CN216973543U - A foundation backfill device for civil construction - Google Patents

A foundation backfill device for civil construction Download PDF

Info

Publication number
CN216973543U
CN216973543U CN202220663447.7U CN202220663447U CN216973543U CN 216973543 U CN216973543 U CN 216973543U CN 202220663447 U CN202220663447 U CN 202220663447U CN 216973543 U CN216973543 U CN 216973543U
Authority
CN
China
Prior art keywords
gear
fixedly connected
crushing
wall
civil engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220663447.7U
Other languages
Chinese (zh)
Inventor
刘鸿斌
李昕越
任家伟
高静静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220663447.7U priority Critical patent/CN216973543U/en
Application granted granted Critical
Publication of CN216973543U publication Critical patent/CN216973543U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Crushing And Grinding (AREA)

Abstract

本实用新型涉及回填装置领域,具体的说是一种土建施工用基础回填装置,包括;破碎机本体;以及破碎填平机构,破碎填平机构包括破碎机构、平整机构和传动机构,破碎填平机构包括破碎机构、平整机构和传动机构均设于破碎机本体的一侧端;当人们对土方进行回填时,经常会遇到大块的石块,不方便人们对土方回填,此时可以通过破碎机构对大块的石块进行破碎,破碎后的石块较为细小,此时使用细小的石块可以更加方便地进行回填,当人想要对回填好的土方进行平整时,可以通过平整机构,对破碎后的土方进行抹平,方便了人们下一步对回填好的土方进行夯实等工作。

Figure 202220663447

The utility model relates to the field of backfilling devices, in particular to a foundation backfilling device for civil construction, comprising: a crusher body; The mechanism includes a crushing mechanism, a leveling mechanism and a transmission mechanism, all of which are located on one side of the crusher body; when people backfill the earthwork, they often encounter large stones, which are inconvenient for people to backfill the earthwork. The crushing mechanism crushes large stones, and the crushed stones are relatively small. At this time, it is more convenient to use small stones for backfilling. When people want to level the backfilled earth, they can use the leveling mechanism. , smoothing the broken earthwork, which is convenient for people to compact the backfilled earthwork in the next step.

Figure 202220663447

Description

一种土建施工用基础回填装置A foundation backfill device for civil construction

技术领域technical field

本实用新型涉及回填装置领域,特别的涉及一种土建施工用基础回填装置。The utility model relates to the field of backfilling devices, in particular to a foundation backfilling device for civil construction.

背景技术Background technique

土方回填,是建筑工程的填土,主要有地基填土、基坑(槽)或管沟回填、室内地坪回填、室外场地回填平整等。Earthwork backfill is the filling of construction projects, mainly including foundation filling, foundation pit (slot) or pipe trench backfilling, indoor floor backfilling, and outdoor site backfilling and leveling.

对地下设施工程(如地下结构物、沟渠、管线沟等)的两侧或四周及上部的回填土,应先对地下工程进行各项检查,办理验收手续后方可回填。For the backfill on both sides or around and on the upper part of underground facilities projects (such as underground structures, ditches, pipeline trenches, etc.), various inspections of the underground projects shall be carried out first, and the backfill shall be conducted after the acceptance procedures.

在现有技术中,对土方回填时,经常会有大块石块,在回填时不易使用,容易导致回填凹凸不平,在对管道进行回填时,大块石块也容易因挤压等因素导致管道损坏等,不方便人们的使用。In the prior art, when backfilling earthwork, there are often large stones, which are not easy to use during backfilling, and easily lead to uneven backfilling. When backfilling pipelines, large stones are also easily caused by factors such as extrusion. Pipe damage, etc., inconvenient for people to use.

实用新型内容Utility model content

本实用新型的目的就在于为了解决上述问题而提供一种土建施工用基础回填装置,改善了在现有技术中,对土方回填时,经常会有大块石块,在回填时不易使用,容易导致回填凹凸不平,在对管道进行回填时,大块石块也容易因挤压等因素导致管道损坏等,不方便人们的使用。的问题。The purpose of the present utility model is to provide a foundation backfilling device for civil construction in order to solve the above problems, which improves the prior art, when backfilling earthwork, there are often large stones, which are not easy to use during backfilling, and are easy to use. As a result, the backfilling is uneven. When backfilling the pipeline, the large stones are also prone to damage to the pipeline due to factors such as extrusion, which is inconvenient for people to use. The problem.

本实用新型通过以下技术方案来实现上述目的,一种土建施工用基础回填装置,破碎机本体;以及破碎填平机构,所述破碎填平机构包括破碎机构、平整机构和传动机构,所述破碎填平机构包括破碎机构、平整机构和传动机构均设于破碎机本体的一侧端。The utility model achieves the above purpose through the following technical solutions: a foundation backfilling device for civil construction, a crusher body; The filling and leveling mechanism includes a crushing mechanism, a leveling mechanism and a transmission mechanism, which are all arranged on one side end of the crusher body.

优选的,所述破碎机本体的一侧端固定连接有安装板,所述安装板的一侧端固定连接有电机,所述电机的输出端固定连接有传动轴。Preferably, a mounting plate is fixedly connected to one end of the crusher body, a motor is fixedly connected to one side of the mounting plate, and a transmission shaft is fixedly connected to the output end of the motor.

优选的,所述破碎机构包括第一齿轮、第二齿轮和两组碾碎机构,所述第一齿轮固定连接于传动轴的圆周表面,所述第二齿轮与第一齿轮啮合连接,两组所述碾碎机构分别设于第一齿轮和第二齿轮的一侧。Preferably, the crushing mechanism includes a first gear, a second gear and two groups of crushing mechanisms, the first gear is fixedly connected to the circumferential surface of the transmission shaft, the second gear is meshed with the first gear, and the two groups are The crushing mechanisms are respectively arranged on one side of the first gear and the second gear.

优选的,每组所述碾碎机构均包括破碎轴和多个破碎盘,两个破碎轴均转动连接于破碎机本体的一侧内壁,两个所述破碎轴的一端均活动贯穿破碎机本体的一侧端并向延伸,其中一个所述破碎轴的一端固定连接于传动轴的一端,另一个所述破碎轴固定连接于第二齿轮的圆周内壁,多个破碎盘分别固定连接于两个破碎轴的圆周表面。Preferably, each group of the crushing mechanisms includes a crushing shaft and a plurality of crushing discs, the two crushing shafts are both rotatably connected to the inner wall of one side of the crusher body, and one end of the two crushing shafts is movable through the crusher body one end of the crushing shaft is fixedly connected to one end of the transmission shaft, the other said crushing shaft is fixedly connected to the circumferential inner wall of the second gear, and a plurality of crushing discs are fixedly connected to two The circumferential surface of the crushing shaft.

优选的,所述传动机构包括第三齿轮、齿轮带和第四齿轮,所述第三齿轮固定连接于传动轴的圆周表面,所述第四齿轮通过齿轮带与第三齿轮啮合传动。Preferably, the transmission mechanism includes a third gear, a gear belt and a fourth gear, the third gear is fixedly connected to the circumferential surface of the transmission shaft, and the fourth gear is meshed with the third gear through the gear belt for transmission.

优选的,所述平整机构包括往复丝杆、长形螺母和限位机构,所述往复丝杆固定连接于第四齿轮的内壁,所述往复丝杆的一端活动贯穿破碎机本体的一侧内壁并向外延伸转动连接于破碎机本体的另一侧内壁,所述长形螺母滑动连接于破碎机本体的内壁,所述往复丝杆和长形螺母螺纹连接,所述限位机构设于破碎机本体的一侧。Preferably, the leveling mechanism includes a reciprocating screw rod, an elongated nut and a limiting mechanism, the reciprocating screw rod is fixedly connected to the inner wall of the fourth gear, and one end of the reciprocating screw rod movably penetrates one side of the inner wall of the crusher body It extends and rotates outwardly and is connected to the other inner wall of the crusher body. The elongated nut is slidably connected to the inner wall of the crusher body. The reciprocating screw rod and the elongated nut are threadedly connected. side of the main body.

优选的,所述限位机构包括两个限位杆,两个所述限位杆均固定连接于破碎机本体的一侧内壁,两个所述限位杆的一端均活动贯穿长形螺母的一侧端并向外延伸固定连接于破碎机本体的另一侧内壁。Preferably, the limit mechanism includes two limit rods, both of which are fixedly connected to one side inner wall of the crusher body, and one end of the two limit rods is movable through the length of the elongated nut. One side end extends outward and is fixedly connected to the other side inner wall of the crusher body.

优选的,所述破碎机本体的下端开设有两个推土槽,所述往复丝杆的一端固定连接有阻挡盘,所述阻挡盘设于第四齿轮的一侧,且不与第四齿轮接触。Preferably, the lower end of the crusher body is provided with two bulldozing grooves, and one end of the reciprocating screw rod is fixedly connected with a blocking disc, and the blocking disc is arranged on one side of the fourth gear and is not connected with the fourth gear. touch.

本实用新型的有益效果是:The beneficial effects of the present utility model are:

1、当人们对土方进行回填时,经常会遇到大块的石块,不方便人们对土方回填,此时可以通过破碎机构对大块的石块进行破碎,破碎后的石块较为细小,此时使用细小的石块可以更加方便地进行回填。1. When people backfill the earthwork, they often encounter large stones, which is inconvenient for people to backfill the earthwork. At this time, the large stones can be broken by the crushing mechanism, and the broken stones are relatively small. In this case, backfilling can be more easily done with fine stones.

2、当人想要对回填好的土方进行平整时,可以通过平整机构,对破碎后的土方进行抹平,方便了人们下一步对回填好的土方进行夯实等工作。2. When people want to level the backfilled earthwork, they can use the leveling mechanism to smooth the broken earthwork, which is convenient for people to compact the backfilled earthwork in the next step.

附图说明Description of drawings

图1为本实用新型的主视立体图;Fig. 1 is the front perspective view of the utility model;

图2为本实用新型的图1中A处的局部放大图;Fig. 2 is the partial enlarged view of A place in Fig. 1 of the utility model;

图3为本实用新型的第一视角立体图;Fig. 3 is the first perspective perspective view of the utility model;

图4为本实用新型的第一视角剖视立体图;4 is a cross-sectional perspective view of the utility model from a first perspective;

图5为本实用新型的第二视角立体图。FIG. 5 is a perspective view of the present invention from a second perspective.

图中:1、破碎机本体;2、安装板;3、电机;4、传动轴;5、第一齿轮;6、阻挡盘;7、第二齿轮;8、破碎轴;9、破碎盘;10、第三齿轮;11、齿轮带;12、第四齿轮;13、往复丝杆;14、长形螺母;15、限位杆;16、推土槽。In the figure: 1. Crusher body; 2. Mounting plate; 3. Motor; 4. Transmission shaft; 5. First gear; 6. Blocking disc; 7. Second gear; 8. Crushing shaft; 9. Crushing disc; 10, the third gear; 11, the gear belt; 12, the fourth gear; 13, the reciprocating screw; 14, the long nut; 15, the limit rod; 16, the bulldozer.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

具体实施时:如图1-5所示,一种土建施工用基础回填装置,破碎机本体1;以及破碎填平机构,破碎填平机构包括破碎机构、平整机构和传动机构,破碎填平机构包括破碎机构、平整机构和传动机构均设于破碎机本体1的一侧端,因土块石块较大,使得人们回填土方不再方便,人们想要对土方进行回填和平整时,首先将土由破碎机本体1的上端倒入,此时可以通过破碎机构对较大的土块石块进行破碎,对破碎后的石块进行平整抹平,方便人们下一步对回填后的地面进行夯实等工作,破碎机本体1的一侧端固定连接有安装板2,安装板2的一侧端固定连接有电机3,电机3的输出端固定连接有传动轴4,当人们想要破碎填平机构对土方进行回填平整时,可以将本装置放置于需要回填的坑上方,然后启动电机3,于是电机3会带动传动轴4进行转动,传动轴4会驱动破碎填平机构,对土方大块进行破碎和表面平整,对于本技术领域工作人员而言电机3为现有技术,在此不进行过多赘述。In specific implementation: as shown in Figures 1-5, a foundation backfilling device for civil construction, a crusher body 1; The crushing mechanism, the leveling mechanism and the transmission mechanism are all located on one side of the crusher body 1. Due to the large size of the soil and rocks, it is not convenient for people to backfill the soil. When people want to backfill and level the soil, first The soil is poured from the upper end of the crusher body 1. At this time, the larger soil blocks and stones can be crushed by the crushing mechanism, and the crushed stones can be leveled and leveled, which is convenient for people to ram the ground after backfilling in the next step. and other work, one side end of the crusher body 1 is fixedly connected with the mounting plate 2, one side end of the mounting plate 2 is fixedly connected with the motor 3, and the output end of the motor 3 is fixedly connected with the transmission shaft 4. When the mechanism is backfilling and leveling the earthwork, the device can be placed above the pit to be backfilled, and then start the motor 3, then the motor 3 will drive the transmission shaft 4 to rotate, and the transmission shaft 4 will drive the crushing and filling mechanism to remove large pieces of earthwork. For crushing and surface leveling, the motor 3 is the prior art for those skilled in the art, and details are not described here.

如图2、图5和图4所示,破碎机构包括第一齿轮5、第二齿轮7和两组碾碎机构,第一齿轮5固定连接于传动轴4的圆周表面,第二齿轮7与第一齿轮5啮合连接,两组碾碎机构分别设于第一齿轮5和第二齿轮7的一侧,当传动轴4转动时,会带动第一齿轮5进行转动,第一齿轮5和传动轴4同时带动两组碾碎机构同时运转对大块石块和土块进行破碎,每组碾碎机构均包括破碎轴8和多个破碎盘9,两个破碎轴8均转动连接于破碎机本体1的一侧内壁,两个破碎轴8的一端均活动贯穿破碎机本体1的一侧端并向延伸,其中一个破碎轴8的一端固定连接于传动轴4的一端,另一个破碎轴8固定连接于第二齿轮7的圆周内壁,多个破碎盘9分别固定连接于两个破碎轴8的圆周表面,当第一齿轮5和第二齿轮7同时转动时,会带动两个破碎轴8相反方向转动,于是破碎轴8带动多个破碎盘9对土块进行破碎。As shown in Figures 2, 5 and 4, the crushing mechanism includes a first gear 5, a second gear 7 and two sets of crushing mechanisms. The first gear 5 is fixedly connected to the circumferential surface of the transmission shaft 4, and the second gear 7 is connected to the The first gear 5 is meshed and connected, and two sets of crushing mechanisms are respectively arranged on one side of the first gear 5 and the second gear 7. When the transmission shaft 4 rotates, it will drive the first gear 5 to rotate, and the first gear 5 and the transmission The shaft 4 simultaneously drives two groups of crushing mechanisms to operate at the same time to crush large stones and soil blocks. Each group of crushing mechanisms includes a crushing shaft 8 and a plurality of crushing discs 9. The two crushing shafts 8 are both rotatably connected to the crusher. On the inner wall of one side of the main body 1, one end of the two crushing shafts 8 is movable through one side end of the crusher body 1 and extends, and one end of one crushing shaft 8 is fixedly connected to one end of the transmission shaft 4, and the other crushing shaft 8 It is fixedly connected to the circumferential inner wall of the second gear 7, and a plurality of crushing discs 9 are respectively fixedly connected to the circumferential surfaces of the two crushing shafts 8. When the first gear 5 and the second gear 7 rotate at the same time, the two crushing shafts 8 will be driven. Rotating in the opposite direction, the crushing shaft 8 drives a plurality of crushing discs 9 to crush the clods.

如图2、图5和图4所示,传动机构包括第三齿轮10、齿轮带11和第四齿轮12,第三齿轮10固定连接于传动轴4的圆周表面,第四齿轮12通过齿轮带11和第三齿轮10啮合传动,同时当传动轴4转动时,会带动第三齿轮10进行转动,第三齿轮10会通过齿轮带11带动第四齿轮12进行转动,带动平整机构对回填土方进行平整,平整机构包括往复丝杆13、长形螺母14和限位机构,往复丝杆13固定连接于第四齿轮12的内壁,往复丝杆13的一端活动贯穿破碎机本体1的一侧内壁并向外延伸转动连接于破碎机本体1的另一侧内壁,长形螺母14滑动连接于破碎机本体1的内壁,往复丝杆13和长形螺母14螺纹连接,限位机构设于破碎机本体1的一侧,当第四齿轮12转动时,会带动往复丝杆13进行转动,往复丝杆13会通过表面螺纹带动长形螺母14往复对由破碎机本体1上端填入的回填土方进行推平,对于本技术领域工作人员而言往复丝杆13和长形螺母14均为现有技术在此不进行过多赘述,限位机构包括两个限位杆15,两个限位杆15均固定连接于破碎机本体1的一侧内壁,两个限位杆15的一端均活动贯穿长形螺母14的一侧端并向外延伸固定连接于破碎机本体1的另一侧内壁,当长形螺母14在推动土块时,可能发生转动,导致无法推动土块也容易损坏,此时可以通过限位杆15对长形螺母14的运动进行限位,使得长形螺母14不易发生转动,增加了长形螺母14使的稳定性,减少了损坏的可能性,破碎机本体1的下端开设有两个推土槽16,往复丝杆13的一端固定连接有阻挡盘6,阻挡盘6设于第四齿轮12的一侧,且不与第四齿轮12接触,当长形螺母14推动时,长形螺母14可以通过推土槽16将土块由破碎机本体1内推出,防止堆积满后长形螺母14无法再推动土块导致损坏,将多余土块推出也增加了平整效果,当第四齿轮12转时,因靠近地面容易有杂物进入第四齿轮12和齿轮带11的啮合处,容易导致损坏,此时可以通过阻挡盘6对第四齿轮12和齿轮带11啮合处遮挡,减少杂物进入的可能性。As shown in Figures 2, 5 and 4, the transmission mechanism includes a third gear 10, a gear belt 11 and a fourth gear 12, the third gear 10 is fixedly connected to the circumferential surface of the transmission shaft 4, and the fourth gear 12 passes through the gear belt 11 and the third gear 10 mesh for transmission, and when the transmission shaft 4 rotates, it will drive the third gear 10 to rotate, the third gear 10 will drive the fourth gear 12 to rotate through the gear belt 11, and drive the leveling mechanism to carry out the backfilling. Leveling, the leveling mechanism includes a reciprocating screw rod 13, an elongated nut 14 and a limit mechanism. The reciprocating screw rod 13 is fixedly connected to the inner wall of the fourth gear 12, and one end of the reciprocating screw rod 13 moves through the inner wall of one side of the crusher body 1. It extends outward and is rotatably connected to the other side inner wall of the crusher body 1, the elongated nut 14 is slidably connected to the inner wall of the crusher body 1, the reciprocating screw rod 13 and the elongated nut 14 are threadedly connected, and the limiting mechanism is provided on the crusher body. On one side of 1, when the fourth gear 12 rotates, it will drive the reciprocating screw 13 to rotate, and the reciprocating screw 13 will drive the long nut 14 to reciprocate through the surface thread to push the backfill soil filled by the upper end of the crusher body 1. For those skilled in the art, the reciprocating screw 13 and the elongated nut 14 are both in the prior art and will not be repeated here. The limit mechanism includes two limit rods 15, both of which are It is fixedly connected to one side of the inner wall of the crusher body 1, and one end of the two limit rods 15 is movable through one side end of the long nut 14 and extends outward and is fixedly connected to the other side inner wall of the crusher body 1. When the nut 14 pushes the clod, it may rotate, which makes it easy to damage if the clod cannot be pushed. At this time, the movement of the elongated nut 14 can be limited by the limit rod 15, so that the elongated nut 14 is not easy to rotate. The stability of the long nut 14 is increased, and the possibility of damage is reduced. The lower end of the crusher body 1 is provided with two bulldozer grooves 16, and one end of the reciprocating screw rod 13 is fixedly connected with a blocking disc 6. On one side of the fourth gear 12 and not in contact with the fourth gear 12, when the elongated nut 14 is pushed, the elongated nut 14 can push the clod out of the crusher body 1 through the bulldozer 16 to prevent accumulation The rear long nut 14 can no longer push the clods to cause damage. Pushing out the excess clods also increases the leveling effect. When the fourth gear 12 rotates, it is easy for sundries to enter the meshing of the fourth gear 12 and the gear belt 11 because it is close to the ground. At this point, it is easy to cause damage. At this time, the blocking disc 6 can block the engagement of the fourth gear 12 and the gear belt 11 to reduce the possibility of sundries entering.

本实用新型在使用时,因土块石块较大,使得人们回填土方不再方便,人们想要对土方进行回填和平整时,可以将本装置放置于需要回填的坑上方,首先将土由破碎机本体1的上端倒入,然后启动电机3,于是电机3会带动传动轴4进行转动,当传动轴4转动时,会带动第一齿轮5进行转动,第一齿轮5和传动轴4同时带动两个破碎轴8相反方向转动,于是破碎轴8带动多个破碎盘9对土块进行破碎,同时当传动轴4转动时,会带动第三齿轮10进行转动,第三齿轮10会通过齿轮带11带动第四齿轮12进行转动,会带动往复丝杆13进行转动,往复丝杆13会通过表面螺纹带动长形螺母14往复对由破碎机本体1上端填入的回填土方进行推平,然后将多余土块由推土槽16推出破碎机本体1的内部。When the utility model is in use, due to the large soil blocks and stones, it is no longer convenient for people to backfill the earthwork. When people want to backfill and level the earthwork, the device can be placed above the pit that needs to be backfilled. The upper end of the crusher body 1 is poured, and then the motor 3 is started, so the motor 3 will drive the transmission shaft 4 to rotate. When the transmission shaft 4 rotates, it will drive the first gear 5 to rotate. The first gear 5 and the transmission shaft 4 rotate at the same time. The two crushing shafts 8 are driven to rotate in opposite directions, so the crushing shaft 8 drives a plurality of crushing discs 9 to crush the soil blocks. At the same time, when the transmission shaft 4 rotates, it will drive the third gear 10 to rotate, and the third gear 10 will pass through the gear. The belt 11 drives the fourth gear 12 to rotate, which will drive the reciprocating screw 13 to rotate, and the reciprocating screw 13 will drive the elongated nut 14 through the surface thread to reciprocate to level the backfill soil filled by the upper end of the crusher body 1, and then The excess clods are pushed out of the crusher body 1 from the bulldozer 16 .

此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。In addition, it should be understood that although this specification is described in terms of embodiments, not each embodiment only includes an independent technical solution, and this description in the specification is only for the sake of clarity, and those skilled in the art should take the specification as a whole , the technical solutions in each embodiment can also be appropriately combined to form other implementations that can be understood by those skilled in the art.

Claims (8)

1. The utility model provides a foundation backfill device for civil engineering which characterized in that includes: a crusher body (1); and
the crushing and leveling mechanism comprises a crushing mechanism, a leveling mechanism and a transmission mechanism, wherein the crushing mechanism, the leveling mechanism and the transmission mechanism are all arranged at one side end of the crusher body (1).
2. The foundation backfill device for civil engineering according to claim 1, characterized in that: one side end fixedly connected with mounting panel (2) of breaker body (1), one side end fixedly connected with motor (3) of mounting panel (2), the output end fixedly connected with transmission shaft (4) of motor (3).
3. The foundation backfill device for civil engineering according to claim 2, characterized in that: the crushing mechanism comprises a first gear (5), a second gear (7) and two groups of crushing mechanisms, wherein the first gear (5) is fixedly connected to the circumferential surface of the transmission shaft (4), the second gear (7) is meshed with the first gear (5), and the two groups of crushing mechanisms are respectively arranged on one side of the first gear (5) and one side of the second gear (7).
4. The foundation backfill device for civil engineering according to claim 3, characterized in that: each group grinding mechanism comprises a grinding shaft (8) and a plurality of grinding discs (9), the two grinding shafts (8) are rotatably connected to the inner wall of one side of the crusher body (1), one ends of the two grinding shafts (8) movably penetrate through one side end of the crusher body (1) and extend towards the side end, one end of one grinding shaft (8) is fixedly connected to one end of the transmission shaft (4), the other end of the other grinding shaft (8) is fixedly connected to the inner wall of the circumference of the second gear (7), and the plurality of grinding discs (9) are fixedly connected to the circumferential surfaces of the two grinding shafts (8) respectively.
5. The foundation backfill device for civil engineering according to claim 1, characterized in that: the transmission mechanism comprises a third gear (10), a gear belt (11) and a fourth gear (12), the third gear (10) is fixedly connected to the circumferential surface of the transmission shaft (4), and the fourth gear (12) is in meshing transmission with the third gear (10) through the gear belt (11).
6. The foundation backfill device for civil engineering according to claim 1, characterized in that: level mechanism and include reciprocal lead screw (13), microscler nut (14) and stop gear, reciprocal lead screw (13) fixed connection is in the inner wall of fourth gear (12), one end activity of reciprocal lead screw (13) runs through one side inner wall of breaker body (1) and outwards extends and rotate the opposite side inner wall of connecting in breaker body (1), microscler nut (14) sliding connection is in the inner wall of breaker body (1), reciprocal lead screw (13) and microscler nut (14) threaded connection, stop gear locates one side of breaker body (1).
7. The foundation backfill device for civil engineering according to claim 6, characterized in that: stop gear includes two gag lever post (15), two equal fixed connection in one side inner wall of breaker body (1) of gag lever post (15), two the equal activity of one end of gag lever post (15) runs through a side of microscler nut (14) and outwards extends fixed connection in the opposite side inner wall of breaker body (1).
8. The foundation backfill device for civil engineering according to claim 6, characterized in that: two soil pushing grooves (16) are formed in the lower end of the crusher body (1), a blocking disc (6) is fixedly connected to one end of the reciprocating screw rod (13), and the blocking disc (6) is arranged on one side of the fourth gear (12) and does not contact with the fourth gear (12).
CN202220663447.7U 2022-03-25 2022-03-25 A foundation backfill device for civil construction Expired - Fee Related CN216973543U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220663447.7U CN216973543U (en) 2022-03-25 2022-03-25 A foundation backfill device for civil construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220663447.7U CN216973543U (en) 2022-03-25 2022-03-25 A foundation backfill device for civil construction

Publications (1)

Publication Number Publication Date
CN216973543U true CN216973543U (en) 2022-07-15

Family

ID=82339222

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220663447.7U Expired - Fee Related CN216973543U (en) 2022-03-25 2022-03-25 A foundation backfill device for civil construction

Country Status (1)

Country Link
CN (1) CN216973543U (en)

Similar Documents

Publication Publication Date Title
CN113417293B (en) Deep foundation pit supporting structure for building construction
CN106735522B (en) A kind of tube cutting machine built in well casing
CN116145754A (en) Ditching machine for urban construction
CN220326214U (en) Width adjustable tealeaves is planted and is used ditching equipment
CN210195659U (en) An earthwork excavation and backfill device for engineering construction
CN206464606U (en) A kind of tube cutting machine built in well casing
CN214695794U (en) Excavator for hydraulic engineering
CN215290334U (en) Water conservancy is surveyed with filling hole device
CN214574234U (en) A foundation pit excavation device for municipal civil construction
CN214784271U (en) A high-efficiency excavation device for construction foundation
CN105386505B (en) The closely knit construction method of circular arc under sand substrate drainpipe
CN217480285U (en) Construction equipment is seted up to building escape canal
CN214940532U (en) Groove excavation device for underground pipe network construction
CN212104096U (en) A device for excavating concrete pipe piles in construction engineering
CN105156019A (en) Spiral rod pit digging device
CN116180719A (en) A New Type of Recyclable Prefabricated Pile
CN221702440U (en) Earthwork support device
CN215406075U (en) Supporting device for building foundation pit
CN108678765A (en) A kind of tunnel excavating gear facilitating rubble
CN221798549U (en) Hydraulic engineering digs canal equipment
CN213509658U (en) A leveling device for building construction
CN221919457U (en) Slope construction protector
CN101831899B (en) Mixed compaction integral mechanism for dike non-slipping solid material
CN114000556A (en) Soil loosening, ditching and embedding device for on-site pipeline of prefabricated current-variant building engineering
CN216108713U (en) An excavator bucket with loosening function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220715

CF01 Termination of patent right due to non-payment of annual fee