CN216898671U - Hydraulic engineering site operation pipeline pipe diameter check out test set - Google Patents
Hydraulic engineering site operation pipeline pipe diameter check out test set Download PDFInfo
- Publication number
- CN216898671U CN216898671U CN202123320655.1U CN202123320655U CN216898671U CN 216898671 U CN216898671 U CN 216898671U CN 202123320655 U CN202123320655 U CN 202123320655U CN 216898671 U CN216898671 U CN 216898671U
- Authority
- CN
- China
- Prior art keywords
- wall
- base
- box
- hydraulic engineering
- slotted hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000012360 testing method Methods 0.000 title claims description 6
- 230000007246 mechanism Effects 0.000 claims abstract description 11
- 230000005540 biological transmission Effects 0.000 claims description 4
- 230000008878 coupling Effects 0.000 claims description 4
- 238000010168 coupling process Methods 0.000 claims description 4
- 238000005859 coupling reaction Methods 0.000 claims description 4
- 238000005192 partition Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 9
- 238000001514 detection method Methods 0.000 abstract description 8
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 30
- 239000003345 natural gas Substances 0.000 description 15
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 11
- 238000005259 measurement Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 241000282414 Homo sapiens Species 0.000 description 2
- 230000001276 controlling effect Effects 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000010779 crude oil Substances 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000008030 elimination Effects 0.000 description 1
- 238000003379 elimination reaction Methods 0.000 description 1
- 239000007789 gas Substances 0.000 description 1
- 238000003973 irrigation Methods 0.000 description 1
- 230000002262 irrigation Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000003756 stirring Methods 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 239000002352 surface water Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Sewage (AREA)
Abstract
The utility model relates to the technical field of hydraulic engineering and discloses a hydraulic engineering site construction pipeline diameter detection device which comprises a fixed plate, wherein the top of the fixed plate is fixedly connected with a base, the top of the base is fixedly connected with a motor base, the top of the base is provided with a measuring mechanism, the measuring mechanism comprises a motor, a rotating shaft, a box body, a turntable, a contact rod, a baffle plate, a fixed sleeve and a coupler, the box body is fixedly arranged at the top of the base, the left side of the outer wall of the box body is provided with a first bearing, and one end of the rotating shaft is rotatably connected to the inner wall of the first bearing and penetrates through the box body to extend inwards. According to the utility model, through the arranged measuring mechanism, the motor drives the rotating shaft to rotate, so that the rotating disc rotates, and then the movable contact rod is driven to move along the two sliding grooves, so that the periphery of the center of the box moves, and the pipe diameter can be measured.
Description
Technical Field
The utility model relates to the technical field of hydraulic engineering, in particular to a hydraulic engineering on-site construction pipeline diameter detection device.
Background
Hydraulic engineering (Hydraulic engineering) is a general term for various engineering constructions built for controlling, utilizing and protecting water resources and environments on the earth surface and underground.
The method comprises the projects of flood control, waterlogging elimination, irrigation, power generation, water supply, reclamation, water and soil conservation, immigration, water resource protection and the like (including new construction, extension, reconstruction, reinforcement, restoration), and the matching and auxiliary projects thereof. Used for controlling and allocating surface water and underground water in the nature to achieve the purposes of removing harm and benefiting. Also known as water engineering. Water is a valuable resource essential for human production and life, but its naturally occurring state does not completely meet the needs of human beings. Only when hydraulic engineering is built, water flow can be controlled, flood disasters are prevented, and water quantity is adjusted and distributed to meet the requirements of people on water resources in life and production.
In the process of water conservancy construction, a natural gas pipeline is laid in a special place, the natural gas pipeline consists of a pipeline and accessories thereof, and a corresponding pump unit is arranged according to the requirements of the process flow and is designed and installed into a complete pipeline system for completing the tasks of natural gas receiving, unloading and transferring. The natural gas pipeline system, i.e. the pipeline system for transporting natural gas and natural gas products, is mainly composed of pipeline lines, gas transmission stations and other auxiliary related equipment, is one of the main equipment in natural gas storage and transportation industry, and is also the most main transportation equipment for crude oil and natural gas products. The pipes of the natural gas pipeline are generally steel pipes, are connected into a long-distance pipeline by welding, flanges and other connecting devices, and are opened and closed and flow-regulated by using valves. Natural gas pipelines have become one of the major transportation vehicles for natural gas and continue to have considerable potential for development in the future. When the natural gas pipeline is laid, the pipe diameter of the pipeline to be laid needs to be checked, so that the pipe diameter of the natural gas needs to be measured quickly. According to the Chinese patent 'diameter measuring device for natural gas pipeline', the patent number is 'CN 207763628U', the distance between the opposite surfaces of the first vertical inserting plate and the second vertical inserting plate is transmitted to the measuring rod at the upper end of the diameter dimension transmitting structure through the diameter dimension transmitting structure, and the natural gas pipelines with different diameters can be rapidly measured. Although this patent solves the measurement problem, the measurement accuracy is still to be improved when measuring, so a device for facilitating the measurement is needed to perform the detection of the pipeline.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide equipment for detecting the pipe diameter of a pipeline in the field construction of hydraulic engineering, which solves the problems mentioned in the background.
In order to achieve the purpose, the utility model provides the following technical scheme: the hydraulic engineering site construction pipeline diameter detection equipment comprises a fixed plate, wherein the top of the fixed plate is fixedly connected with a base, the top of the base is fixedly connected with a motor base, the top of the base is provided with a measuring mechanism, the measuring mechanism comprises a motor, a rotating shaft, a box body, a rotating disc, a contact rod, a baffle plate, a fixed sleeve and a coupler, the box body is fixedly arranged at the top of the base, the left side of the outer wall of the box body is provided with a first bearing, one end of the rotating shaft is rotatably connected with the inner wall of the first bearing and penetrates through the box body to extend inwards, the rotating disc is fixedly sleeved on the outer wall of the extending end of the rotating shaft, the right side wall of the box body is provided with three first sliding groove holes, the number of the first sliding groove holes is three, the three first sliding groove holes are equally divided and arranged on the right side wall of the box body, the rotating disc is provided with three second sliding groove holes, three second slotted hole partition sets up on the carousel, the one end of contact lever runs through first slotted hole and second slotted hole in proper order and inwards extends, the fixed cover of plate washer is established and is located the box and obtain the outside at the outer wall of contact lever, the fixed cover of fixed cover is established and is located the left side of carousel at the outer wall of the extension end of contact lever, motor fixed mounting is on motor base, the transmission shaft of motor passes through shaft coupling fixed connection at the outer wall left end of pivot.
Preferably, the number of the contact rods, the baffles and the fixing sleeves is three, and the three contact rods, the baffles and the fixing sleeves are respectively and identically arranged in the three first sliding groove holes and the three second sliding groove holes. Through the three contact bars of group that set up for measurement effect to the pipeline is more accurate.
Preferably, the opening directions of the first slide slot hole and the second slide slot hole are mirror images opposite. The first sliding groove hole and the second sliding groove hole which are arranged in opposite scenes are convenient for limiting and shifting the contact rod.
Preferably, the bottom of fixed plate is provided with first bearing, the inner wall of first bearing rotates and is connected with electric push rod, the flexible end fixedly connected with backup pad of electric push rod, the bottom of backup pad is provided with anti-skidding spine, the top of fixed plate is provided with the handrail, the bottom of fixed plate is provided with the pulley, the quantity of pulley is four, the outer wall of box is provided with the scale mark. Through the anti-skidding spine that sets up, improved the stability of this equipment in the detection.
The utility model provides a hydraulic engineering site construction pipeline pipe diameter detection device. The method has the following beneficial effects:
(1) through the measuring mechanism, the motor drives the rotating shaft to rotate, so that the rotating disc rotates, and then the movable contact rod is driven to move along the two sliding grooves, so that the periphery of the center of a circle of the box moves, and the pipe diameter can be measured.
(2) The anti-skidding spine has the advantages that the stability of the device in detection is improved through the arranged anti-skidding spine, the reading can be directly read through the arranged scale marks, and the pipe diameter can be conveniently measured.
Drawings
FIG. 1 is a front view of the present invention;
FIG. 2 is a side view of the present invention;
FIG. 3 is a top view of the base of the present invention;
in the figure: 1. a fixing plate; 2. a base; 3. a measuring mechanism; 301. a motor; 302. a rotating shaft; 303. a box body; 304. a turntable; 305. a contact lever; 306. a baffle plate; 307. fixing a sleeve; 308. a coupling; 4. a pulley; 5. a handrail; 6. an electric push rod; 7. a support plate; 8. anti-skid spikes; 9. motor base.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1-3, the present invention provides a technical solution: a hydraulic engineering site construction pipeline diameter detection device comprises a fixing plate 1, wherein the top of the fixing plate 1 is fixedly connected with a base 2, the top of the base 2 is fixedly connected with a motor base 9, the top of the base 2 is provided with a measuring mechanism 3, the measuring mechanism 3 comprises a motor 301, a rotating shaft 302, a box body 303, a rotating disc 304, a contact rod 305, a baffle plate 306, a fixing sleeve 307 and a coupler 308, the box body 303 is fixedly arranged at the top of the base 2, the left side of the outer wall of the box body 303 is provided with a first bearing, one end of the rotating shaft 302 is rotatably connected to the inner wall of the first bearing and penetrates through the box body 303 to extend inwards, the rotating disc 304 is fixedly sleeved on the outer wall of the extending end of the rotating shaft 302, the right side wall of the box body 303 is provided with three first sliding groove holes, the three first sliding groove holes are equally distributed on the right side wall of the box body 303, the rotating disc 304 is provided with three second sliding groove holes, three second sliding slot holes are arranged on the turntable 304 in equal intervals, one end of a contact rod 305 sequentially penetrates through a first sliding slot hole and a second sliding slot hole and extends inwards, a baffle 306 is fixedly sleeved on the outer wall of the contact rod 305 and is positioned outside the box body 303, a fixed sleeve 307 is fixedly sleeved on the outer wall of the extending end of the contact rod 305 and is positioned on the left side of the turntable 304, the motor 301 is fixedly arranged on the motor base 9, a transmission shaft of the motor 301 is fixedly connected to the left end of the outer wall of the rotating shaft 302 through a coupler 308, the number of the contact rod 305 and the baffle 306 is three, the three contact rods 305, the three baffles 306 and the fixed sleeve 307 are respectively and identically arranged in three first sliding slot holes and three second sliding slot holes, the measuring effect on the pipeline is more accurate through the three groups of contact rods 305, the opening directions of the first sliding slot holes and the second sliding slot holes are opposite in mirror image, and through the first sliding slot holes and the second sliding slot holes which are opposite in view, be convenient for spacing and stirring to contact rod 305, the bottom of fixed plate 1 is provided with first bearing, the inner wall of first bearing rotates and is connected with electric push rod 6, electric push rod 6's flexible fixedly connected with backup pad 7, the bottom of backup pad 7 is provided with anti-skidding spine 8, the top of fixed plate 1 is provided with handrail 5, the bottom of fixed plate 1 is provided with pulley 4, pulley 4's quantity is four, the outer wall of box 303 is provided with the scale mark, through the anti-skidding spine 8 that sets up, the stability of this equipment when detecting has been improved.
When using, through opening electric push rod 6 for backup pad 7 and ground contact, alright with the rotation direction of adjusting this measuring equipment, then again through placing the pipeline on three contact lever 305, then open motor 301, it is rotatory to drive pivot 302, thereby it is rotatory to drive carousel 304, because contact lever 305 is the activity on box 303 and carousel 304, only it is spacing because the spout hole of mirror image has carried out it, consequently when carousel 304 is rotatory, can oppress the position removal that contact lever 305 contacted along two slotted hole, when three contact lever 305 contacted the pipeline, can directly read out the reading of contact lever 305 stop position department on box 303 can.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (4)
1. The utility model provides a hydraulic engineering site operation pipeline pipe diameter check out test set, includes fixed plate (1), its characterized in that: the top fixedly connected with base (2) of fixed plate (1), the top fixedly connected with motor base (9) of base (2), the top of base (2) is provided with measuring mechanism (3), measuring mechanism (3) includes motor (301), pivot (302), box (303), carousel (304), contact lever (305), plate washer (306), fixed cover (307), shaft coupling (308), box (303) fixed mounting is at the top of base (2), the outer wall left side of box (303) is provided with first bearing, the one end of pivot (302) rotates to be connected in the inner wall of first bearing and runs through box (303) and inwards extends, carousel (304) fixed cover is established at the outer wall of pivot (302) extension end, first slotted hole has been seted up to the right side wall of box (303), the quantity of first slotted hole is three, three first slotted hole partition sets up on the right side wall of box (303), the second slotted hole has been seted up on carousel (304), the quantity of second slotted hole is three, three second slotted hole partition sets up on carousel (304), the one end of contact lever (305) runs through first slotted hole and second slotted hole in proper order and inwards extends, the outer wall that contact lever (305) was located box (303) and obtains outside in the fixed cover of shelves (306), the outer wall that fixed cover was established at contact lever (305) is located the left side of carousel (304) in fixed cover of fixed cover (307), motor (301) fixed mounting is on motor base (9), the transmission shaft of motor (301) passes through shaft coupling (308) fixed connection at the outer wall left end of pivot (302).
2. The hydraulic engineering site operation pipeline pipe diameter check out test set of claim 1, characterized in that: the number of the contact rods (305), the baffles (306) and the fixing sleeves (307) is three, three contact rods (305), baffles (306) and the fixing sleeves (307) are respectively and identically arranged in three first sliding groove holes and three second sliding groove holes.
3. The hydraulic engineering site operation pipeline pipe diameter check out test set of claim 1, characterized in that: the opening directions of the first sliding slot hole and the second sliding slot hole are opposite in mirror image.
4. The hydraulic engineering site operation pipeline pipe diameter check out test set of claim 1, characterized in that: the bottom of fixed plate (1) is provided with first bearing, the inner wall of first bearing rotates and is connected with electric push rod (6), the flexible end fixedly connected with backup pad (7) of electric push rod (6), the bottom of backup pad (7) is provided with anti-skidding spine (8), the top of fixed plate (1) is provided with handrail (5), the bottom of fixed plate (1) is provided with pulley (4), the quantity of pulley (4) is four, the outer wall of box (303) is provided with the scale mark.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123320655.1U CN216898671U (en) | 2021-12-27 | 2021-12-27 | Hydraulic engineering site operation pipeline pipe diameter check out test set |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123320655.1U CN216898671U (en) | 2021-12-27 | 2021-12-27 | Hydraulic engineering site operation pipeline pipe diameter check out test set |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216898671U true CN216898671U (en) | 2022-07-05 |
Family
ID=82208987
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202123320655.1U Expired - Fee Related CN216898671U (en) | 2021-12-27 | 2021-12-27 | Hydraulic engineering site operation pipeline pipe diameter check out test set |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216898671U (en) |
-
2021
- 2021-12-27 CN CN202123320655.1U patent/CN216898671U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110306611B (en) | Intelligent lifting equipment for sliding inclinometer and inclination measuring method | |
CN207703522U (en) | A kind of numerically controlled automatic constructing device for large-scale geophysical exploration experiment | |
CN108180346A (en) | A kind of pipeline inspecting robot | |
CN105887942A (en) | Automatic and intelligent foundation pit inclinometry method | |
CN219527926U (en) | Urban water supply and drainage pipeline cleaning robot | |
CN216898671U (en) | Hydraulic engineering site operation pipeline pipe diameter check out test set | |
CN111894105A (en) | Sewage pipeline burying device for municipal engineering and implementation method thereof | |
CN210890359U (en) | Rectangular pipe jacking machine rotary joint with cutter head speed measuring function | |
CN214119373U (en) | Variable-diameter pipeline detection robot | |
CN115059828B (en) | Pipeline in-situ curing and repairing method | |
CN114543929A (en) | Portable groundwater water level automatic measure recorder | |
CN212583684U (en) | Drilling follow-reading type footage meter counter | |
CN115753038A (en) | Downhole instrument and tool multi-working-condition simulation test system and test method | |
CN209745331U (en) | Flow measuring device for non-full pipe flow of pipeline | |
CN210621665U (en) | Intelligent lifting equipment for sliding inclinometer | |
CN113252797A (en) | Pipeline external detection mechanism | |
CN216560200U (en) | Underground pipeline corrosion monitoring device | |
CN113568052A (en) | Rapid layout system and layout method for prefabricated magnetic field of sliding body | |
CN205679365U (en) | A kind of house for building leak-checking apparatus | |
CN220467415U (en) | Double-track traction type radar wave current measurement carrying cableway system | |
CN219319397U (en) | Long-shore large-span bridge pier settlement observation system | |
CN214893525U (en) | Hydrogeology multilayer groundwater water level observation device | |
CN216383485U (en) | Non-excavation local prosthetic devices of sewer line | |
CN218970090U (en) | Foundation detection room | |
CN106640037B (en) | Rotary guiding tool fluid testing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220705 |