmission line iron tower device in high-altitude area | |
| CN212908850U (en) | Cable protection pipe convenient to installation | |
| CN209561145U (en) | A kind of oil-immersed transformer | |
| CN208696620U (en) | An omnidirectional welding device for semi-trailer | |
| CN218709007U (en) | Aerial work lifting operation platform | |
| CN215450438U (en) | Meteorological monitoring equipment applied to expressway | |
| CN213770820U (en) | Pay-off device for electrified railway power supply rack | |
| CN218253616U (en) | Positioning welding equipment for roller shell of oil pumping unit | |
| CN219885530U (en) | Windproof structure of tower crane | |
| CN212293792U (en) | Anode bridge adjusting device for tinning production line | |
| CN217116450U (en) | Electrode splicing device for electric arc furnace | |
| CN2924725Y (en) | Insulated lifting platform |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220719 |