CN216981155U - An easy-to-connect box - Google Patents
An easy-to-connect box Download PDFInfo
- Publication number
- CN216981155U CN216981155U CN202220511355.7U CN202220511355U CN216981155U CN 216981155 U CN216981155 U CN 216981155U CN 202220511355 U CN202220511355 U CN 202220511355U CN 216981155 U CN216981155 U CN 216981155U
- Authority
- CN
- China
- Prior art keywords
- box
- wire inlet
- outlet
- transformer substation
- cable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000007789 sealing Methods 0.000 claims description 5
- 238000010276 construction Methods 0.000 abstract description 8
- 230000009286 beneficial effect Effects 0.000 abstract description 3
- 238000009825 accumulation Methods 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 230000015556 catabolic process Effects 0.000 description 2
- 238000006731 degradation reaction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000005494 condensation Effects 0.000 description 1
- 238000009833 condensation Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
Images
Landscapes
- Housings And Mounting Of Transformers (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及箱式变电站领域,尤其涉及一种易接线箱变。The utility model relates to the field of box-type transformer substations, in particular to an easy-connection box transformer.
背景技术Background technique
现有箱式变电站(简称箱变)的底部设进出线孔,进出线电缆必须从箱变底部纵向插入或拔出进出线孔,为此,箱变的基础需要包括一个深挖的电缆井,为了施工人员作业方便和盘旋待安装进入箱变的尾端电缆,电缆井深度约2米,面积接近箱变。现有箱变基础需要开挖土方,现场浇注混凝土基础,容易受现场环境和天气影响,也容易对现场环境和交通造成较大影响,施工工期长达20天,而且电缆井容易积水,潮气自箱变电缆井进入箱变内部,在箱变内部产生凝露、结霜现象,降低箱变电气性能。The bottom of the existing box-type substation (referred to as the box-type substation) is provided with inlet and outlet holes, and the inlet and outlet cables must be inserted or pulled out of the inlet and outlet holes longitudinally from the bottom of the box-type substation. In order to facilitate the operation of construction personnel and to circle the end cable to be installed into the box-type transformer, the depth of the cable well is about 2 meters, and the area is close to the box-type transformer. The existing box substation foundation needs to be excavated and the concrete foundation is poured on site, which is easily affected by the on-site environment and weather, and easily has a great impact on the on-site environment and traffic. The construction period is as long as 20 days, and the cable well is prone to accumulation of water and moisture. From the box-transformer cable well into the box-transformer, condensation and frost will occur inside the box-transformer, reducing the electrical performance of the box-transformer.
实用新型内容Utility model content
针对现有技术的不足之处,本实用新型提供一种易接线箱变,以解决上述技术问题。Aiming at the deficiencies of the prior art, the utility model provides an easy-connection box transformer to solve the above-mentioned technical problems.
本实用新型的技术方案提供一种易接线箱变,箱变底座靠边框设C型进出线孔,所述C型进出线孔上方设进出线箱门,进出线电缆通过所述C型进出线孔的开口部及打开的所述进出线箱门横向摆动移入或移出所述箱变。The technical scheme of the utility model provides an easy-to-connect box transformer, the base of the box transformer is provided with a C-shaped inlet and outlet hole, the upper part of the C-shaped inlet and outlet is provided with an inlet and outlet box door, and the inlet and outlet cables pass through the C-shaped inlet and outlet wires. The opening of the hole and the opened door of the incoming and outgoing line box are laterally moved into or out of the box.
作为本实用新型的优选,所述开口部设封口件,所述封口件在所述箱变内部紧固。As a preference of the present invention, the opening is provided with a sealing member, and the sealing member is fastened inside the box.
本实用新型具有以下有益效果:1、大幅降低电缆进线施工的难度;2、可以取消箱变基础中的电缆井,缩短施工周期,降低对环境影响,降低成本;3、避免电缆井积水导致箱变受潮,降低电气性能下降的风险。The utility model has the following beneficial effects: 1. The difficulty of cable entry construction is greatly reduced; 2. The cable well in the box-transformation foundation can be eliminated, the construction period can be shortened, the impact on the environment and the cost; 3. Water accumulation in the cable well can be avoided Causes the box to become damp, reducing the risk of electrical performance degradation.
附图说明Description of drawings
图1为本实用新型的一种易接线箱变进线安装示意图;Fig. 1 is the installation schematic diagram of a kind of easy-to-connect box transformer inlet line of the present invention;
图2为本实用新型的一种易接线箱变运行状态示意图。Fig. 2 is a schematic diagram of the operation state of an easy-connect box transformer of the present invention.
具体实施方式Detailed ways
以下结合附图对本实用新型作进一步详细说明。The present utility model will be further described in detail below in conjunction with the accompanying drawings.
如图1所示,作为本实用新型方案的一种实施例,一种易接线箱变,箱变1底座8安装在基础2上,底座8靠边框设C型进出线孔3,C型进出线孔3上方设进出线箱门4,进出线电缆6通过C型进出线孔3的开口部及打开的进出线箱门4横向摆动移入或移出箱变1的进出线柜5。在施工过程中,工人在地面摆动方式横向移动电缆进出线的操作难度相比传统的在电缆井下推拉插拔电缆的操作难度大幅降低。可以取消基础2中的电缆井,有利实现采用预制基础,施工周期从约20天缩短到1天,降低对环境影响,降低成本。As shown in FIG. 1, as an embodiment of the solution of the present utility model, an easy-to-connect box transformer, the
如图2所示,开口部设封口件7,封口件7在箱变1内部用螺栓紧固。进出线电缆6可以通过电缆沟,也可以通过直埋方式敷设到箱变边缘,更加灵活便利。在箱变运行状态,避免电缆井积水导致箱变受潮,降低电气性能下降的风险。As shown in FIG. 2 , a sealing
上面所述的实施例仅是对本实用新型的优选实施方式进行描述,并非对本实用新型的构思和范围进行限定。在不脱离本实用新型设计构思的前提下,本领域普通人员对本实用新型的技术方案做出的各种变型和改进,均应落入到本实用新型的保护范围,本实用新型请求保护的技术内容,已经全部记载在权利要求书中。The above-mentioned embodiments merely describe the preferred embodiments of the present invention, and do not limit the concept and scope of the present invention. Under the premise of not departing from the design concept of the present invention, various modifications and improvements made by ordinary persons in the art to the technical solutions of the present invention shall fall within the protection scope of the present invention. The content has been fully described in the claims.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202220511355.7U CN216981155U (en) | 2022-03-10 | 2022-03-10 | An easy-to-connect box |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202220511355.7U CN216981155U (en) | 2022-03-10 | 2022-03-10 | An easy-to-connect box |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN216981155U true CN216981155U (en) | 2022-07-15 |
Family
ID=82359057
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202220511355.7U Active CN216981155U (en) | 2022-03-10 | 2022-03-10 | An easy-to-connect box |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN216981155U (en) |
-
2022
- 2022-03-10 CN CN202220511355.7U patent/CN216981155U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202969415U (en) | Multifunctional assembled comprehensive pipe gallery | |
| CN216981155U (en) | An easy-to-connect box | |
| CN110346620A (en) | A kind of open air pole type combination low pressure ammeter box | |
| CN217934622U (en) | Bury horizontal looped netowrk cabinet | |
| RU174434U1 (en) | TUBULAR ANTENNA MAST WITH SUPPORT | |
| CN206976912U (en) | A kind of transforming plant assembly type builds the new breaking of contact tank mounting structure of lightning protection | |
| CN209837365U (en) | A waterproof closure structure for exterior walls | |
| CN210608426U (en) | Low-voltage side cable outlet structure of wind turbine generator set transformer substation | |
| CN216981305U (en) | Box transformer substation foundation | |
| CN204793964U (en) | Prevent wind husky cable pit | |
| CN101962963A (en) | Integrated water supply device for underground reservoir | |
| CN221276482U (en) | Intelligent gate system for water replenishing port of river channel | |
| CN220014055U (en) | Substation gate water stop ridge | |
| CN205489404U (en) | High voltage cable termination locates three finger -type cable pits | |
| CN221297675U (en) | A pedestrian passage gate speed gate swing gate | |
| CN218976105U (en) | Box transformer substation foundation preventing seepage of water | |
| CN221689087U (en) | Buried outdoor cabinet structure | |
| CN222145931U (en) | A waterproof installation structure for underground transformer | |
| CN222884115U (en) | Landscape type box-type transformer substation | |
| CN206611052U (en) | A box type substation box body | |
| CN219513550U (en) | Novel looped netowrk cabinet anti-condensation device | |
| CN221688117U (en) | A high-strength, lightweight, assembled ultra-high-performance concrete ring main unit | |
| CN106558842A (en) | A kind of 630KVA power transformation boxes and installation foundation | |
| CN205986069U (en) | Assembled cable pit | |
| CN221742639U (en) | A tunnel entrance insulation shed structure in high-cold areas |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| EE01 | Entry into force of recordation of patent licensing contract |
Assignee: GUANGDONG KANDE WEI ELECTRIC CO.,LTD. Assignor: SHENZHEN DAILU TECHNOLOGY Co.,Ltd. Contract record no.: X2025980005461 Denomination of utility model: A type of easy junction box transformer Granted publication date: 20220715 License type: Exclusive License Record date: 20250320 |
|
| EE01 | Entry into force of recordation of patent licensing contract |