Wave-proof hydrology and water quality monitoring floating platform Download PDFInfo
- Publication number
- CN216847776U CN216847776U CN202220238007.7U CN202220238007U CN216847776U CN 216847776 U CN216847776 U CN 216847776U CN 202220238007 U CN202220238007 U CN 202220238007U CN 216847776 U CN216847776 U CN 216847776U
- Authority
- CN
- China
- Prior art keywords
- gear
- auxiliary
- fixedly connected
- water quality
- screw rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 69
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 43
- 238000009434 installation Methods 0.000 claims abstract description 28
- 230000007246 mechanism Effects 0.000 claims abstract description 26
- 230000009194 climbing Effects 0.000 claims abstract description 10
- 230000000087 stabilizing effect Effects 0.000 claims description 10
- 230000002349 favourable effect Effects 0.000 abstract description 28
- 230000000630 rising effect Effects 0.000 description 6
- 238000000034 method Methods 0.000 description 5
- 239000003643 water by type Substances 0.000 description 4
- 238000010586 diagram Methods 0.000 description 2
- 238000003911 water pollution Methods 0.000 description 2
- 230000004308 accommodation Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000006866 deterioration Effects 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000010978 in-process monitoring Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Landscapes
- Revetment (AREA)
Abstract
The utility model provides a prevent unrestrained hydrology water quality monitoring floating platform, the four corners fixedly connected with equipment fixing guard box on monitoring station top, the middle part fixedly connected with climbing body in the monitoring station outside, the middle part on monitoring station top is equipped with heightening mechanism, heightening mechanism's top is equipped with spacing roof, heightening mechanism's bottom is equipped with firm base, firm base's bottom is equipped with fixed establishment. The utility model has the advantages that: the height of being convenient for adjust the monitoring platform, comparatively convenient labour saving and time saving during the regulation, the steadiness of increaseing is better, is favorable to reducing the area that the wave tide was patted on the device, is favorable to improving the steadiness that the device supported, is favorable to improving the life-span that the device used, is convenient for install the device fixedly, comparatively convenient labour saving and time saving during the installation, the steadiness of installation is better be favorable to preventing that the device from taking place the slope.
Description
Technical Field
The utility model relates to a water environment monitoring technology field, concretely relates to prevent unrestrained hydrology water quality monitoring floating platform.
Background
At present, water resources are in short supply and water pollution is serious in China, water quality monitoring is an important basis for water resource management and protection, water quality information provided by water quality monitoring is particularly important, in recent years, the water quality of main waters, rivers and lakes in China generally presents a deterioration trend, and hydrological monitoring tasks are very heavy; the monitoring of waters of sea areas, rivers and lakes, which need to change monitoring points at will, is mainly realized by a buoy type automatic water quality monitoring station, the purposes of timely grasping the water quality condition of key section waters of main watersheds, early warning and forecasting major or watershed water quality pollution accidents, solving disputes of water pollution accidents across administrative watersheds, monitoring the implementation situation of a total control system, discharging the water to reach the standard and the like are achieved by monitoring, and meanwhile, relevant government departments can be timely notified when source water quality pollution occurs, corresponding emergency plans are started, and the safety of urban water supply is ensured.
Current hydrology water quality monitoring platform, mostly all can not height-adjusting, the impact area of monitoring platform contact is great when the great unrestrained bat of area of monitoring platform is patted, make the impact force that the device received great, the impact time has been long the device and has taken place easily and empty, and the unrestrained when patting the monitoring bench of water of patting, influence the operation of monitoring bench equipment easily, make the life-span of equipment use reduce, current hydrology water quality monitoring platform is comparatively troublesome when the installation is fixed, comparatively waste time and energy the problem during the installation, provide a prevent unrestrained hydrology water quality monitoring floating platform for this reason.
SUMMERY OF THE UTILITY MODEL
The utility model aims at overcoming prior art not enough, provide a prevent unrestrained hydrographic water quality monitoring floating platform, be convenient for adjust the height of monitoring station, comparatively convenient labour saving and time saving during the regulation, the steadiness of increaseing is better, be favorable to reducing the wave and pat the area on the device, be favorable to improving the steadiness that the device supported, be favorable to improving the life-span that the device used, be convenient for install fixedly to the device, comparatively convenient labour saving and time saving during the installation, the steadiness of installation is better to be favorable to preventing that the device from taking place the slope.
In order to realize the technical characteristics, the purpose of the utility model is realized as follows: the utility model provides a prevent unrestrained hydrology water quality monitoring floating platform which characterized in that: it includes the monitoring station, the four corners fixedly connected with equipment fixing guard box on monitoring station top, the middle part fixedly connected with climbing body in the monitoring station outside, the middle part on monitoring station top is equipped with heightening mechanism, heightening mechanism's top is equipped with spacing roof, heightening mechanism's bottom is equipped with firm base, firm base's bottom is equipped with fixed establishment.
The height-adjusting mechanism comprises a disc stacking rod, a sliding cavity is fixedly connected to the middle part of the inner side of the monitoring platform, installation fixing grooves are fixedly connected to four positions of the top end of the sliding cavity, a fixing support clamping plate is fixedly connected to the middle part of the top end of the installation fixing groove, a clamp gear is rotatably connected to the middle part of the inner side of the fixing support clamping plate, a first trapezoidal gear is fixedly connected to the middle part of one side of the clamp gear and is located at one end of each of two sides of the fixing support clamping plate, a second trapezoidal gear is connected to the top end of the first trapezoidal gear in a meshed mode, a first adjusting gear is fixedly connected to the top end of the second trapezoidal gear, an installation hanging plate is arranged between the first adjusting gear and the second trapezoidal gear, one side of the installation hanging plate is fixedly connected with two sides of the fixing support clamping plate, and an adjusting gear ring is connected to the outer side of the first adjusting gear in a meshed mode, and one side of the middle part of one end of the adjusting gear ring is connected with a second adjusting gear in a meshing manner.
Fixing mechanism includes main hob, four position swivelling joints of firm base bottom have first pair of hob and the vice hob of second, the vice hob of second is located the inboard of first pair of hob, the middle part swivelling joint of firm base inner chamber bottom has main drive gear, the middle part on main drive gear top is equipped with driving motor, main drive gear's outside meshing is connected with the vice drive gear of third, the outside meshing of the vice drive gear of third is connected with first pair of drive gear, first pair of drive gear's outside meshing is connected with the vice drive gear of second, driving motor's the outside is equipped with the drive power supply box, the middle part fixedly connected with main hob of main drive gear bottom, the middle part of first pair of drive gear bottom is fixedly connected with first pair of hob and the vice hob of second respectively.
The joint of the adjusting gear ring, the fixed supporting clamping plate and the monitoring table is provided with a limiting rotating cavity, and the size of the outer side of the adjusting gear ring is matched with the size of the inner side of the limiting rotating cavity.
The inboard and the outside of adjusting gear ring all fixedly connected with tooth piece, the plan view of adjusting gear ring is the annular.
The number of the first adjusting gears is four, the number of the mounting hanger plates is four, and the number of the second trapezoidal gears is four.
The quantity of first trapezoidal gear has four groups, the quantity of clamp gear has two sets ofly, the quantity of fixed stay splint has two sets ofly.
The top view of firm base is the cross, the quantity of first pair of hob has two sets ofly, the quantity of the vice hob of second has two sets ofly.
The number of the first auxiliary driving gears is four, the number of the second auxiliary driving gears is two, the number of the third auxiliary driving gears is two, and the side view of the main driving gear is in a horizontal H shape.
The utility model discloses there is following beneficial effect:
1. monitoring floating platform is convenient for adjust the height of monitoring station, comparatively convenient labour saving and time saving during the regulation, the steadiness of increaseing is better, is favorable to reducing the area that the wave tide patted on the device, is favorable to improving the steadiness that the device supported, is favorable to improving the life-span that the device used, is convenient for install the device fixedly, comparatively convenient labour saving and time saving during the installation, the steadiness of installation is better to be favorable to preventing that the device from taking place the slope.
2. When the device is required to be heightened by using the designed heightening mechanism, the rotating motor drives the second adjusting gear to rotate clockwise, the adjusting gear ring which is meshed and connected with the second adjusting gear and the first adjusting gear rotates clockwise, the second trapezoidal gear which is fixedly connected with the bottom end of the first adjusting gear rotates, the first trapezoidal gear which is meshed and connected with the second trapezoidal gear drives the clamp gear to rotate clockwise, so that the clamp gear slowly clamps and rises along the groove on the stacking rod and stops rising after rising to a specified height, when the rotating motor drives the second adjusting gear to rotate anticlockwise, the mutual matching among parts can drive the clamp gear to move downwards along the clamp on the stacking rod anticlockwise along the groove on the stacking rod, when the clamp gear moves downwards to a climbing body to contact with the water surface, the clamp body can climb onto a monitoring table to achieve the height convenient for adjusting the monitoring table, comparatively convenient labour saving and time saving during the regulation, the steadiness of increaseing is better, is favorable to reducing the area that the wave tide was patted on the device, is favorable to improving the steadiness that the device supported, is favorable to improving the life-span that the device used.
3. Through the designed fixing mechanism, when the device is installed, when a main screw rod arranged at the bottom end of a stabilizing base of the device is contacted with a riverbed of a water area, a driving motor drives a main driving gear and the main screw rod to rotate, so that the main screw rod is slowly downwards moved to be clamped into the riverbed, when the main screw rod is downwards moved to the top end of a first auxiliary screw rod and a second auxiliary screw rod, the rotating main driving gear is mutually matched with the first auxiliary driving gear and the second auxiliary driving gear which are meshed and connected through a third auxiliary driving gear and a third auxiliary driving gear which are meshed and connected, so that the first auxiliary screw rod and the second auxiliary screw rod are synchronously rotated and downwards moved, the first auxiliary screw rod and the second auxiliary screw rod are clamped into the riverbed, the stabilizing base is driven to be installed at the top end of the riverbed, the device is conveniently installed and fixed, and is convenient, time and labor are saved during installation, the better steadiness of installation is favorable to preventing that the device from taking place to incline.
Drawings
The present invention will be further explained with reference to the drawings and examples.
Fig. 1 is a schematic structural diagram of the overall perspective view of the present invention.
Fig. 2 is the utility model discloses the whole three-dimensional map of monitoring station and equipment fixing guard box.
Fig. 3 is the utility model discloses the whole three-dimensional picture of monitoring station and heightening mechanism assembly.
Fig. 4 is a schematic structural diagram of an enlarged view of a portion a in fig. 3 according to the present invention.
Fig. 5 is a schematic structural view of a partial perspective view of the disc stacking rod of the present invention.
Fig. 6 is a schematic structural view of a side view cross-sectional view of the stabilizing base of the present invention.
In the figure: 1 monitoring station, 2 equipment fixing protective boxes, 3 climbing bodies, 4 limiting top plates, 5 heightening mechanisms, 51 disc stacking rods, 52 sliding cavities, 53 fixing grooves, 54 fixing support clamping plates, 55 clamp gears, 56 first trapezoidal gears, 57 second trapezoidal gears, 58 mounting hanging plates, 59 first adjusting gears, 510 adjusting gear rings, 511 second adjusting gears, 6 stable bases, 7 fixing mechanisms, 71 main screw rods, 72 first auxiliary screw rods, 73 second auxiliary screw rods, 74 first auxiliary driving gears, 75 second auxiliary driving gears, 76 third auxiliary driving gears, 77 main driving gears, 78 driving motors and 79 driving power boxes.
Detailed Description
The following describes embodiments of the present invention with reference to the accompanying drawings.
Example 1:
referring to fig. 1-6, the present invention provides a technical solution: the utility model provides a prevent unrestrained hydrology water quality monitoring floating platform, includes monitoring station 1, the four corners fixedly connected with equipment fixing guard box 2 on 1 top of monitoring station, the middle part fixedly connected with climbing body 3 in the 1 outside of monitoring station, the middle part on 1 top of monitoring station is equipped with heightening mechanism 5, heightening mechanism 5's top is equipped with spacing roof 4, heightening mechanism 5's bottom is equipped with firm base 6, firm base 6's bottom is equipped with fixed establishment 7. Through adopting the monitoring floating platform of above-mentioned structure, its stability is good, in concrete working process, the regulation of realization height that can be convenient, accommodation process easy operation is convenient moreover, after through the altitude mixture control, be favorable to reducing the area that the wave tide patted on the device, be favorable to improving the steadiness that the device supported, be favorable to improving the life-span that the device used, be convenient for install the device fixedly, comparatively convenient labour saving and time saving during the installation, the steadiness of installation is better be favorable to preventing that the device from taking place the slope.
Further, the height-adjusting mechanism 5 comprises a stacking rod 51, a sliding cavity 52 is fixedly connected to the middle of the inner side of the monitoring station 1, four positions at the top end of the sliding cavity 52 are fixedly connected with installation fixing grooves 53, a fixed supporting clamping plate 54 is fixedly connected to the middle of the top end of the installation fixing groove 53, a clamping gear 55 is rotatably connected to the middle of the inner side of the fixed supporting clamping plate 54, a first trapezoidal gear 56 is fixedly connected to the middle of one side of the clamping gear 55, the first trapezoidal gear 56 is located at one end of two sides of the fixed supporting clamping plate 54, a second trapezoidal gear 57 is engaged and connected to the top end of the first trapezoidal gear 56, a first adjusting gear 59 is fixedly connected to the top end of the second trapezoidal gear 57, an installation hanging plate 58 is arranged between the first adjusting gear 59 and the second trapezoidal gear 57, one side of the installation hanging plate 58 is fixedly connected to two sides of the fixed supporting clamping plate 54, an adjusting gear ring 510 is engaged and connected to the outer side of the first adjusting gear 59, a second adjusting gear 511 is engaged with one side of the middle of one end of the adjusting gear ring 510. The height of the monitoring station 1 can be adjusted through the height adjusting mechanism 5, and then adjusting power is provided.
In this embodiment, when the device is required to be lifted, the designed lifting mechanism 5 is used, when the device is required to be lifted, the rotating motor drives the second adjusting gear 511 to rotate clockwise, the adjusting gear ring 510 engaged with the second adjusting gear 511 and the first adjusting gear 59 rotates clockwise, so that the second trapezoidal gear 57 fixedly connected with the bottom end of the first adjusting gear 59 rotates, the first trapezoidal gear 56 engaged with the second trapezoidal gear 57 drives the hoop gear 55 to rotate clockwise, so that the hoop gear 55 slowly hoops and rises along the groove on the stacking plate rod 51, and stops rising after rising to a specified height, when the rotating motor drives the second adjusting gear 511 to rotate counterclockwise, the parts are engaged with each other to drive the hoop gear 55 to move down along the groove hoops on the stacking plate rod 51, and when the climbing body 3 contacts the water surface, the climbing body 3 can climb onto the monitoring table 1, played the height of being convenient for adjust the monitoring station, comparatively convenient labour saving and time saving during the regulation, the steadiness of increaseing is better, is favorable to reducing the area that the wave tide was patted on the device, is favorable to improving the steadiness that the device supported, is favorable to improving the life-span that the device used.
Specifically, the fixing mechanism 7 includes a main screw rod 71, four position swivelling joints in firm base 6 bottom have first auxiliary screw pole 72 and second auxiliary screw pole 73, second auxiliary screw pole 73 is located the inboard of first auxiliary screw pole 72, the middle part swivelling joint in firm base 6 inner chamber bottom has main drive gear 77, the middle part on main drive gear 77 top is equipped with driving motor 78, the outside meshing of main drive gear 77 is connected with third auxiliary drive gear 76, the outside meshing of third auxiliary drive gear 76 is connected with first auxiliary drive gear 74, the outside meshing of first auxiliary drive gear 74 is connected with second auxiliary drive gear 75, the outside of driving motor 78 is equipped with drive power supply box 79, the middle part fixedly connected with main screw pole 71 of main drive gear 77 bottom, the middle part of first auxiliary drive gear 74 bottom is fixedly connected with first auxiliary screw pole 72 and second auxiliary screw pole 73 respectively.
In this embodiment, by the designed fixing mechanism 7, when the device is installed, the device is lifted to a position of a designated water area, when the main spiral rod 71 arranged at the bottom end of the device stabilizing base 6 contacts the bed of the water area, the driving motor 78 drives the main driving gear 77 and the main spiral rod 71 to rotate, so that the main spiral rod 71 slowly moves downwards and is clamped into the bed, when the first auxiliary spiral rod 72 and the second auxiliary spiral rod 73 move downwards and contact the top end of the bed, the first auxiliary driving gear 74 and the second auxiliary driving gear 75 meshed and connected by the rotating main driving gear 77 through the third auxiliary driving gear 76 and the third auxiliary driving gear 76 which are meshed and connected are mutually matched, so as to drive the first auxiliary spiral rod 72 and the second auxiliary spiral rod 73 to synchronously rotate downwards and move downwards, so that the first auxiliary spiral rod 72 and the second auxiliary spiral rod 73 are clamped into the bed, so as to drive the stabilizing base 6 to be installed at the top end of the bed, thereby facilitating the installation and fixation of the device, comparatively convenient labour saving and time saving during the installation, the steadiness of installation is better to be favorable to preventing that the device from taking place to incline.
Further, the handing-over of adjusting gear ring 510 and fixed stay splint 54 and monitoring station 1 goes out and is equipped with spacing rotatory chamber, and the size in the adjusting gear ring 510 outside matches with the size in spacing rotatory intracavity side, and the inboard and the outside of adjusting gear ring 510 all fixedly connected with tooth piece, and the top view of adjusting gear ring 510 is the annular.
In this embodiment, through the spacing rotatory chamber of design, during the use, be favorable to improving the rotatory steadiness of adjusting gear ring 510, be favorable to preventing that adjusting gear ring 510 from taking place the skew at rotatory in-process track.
Specifically, there are four sets of the first adjusting gears 59, four sets of the mounting hanger plates 58, four sets of the second ladder gears 57, four sets of the first ladder gears 56, two sets of the clip gears 55, and two sets of the fixing support brackets 54.
In this embodiment, through the first adjusting gear 59, second trapezoidal gear 57, first trapezoidal gear 56 and the clamp gear 55 of design, during the use, be convenient for adjust the height of monitoring station 1, the steadiness of clamp gear 55 swivelling movement is better, is favorable to preventing that clamp gear 55 swivelling upward in-process monitoring station 1 from taking place to rock.
Specifically, the top view of the stabilizing base 6 is cross-shaped, the number of the first secondary screw rods 72 is two, the number of the second secondary screw rods 73 is two, the number of the first secondary driving gears 74 is four, the number of the second secondary driving gears 75 is two, the number of the third secondary driving gears 76 is two, and the side view of the main driving gear 77 is horizontal and flat in an "H" shape.
In this embodiment, through the first auxiliary drive gear 74, the second auxiliary drive gear 75, the third auxiliary drive gear 76 and the main drive gear 77 of design, be convenient for drive first auxiliary screw rod 72 group and the synchronous revolution of second auxiliary screw rod 73 during the use, comparatively convenient labour saving and time saving during the rotation is favorable to improving the rotatory steadiness of screw rod.
Example 2:
a use method of a wave-proof hydrological water quality monitoring floating platform comprises the following steps:
the method comprises the following steps: when the device is installed, the device is lifted to the position of a specified water area, and when the main screw rod 71 arranged at the bottom end of the device stabilizing base 6 contacts the riverbed of the water area, the driving motor 78 drives the main driving gear 77 and the main screw rod 71 to rotate, so that the main screw rod 71 slowly moves downwards to be clamped into the riverbed;
step two: when the first auxiliary screw rod 72 and the second auxiliary screw rod 73 are moved downwards to contact the top end of the river bed, the first auxiliary drive gear 74 and the second auxiliary drive gear 75 which are meshed and connected through the third auxiliary drive gear 76 and the third auxiliary drive gear 76 which are meshed and connected by the rotating main drive gear 77 are mutually matched, so that the first auxiliary screw rod 72 and the second auxiliary screw rod 73 are driven to synchronously rotate and move downwards, the first auxiliary screw rod 72 and the second auxiliary screw rod 73 are clamped into the river bed, and the stabilizing base 6 is driven to be installed at the top end of the river bed;
step three: when the device needs to be heightened, the rotating motor drives the second adjusting gear 511 to rotate clockwise, by the clockwise rotation of the adjusting gear ring 510 which is in meshed connection with the second adjusting gear 511 and the first adjusting gear 59, so that the second ladder gear 57 fixedly coupled to the bottom end of the first adjusting gear 59 is rotated, the yoke gear 55 is rotated clockwise by the first ladder gear 56 engaged with the second ladder gear 57, so that the clamp gear 55 slowly clamps and rises along the groove on the disc stacking rod 51, and stops rising after rising to a designated height, when the rotating motor drives the second adjusting gear 511 to rotate counterclockwise, the parts are mutually matched to drive the clamp gear 55 to move downwards along the groove clamp on the disc stacking rod 51 anticlockwise and move downwards when the climbing body 3 contacts the water surface, climb to monitoring station 1 through climbing body 3 on, monitor the hydrology quality of water in the waters through the equipment of the inboard installation of equipment fixing guard box.
Claims (9)
1. The utility model provides a prevent unrestrained hydrology water quality monitoring floating platform which characterized in that: it includes monitoring station (1), four corners fixedly connected with equipment fixing guard box (2) on monitoring station (1) top, the middle part fixedly connected with climbing body (3) in monitoring station (1) outside, the middle part on monitoring station (1) top is equipped with heightening mechanism (5), heightening mechanism's (5) top is equipped with spacing roof (4), heightening mechanism's (5) bottom is equipped with firm base (6), the bottom of firm base (6) is equipped with fixed establishment (7).
2. The wave-resistant hydrology and water quality monitoring floating platform according to claim 1, characterized in that: the height-adjusting mechanism (5) comprises a disc stacking rod (51), a sliding cavity (52) is fixedly connected to the inner side of the monitoring platform (1), installation fixing grooves (53) are fixedly connected to four positions of the top end of the sliding cavity (52), a fixed supporting clamping plate (54) is fixedly connected to the middle of the top end of the installation fixing groove (53), a clamp gear (55) is rotatably connected to the inner side of the fixed supporting clamping plate (54), a first trapezoidal gear (56) is fixedly connected to the middle of one side of the clamp gear (55), the first trapezoidal gear (56) is located at one end of each of two sides of the fixed supporting clamping plate (54), a second trapezoidal gear (57) is connected to the top end of the first trapezoidal gear (56) in a meshed mode, a first adjusting gear (59) is fixedly connected to the top end of the second trapezoidal gear (57), and an installation hanging plate (58) is arranged between the first adjusting gear (59) and the second trapezoidal gear (57), one side of installation hanger plate (58) and the both sides fixed connection of fixed stay splint (54), the outside meshing of first adjusting gear (59) is connected with adjusting gear ring (510), the meshing of one side at adjusting gear ring (510) one end middle part is connected with second adjusting gear (511).
3. The wave-resistant hydrology and water quality monitoring floating platform according to claim 1, characterized in that: the fixing mechanism (7) comprises a main screw rod (71), four directions of the bottom end of the stabilizing base (6) are rotatably connected with a first auxiliary screw rod (72) and a second auxiliary screw rod (73), the second auxiliary screw rod (73) is positioned on the inner side of the first auxiliary screw rod (72), the middle part of the bottom end of the inner cavity of the stabilizing base (6) is rotatably connected with a main driving gear (77), the middle part of the top end of the main driving gear (77) is provided with a driving motor (78), the outer side of the main driving gear (77) is meshed with a third auxiliary driving gear (76), the outer side of the third auxiliary driving gear (76) is meshed with a first auxiliary driving gear (74), the outer side of the first auxiliary driving gear (74) is meshed with a second auxiliary driving gear (75), the outer side of the driving motor (78) is provided with a driving power supply box (79), and the middle part of the bottom end of the main driving gear (77) is fixedly connected with the main screw rod (71), the middle part of the bottom end of the first auxiliary driving gear (74) is fixedly connected with a first auxiliary screw rod (72) and a second auxiliary screw rod (73) respectively.
4. The wave-resistant hydrology and water quality monitoring floating platform according to claim 2, characterized in that: the joint of the adjusting gear ring (510) and the fixed supporting clamping plate (54) and the monitoring platform (1) is provided with a limiting rotating cavity, and the size of the outer side of the adjusting gear ring (510) is matched with the size of the inner side of the limiting rotating cavity.
5. The wave-resistant hydrology and water quality monitoring floating platform according to claim 2, characterized in that: the inboard and the outside of adjusting gear ring (510) all fixedly connected with tooth piece, the top view of adjusting gear ring (510) is the annular.
6. The wave-resistant hydrological water quality monitoring floating platform according to claim 2, characterized in that: the number of the first adjusting gears (59) is four, the number of the mounting hanger plates (58) is four, and the number of the second trapezoidal gears (57) is four.
7. The wave-resistant hydrology and water quality monitoring floating platform according to claim 2, characterized in that: the number of the first trapezoidal gears (56) is four, the number of the hoop gears (55) is two, and the number of the fixed supporting clamping plates (54) is two.
8. The wave-resistant hydrology and water quality monitoring floating platform according to claim 3, characterized in that: the top view of firm base (6) is the cross, there are two sets for the quantity of first pair screw rod (72), there are two sets for the quantity of second pair screw rod (73).
9. The wave-proof hydrological water quality monitoring floating platform according to claim 3, characterized in that: the number of the first auxiliary driving gears (74) is four, the number of the second auxiliary driving gears (75) is two, the number of the third auxiliary driving gears (76) is two, and the side view of the main driving gear (77) is in a horizontal H shape.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202220238007.7U CN216847776U (en) | 2022-01-28 | 2022-01-28 | Wave-proof hydrology and water quality monitoring floating platform |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202220238007.7U CN216847776U (en) | 2022-01-28 | 2022-01-28 | Wave-proof hydrology and water quality monitoring floating platform |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN216847776U true CN216847776U (en) | 2022-06-28 |
Family
ID=82089343
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202220238007.7U Active CN216847776U (en) | 2022-01-28 | 2022-01-28 | Wave-proof hydrology and water quality monitoring floating platform |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN216847776U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114353762A (en) * | 2022-01-28 | 2022-04-15 | 长江生态环保集团有限公司 | Wave-proof hydrological water quality monitoring floating platform and use method |
-
2022
- 2022-01-28 CN CN202220238007.7U patent/CN216847776U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114353762A (en) * | 2022-01-28 | 2022-04-15 | 长江生态环保集团有限公司 | Wave-proof hydrological water quality monitoring floating platform and use method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN216847776U (en) | Wave-proof hydrology and water quality monitoring floating platform | |
| CN211973139U (en) | Positioning mechanism based on during installation of highway bridge prefabricated pier | |
| CN114826113B (en) | Novel sea surface floating type photovoltaic power generation device | |
| CN205779444U (en) | Wave energy and energy and wind energy combined power generation device | |
| CN114353762A (en) | Wave-proof hydrological water quality monitoring floating platform and use method | |
| CN210505299U (en) | Support frame for water conservancy and hydropower construction | |
| CN216356579U (en) | Floating island water surface movable photovoltaic independent power supply device | |
| CN218562269U (en) | River course river ecological remediation sewage treatment device | |
| CN108411883B (en) | A generator installation platform | |
| CN217552034U (en) | Burr grinding device is used in production of combined material well lid | |
| CN219569552U (en) | Template device with rotary structure for civil construction | |
| CN217231760U (en) | Combined bearing plate for composite foundation load test | |
| CN211913840U (en) | Testboard convenient to remove and enlarged area | |
| CN211058264U (en) | Portable support is used in photovoltaic project construction on water | |
| CN222136958U (en) | Water conservancy buoy convenient to store | |
| CN114411625A (en) | Flood control device with good protection effect | |
| CN223315189U (en) | A portable marine living cabin | |
| CN221239325U (en) | Prompt device for geological disasters | |
| CN219284424U (en) | Water level monitoring device for hydraulic engineering | |
| CN215098138U (en) | An unmanned ship that is easy to dock | |
| CN221095070U (en) | A construction platform for underwater operations | |
| CN220865628U (en) | Safety device for tidal flat photovoltaic construction | |
| CN216232868U (en) | A slow-flowing water surface floating garbage cleaning robot | |
| CN112339923A (en) | Floating offshore charging platform | |
| CN222820239U (en) | A floating platform for offshore installation with good stability |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |