CN216921297U - A fixed support structure for a hanging basket - Google Patents

A fixed support structure for a hanging basket Download PDF

Info

Publication number
CN216921297U
CN216921297U CN202122186834.4U CN202122186834U CN216921297U CN 216921297 U CN216921297 U CN 216921297U CN 202122186834 U CN202122186834 U CN 202122186834U CN 216921297 U CN216921297 U CN 216921297U
Authority
CN
China
Prior art keywords
bracket
hanging basket
fixed
structural steel
support structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122186834.4U
Other languages
Chinese (zh)
Inventor
齐善扬
李晓东
田亮
任思鑫
缪建杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 7 Group Co Ltd
Original Assignee
Shanghai Construction No 7 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 7 Group Co Ltd filed Critical Shanghai Construction No 7 Group Co Ltd
Priority to CN202122186834.4U priority Critical patent/CN216921297U/en
Application granted granted Critical
Publication of CN216921297U publication Critical patent/CN216921297U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

本实用新型的一种吊篮的固定支撑结构,涉及建筑施工设备技术领域。针对现有吊篮的架设方式易对建筑已完成结构造成操作,施工成本高,且安全性差的问题。它包括水平设置的横梁,竖向设置并可拆卸式连接于横梁同一侧的第一支架和第二支架,连接于横梁另一侧并与第二支架位于同一垂线的支杆,以及绕过支杆分别与横梁两端可拆卸式连接的钢丝绳,吊篮和第一支架分别位于横梁的两端,第一支架和第二支架的底部均可拆卸式连接于建筑内已安装完成的结构钢梁。

Figure 202122186834

The utility model relates to a fixed support structure for a hanging basket, which relates to the technical field of construction equipment. Aiming at the problems that the erection method of the existing hanging basket is easy to cause operation to the completed structure of the building, the construction cost is high, and the safety is poor. It includes a horizontal beam, a first bracket and a second bracket vertically arranged and detachably connected to the same side of the beam, a strut connected to the other side of the beam and located on the same vertical line with the second bracket, and a support rod that bypasses the beam. The support rods are detachably connected to the wire ropes at both ends of the beam, the hanging basket and the first bracket are located at the two ends of the beam respectively, and the bottoms of the first bracket and the second bracket can be detachably connected to the structural steel that has been installed in the building. beam.

Figure 202122186834

Description

一种吊篮的固定支撑结构A fixed support structure for a hanging basket

技术领域technical field

本实用新型涉及建筑施工设备技术领域,特别涉及一种吊篮的固定支撑结构。The utility model relates to the technical field of construction equipment, in particular to a fixed support structure for a hanging basket.

背景技术Background technique

目前,吊篮凭借其搭设拆除方便、适用性强、占用场地少和施工效率高等优点,广泛应用于幕墙工程、建筑外墙等高空作业施工。但吊篮作业危险性较大,吊篮倾覆、钢丝断裂引起的高处坠落事故时有发生。现有的吊篮架设方式一般是将吊篮悬架于屋面并设置配重块;或者采用女儿墙夹钳式屋面悬挂机构将吊篮悬吊于其下方等,然而,吊篮的上述架设方式易对建筑已完成结构造成损伤,施工成本高,且安全性差。At present, hanging baskets are widely used in high-altitude operations such as curtain wall projects and building exterior walls due to their advantages of convenient erection and dismantling, strong applicability, less space occupation and high construction efficiency. However, the operation of the hanging basket is very dangerous, and the falling accidents caused by the overturning of the hanging basket and the fracture of the steel wire occur from time to time. The existing hanging basket erection method is generally to suspend the hanging basket on the roof and set the counterweight; It is easy to cause damage to the completed structure of the building, the construction cost is high, and the safety is poor.

发明内容SUMMARY OF THE INVENTION

针对现有吊篮的架设方式易对建筑已完成结构造成操作,施工成本高,且安全性差的问题。本实用新型的目的是提供一种吊篮的固定支撑结构。Aiming at the problems that the erection method of the existing hanging basket is easy to cause operation to the completed structure of the building, the construction cost is high, and the safety is poor. The purpose of the utility model is to provide a fixed support structure for a hanging basket.

本实用新型解决其技术问题所采用的技术方案是:一种吊篮的固定支撑结构,它包括横梁、第一支架、第二支架、支杆及钢丝绳,所述横梁水平设置,且横梁侧面设有横向贯通的多个螺栓孔,吊篮、第一支架和第二支架竖向设置于横梁的同一侧,吊篮和第一支架分别位于横梁的两端,第二支架位于吊篮和第一支架之间,支杆固接于横梁的另一侧,且支杆与第二支架位于同一垂线,第一支架和第二支架的顶部可拆卸式连接于横梁,第一支架和第二支架的底部可拆卸式连接于建筑已安装的结构钢梁,所述钢丝绳绕过支杆顶端且其两端分别与横梁可拆卸式连接,所述钢丝绳与横梁的两个连接节点分别与吊篮、第一支架与横梁的连接节点的位置相对应。The technical scheme adopted by the utility model to solve the technical problem is: a fixed support structure for a hanging basket, which comprises a beam, a first bracket, a second bracket, a support rod and a steel wire rope, the beam is arranged horizontally, and the side of the beam is arranged There are a plurality of bolt holes that penetrate horizontally, the hanging basket, the first bracket and the second bracket are vertically arranged on the same side of the beam, the hanging basket and the first bracket are respectively located at both ends of the beam, and the second bracket is located between the hanging basket and the first bracket. Between the supports, the support rod is fixed on the other side of the beam, and the support rod and the second support are located on the same vertical line, the tops of the first support and the second support are detachably connected to the cross beam, the first support and the second support The bottom of the steel wire rope is detachably connected to the installed structural steel beam of the building, the wire rope goes around the top of the strut and its two ends are detachably connected to the beam respectively, and the two connection nodes of the wire rope and the beam are respectively connected to the hanging basket, The first bracket corresponds to the position of the connecting node of the beam.

本实用新型的吊篮的固定支撑结构,它包括水平设置的横梁,竖向设置并可拆卸式连接于横梁同一侧的第一支架和第二支架,连接于横梁另一侧并与第二支架位于同一垂线的支杆,以及绕过支杆分别与横梁两端可拆卸式连接的钢丝绳,吊篮和第一支架分别位于横梁的两端,第一支架和第二支架的底部均可拆卸式连接于建筑内已安装完成的结构钢梁;由于横梁、支杆和钢丝绳共同构成牢固可靠的三角形支撑结构,而且连接于横梁一侧的第一支架和第二支架均可拆卸式连接于已有的结构钢梁,从而能够将吊篮稳定地悬吊于横梁另一侧,整个固定支撑结构自重较轻,且无需设置配重,降低了材料成本;两个支架可拆卸式连接于已有的结构钢梁,拆装方便,提高了各构件的利用率;建筑结构钢梁1安装完成后即可安装吊篮,提高了施工效率;由于避免了高空焊接作业,减少了对已完成结构的损伤,提高了施工的安全性,解决了钢结构异形屋面施工中吊篮安装的难题。The fixed support structure of the hanging basket of the utility model comprises a horizontal beam, a first bracket and a second bracket which are vertically arranged and detachably connected to the same side of the beam, are connected to the other side of the beam and are connected with the second bracket. The struts located on the same vertical line, and the wire ropes that bypass the struts and are detachably connected to both ends of the beam respectively, the gondola and the first bracket are located at both ends of the beam, and the bottoms of the first bracket and the second bracket can be detached It is connected to the installed structural steel beams in the building; because the beams, struts and wire ropes together form a solid and reliable triangular support structure, and the first bracket and the second bracket connected to one side of the beam can be detachably connected to the already installed With some structural steel beams, the hanging basket can be stably suspended on the other side of the beam. The entire fixed support structure is light in weight, and no counterweight is required, which reduces the material cost; the two brackets are detachably connected to the existing The structural steel beam is easy to disassemble and assemble, which improves the utilization rate of each component; the hanging basket can be installed after the installation of the building structural steel beam 1 is completed, which improves the construction efficiency; because the high-altitude welding operation is avoided, the completed structure is reduced. damage, improve the safety of construction, and solve the problem of hanging basket installation in the construction of steel structure special-shaped roof.

进一步的,所述第一支架包括水平设置的横杆,垂直连接于横杆中部的竖杆,及沿竖杆对称设置的一对斜撑,斜撑的两端分别与横杆和竖杆固接,横杆设有至少一对螺栓孔,一对螺栓孔沿第一支架的轴线对称设置,第一支架通过贯穿螺栓孔的螺杆锁紧固定于所述钢结构梁。Further, the first support includes a horizontally arranged horizontal bar, a vertical bar vertically connected to the middle of the horizontal bar, and a pair of diagonal braces symmetrically arranged along the vertical bar, two ends of the diagonal brace are respectively fixed to the horizontal bar and the vertical bar. The crossbar is provided with at least a pair of bolt holes, the pair of bolt holes are symmetrically arranged along the axis of the first bracket, and the first bracket is locked and fixed to the steel structural beam by the screw rod passing through the bolt holes.

进一步的,所述第一支架的底部通过紧固件连接于结构钢梁,所述紧固件包括两块拉结筋板及多个螺杆,两个拉结筋板设有与第一支架横杆上位置相对应的螺栓孔,且第一支架横杆和拉结筋板上的螺栓孔均位于结构钢梁的外侧,一块拉结筋板设置于结构钢梁底部,另一块拉结筋板设置于第一支架横杆顶部,两块拉结筋板及第一支架横杆通过多个贯穿的螺杆锁紧固定于结构钢梁外侧。Further, the bottom of the first bracket is connected to the structural steel beam by a fastener, and the fastener includes two tie-beam plates and a plurality of screws, and the two tie-beam plates are provided with a transverse direction of the first bracket. The bolt holes corresponding to the positions on the rod, and the bolt holes on the first bracket crossbar and the tie-beam plate are all located on the outside of the structural steel beam, one tie-beam plate is arranged at the bottom of the structural steel beam, and the other tie-beam plate is located at the bottom of the structural steel beam. It is arranged on the top of the first support cross bar, and the two tie rib plates and the first support cross bar are locked and fixed to the outer side of the structural steel beam by a plurality of penetrating screws.

进一步的,它还包括分别连接于第一支架和第二支架顶部的两个承托架,承托架包括与第一支架或第二支架的竖杆连接的基座,及分别对称连接于基座两侧的翼板,两块翼板卡扣于横梁的两侧并与其螺栓连接。Further, it also includes two support brackets connected to the top of the first bracket and the second bracket respectively, the support bracket includes a base connected to the vertical rod of the first bracket or the second bracket, and symmetrically connected to the base. The wings on both sides of the seat, the two wings are fastened on both sides of the beam and connected with bolts.

进一步的,所述横梁由至少两根横梁标准节螺栓连接而成。Further, the beam is formed by connecting at least two beam standard sections with bolts.

进一步的,所述钢丝绳的两端还分别设有一个连接件,钢丝绳的端部贯穿连接件一端的通孔并锁紧固定,连接件另一端与横梁之间通过螺栓锁紧固定。Further, two ends of the wire rope are respectively provided with a connecting piece, the end of the wire rope penetrates the through hole at one end of the connecting piece and is locked and fixed, and the other end of the connecting piece and the beam are locked and fixed by bolts.

附图说明Description of drawings

图1为本实用新型的吊篮的固定支撑结构一实施例的结构示意图;1 is a schematic structural diagram of an embodiment of a fixed support structure for a hanging basket of the present invention;

图2为支架与已有的结构钢梁之间连接节点的示意图;Fig. 2 is the schematic diagram of the connection node between the bracket and the existing structural steel beam;

图3为图2的侧视图。FIG. 3 is a side view of FIG. 2 .

图中标号如下:The symbols in the figure are as follows:

结构钢梁1;横梁10;第一支架20;横杆21;竖杆22;斜撑23;承托架24;第二支架30;拉结筋板41;螺杆42;支杆51;钢丝绳52;连接件53;吊篮60。Structural steel beam 1; cross beam 10; first bracket 20; cross bar 21; vertical bar 22; diagonal brace 23; bearing bracket 24; second bracket 30; ; connecting piece 53; gondola 60.

具体实施方式Detailed ways

以下结合附图和具体实施例对本实用新型作进一步详细说明。需说明的是,附图均采用非常简化的形式且均使用非精准的比例,仅用以方便、明晰地辅助说明本实用新型实施例的目的。为叙述方便,下文中所述的“上”、“下”与附图的上、下的方向一致,但这不能成为本实用新型技术方案的限制。The present utility model will be described in further detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that, the accompanying drawings are all in a very simplified form and in inaccurate scales, and are only used to facilitate and clearly assist the purpose of explaining the embodiments of the present invention. For the convenience of description, the "up" and "down" described below are consistent with the upper and lower directions of the drawings, but this cannot be a limitation of the technical solution of the present invention.

结合图1至图3说明本实用新型的吊篮的固定支撑结构,它包括:横梁10、第一支架20、第二支架30、支杆51及钢丝绳52,横梁10水平设置,且横梁10侧面设有横向贯通的多个螺栓孔,吊篮60、第一支架20和第二支架30竖向设置于横梁10的同一侧,吊篮60和第一支架20分别位于横梁10的两端,第二支架30位于吊篮60和第一支架20之间,支杆51固接于横梁10的另一侧,且支杆51与第二支架30位于同一垂线,第一支架20和第二支架30的顶部可拆卸式连接于横梁10,第一支架20和第二支架30的底部可拆卸式连接于建筑已安装的结构钢梁1,钢丝绳52绕过支杆51顶端且其两端分别与横梁10可拆卸式连接,钢丝绳52与横梁10的两个连接节点分别与吊篮60、第一支架20与横梁10的连接节点的位置相对应。1 to 3, the fixed support structure of the hanging basket of the present invention is described, which includes: a beam 10, a first bracket 20, a second bracket 30, a support rod 51 and a wire rope 52, the beam 10 is horizontally arranged, and the side of the beam 10 is There are a plurality of bolt holes penetrating horizontally, the hanging basket 60, the first bracket 20 and the second bracket 30 are vertically arranged on the same side of the beam 10, the hanging basket 60 and the first bracket 20 are respectively located at both ends of the beam 10, The two brackets 30 are located between the gondola 60 and the first bracket 20 , the support rod 51 is fixed on the other side of the beam 10 , and the support rod 51 and the second bracket 30 are located on the same vertical line. The first bracket 20 and the second bracket The top of the 30 is detachably connected to the beam 10, the bottoms of the first bracket 20 and the second bracket 30 are detachably connected to the structural steel beam 1 that has been installed in the building, and the wire rope 52 goes around the top of the support rod 51 and its two ends are respectively connected with each other. The beam 10 is detachably connected, and the two connection nodes of the wire rope 52 and the beam 10 correspond to the positions of the connection nodes of the gondola 60 and the first bracket 20 and the beam 10 respectively.

本实用新型的吊篮的固定支撑结构,它包括水平设置的横梁10,竖向设置并可拆卸式连接于横梁10同一侧的第一支架20和第二支架30,连接于横梁10另一侧并与第二支架30位于同一垂线的支杆51,以及绕过支杆51分别与横梁10两端可拆卸式连接的钢丝绳52,吊篮60和第一支架20分别位于横梁10的两端,第一支架20和第二支架30的底部均可拆卸式连接于建筑内已安装完成的结构钢梁1;由于横梁10、支杆51和钢丝绳52共同构成牢固可靠的三角形支撑结构,而且连接于横梁10一侧的第一支架20和第二支架30均可拆卸式连接于已有的结构钢梁1,从而能够将吊篮60稳定地悬吊于横梁10另一侧,整个固定支撑结构自重较轻,且无需设置配重,降低了材料成本;两个支架可拆卸式连接于已有的结构钢梁1,拆装方便,提高了各构件的利用率;建筑结构钢梁1安装完成后即可安装吊篮60,提高了施工效率;由于避免了高空焊接作业,减少了对已完成结构的损伤,提高了施工的安全性,解决了钢结构异形屋面施工中吊篮60安装的难题。The fixed support structure of the hanging basket of the present invention includes a horizontal beam 10, a first bracket 20 and a second bracket 30 which are vertically arranged and detachably connected to the same side of the beam 10, and are connected to the other side of the beam 10. The support rod 51 and the second bracket 30 are located on the same vertical line, and the wire rope 52 bypasses the support rod 51 and is detachably connected to both ends of the beam 10. The hanging basket 60 and the first support 20 are located at the two ends of the beam 10 respectively. , the bottoms of the first support 20 and the second support 30 can be detachably connected to the structural steel beam 1 that has been installed in the building; The first bracket 20 and the second bracket 30 on one side of the beam 10 can be detachably connected to the existing structural steel beam 1, so that the gondola 60 can be stably suspended on the other side of the beam 10, and the whole fixed support structure. The self-weight is light, and no counterweight is required, which reduces the material cost; the two brackets are detachably connected to the existing structural steel beam 1, which is convenient for disassembly and assembly, and improves the utilization rate of each component; the installation of the building structural steel beam 1 is completed. The hanging basket 60 can be installed afterwards, which improves the construction efficiency; because the high-altitude welding operation is avoided, the damage to the completed structure is reduced, the construction safety is improved, and the installation problem of the hanging basket 60 in the steel structure special-shaped roof construction is solved. .

如图2和图3所示,第一支架20包括水平设置的横杆21,垂直连接于横杆21中部的竖杆22,及沿竖杆22对称设置的一对斜撑23,斜撑23的两端分别与横杆21和竖杆22固接,横杆21设有至少一对螺栓孔,一对螺栓孔沿第一支架20的轴线对称设置,第一支架20通过贯穿螺栓孔的螺杆42锁紧固定于钢结构梁,第二支架30与第一支架20的具体结构及连接关系相同,此处不再赘述。As shown in FIG. 2 and FIG. 3 , the first bracket 20 includes a horizontal bar 21 , a vertical bar 22 vertically connected to the middle of the horizontal bar 21 , and a pair of diagonal braces 23 symmetrically arranged along the vertical bar 22 . The diagonal brace 23 The two ends of the cross bar 21 and the vertical bar 22 are respectively fixedly connected. The cross bar 21 is provided with at least a pair of bolt holes, and the pair of bolt holes are symmetrically arranged along the axis of the first bracket 20. 42 is locked and fixed to the steel structure beam, and the specific structure and connection relationship of the second bracket 30 and the first bracket 20 are the same, which will not be repeated here.

请继续参考图2和图3,第一支架20和第二支架30的底部通过紧固件连接于结构钢梁1,本实施例以第一支架20与结构钢梁1之间的可拆卸式连接为例进行说明,紧固件包括两块拉结筋板41及多个螺杆42,两个拉结筋板41设有与第一支架20横杆21上位置相对应的螺栓孔,且第一支架20横杆21和拉结筋板41上的螺栓孔均位于结构钢梁1的外侧,一块拉结筋板41设置于结构钢梁1底部,另一块拉结筋板41设置于第一支架20横杆21顶部,两块拉结筋板41及第一支架20横杆21通过多个贯穿的螺杆42锁紧固定于结构钢梁1外侧,即两块拉结筋板41呈抱箍式夹紧固定于结构钢梁1。通过将两个支架连接于已有的结构钢梁1来平衡吊篮60的重量,无需为吊篮60设置配重,简化了固定支撑结构,而且,支架通过与紧固件抱箍式夹紧固定于已有结构钢梁1,避免了焊接作业对已有结构的损伤,提高了施工安全。上述拉结筋板41由钢板或多根槽钢10#焊接而成,螺杆42采用M16螺杆42,并设置二次保护钢丝绳52。Please continue to refer to FIG. 2 and FIG. 3 , the bottoms of the first bracket 20 and the second bracket 30 are connected to the structural steel beam 1 through fasteners. The connection is illustrated as an example. The fastener includes two tie bead plates 41 and a plurality of screws 42. The two tie bead plates 41 are provided with bolt holes corresponding to the positions on the cross bar 21 of the first bracket 20, and the first The bolt holes on the cross bar 21 of the bracket 20 and the tie rib plate 41 are both located on the outer side of the structural steel beam 1, one tie rib plate 41 is arranged at the bottom of the structural steel beam 1, and the other The top of the cross bar 21 of the bracket 20, the two tie rib plates 41 and the first bracket 20 cross bar 21 are locked and fixed to the outside of the structural steel beam 1 through a plurality of through screws 42, that is, the two tie rib plates 41 are in the form of a hoop. It is clamped and fixed to the structural steel beam 1. By connecting the two brackets to the existing structural steel beam 1 to balance the weight of the gondola 60, there is no need to provide counterweights for the gondola 60, which simplifies the fixed support structure, and the brackets are clamped by a hoop with fasteners It is fixed on the existing structural steel beam 1, which avoids the damage to the existing structure caused by the welding operation and improves the construction safety. The above-mentioned tie rib plate 41 is welded by steel plate or a plurality of channel steels 10#, the screw rod 42 is M16 screw rod 42, and a secondary protection wire rope 52 is provided.

如图1所示,它还包括分别连接于第一支架20和第二支架30顶部的两个承托架24,承托架24包括与第一支架20或第二支架30的竖杆22连接的基座,及分别对称连接于基座两侧的翼板,两块翼板卡扣于横梁10的两侧并与其螺栓连接,第一支架20和第二支架30通过顶部的承托架24实现与横梁10之间的可拆卸式连接,能够根据施工现场已安装完成的钢结构梁的实际位置调整支架的安装位置,操作灵活方便,使得吊篮60的固定支撑结构的适用范围更加广泛。As shown in FIG. 1 , it also includes two support brackets 24 respectively connected to the top of the first bracket 20 and the second bracket 30 . The support bracket 24 includes a vertical rod 22 connected to the first bracket 20 or the second bracket 30 . The base, and the wings symmetrically connected to the two sides of the base respectively, the two wings are buckled on both sides of the beam 10 and connected with bolts, the first bracket 20 and the second bracket 30 pass through the top support bracket 24 The detachable connection with the beam 10 is realized, the installation position of the bracket can be adjusted according to the actual position of the installed steel structure beam on the construction site, the operation is flexible and convenient, and the fixed support structure of the hanging basket 60 has a wider application range.

如图1所示,横梁10由至少两根横梁10标准节螺栓连接而成,使得横梁10能够根据吊篮60安装位置与已有的结构钢梁1之间的实际距离灵活调整长度,有利于固定支撑结构的再利用。本实施例的横梁10由工字钢制成。As shown in FIG. 1, the beam 10 is formed by connecting at least two standard sections of the beam 10 with bolts, so that the length of the beam 10 can be flexibly adjusted according to the actual distance between the installation position of the gondola 60 and the existing structural steel beam 1, which is beneficial to Reuse of fixed support structures. The beam 10 of this embodiment is made of I-beam.

请继续参考图1,钢丝绳52的两端还分别设有一个连接件53,钢丝绳52的端部贯穿连接件53一端的通孔并锁紧固定,连接件53另一端与横梁10之间通过螺栓锁紧固定。连接件53的设置,提高了钢丝绳52与横梁10之间连接的安全性及稳定性。Please continue to refer to FIG. 1 , two ends of the wire rope 52 are respectively provided with a connecting piece 53 , the end of the wire rope 52 penetrates the through hole at one end of the connecting piece 53 and is locked and fixed, and the other end of the connecting piece 53 and the beam 10 are connected by bolts Lock and fix. The arrangement of the connecting piece 53 improves the safety and stability of the connection between the wire rope 52 and the beam 10 .

下面结合图1说明本实用新型的吊篮的固定支撑结构的使用过程:The use process of the fixed support structure of the hanging basket of the present utility model is described below in conjunction with Fig. 1:

待建筑内的结构钢梁1施工完成后,测量吊篮60安装位置与结构钢梁1之间的实际距离,调整横梁10的长度使其满足施工要求,支杆51垂直固定于横梁10一侧,钢丝绳52绕过支杆51顶端且其两端分别与横梁10两端螺栓连接,将第一支架20和第二支架30的顶部螺栓连接于横梁10的另一侧,并将第一支架20和第二支架30的底部通过紧固件螺栓连接于结构钢梁1,保证横梁10前挑尺寸范围为1.3~1.5m,在横梁10端部安装吊篮60,注意人员的安全防护,并做好防坠措施;吊篮60的固定支撑结构固定于建筑楼顶适当位置并牢靠紧固,如经过锐角和障碍物,注意使用橡胶软管做保护。After the construction of the structural steel beam 1 in the building is completed, measure the actual distance between the installation position of the hanging basket 60 and the structural steel beam 1, adjust the length of the beam 10 to meet the construction requirements, and the support rod 51 is vertically fixed on one side of the beam 10. , the wire rope 52 goes around the top of the support rod 51 and its two ends are bolted to the two ends of the beam 10 respectively, the top of the first bracket 20 and the top of the second bracket 30 are bolted to the other side of the beam 10, and the first bracket 20 and the bottom of the second bracket 30 are connected to the structural steel beam 1 through fasteners and bolts to ensure that the front overhang of the beam 10 ranges from 1.3 to 1.5 m. Install the hanging basket 60 at the end of the beam 10, pay attention to the safety protection of personnel, and do Take good anti-falling measures; the fixed support structure of the hanging basket 60 is fixed at an appropriate position on the roof of the building and firmly fastened. If it passes through acute angles and obstacles, pay attention to use rubber hoses for protection.

上述描述仅是对本实用新型较佳实施例的描述,并非对本实用新型范围的任何限定,本实用新型领域的普通技术人员根据上述揭示内容做的任何变更、修饰,均属于权利要求范围。The above description is only a description of the preferred embodiments of the present utility model, and is not intended to limit the scope of the present utility model. Any changes and modifications made by those of ordinary skill in the field of the present utility model according to the above disclosure all belong to the scope of the claims.

Claims (6)

1.一种吊篮的固定支撑结构,其特征在于:它包括横梁、第一支架、第二支架、支杆及钢丝绳,所述横梁水平设置,且横梁侧面设有横向贯通的多个螺栓孔,吊篮、第一支架和第二支架竖向设置于横梁的同一侧,吊篮和第一支架分别位于横梁的两端,第二支架位于吊篮和第一支架之间,支杆固接于横梁的另一侧,且支杆与第二支架位于同一垂线,第一支架和第二支架的顶部可拆卸式连接于横梁,第一支架和第二支架的底部可拆卸式连接于建筑已安装的结构钢梁,所述钢丝绳绕过支杆顶端且其两端分别与横梁可拆卸式连接,所述钢丝绳与横梁的两个连接节点分别与吊篮、第一支架与横梁的连接节点的位置相对应。1. The fixed support structure of a hanging basket is characterized in that: it comprises a cross beam, a first support, a second support, a support rod and a wire rope, and the cross beam is arranged horizontally, and the lateral beam side is provided with a plurality of bolt holes that penetrate horizontally. , the hanging basket, the first bracket and the second bracket are vertically arranged on the same side of the beam, the hanging basket and the first bracket are respectively located at both ends of the beam, the second bracket is located between the hanging basket and the first bracket, and the support rod is fixed On the other side of the beam, and the support rod and the second bracket are located on the same vertical line, the tops of the first bracket and the second bracket are detachably connected to the beam, and the bottoms of the first bracket and the second bracket are detachably connected to the building The installed structural steel beam, the wire rope goes around the top of the strut and its two ends are respectively connected to the beam in a detachable manner, and the two connection nodes of the wire rope and the beam are respectively connected with the gondola, the first bracket and the beam. corresponding position. 2.根据权利要求1所述的吊篮的固定支撑结构,其特征在于:所述第一支架包括水平设置的横杆,垂直连接于横杆中部的竖杆,及沿竖杆对称设置的一对斜撑,斜撑的两端分别与横杆和竖杆固接,横杆设有至少一对螺栓孔,一对螺栓孔沿第一支架的轴线对称设置,第一支架通过贯穿螺栓孔的螺杆锁紧固定于所述结构钢梁。2. The fixed support structure of the hanging basket according to claim 1, wherein the first bracket comprises a horizontally arranged horizontal bar, a vertical bar vertically connected to the middle of the horizontal bar, and a symmetrically arranged one along the vertical bar. For the diagonal bracing, the two ends of the diagonal bracing are respectively fixed with the horizontal rod and the vertical rod. The horizontal rod is provided with at least a pair of bolt holes, and the pair of bolt holes are symmetrically arranged along the axis of the first bracket, and the first bracket passes through the bolt holes. The screw is locked and fixed on the structural steel beam. 3.根据权利要求2所述的吊篮的固定支撑结构,其特征在于:所述第一支架的底部通过紧固件连接于结构钢梁,所述紧固件包括两块拉结筋板及多个螺杆,两个拉结筋板设有与第一支架横杆上位置相对应的螺栓孔,且第一支架横杆和拉结筋板上的螺栓孔均位于结构钢梁的外侧,一块拉结筋板设置于结构钢梁底部,另一块拉结筋板设置于第一支架横杆顶部,两块拉结筋板及第一支架横杆通过多个贯穿的螺杆锁紧固定于结构钢梁外侧。3 . The fixed support structure of the hanging basket according to claim 2 , wherein the bottom of the first bracket is connected to the structural steel beam by fasteners, and the fasteners include two tie-rib plates and A plurality of screws, the two tie rib plates are provided with bolt holes corresponding to the positions on the first bracket crossbar, and the bolt holes on the first bracket crossbar and the tie rib plate are both located on the outer side of the structural steel beam. The tie rib plate is arranged at the bottom of the structural steel beam, and the other tie rib plate is arranged on the top of the first bracket cross bar, and the two tie tie bars and the first bracket cross bar are locked and fixed to the structural steel through a plurality of penetrating screws. Outside the beam. 4.根据权利要求1所述的吊篮的固定支撑结构,其特征在于:它还包括分别连接于第一支架和第二支架顶部的两个承托架,承托架包括与第一支架或第二支架的竖杆连接的基座,及分别对称连接于基座两侧的翼板,两块翼板卡扣于横梁的两侧并与其螺栓连接。4. The fixed support structure of the hanging basket according to claim 1, characterized in that: it further comprises two support brackets connected to the tops of the first bracket and the second bracket respectively, the support brackets are connected with the first bracket or The base connected with the vertical rods of the second bracket, and the wing plates symmetrically connected to the two sides of the base respectively, the two wing plates are buckled on the two sides of the beam and connected with bolts. 5.根据权利要求1所述的吊篮的固定支撑结构,其特征在于:所述横梁由至少两根横梁标准节螺栓连接而成。5 . The fixed support structure of the hanging basket according to claim 1 , wherein the beam is formed by connecting at least two beam standard sections with bolts. 6 . 6.根据权利要求1所述的吊篮的固定支撑结构,其特征在于:所述钢丝绳的两端还分别设有一个连接件,钢丝绳的端部贯穿连接件一端的通孔并锁紧固定,连接件另一端与横梁之间通过螺栓锁紧固定。6 . The fixed support structure of the hanging basket according to claim 1 , wherein the two ends of the wire rope are respectively provided with a connecting piece, and the end of the steel wire rope penetrates through the through hole at one end of the connecting piece and is locked and fixed. 7 . The other end of the connecting piece and the beam are locked and fixed by bolts.
CN202122186834.4U 2021-09-10 2021-09-10 A fixed support structure for a hanging basket Expired - Fee Related CN216921297U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122186834.4U CN216921297U (en) 2021-09-10 2021-09-10 A fixed support structure for a hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122186834.4U CN216921297U (en) 2021-09-10 2021-09-10 A fixed support structure for a hanging basket

Publications (1)

Publication Number Publication Date
CN216921297U true CN216921297U (en) 2022-07-08

Family

ID=82223529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122186834.4U Expired - Fee Related CN216921297U (en) 2021-09-10 2021-09-10 A fixed support structure for a hanging basket

Country Status (1)

Country Link
CN (1) CN216921297U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117552614A (en) * 2023-11-14 2024-02-13 中建三局集团(海南)有限公司 A kind of building hanging basket bracket and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117552614A (en) * 2023-11-14 2024-02-13 中建三局集团(海南)有限公司 A kind of building hanging basket bracket and its construction method

Similar Documents

Publication Publication Date Title
CN110748139B (en) A hanging basket support system
CN105781096B (en) A kind of safe Hanging Basket and its construction method for working at height
CN211736298U (en) Double-rod diagonal cantilever scaffold
CN109505225A (en) A kind of safe and stable type suspension bridge and its construction technology
CN216921297U (en) A fixed support structure for a hanging basket
CN210316599U (en) A curtain wall annular track for roof frame beams
CN104278830A (en) Integral combined scaffold
CN106639303B (en) Elevator dedicated hydraulic creeping formwork frame body
CN205742956U (en) A kind of safe Hanging Basket for work high above the ground
CN209568359U (en) A kind of falsework for the construction of outer-enwraped type Guard fence base
CN211173007U (en) Novel tripod of encorbelmenting
CN213329975U (en) Steel pull rod hanging and pulling overhanging bearing steel beam structure
CN217379782U (en) High-altitude large-span inter-building independent beam formwork support system
CN204212388U (en) Integral combined scaffolding
CN115853246A (en) Aluminum alloy operation hanging frame for overhead arc door and building method thereof
CN214885842U (en) Support frame capable of being adjusted in lifting mode
CN208702128U (en) High and big die plate construction steel pipe scaffold fast dismounting device
CN108775016B (en) Concrete support horizontal movement adjustable hanging basket
CN220521918U (en) Combined type finalized steel pipe supporting temporary scaffold
CN218522196U (en) A steel column for climbing frame attachment
CN207453448U (en) A kind of bar type wall-attached frame
CN215393363U (en) Steel lining inner support and adjustable welding support integrated device
CN216787787U (en) Manual operation platform for tower crane dismantling
CN217172928U (en) Hoisting fixing device
CN217810529U (en) Square steel pier stud top assembled operation platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220708