CN216892441U - Anchor cable device vertically implanted into soil body - Google Patents

Anchor cable device vertically implanted into soil body Download PDF

Info

Publication number
CN216892441U
CN216892441U CN202220230492.3U CN202220230492U CN216892441U CN 216892441 U CN216892441 U CN 216892441U CN 202220230492 U CN202220230492 U CN 202220230492U CN 216892441 U CN216892441 U CN 216892441U
Authority
CN
China
Prior art keywords
anchor cable
support
pulley
anchor
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220230492.3U
Other languages
Chinese (zh)
Inventor
张光建
王定伟
李明
梁冰冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Tianli Building Technology Co ltd
Original Assignee
Hubei Tianli Building Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Tianli Building Technology Co ltd filed Critical Hubei Tianli Building Technology Co ltd
Priority to CN202220230492.3U priority Critical patent/CN216892441U/en
Application granted granted Critical
Publication of CN216892441U publication Critical patent/CN216892441U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to an anchor cable device vertically implanted into a soil body, which comprises a support pile, a crown beam, an anchor cable, a vertical mounting hole, a fixed pulley, a pulley support, a support foundation and an anchor device, wherein the support pile is fixedly arranged on the support pile; the anchor cable fixing device is characterized in that the pulley support is fixed on a support foundation, the fixed pulley is installed on the support foundation, the top beam is located above the support pile, one end of the anchor cable is fixed on the top beam through an anchor, the other end of the anchor cable bypasses the fixed pulley to be in a vertical state, and a rod body at the lower end of the anchor cable is inserted into the vertical mounting hole. The anchor cable structure can facilitate the earth excavation and the construction of the underground structure in the later period, and can prevent the anchor cable structure from exceeding the red line of land acquisition.

Description

Anchor cable device vertically implanted into soil body
Technical Field
The utility model relates to the field of foundation pit supporting engineering, in particular to an anchor cable device vertically implanted into a soil body.
Background
With the continuous expansion of the development scale of urban underground space in China, a large number of foundation pit projects are generated. The anchor cable supporting technology is an important supporting means and is widely applied to urban foundation pit engineering. As an anchor cable left in a rock-soil body after construction, the anchor cable is generally buried in the ground permanently, which causes pollution of an underground space and has serious influence on excavation of foundation pits of adjacent land blocks, construction of surrounding municipal facilities, long-term planning of urban underground spaces and the like.
As ordinary anchor lines take up space in the ground for a long time, many cities have started to prohibit the use of ordinary anchor lines, so that the development of recyclable anchor lines has been vigorous. The recoverable anchor cable can also exceed the land acquisition range of the building, and because the structure is complex, the installation and recovery are troublesome in the construction process, the recovery rate of a plurality of recoverable anchor cables is difficult to guarantee, a large number of recoverable anchor cables are still buried in underground space outside the red land acquisition line permanently, and the sustainable development of the urban underground space is seriously restricted.
Disclosure of Invention
The utility model aims to solve the technical problem of providing an anchor cable device vertically implanted into a soil body, which can facilitate the excavation of the earth and the construction of a later underground structure and can prevent the anchor cable structure from exceeding a land acquisition red line.
The technical scheme adopted by the utility model for solving the technical problems is as follows: an anchor cable device vertically implanted into a soil body is constructed, and comprises a supporting pile, a crown beam, an anchor cable, a vertical mounting hole, a fixed pulley, a pulley support, a support foundation and an anchor;
the anchor cable fixing device is characterized in that the pulley support is fixed on a support foundation, the fixed pulley is installed on the support foundation, the crown beam is located above the support pile, one end of the anchor cable is fixed on the crown beam through an anchor, the other end of the anchor cable bypasses the fixed pulley to be in a vertical state, and a rod body at the lower end of the anchor cable is inserted into the vertical mounting hole.
According to the scheme, the pulley protective sleeve is sleeved on the outer side of the anchor cable.
According to the scheme, the end part of the pulley protective sleeve is provided with the grout stopping plug.
According to the scheme, the steel plate cushion block is arranged on the support base, and the pulley support is fixed on the steel plate cushion block.
The utility model also provides a construction method of the anchor cable device vertically implanted into the soil body, which comprises the following steps:
the method comprises the following steps: after the construction of the support pile is completed, starting to construct a vertical mounting hole, putting a rod body of the anchor cable, and grouting to an orifice;
step two: excavating earthwork in the range of the crown beam and the anchor cable to the pile top elevation of the support pile;
step three: constructing a support foundation;
step four: constructing a steel plate cushion block after the support foundation meets the strength requirement;
step five: a pulley support and a fixed pulley are arranged on the steel plate cushion block;
step six: the anchor cable penetrates through the pulley protective sleeve to enable the anchor cable to work normally on the fixed pulley, and the front and rear ports of the pulley protective sleeve are provided with grout stopping plugs;
step seven: pouring a crown beam of the support pile, and locking the anchor cable on an anchor on the crown beam after the crown beam reaches the design strength;
step eight: and after the anchor cable device is completely constructed, excavating foundation pit earthwork layer by layer.
The anchor cable device vertically implanted into the soil body has the following beneficial effects:
the anchor cable is converted into a horizontal direction through the pulley device, and then is locked on the crown beam. The anchor cable is constructed vertically, is different from the conventional anchor cable constructed at a certain inclination angle, and can effectively avoid the situation that the anchor cable structure exceeds the land acquisition red line and does not influence the normal use of the underground space outside the land acquisition red line. The anchor cable can be a common anchor cable or a recyclable anchor cable, and is very flexible and convenient.
Drawings
The utility model will be further described with reference to the accompanying drawings and examples, in which:
fig. 1 is a cross-sectional view of the anchor cable device in an operating state;
FIG. 2 is a schematic structural view of a pulley device;
fig. 3 is a plan view of the anchor cable device in an operating state.
Detailed Description
For a more clear understanding of the technical features, objects and effects of the present invention, embodiments of the present invention will now be described in detail with reference to the accompanying drawings.
As shown in fig. 1 to 3, the anchor cable device for vertical soil body implantation of the present invention includes a support pile 1, a crown beam 2, an anchor cable 3, a vertical mounting hole 4, a fixed pulley 5, a pulley support 6, a support foundation 10, and an anchor 11.
The pulley support 6 is fixed on a support foundation 10, the fixed pulley 5 is installed on the support foundation 10, the top beam 2 is located above the support pile 1, one end of the anchor cable 3 is fixed on the top beam 2 through the anchor 11, the other end of the anchor cable 3 bypasses the fixed pulley 5 to be in a vertical state, and a rod body at the lower end of the anchor cable 3 is inserted into the vertical installation hole 4.
Optionally, the outer side of the anchor cable 3 is sleeved with a pulley protective sleeve 8. The end of the pulley protective sleeve 8 is provided with a grout stop plug 9. The support foundation 10 is provided with a steel plate cushion block 7, and the pulley support 6 is fixed on the steel plate cushion block 7.
The anchor cable device vertically implanted into the soil body converts the vertically constructed anchor cable into a horizontal direction through a pulley device, and then locks the anchor cable on the crown beam 2. The anchor cable 3 is constructed vertically, is different from the conventional anchor cable 3 constructed at a certain inclination angle, and can effectively avoid the situation that the anchor cable structure exceeds the land acquisition red line and does not influence the normal use of the underground space outside the land acquisition red line. The anchor cable 3 can be a common anchor cable or a recyclable anchor cable, and is very flexible and convenient. According to different foundation pit types and surrounding environments, different pulley device combinations can be selected.
Alternatively, the steel plate spacers 7 may be separately arranged or may be continuously arranged throughout. When the full length is continuously arranged, the pulley supports 6 are positioned on the same steel plate cushion block 7, the integrity of the anchor cable under the working condition is enhanced, the coordinated and balanced stress of the anchor cable is ensured, and the length and the number of the anchor cable can be optimized.
Optionally, the pulley support 6 is fixed on the steel plate cushion block 7, and is mechanically or welded to the steel plate cushion block 7. Also can adopt assembled modular component, easy to assemble and dismantlement, reuse, green more. Optionally, the anchor cable 3 can adopt a common or recyclable steel strand structure form, can also adopt a prefabricated part form, and is very flexible and convenient.
The utility model also provides a construction method of the anchor cable device vertically implanted into the soil body, which comprises the following steps:
the method comprises the following steps: after the construction of the support pile 1 is completed, starting to construct the vertical mounting hole 4, putting a rod body of the anchor cable 3 and grouting to an orifice;
step two: excavating earthwork in the range of the crown beam 2 and the anchor cable 3 to the pile top elevation of the support pile 1;
step three: constructing a support foundation 10;
step four: after the support foundation 10 meets the strength requirement, constructing a steel plate cushion block 7;
step five: a pulley support 6 and a fixed pulley 5 are arranged on the steel plate cushion block 7;
step six: the anchor cable 3 penetrates through a pulley protective sleeve 8 to enable the anchor cable to work normally on a fixed pulley 5, and grout stopping plugs 9 are arranged at the front and rear ports of the pulley protective sleeve 8;
step seven: pouring a crown beam 2 of the support pile 1, and locking the anchor cable 3 on an anchorage device 11 on the crown beam 2 after the crown beam reaches the design strength;
step eight: and after the anchor cable device is completely constructed, the foundation pit earthwork is excavated layer by layer.
While the present invention has been described with reference to the embodiments shown in the drawings, the present invention is not limited to the embodiments, which are illustrative and not restrictive, and it will be apparent to those skilled in the art that various changes and modifications can be made therein without departing from the spirit and scope of the utility model as defined in the appended claims.

Claims (4)

1. An anchor cable device vertically implanted into a soil body is characterized by comprising a support pile (1), a crown beam (2), an anchor cable (3), a vertical mounting hole (4), a fixed pulley (5), a pulley support (6), a support foundation (10) and an anchorage device (11);
the anchor rod is characterized in that the pulley support (6) is fixed on a support foundation (10), the fixed pulley (5) is installed on the support foundation (10), the crown beam (2) is located above the support pile (1), one end of the anchor cable (3) is fixed on the crown beam (2) through the anchor (11), the other end of the anchor cable (3) is wound around the fixed pulley (5) to be in a vertical state, and the rod body of the lower end of the anchor cable (3) is inserted into the vertical mounting hole (4).
2. The anchor line device for vertical soil implantation according to claim 1, wherein the outer side of the anchor line (3) is sleeved with a pulley protection sleeve (8).
3. The anchor line device for vertical soil implantation according to claim 2, wherein the end of the pulley protection sleeve (8) is provided with a grout stopper (9).
4. The anchor line device for vertical soil body implantation according to claim 1, wherein the support base (10) is provided with a steel plate pad (7), and the pulley support (6) is fixed on the steel plate pad (7).
CN202220230492.3U 2022-01-27 2022-01-27 Anchor cable device vertically implanted into soil body Active CN216892441U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220230492.3U CN216892441U (en) 2022-01-27 2022-01-27 Anchor cable device vertically implanted into soil body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220230492.3U CN216892441U (en) 2022-01-27 2022-01-27 Anchor cable device vertically implanted into soil body

Publications (1)

Publication Number Publication Date
CN216892441U true CN216892441U (en) 2022-07-05

Family

ID=82183241

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220230492.3U Active CN216892441U (en) 2022-01-27 2022-01-27 Anchor cable device vertically implanted into soil body

Country Status (1)

Country Link
CN (1) CN216892441U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114351726A (en) * 2022-01-27 2022-04-15 湖北天利建筑技术有限责任公司 Anchor cable device vertically implanted in soil and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114351726A (en) * 2022-01-27 2022-04-15 湖北天利建筑技术有限责任公司 Anchor cable device vertically implanted in soil and its construction method

Similar Documents

Publication Publication Date Title
CN103114595A (en) Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN206034454U (en) Supporting construction
CN216892441U (en) Anchor cable device vertically implanted into soil body
CN114033388B (en) Shaft construction method for water-rich silty sand layer underground tunnel roof pipe
CN111485560A (en) Supporting structure of deep foundation pit under ultra-wide pipeline and construction method of deep foundation pit under ultra-wide pipeline
CN107476316B (en) Building foundation pit internal and external support structure and construction method
CN114351726A (en) Anchor cable device vertically implanted in soil and its construction method
CN214169107U (en) Cast-in-situ bored pile structure in area with intense karst
CN213571956U (en) Combined construction method pile supporting structure
CN112726627A (en) Cast-in-situ bored pile structure in area with intense karst and construction method
CN218622256U (en) Double-row pile and inclined pile combined type foundation pit support structure
CN216640435U (en) Dense-row pile supporting and retaining reinforcing structure under deep soft soil condition
CN214738115U (en) A miniature stake pile bolck anchor draws supporting construction for finite space foundation ditch
KR20090110100A (en) Freestanding Digging Method for Deep Excavation
CN212742557U (en) Cement mixing pile enclosure wall-profile steel cantilever type combined support
CN215977295U (en) Foundation pit supporting structure
CN206408631U (en) Anchored Sheet Pile Wall for Excavation system for closing on existing underground structure
CN212926083U (en) Cement-soil enclosure wall-precast pile cantilever type combined support
CN210368935U (en) Miniature pile structure, crown beam structure and miniature pile foundation pit supporting system
CN210421112U (en) Foundation ditch SMW worker method stake supporting construction
CN113863714A (en) A kind of underpinning structure and construction method for in-situ protection of archway
CN217298886U (en) Transmission line engineering slip casting rock anchor foundation structure
CN219992477U (en) Pile-anchor combined supporting structure for soft soil foundation pit without super red line
CN112922614A (en) Loading device for simulating soil pressure balance type shield construction tunneling pushing and grouting load
CN218813743U (en) A cable-type foundation pit enclosure structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant