CN216921306U - Scaffold special for cement bucket for building - Google Patents

Scaffold special for cement bucket for building Download PDF

Info

Publication number
CN216921306U
CN216921306U CN202220331782.7U CN202220331782U CN216921306U CN 216921306 U CN216921306 U CN 216921306U CN 202220331782 U CN202220331782 U CN 202220331782U CN 216921306 U CN216921306 U CN 216921306U
Authority
CN
China
Prior art keywords
scaffold
groove
cement
jacking
grooves
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220331782.7U
Other languages
Chinese (zh)
Inventor
王梦梦
胡文静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Fangyuanda Construction Group Co ltd
Original Assignee
Qingdao Fangyuanda Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Fangyuanda Construction Group Co ltd filed Critical Qingdao Fangyuanda Construction Group Co ltd
Priority to CN202220331782.7U priority Critical patent/CN216921306U/en
Application granted granted Critical
Publication of CN216921306U publication Critical patent/CN216921306U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to the technical field of buildings, in particular to a scaffold special for a cement barrel for a building, which comprises a scaffold, wherein a pedal is arranged on the surface of the scaffold, a sliding groove is formed in the surface of the pedal, a supporting rod is arranged in the sliding groove in a sliding manner, a bolt is arranged on the surface of the supporting rod, a limiting clamping plate is arranged on the surface of the bolt, a bearing plate is arranged on the upper end surface of the supporting rod, two groups of placing grooves are formed in the surface of the bearing plate, clamping components are arranged on the surfaces of the two groups of placing grooves, and a barrel is placed in the placing grooves; be provided with on the surface of cement cask and encircle the centre gripping subassembly, avoid the cement cask at the in-process landing that removes, avoid causing the injury to the human body, cement receives rocking of scaffold frame when using cement to the spacing fixed of centre gripping of cask simultaneously, avoids cement to spill, and the cement cask drops when also avoiding high altitude construction simultaneously, avoids causing the injury to construction worker.

Description

Scaffold special for cement bucket for building
Technical Field
The utility model relates to the technical field of buildings, in particular to a scaffold special for a cement bucket used for buildings.
Background
The scaffold is a working platform which is erected for ensuring that each construction process is smoothly carried out. The scaffold is divided into an outer scaffold and an inner scaffold according to the erected positions; the scaffold can be divided into a wood scaffold, a bamboo scaffold and a steel pipe scaffold according to different materials; the scaffold is divided into a vertical rod type scaffold, a bridge type scaffold, a door type scaffold, a suspension type scaffold, a hanging type scaffold, a lifting type scaffold and a climbing type scaffold according to the structural form.
The range of the scaffold used when a house is built in life is wider, the cement barrel is required to be used when a wall body is built in the building, the cement barrel used for the building in the prior art is frequently used, and cement needs to be continuously put into the barrel for construction workers to use.
When high altitude construction operation, the cement barrel is only placed at the scaffold, because the stability of placing of high altitude construction cement barrel is relatively poor, carelessness when construction worker uses can lead to the cement barrel to drop from the high altitude and cause the injury to construction worker, still can lead to cement to cause the waste from unrestrained, and the scaffold can not place multiunit cement drum simultaneously, and it is more troublesome to need to add cement to the cement drum many times, extravagant construction man-hour.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a special scaffold for a cement bucket used for a building, which aims to solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides a special scaffold frame of cement bucket that building was used, includes the scaffold frame, the surface of scaffold frame is provided with the footboard, the spout has been seted up on the surface of footboard, it is provided with the bracing piece to slide in the spout, the surface of bracing piece is provided with the bolt, the surface of bolt is provided with spacing cardboard, the upper end surface of bracing piece is provided with the bearing board, two sets of standing grooves have been seted up on the surface of bearing board, and is two sets of the surface of standing groove is provided with the centre gripping subassembly, the cask has been placed in the standing groove, the equal symmetry in surface of standing groove has been seted up and has been held the groove, the surface symmetry of centre gripping subassembly is provided with the top and holds the pole, it holds the spring to be provided with the top between groove and the top and hold the pole.
Preferably, the footboard is of a rectangular plate structure, a plurality of groups of limiting clamping grooves are formed in the surface of the footboard, the clamping grooves are of an Contraband-shaped structure, the limiting clamping plates are of a square plate structure and are of a square plate structure, and the limiting clamping grooves are correspondingly formed in the shape of the limiting clamping grooves.
Preferably, the bearing plate is a rectangular plate-shaped structure, the placing groove is a cylindrical groove, the clamping assembly comprises a bottom plate, the bottom plate is a semicircular plate-shaped structure, an arc groove is formed in the surface of the bottom plate and provided with multiple groups, the arc groove is of a structure shaped like 'Contraband', the arc groove surrounds the surface of the clamping assembly, a spring is arranged in the arc groove, a limiting jacking block is arranged on the surface of the spring, and the limiting jacking block is a rubber block of a semicircular structure.
Preferably, the propping groove is in an Contraband-shaped structure, the propping rod is arranged at the position of the clamping assembly close to the lower end surface and is in an inverted T-shaped structure, and the port of the propping rod and the size of the notch of the propping groove are correspondingly arranged.
Preferably, the supporting rod is of a cylindrical structure, the surfaces of the supporting rods are symmetrically provided with sliding blocks, one side surface of each sliding block is arranged on the surface of the corresponding supporting rod, and the sliding blocks drive the supporting rods to slide in the sliding grooves.
Compared with the prior art, the utility model has the beneficial effects that:
1. the surrounding clamping assembly is arranged on the surface of the cement barrel, so that the cement barrel is prevented from sliding off in the moving process, the damage to a human body is avoided, the clamping limiting fixation of the barrel is avoided, the cement is prevented from being shaken by a scaffold when the cement in the barrel is used, the cement is prevented from being scattered, the cement barrel is prevented from falling off during high-altitude operation, and the damage to construction workers is avoided;
2. according to the utility model, by arranging the slidable structure, the position of the barrel can be moved at will according to the range used by construction workers, the limiting clamping plate on the surface of the bolt can be moved and used to be inserted into the limiting clamping groove to fix the barrel, meanwhile, a plurality of groups of cement barrels can be placed on the surface of the scaffold, so that the construction workers can use the barrels in time directly, and the construction work efficiency is improved.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged view of the structure at A in FIG. 1;
FIG. 3 is a schematic view of a clamping assembly according to the present invention;
FIG. 4 is a schematic view of a card slot structure of the present invention;
FIG. 5 is a schematic view of the structure of the supporting rod and the sliding groove of the present invention.
In the figure: scaffold frame 1, footboard 2, draw-in groove 20, spout 3, bracing piece 4, bolt 5, spacing cardboard 6, bearing board 7, standing groove 8, centre gripping subassembly 9, bottom plate 90, circular arc groove 91, spring 92, top hold piece 93, top hold groove 10, top hold pole 11, top hold spring 12, cask 80.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1 to 5, the present invention provides a technical solution: a scaffold special for a cement bucket used for a building comprises a scaffold 1, wherein a pedal 2 is installed on the surface of the scaffold 1, the pedal 2 is of a rectangular plate-shaped structure, a plurality of groups of limiting clamping grooves 20 are formed in the surface of the pedal 2, the limiting clamping grooves 20 are arranged corresponding to limiting clamping plates 6 in shape, the limiting clamping grooves 20 are of an Contraband-shaped structure, sliding grooves 3 are formed in the surface of the pedal 2, when a barrel 80 needs to be moved, supporting rods 4 can be manually pushed, sliding blocks on the surfaces of the supporting rods 4 start to move along the sliding grooves 3, supporting rods 4 are slidably installed in the sliding grooves 3, the supporting rods 4 are of a cylindrical structure, sliding blocks are symmetrically installed on the surfaces of the supporting rods 4, one side surfaces of the sliding blocks are installed on the surfaces of the supporting rods, the sliding blocks drive the supporting rods 4 to slide in the sliding grooves 3, bolts 5 are movably installed on the surfaces of the supporting rods 4, and slots are formed in the surfaces, which are close to the upper ends of the supporting rods 4, if the barrel 80 needs to be moved, the bolt 80 is manually lifted upwards to separate the limiting clamping plate from the limiting clamping groove 20, then the direction of the bolt 80 is manually rotated, and the upper end of the bolt 80 is inserted into the slot formed in the surface of the support rod 4 to complete the operation;
the surface of the bolt 5 is provided with a limiting clamping plate 6, the limiting clamping plate 6 is of a square plate structure, the upper end surface of the support rod 4 is provided with a bearing plate 7, the surface of the bearing plate 7 is provided with two groups of placing grooves 8, the placing grooves 8 are cylindrical grooves, the surfaces of the two groups of placing grooves 8 are provided with clamping components 9, the placing grooves 8 are internally provided with a barrel 80, the clamping components 9 comprise a bottom plate 90, the bottom plate 90 is of a semicircular plate structure, the surface of the bottom plate 90 is provided with arc grooves 91, the arc grooves 91 are provided with a plurality of groups, the arc grooves 91 are of an Contraband-shaped structure, the arc grooves 91 are arranged on the surface of the clamping components 9 in a surrounding manner, the arc grooves 91 are internally provided with springs 92, the surface of each spring 92 is provided with a limiting jacking block 93, the limiting jacking blocks 93 are rubber blocks of a semicircular structure, the surfaces of the placing grooves 8 are symmetrically provided with jacking grooves 10, the jacking rods 11 are symmetrically arranged on the surface of the clamping components 9, the jacking rod 11 is arranged at the position of the clamping component 9 close to the lower end surface, the jacking rod 11 is of an inverted T-shaped structure, the port of the jacking rod 11 and the size of the notch of the jacking groove 10 are correspondingly arranged, and a jacking spring 12 is arranged between the jacking groove 10 and the jacking rod 11.
In the practical use process of the utility model, when in use, the barrel 80 containing cement is placed into the placing groove 8, the surface of the barrel 80 is contacted with the clamping component 9, at the moment, the top holding block 93 supports the surface of the barrel 80 in a surrounding manner, at the moment, the spring 92 is in a telescopic state under the extrusion of the top holding block 93, the clamping component 9 starts to move towards two sides due to the clamping of the barrel 80, the clamping component 9 starts to extrude the top holding spring 12 by the top holding rod 11 on the lower end surface, the top holding rod 11 starts to gradually enter the top holding groove 10 under the extrusion of the clamping component 9, the top holding spring 12 is in an extrusion telescopic state, at the moment, the barrel 80 is placed, when the barrel 80 needs to be moved, the supporting rod 4 can be manually pushed, the sliding block on the surface of the supporting rod 4 starts to move along the sliding groove 3, after the supporting rod 4 is moved to a position required by itself, the bolt 5 is manually pressed downwards, the limit clamping plate 6 on the lower end surface of the bolt 5 is clamped into the limit clamping groove 20, can stop the removal to bracing piece 4, if need carry out the position removal to cask 80 again, manual upwards mention bolt 80 breaks away from spacing cardboard spacing draw-in groove 20, then manual rotation bolt 80's direction can accomplish the operation in inserting the slot that the bracing piece 4 surface was seted up into with the upper end of bolt 80, easy operation, convenient to use.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a special scaffold frame of cement bucket that building was used, includes scaffold frame (1), its characterized in that: the surface of the scaffold (1) is provided with a pedal (2), the surface of the pedal (2) is provided with a chute (3), a supporting rod (4) is arranged in the sliding groove (3) in a sliding way, a bolt (5) is arranged on the surface of the supporting rod (4), a limiting clamping plate (6) is arranged on the surface of the bolt (5), a bearing plate (7) is arranged on the surface of the upper end of the supporting rod (4), two groups of placing grooves (8) are arranged on the surface of the bearing plate (7), clamping components (9) are arranged on the surfaces of the two groups of placing grooves (8), a barrel (80) is arranged in the placing groove (8), the surface of the placing groove (8) is symmetrically provided with supporting grooves (10), the surface of the clamping component (9) is symmetrically provided with a jacking rod (11), and a jacking spring (12) is arranged between the jacking groove (10) and the jacking rod (11).
2. The scaffold special for the cement bucket for the building of claim 1 is characterized in that: the pedal (2) is of a rectangular plate-shaped structure, a plurality of groups of limiting clamping grooves (20) are formed in the surface of the pedal (2), the clamping grooves (20) are of Contraband-shaped structures, the limiting clamping plate (6) is of a square plate-shaped structure, and the limiting clamping grooves (20) are arranged correspondingly to the limiting clamping plate (6).
3. The scaffold special for the cement bucket for the building of claim 1 is characterized in that: the utility model discloses a clamping assembly, including centre gripping subassembly, bearing board (7), standing groove (8), clamping assembly (9) and spring (92), bearing board (7) are rectangle platelike structure, standing groove (8) are the cylinder groove, clamping assembly (9) are including bottom plate (90), and bottom plate (90) are semi-circular platelike structure, circular arc groove (91) have been seted up on the surface of bottom plate (90), and circular arc groove (91) are provided with the multiunit, and circular arc groove (91) are "Contraband" font structure, and circular arc groove (91) encircle the surface that sets up at clamping assembly (9), be provided with spring (92) in circular arc groove (91), the surface of spring (92) is provided with spacing top and holds piece (93), and spacing top holds piece (93) and is semi-circular structure's block rubber.
4. The scaffold special for the cement bucket for the building of claim 1 is characterized in that: the jacking groove (10) is of an Contraband-shaped structure, the jacking rod (11) is arranged at the position, close to the lower end surface, of the clamping assembly (9), the jacking rod (11) is of an inverted T-shaped structure, and the port of the jacking rod (11) and the size of the notch of the jacking groove (10) are correspondingly arranged.
5. The scaffold special for the cement bucket for the building of claim 1 is characterized in that: the support rod (4) is of a cylindrical structure, the surface of the support rod (4) is symmetrically provided with sliding blocks, one side surface of each sliding block is arranged on the surface of the support rod, and the sliding blocks drive the support rod (4) to slide in the sliding grooves (3).
CN202220331782.7U 2022-02-18 2022-02-18 Scaffold special for cement bucket for building Expired - Fee Related CN216921306U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220331782.7U CN216921306U (en) 2022-02-18 2022-02-18 Scaffold special for cement bucket for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220331782.7U CN216921306U (en) 2022-02-18 2022-02-18 Scaffold special for cement bucket for building

Publications (1)

Publication Number Publication Date
CN216921306U true CN216921306U (en) 2022-07-08

Family

ID=82267918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220331782.7U Expired - Fee Related CN216921306U (en) 2022-02-18 2022-02-18 Scaffold special for cement bucket for building

Country Status (1)

Country Link
CN (1) CN216921306U (en)

Similar Documents

Publication Publication Date Title
CN216921306U (en) Scaffold special for cement bucket for building
CN205153502U (en) Support arrangement for but lifting height for building
CN108792924B (en) Reinforcing steel bar positioning frame
CN216512448U (en) Metal crane anchoring device
CN212670344U (en) Bridge maintenance jacking device for municipal bridge engineering
CN208843564U (en) A kind of energy-conserving plate material bucket device
CN212669157U (en) Telescopic bracket for overhauling substation equipment
CN212559138U (en) Hydraulic pressure station transportation equipment of lifting by crane
CN212295561U (en) Scaffold capable of being assembled and disassembled quickly
CN209868868U (en) Plank nailing device for interior decoration
CN210263829U (en) Building wall scaffold
CN214364970U (en) Special modular supporting device for high formwork support body of building
CN212269333U (en) Reverse chain return pushing jacking device
CN219315701U (en) A connection structure that is used for steel bushing case to promote removable stand in station
CN220811087U (en) Wood holding device for brick making production line
CN213806464U (en) Construction scaffold frame that can fast assembly
CN212605875U (en) Adjustable take-off and landing platform for aircraft
CN216004921U (en) Special lifting appliance for cylindrical universal parts
CN214446312U (en) Movable tool rack
CN211817822U (en) Scaffold frame for building engineering convenient to adjust
CN215331292U (en) Construction support for building engineering
CN210460025U (en) Limiting device for block building assembly construction wall piece
CN219365339U (en) Scaffold for plastering house wall surfaces
CN215859175U (en) Lifting protection device for assembled building wallboard
CN218849037U (en) Information bulletin board convenient to adjust

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220708

CF01 Termination of patent right due to non-payment of annual fee