CN216997496U - Auxiliary installation lifting equipment for electric power engineering - Google Patents

Auxiliary installation lifting equipment for electric power engineering Download PDF

Info

Publication number
CN216997496U
CN216997496U CN202220365447.9U CN202220365447U CN216997496U CN 216997496 U CN216997496 U CN 216997496U CN 202220365447 U CN202220365447 U CN 202220365447U CN 216997496 U CN216997496 U CN 216997496U
Authority
CN
China
Prior art keywords
electric power
gear
power engineering
fixed block
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220365447.9U
Other languages
Chinese (zh)
Inventor
王伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Huashang Tongxiang Power Supply Installation Engineering Co ltd
Original Assignee
Beijing Huashang Tongxiang Power Supply Installation Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Huashang Tongxiang Power Supply Installation Engineering Co ltd filed Critical Beijing Huashang Tongxiang Power Supply Installation Engineering Co ltd
Priority to CN202220365447.9U priority Critical patent/CN216997496U/en
Application granted granted Critical
Publication of CN216997496U publication Critical patent/CN216997496U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forklifts And Lifting Vehicles (AREA)

Abstract

The utility model relates to the technical field of electric power engineering, in particular to auxiliary mounting lifting equipment for electric power engineering, which comprises a base, wherein the base is fixedly mounted on a lifting platform for electric power workers to sit on, an upright post is arranged on the base, a sliding cylinder is connected on the upright post in a sliding manner, a lifting table and a fixed block are arranged on the outer wall of the sliding cylinder, the positions of the lifting table and the fixed block are different, a vertical mounting rack is also arranged on the base, a gear is arranged at the top end of the mounting rack, and a rack matched with the gear is arranged on the side surface, facing the gear, of the fixed block. So as to meet the optimal installation and use requirements, and has convenient operation and good use effect.

Description

Auxiliary installation lifting equipment for electric power engineering
Technical Field
The utility model relates to the technical field of electric power engineering, in particular to an auxiliary installation lifting device for the electric power engineering.
Background
Electric power is the indispensable partly in modern work and the life, power equipment is vigorous need erect in higher position, traditional lift platform can raise the eminence with electric power workman, but the toolbox that the staff carried about lacks necessary supplementary lift support, in the middle of the actual operation process, if can't lift this toolbox in higher position department, during staff erection equipment, the instrument of can't in time taking, this can lead to work efficiency to reduce, also has certain potential safety hazard in addition.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the defects in the prior art, and provides an auxiliary lifting device for electric power engineering.
In order to achieve the purpose, the utility model adopts the following technical scheme:
supplementary installation jacking equipment of electric power engineering, the on-line screen storage device comprises a base, base fixed mounting is provided with the stand on the base on the lift platform that the electric power workman took the usefulness, and sliding connection has a sliding cylinder on the stand, is provided with elevating platform and fixed block on the outer wall of sliding cylinder, and the elevating platform is different with the position of fixed block, still be provided with vertical mounting bracket on the base, the top of mounting bracket is provided with the gear, the fixed block orientation the side of gear be provided with the rack of gear looks adaptation.
Preferably, the upright is a cylinder, the diameter of the upright is matched with the inner diameter of the sliding cylinder, and the sliding cylinder slides vertically along the upright.
Preferably, the lifting platform is used for placing the electric power tool box.
Preferably, a rotation shaft for controlling rotation of the gear is inserted into a center of the gear.
Preferably, the rack is vertically arranged, and the length of the rack is greater than that of the fixed block.
Preferably, a fixed distance is kept between the sliding cylinder and the mounting frame, and the sliding cylinder is not in contact with the gear.
The utility model has the beneficial effects that: through the jacking equipment that this scheme provided, the toolbox that uses when having solved the power equipment installation highly can't be controlled, this problem that can influence staff's work efficiency, this jacking equipment's proposition, directly place the power tool case on the elevating platform, the staff can be according to the height of this toolbox of equipment fixing needs real-time adjustment to reach best installation use needs, convenient operation, excellent in use effect.
Drawings
Fig. 1 is a schematic structural view of a power engineering auxiliary installation lifting device according to the present invention;
fig. 2 is a schematic top view of a sliding barrel of an auxiliary installation lifting device in power engineering according to the present invention.
In the figure: 1. a base; 2. a column; 3. a sliding cylinder; 4. a fixed block; 5. a mounting frame; 6. a gear; 7. a rack; 8. a lifting platform.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
In this embodiment, referring to fig. 1-2, the lifting device for assisting installation in electric power engineering comprises a base 1, wherein the base 1 is fixedly installed on a lifting platform for taking a power bus, a stand column 2 is arranged on the base 1, a sliding cylinder 3 is connected to the stand column 2 in a sliding manner, the stand column 2 is a cylinder, the diameter of the stand column 2 is matched with the inner diameter of the sliding cylinder 3, and the sliding cylinder 3 vertically slides along the stand column 2. Be provided with elevating platform 8 and fixed block 4 on the outer wall of sliding tube 3, elevating platform 8 is different with the position of fixed block 4, is used for placing electric power tool case on the elevating platform 8. Still be provided with vertical mounting bracket 5 on the base 1, the top of mounting bracket 5 is provided with gear 6, and fixed block 4 is provided with rack 7 with gear 6 looks adaptation towards the side of gear 6. A rotation shaft for controlling rotation thereof is inserted in the center of the gear 6. The rack 7 is vertically arranged, and the length of the rack 7 is greater than that of the fixed block 4. The sliding cylinder 3 and the mounting frame 5 keep a fixed distance, and the sliding cylinder 3 is not contacted with the gear 6.
The electric power tool box is placed on the lifting platform 8, then the gear 6 is rotated, vertical lifting of the fixed block 4 on the rack 7 and the rack 7 can be controlled through transmission, and finally the lifting platform 8 can be ensured to have a height adjusting function due to the fixed connection of the lifting platform 8 and the fixed block 4. Finally, the rotation of the gear 6 requires braking, and therefore the power source controlling the rotation of this gear 6 may be a servomotor.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and equivalent alternatives or modifications according to the technical solution of the present invention and the inventive concept thereof should be covered by the scope of the present invention.

Claims (6)

1. Supplementary installation jacking equipment of electric power engineering, a serial communication port, including base (1), base (1) fixed mounting is provided with stand (2) on base (1) on the lift platform that the electric power workman took the usefulness, and sliding connection has a slide cartridge (3) on stand (2), is provided with elevating platform (8) and fixed block (4) on the outer wall of slide cartridge (3), and elevating platform (8) are different with the position of fixed block (4), still be provided with vertical mounting bracket (5) on base (1), the top of mounting bracket (5) is provided with gear (6), fixed block (4) orientation the side of gear (6) be provided with rack (7) of gear (6) looks adaptation.
2. Electric power engineering installation-assisted lifting device according to claim 1, characterized in that the column (2) is a cylinder and the diameter of the column (2) is adapted to the inner diameter of the sliding cylinder (3), the sliding cylinder (3) sliding vertically along the column (2).
3. Electric power engineering auxiliary installation lifting equipment according to claim 1, characterized in that the lifting platform (8) is used for placing an electric power tool box.
4. Electric power engineering installation-assisted lifting equipment according to claim 1, characterized in that the centre of the gear (6) is inserted with a rotation shaft for controlling its rotation.
5. Electric power engineering installation-assisted lifting device according to claim 1, characterized in that the rack (7) is arranged vertically and the length of the rack (7) is greater than the length of the fixed block (4).
6. Electric power engineering installation-assisted lifting device according to claim 1, characterized in that a fixed distance is maintained between the sliding cylinder (3) and the mounting frame (5), without contact between the sliding cylinder (3) and the gear wheel (6).
CN202220365447.9U 2022-02-23 2022-02-23 Auxiliary installation lifting equipment for electric power engineering Expired - Fee Related CN216997496U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220365447.9U CN216997496U (en) 2022-02-23 2022-02-23 Auxiliary installation lifting equipment for electric power engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220365447.9U CN216997496U (en) 2022-02-23 2022-02-23 Auxiliary installation lifting equipment for electric power engineering

Publications (1)

Publication Number Publication Date
CN216997496U true CN216997496U (en) 2022-07-19

Family

ID=82395751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220365447.9U Expired - Fee Related CN216997496U (en) 2022-02-23 2022-02-23 Auxiliary installation lifting equipment for electric power engineering

Country Status (1)

Country Link
CN (1) CN216997496U (en)

Similar Documents

Publication Publication Date Title
CN113541038A (en) Vehicle-mounted work platform for live working
CN113580044A (en) Clamping device for maintaining electromechanical equipment
CN211998564U (en) Hoisting device for construction equipment
CN216997496U (en) Auxiliary installation lifting equipment for electric power engineering
CN216326281U (en) Rotor overturning and mounting device
CN210132428U (en) Detection apparatus for electrical automation equipment
CN217074163U (en) Trolley for overhauling transformer substation
CN209261243U (en) A kind of bricklaying robot lifting device
CN215698235U (en) Portable removal bore hole equipment of electric drive
CN213409949U (en) High efficiency steel pipe bending device
CN214141331U (en) Good heavy object hoisting accessory for construction of stability
CN211688148U (en) Hoisting accessory is used in motor maintenance
CN213318529U (en) Automatic welding machine in chemical industry storage tank bucket
CN212430339U (en) Floor type electric equipment support
CN218698613U (en) Mechanical clamp convenient to install
CN113791248A (en) Test tool for power equipment maintenance
CN219652541U (en) Hoisting equipment for maintaining marine diesel engine
CN215048465U (en) Work support that power maintenance used
CN219058250U (en) Automobile chassis assembly hoisting support
CN219031449U (en) Suction crane for 180-degree electric turnover steel plate inspection
CN217964908U (en) But bench drill is with height-adjusting formula base
CN215711427U (en) Auxiliary mounting bracket
CN215886211U (en) Curtain hoist device for construction
CN219174105U (en) Maintenance detection device for pure electric automobile
CN215974845U (en) Electric power overhauls platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220719

CF01 Termination of patent right due to non-payment of annual fee