CN216840729U - A combined lateral support device for prefabricated side walls of a subway station - Google Patents

A combined lateral support device for prefabricated side walls of a subway station Download PDF

Info

Publication number
CN216840729U
CN216840729U CN202122744491.9U CN202122744491U CN216840729U CN 216840729 U CN216840729 U CN 216840729U CN 202122744491 U CN202122744491 U CN 202122744491U CN 216840729 U CN216840729 U CN 216840729U
Authority
CN
China
Prior art keywords
rod
side wall
gusset plate
prefabricated side
horizontal rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122744491.9U
Other languages
Chinese (zh)
Inventor
聂善军
梁宇
徐永鹏
杨上伟
张强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Communications Information Technology Group Co ltd
Original Assignee
China Communications Information Technology Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Communications Information Technology Group Co ltd filed Critical China Communications Information Technology Group Co ltd
Priority to CN202122744491.9U priority Critical patent/CN216840729U/en
Application granted granted Critical
Publication of CN216840729U publication Critical patent/CN216840729U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

本实用新型公开的一种地铁车站预制侧墙件组合式侧向支撑装置,包括水平杆、竖向杆以及斜杆,所述水平杆、竖向杆以及斜杆两两之间可拆卸连接并且三者之间构成直角三角形桁架结构;所述竖向杆上设置有用于支撑预制侧墙件的接触支撑结构;所述地板与水平杆的靠近预制侧墙件的一侧之间设置有锚筋结构;所述水平杆的底部设置有顶托结构。本实用新型采用分体组装式的结构,每个可拆解的单元均为质量较轻的结构,便于运输且拆装方便;本实用新型将单杆侧向支撑改进为了单杆组合的侧向支撑体系,提高了底盒侧墙结构混凝土一次性浇筑高度,减少了车站侧墙纵向施工缝,提高了富水区地铁车站结构防水效果,整体实用性强,推广应用价值高。

Figure 202122744491

The utility model discloses a combined lateral support device for prefabricated side walls of a subway station, which comprises a horizontal rod, a vertical rod and an oblique rod. The horizontal rod, the vertical rod and the oblique rod are detachably connected to each other. A right-angled triangular truss structure is formed between the three; the vertical rod is provided with a contact support structure for supporting the prefabricated side wall piece; anchor bars are provided between the floor and the side of the horizontal rod close to the prefabricated side wall piece structure; the bottom of the horizontal rod is provided with a jacking structure. The utility model adopts a split assembly structure, and each disassembled unit is a light-weight structure, which is convenient for transportation and disassembly; the utility model improves the lateral support of a single rod into a lateral support of a single rod combination. The support system increases the one-time pouring height of the side wall structure of the bottom box, reduces the longitudinal construction joints of the side wall of the station, and improves the waterproof effect of the subway station structure in the water-rich area. The overall practicability is strong, and the promotion and application value is high.

Figure 202122744491

Description

一种地铁车站预制侧墙组合式侧向支撑装置A combined lateral support device for prefabricated side walls of a subway station

技术领域technical field

本实用新型涉及建筑支架技术领域,尤其涉及一种地铁车站预制侧墙组合式侧向支撑装置。The utility model relates to the technical field of building supports, in particular to a combined lateral support device for a prefabricated side wall of a subway station.

背景技术Background technique

目前地铁车站结构基本采用现浇法进行施工,但随着理论水平、施工技术发展,环境保护愈发严苛,人口老龄化带来用工紧张及施工现场作业条件要求高等原因,传统的现浇法施工已经难以满足日趋发展的社会需求,为响应国家低碳环保、绿色建筑战略导向,地铁车站结构采用预制装配式技术势在必行,顺应时势,同时,为了便于预制构件运输、吊装,车站侧墙采用叠合构件,为保证侧墙现浇层施工,预制侧墙件侧向支撑系统技术作为地铁车站建造新技术显得尤为重要。At present, the structure of subway stations is basically constructed by the cast-in-place method. However, with the development of theoretical level and construction technology, environmental protection is becoming more and more stringent, and the aging of the population has brought about labor shortages and high requirements on construction site operating conditions. The traditional cast-in-place method The construction has been difficult to meet the increasingly developing social needs. In response to the national low-carbon environmental protection and green building strategy, it is imperative to adopt prefabricated technology for the subway station structure. The wall adopts superimposed components. In order to ensure the construction of the cast-in-place layer of the side wall, the lateral support system technology of the prefabricated side wall piece is particularly important as a new technology for the construction of the subway station.

通过哈尔滨地铁3号线叠合装配式车站吸取的经验:该地铁车站侧墙采用叠合构件,现浇层施工时预制侧墙件采用单杆支撑,单杆支撑的优点是重量轻,搬运、安装方便,缺点是随着预制侧墙件浇筑高度的增加,单杆长度增加其承受侧向混凝土浇筑压力明显下降,为提高其承载能力,需要增大单杆截面尺寸,随之也增加了单杆重量给施工带来不便;同时为保证单杆支撑受力合理,支撑仰角为45度,支撑占用车站空间较大,不利于施工组织,影响工效。The experience learned from the superimposed prefabricated station of Harbin Metro Line 3: the side wall of the subway station adopts superimposed components, and the prefabricated side wall components are supported by a single rod during the construction of the cast-in-place layer. The advantages of the single rod support are light weight, handling, It is easy to install, but the disadvantage is that with the increase of the pouring height of the prefabricated side wall, the length of the single rod increases, and the lateral concrete pouring pressure decreases significantly. The weight of the pole brings inconvenience to the construction; at the same time, in order to ensure the reasonable force of the single pole support, the support elevation angle is 45 degrees, and the support occupies a large space in the station, which is not conducive to the construction organization and affects the work efficiency.

所以为了保证施工安全可靠,便于移动且安拆方便,发明一种更好的预制侧墙件支撑技术势在必行,应用前景广阔。Therefore, in order to ensure safe and reliable construction, easy movement and convenient installation and disassembly, it is imperative to invent a better prefabricated side wall support technology, and the application prospect is broad.

实用新型内容Utility model content

本实用新型的目的在于避免现有技术的不足之处,提供一种地铁车站预制侧墙组合式侧向支撑装置,从而有效解决现有技术中存在的不足之处。The purpose of the utility model is to avoid the deficiencies of the prior art, and to provide a combined lateral support device for a prefabricated side wall of a subway station, thereby effectively solving the deficiencies in the prior art.

为实现上述目的,本实用新型采取的技术方案为:一种地铁车站预制侧墙组合式侧向支撑装置,包括水平杆、竖向杆以及斜杆,所述水平杆、竖向杆以及斜杆两两之间可拆卸连接并且三者之间构成直角三角形桁架结构;In order to achieve the above purpose, the technical scheme adopted by the present utility model is: a combined lateral support device for a prefabricated side wall of a subway station, comprising a horizontal rod, a vertical rod and an oblique rod, the horizontal rod, the vertical rod and the oblique rod. The two are detachably connected and the three form a right-angled triangular truss structure;

所述竖向杆上设置有用于支撑预制侧墙件的接触支撑结构;The vertical rod is provided with a contact support structure for supporting the prefabricated side wall pieces;

所述地板与水平杆的靠近预制侧墙件的一侧之间设置有锚筋结构;An anchor bar structure is arranged between the floor and the side of the horizontal rod close to the prefabricated side wall piece;

所述水平杆的底部设置有顶托结构。The bottom of the horizontal rod is provided with a jacking structure.

进一步,所述水平杆的顶端设置有第一节点板,所述斜杆的顶端通过螺栓与第一节点板固定连接,所述水平杆的两端分别设置有第二节点板与第三节点板,所述竖向杆的底端通过螺栓与第二节点板固定连接,所述斜杆的底端通过螺栓与第三节点板固定连接。Further, the top end of the horizontal rod is provided with a first gusset plate, the top end of the inclined rod is fixedly connected with the first gusset plate by bolts, and the two ends of the horizontal rod are respectively provided with a second gusset plate and a third gusset plate , the bottom end of the vertical rod is fixedly connected with the second gusset plate through bolts, and the bottom end of the inclined rod is fixedly connected with the third gusset plate through bolts.

进一步,所述桁架结构内设置有加强结构;Further, a reinforcing structure is arranged in the truss structure;

所述加强结构包括加强水平杆与加强斜杆,所述竖向杆的中部设置有第四节点板,斜杆的中部设置有第五节点板,水平杆的中部设置有第六节点板,所述加强水平杆的两端分别通过螺栓与第四节点板以及第五节点板固定连接,所述加强斜杆的两端分别通过螺栓与第五节点板以及第六节点板固定连接。The reinforcing structure includes a reinforcing horizontal rod and a reinforcing inclined rod, the middle part of the vertical rod is provided with a fourth gusset plate, the middle part of the inclined rod is provided with a fifth gusset plate, and the middle part of the horizontal rod is provided with a sixth gusset plate, so the The two ends of the reinforcing horizontal rod are respectively fixedly connected to the fourth gusset plate and the fifth gusset plate through bolts, and the two ends of the reinforcing inclined rod are respectively fixedly connected to the fifth gusset plate and the sixth gusset plate through bolts.

进一步,还包括安装定位板,安装定位板同时与所述加强水平杆、加强斜杆以及斜杆的一侧贴合设置,安装定位板上分别配合加强水平杆与加强斜杆设置有定位夹片,安装定位板上配合斜杆的侧面设置有连接部,连接部通过连接件与斜杆可拆卸的连接。Further, it also includes an installation positioning plate, the installation positioning plate is attached to the reinforcing horizontal rod, the reinforcing inclined rod and one side of the inclined rod at the same time. and a connecting part is arranged on the side of the matching inclined rod on the installation and positioning plate, and the connecting part is detachably connected with the inclined rod through the connecting piece.

进一步,所述接触支撑结构包括与预制侧墙件贴合设置的支撑板以及用于和竖向杆连接的连接架。Further, the contact support structure includes a support plate fitted with the prefabricated side wall piece and a connecting frame for connecting with the vertical rod.

进一步,所述接触支撑结构设置有两组,两组接触支撑结构分别位于竖向杆的顶部与中部。Further, two groups of the contact support structures are provided, and the two groups of contact support structures are respectively located at the top and the middle of the vertical rod.

进一步,所述锚筋结构包括锚筋与拉件,拉件压在所述水平杆与竖向杆的连接位置,锚筋的一端与拉件可拆卸的连接,锚筋的另一端预埋固定在地板内。Further, the anchor bar structure includes an anchor bar and a tension member, the tension member is pressed at the connection position of the horizontal rod and the vertical rod, one end of the anchor bar is detachably connected with the tension member, and the other end of the anchor bar is pre-embedded and fixed. inside the floor.

进一步,所述拉件上配合锚筋设置有穿孔,所述锚筋的顶部螺接有锁紧套,锁紧套与拉件的顶部压接。Further, a perforation is provided on the tie member in cooperation with the anchor rib, a locking sleeve is screwed on the top of the anchor rib, and the locking sleeve is crimped with the top of the tie member.

进一步,所述顶托结构包括固定设置在水平杆两侧的支撑杆,支撑杆上固定设置有滑套,滑套内可上下活动的设置有螺杆,螺杆在滑套的上下两侧分别螺接有锁紧件,螺杆的底部固定设置有脚板。Further, the jacking structure includes support rods fixedly arranged on both sides of the horizontal rod, a sliding sleeve is fixedly arranged on the support rod, a screw rod is arranged in the sliding sleeve which can move up and down, and the screw rod is screwed on the upper and lower sides of the sliding sleeve respectively. There are locking pieces, and the bottom of the screw rod is fixedly provided with a foot plate.

进一步,所述水平杆的底部设置有移动轮组件。Further, the bottom of the horizontal rod is provided with a moving wheel assembly.

本实用新型的上述技术方案具有以下有益效果:本实用新型采用分体组装式的结构,每个可拆解的单元均为质量较轻的结构,便于运输且拆装方便;本实用新型整体结构合理,强度高,大大的减少了整个支撑装置的占用空间,提高了施工期间材料、设备、人员的通行效率;本实用新型将单杆侧向支撑改进为了单杆组合的侧向支撑体系,提高了底盒侧墙结构混凝土一次性浇筑高度,减少了车站侧墙纵向施工缝,提高了富水区地铁车站结构防水效果,整体实用性强,推广应用价值高。The above-mentioned technical solutions of the present invention have the following beneficial effects: the present invention adopts a split-assembly structure, and each disassembled unit is a light-weight structure, which is convenient for transportation and disassembly; the overall structure of the present invention Reasonable and high strength, greatly reducing the occupied space of the entire supporting device, and improving the passing efficiency of materials, equipment and personnel during construction; the utility model improves the single-pole lateral support into a single-pole combined lateral support system, which improves the efficiency of the construction. The one-time pouring height of the bottom box side wall structure concrete is reduced, the longitudinal construction joints of the station side wall are reduced, and the waterproof effect of the subway station structure in the water-rich area is improved. The overall practicability is strong, and the promotion and application value is high.

附图说明Description of drawings

图1为本实用新型实施例结构示意图;Fig. 1 is the structural representation of the embodiment of the present utility model;

图2为图1中A处的局部放大图;Fig. 2 is the partial enlarged view of A place in Fig. 1;

图3为图2中C向的结构示意图FIG. 3 is a schematic view of the structure of the C direction in FIG. 2

图4为图1中B处的局部放大图;Fig. 4 is a partial enlarged view at B in Fig. 1;

图5为本实用新型实施例拉件与水平杆的配合状态图;FIG. 5 is a state diagram of the cooperation between the pulling member and the horizontal rod according to the embodiment of the present invention;

图6为本实用新型第二种实施例结构示意图;6 is a schematic structural diagram of the second embodiment of the present invention;

图7为本实用新型第二种实施例中安装定位板的立体图。FIG. 7 is a perspective view of the installation positioning plate in the second embodiment of the present invention.

具体实施方式Detailed ways

下面结合附图和实施例对本实用新型的实施方式作进一步详细描述。以下实施例用于说明本实用新型,但不能用来限制本实用新型的范围。The embodiments of the present utility model will be described in further detail below with reference to the accompanying drawings and examples. The following examples are used to illustrate the present invention, but cannot be used to limit the scope of the present invention.

在本实用新型的描述中,除非另有说明,“多个”的含义是两个或两个以上;术语“上”、“下”、“左”、“右”、“内”、“外”、“前端”、“后端”、“头部”、“尾部”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。在本实用新型的描述中,需要说明的是,除非另有明确的规定和限定,术语“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本实用新型中的具体含义。In the description of the present utility model, unless otherwise specified, "multiple" means two or more; the terms "upper", "lower", "left", "right", "inner", "outer" ", "front end", "rear end", "head", "tail" and other indications of orientation or positional relationship are based on the orientation or positional relationship shown in the accompanying drawings, only for the convenience of describing the present utility model and simplifying the description, Rather than indicating or implying that the indicated device or element must have a particular orientation, be constructed and operate in a particular orientation, it should not be construed as a limitation of the present invention. In the description of the present invention, it should be noted that, unless otherwise expressly specified and limited, the terms "connected" and "connected" should be understood in a broad sense, for example, it may be a fixed connection or a detachable connection, or It can be connected integrally; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood in specific situations.

如图1-5所示,本实施例所述的一种地铁车站预制侧墙组合式侧向支撑装置,包括水平杆1、竖向杆2以及斜杆3,水平杆1、竖向杆以及斜杆3两两之间可拆卸连接并且三者之间构成直角三角形桁架结构。As shown in Figures 1-5, a combined lateral support device for a prefabricated side wall of a subway station described in this embodiment includes a horizontal rod 1, a vertical rod 2 and an oblique rod 3, a horizontal rod 1, a vertical rod and The diagonal rods 3 are detachably connected to each other and form a right-angled triangular truss structure.

竖向杆2上设置有用于支撑预制侧墙件4的接触支撑结构,预制侧墙件4贴附在侧墙现浇层21上;地板5与水平杆1的靠近预制侧墙件4的一侧之间设置有锚筋结构,锚筋结构用于给与水平杆1拉力,水平杆1的底部设置有顶托结构,顶托结构用于给与水平杆1支撑力,这种受力形式与现浇法侧墙定型钢模板体系受力模式相同,具有丰富的实践经验,安全可靠。The vertical rod 2 is provided with a contact support structure for supporting the prefabricated side wall piece 4, and the prefabricated side wall piece 4 is attached to the cast-in-place layer 21 of the side wall; An anchor rib structure is arranged between the sides, and the anchor rib structure is used to give tension to the horizontal rod 1. The bottom of the horizontal rod 1 is provided with a jacking structure, which is used to give a supporting force to the horizontal rod 1. This stress form It has the same force mode as the cast-in-place side wall shaped steel formwork system, has rich practical experience, and is safe and reliable.

水平杆1的顶端焊接设置有第一节点板601,斜杆3的顶端通过螺栓与第一节点板601固定连接,水平杆1的两端分别焊接设置有第二节点板602与第三节点板603,竖向杆2的底端通过螺栓与第二节点板 602固定连接,斜杆3的底端通过螺栓与第三节点板603固定连接,该种结构使得每个可拆解的单元均为质量较轻的结构,便于运输且拆装方便。The top end of the horizontal rod 1 is welded with a first gusset plate 601, the top end of the oblique rod 3 is fixedly connected to the first gusset plate 601 by bolts, and the two ends of the horizontal rod 1 are respectively welded with a second gusset plate 602 and a third gusset plate 603, the bottom end of the vertical rod 2 is fixedly connected to the second gusset plate 602 through bolts, and the bottom end of the inclined rod 3 is fixedly connected to the third gusset plate 603 through bolts, this structure makes each disassembled unit Lightweight structure, easy to transport and easy to disassemble.

通过该种结构,使得斜杆3与地面之间呈60°的夹角,较现有技术中45°的夹角结构来说,大大的减少了整个支撑装置的占用空间,提高了施工期间材料、设备、人员的通行效率。Through this structure, the angle between the inclined rod 3 and the ground is 60°, which greatly reduces the space occupied by the entire support device and improves the material during construction compared with the 45° angle structure in the prior art. , equipment, personnel traffic efficiency.

桁架结构内设置有加强结构,加强结构包括加强水平杆7与加强斜杆8,竖向杆2的中部焊接设置有第四节点板604,斜杆3的中部焊接设置有第五节点板605,水平杆1的中部焊接设置有第六节点板606,加强水平杆7的两端分别通过螺栓与第四节点板604以及第五节点板 605固定连接,加强斜杆8的两端分别通过螺栓与第五节点板605以及第六节点板606固定连接。A reinforcing structure is arranged in the truss structure, and the reinforcing structure includes a reinforcing horizontal rod 7 and a reinforcing oblique rod 8. The middle part of the vertical rod 2 is welded with a fourth node plate 604, and the middle part of the inclined rod 3 is welded with a fifth node plate 605. The middle of the horizontal rod 1 is welded with a sixth node plate 606, the two ends of the reinforcing horizontal rod 7 are fixedly connected to the fourth node plate 604 and the fifth node plate 605 through bolts, respectively, and the two ends of the reinforcing oblique rod 8 are respectively connected with the bolts through bolts. The fifth gusset plate 605 and the sixth gusset plate 606 are fixedly connected.

加强斜杆8与水平面之间的夹角为60-70°,通过设置加强结构,能够进一步的保证支撑结构的整体强度,为安全施工提供保证。The included angle between the reinforcing inclined rod 8 and the horizontal plane is 60-70°. By setting the reinforcing structure, the overall strength of the supporting structure can be further ensured, thereby providing a guarantee for safe construction.

接触支撑结构包括与预制侧墙件4贴合设置的支撑板9以及用于和竖向杆2连接的连接架10,其中支撑板9采用直径为200mm,厚度为10mm的钢板制成,连接架10可以采用槽钢或者工字钢,连接架10 的两端分别与支撑板9以及竖向杆2焊接固定。The contact support structure includes a support plate 9 fitted with the prefabricated side wall piece 4 and a connecting frame 10 for connecting with the vertical rod 2, wherein the support plate 9 is made of a steel plate with a diameter of 200mm and a thickness of 10mm. 10 can be made of channel steel or I-beam, and both ends of the connecting frame 10 are welded and fixed with the support plate 9 and the vertical rod 2 respectively.

优选的,接触支撑结构设置有两组,两组接触支撑结构分别位于竖向杆2的顶部与中部,用于实现对预制侧墙件5的多点稳定支撑效果。Preferably, two groups of contact support structures are provided, and the two groups of contact support structures are respectively located at the top and middle of the vertical rod 2 to achieve multi-point stable support for the prefabricated side wall member 5 .

其中位于中部的接触支撑结构与加强水平杆7的位置相对应,使得整体结构受力更加合理。The contact support structure located in the middle corresponds to the position of the reinforcing horizontal rod 7, so that the stress on the overall structure is more reasonable.

锚筋结构包括锚筋11与拉件12,拉件12为中空管状结构,拉件 12压在水平杆1与竖向杆2的连接位置,锚筋11的一端与拉件12可拆卸的连接,锚筋11的另一端预埋固定在地板5内,具体的,拉件12 上配合锚筋11设置有穿孔1201,锚筋11的顶部螺接有锁紧套13,锁紧套13与拉件12的顶部压接。The anchor bar structure includes an anchor bar 11 and a tension member 12. The tension member 12 is a hollow tubular structure. The tension member 12 is pressed at the connection position of the horizontal rod 1 and the vertical rod 2. One end of the anchor bar 11 is detachably connected to the tension member 12. , the other end of the anchor rib 11 is pre-buried and fixed in the floor 5. Specifically, a through hole 1201 is provided on the pulling member 12 in cooperation with the anchor rib 11. The top of the anchor rib 11 is screwed with a locking sleeve 13, and the locking sleeve 13 is connected with the pull The top of the piece 12 is crimped.

优选的,拉件12通过对称设置的两个锚筋11与地板5实现连接,拉件12的中部压在水平杆1与竖向杆2的连接位置。Preferably, the pulling member 12 is connected to the floor 5 through two symmetrically arranged anchor bars 11 , and the middle portion of the pulling member 12 is pressed against the connection position of the horizontal rod 1 and the vertical rod 2 .

锚筋11与水平面之间的夹角为65-75°。The included angle between the anchor bar 11 and the horizontal plane is 65-75°.

顶托结构包括固定设置在水平杆1两侧的支撑杆14,支撑杆14 上固定设置有滑套15,滑套15内可上下活动的设置有螺杆16,螺杆 16在滑套15的上下两侧分别螺接有锁紧件17,螺杆16的底部固定设置有脚板18,通过调节两个锁紧件17的位置,可以对整个支撑装置的高度进行微调,以更满足实际的使用需要。The jacking structure includes support rods 14 fixedly arranged on both sides of the horizontal rod 1 , a sliding sleeve 15 is fixed on the support rod 14 , and a screw 16 is arranged in the sliding sleeve 15 to move up and down, and the screw 16 is located on the upper and lower sides of the sliding sleeve 15 . The sides are respectively screwed with locking pieces 17, and the bottom of the screw rod 16 is fixedly provided with a foot plate 18. By adjusting the positions of the two locking pieces 17, the height of the entire supporting device can be fine-tuned to better meet the actual use needs.

水平杆1的底部设置有移动轮组件19,移动轮组件19包括轮架 1901,轮架1901通过竖直转轴1902与水平杆1转动连接,轮架1901 上设置有滚轮1903,如图4所示,当顶托结构发挥正常支撑作用的时候,滚轮1903处于悬空的状态,当需要移动的时候,将顶托结构向上升,使得脚板18高于滚轮1903,这样滚轮1903便可以与地面接触便于移动。The bottom of the horizontal rod 1 is provided with a moving wheel assembly 19. The moving wheel assembly 19 includes a wheel frame 1901. The wheel frame 1901 is rotatably connected to the horizontal rod 1 through a vertical shaft 1902. The wheel frame 1901 is provided with a roller 1903, as shown in FIG. 4 . , when the jacking structure plays a normal supporting role, the roller 1903 is in a suspended state. When it needs to move, the jacking structure is lifted up so that the foot plate 18 is higher than the roller 1903, so that the roller 1903 can be in contact with the ground for easy movement. .

如图6-7所示,在第二种实施例中,为了进一步的提高结构的稳定性,便于各个结构件的定位安装,设置有安装定位板20,安装定位板20同时与所述加强水平杆7、加强斜杆8以及斜杆3的一侧贴合设置,安装定位板20上分别配合加强水平杆7与加强斜杆8设置有定位夹片2001,定位夹片2001为直接在安装定位板20上冲压弯折形成,定位夹片2001与安装定位板20配合形成U形定位结构,安装定位板 20上配合斜杆3的侧面设置有连接部2002,连接部2002通过连接件 2003与斜杆3可拆卸的连接,连接件2003可以为蝶形螺栓,该安装定位板20,在使用的时候,首先与斜杆3连接在一起,然后通过定位夹片2001可以快速的首先加强水平杆7与加强斜杆8的定位安装,大大的提高了装配效率,在组装完毕后,该安装定位板20可以取下,用于其他支撑装置的组装,也可以不取下,起到结构加强的作用。As shown in FIGS. 6-7 , in the second embodiment, in order to further improve the stability of the structure and facilitate the positioning and installation of each structural component, an installation and positioning plate 20 is provided, and the installation and positioning plate 20 is at the same time as the reinforcement level. One side of the rod 7, the reinforcing inclined rod 8 and the inclined rod 3 are fitted together, and the installation positioning plate 20 is provided with a positioning clip 2001 corresponding to the reinforcing horizontal rod 7 and the reinforcing inclined rod 8, and the positioning clip 2001 is directly installed and positioned. The plate 20 is formed by punching and bending, the positioning clip 2001 cooperates with the installation and positioning plate 20 to form a U-shaped positioning structure, and the side of the installation and positioning plate 20 that cooperates with the inclined rod 3 is provided with a connecting part 2002. The rod 3 is detachably connected, and the connector 2003 can be a wing bolt. The installation positioning plate 20, when in use, is first connected with the oblique rod 3, and then the positioning clip 2001 can quickly strengthen the horizontal rod 7 first. The positioning and installation of the reinforcing inclined rod 8 greatly improves the assembly efficiency. After the assembly is completed, the installation positioning plate 20 can be removed for the assembly of other supporting devices, or it can not be removed, which plays the role of structural strengthening. .

为了达到拼装后的整个支撑体系通过人力就可移动的目的,如在一个施工阶段内(一般浇筑长度为20m)可以设置20个本实用新型中的制侧墙组合式侧向支撑装置,即支撑装置之间的间距为1m,每个支撑装置均独立的存在,单独受力,各个支撑装置之间没有关联,当然,为了提高侧向支撑体系的整体性,也可以通过连接杆将各个单独的侧向支撑装置连接起来,构成侧向整体受力结构。In order to achieve the purpose that the entire support system after assembling can be moved by manpower, for example, in one construction stage (generally the pouring length is 20m), 20 combined lateral support devices of the side wall in the present invention can be installed, that is, the support The distance between the devices is 1m. Each support device exists independently and is stressed independently. There is no relationship between the support devices. Of course, in order to improve the integrity of the lateral support system, each independent The lateral support devices are connected to form a lateral integral force-bearing structure.

本实用新型的实施例是为了示例和描述起见而给出的,而并不是无遗漏的或者将本实用新型限于所公开的形式。很多修改和变化对于本领域的普通技术人员而言是显而易见的。选择和描述实施例是为了更好说明本实用新型的原理和实际应用,并且使本领域的普通技术人员能够理解本实用新型从而设计适于特定用途的带有各种修改的各种实施例。The embodiments of the present invention are presented for purposes of illustration and description, and are not intended to be exhaustive or to limit the invention to the form disclosed. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiment was chosen and described in order to better explain the principles of the invention and the practical application, and to enable others of ordinary skill in the art to understand the invention for the design of various embodiments with various modifications as are suited to the particular use.

Claims (10)

1.一种地铁车站预制侧墙组合式侧向支撑装置,其特征在于:包括水平杆、竖向杆以及斜杆,所述水平杆、竖向杆以及斜杆两两之间可拆卸连接并且三者之间构成直角三角形桁架结构;1. A combined lateral support device for a prefabricated side wall of a subway station is characterized in that: it comprises a horizontal rod, a vertical rod and an oblique rod, and the horizontal rod, the vertical rod and the oblique rod are detachably connected in pairs and A right-angled triangular truss structure is formed between the three; 所述竖向杆上设置有用于支撑预制侧墙件的接触支撑结构;The vertical rod is provided with a contact support structure for supporting the prefabricated side wall pieces; 地板与水平杆的靠近预制侧墙件的一侧之间设置有锚筋结构;An anchor bar structure is arranged between the floor and the side of the horizontal rod close to the prefabricated side wall piece; 所述水平杆的底部设置有顶托结构。The bottom of the horizontal rod is provided with a jacking structure. 2.根据权利要求1所述的一种地铁车站预制侧墙组合式侧向支撑装置,其特征在于:所述水平杆的顶端设置有第一节点板,所述斜杆的顶端通过螺栓与第一节点板固定连接,所述水平杆的两端分别设置有第二节点板与第三节点板,所述竖向杆的底端通过螺栓与第二节点板固定连接,所述斜杆的底端通过螺栓与第三节点板固定连接。2 . The combined lateral support device for a prefabricated side wall of a subway station according to claim 1 , wherein the top end of the horizontal rod is provided with a first gusset plate, and the top end of the inclined rod is connected to the first gusset plate through bolts. 3 . A gusset plate is fixedly connected, the two ends of the horizontal rod are respectively provided with a second gusset plate and a third gusset plate, the bottom end of the vertical rod is fixedly connected to the second gusset plate by bolts, and the bottom end of the inclined rod is fixedly connected with the second gusset plate. The ends are fixedly connected to the third gusset plate by means of bolts. 3.根据权利要求1所述的一种地铁车站预制侧墙组合式侧向支撑装置,其特征在于:所述桁架结构内设置有加强结构;3 . The combined lateral support device for a prefabricated side wall of a subway station according to claim 1 , wherein a reinforcing structure is arranged in the truss structure; 4 . 所述加强结构包括加强水平杆与加强斜杆,所述竖向杆的中部设置有第四节点板,斜杆的中部设置有第五节点板,水平杆的中部设置有第六节点板,所述加强水平杆的两端分别通过螺栓与第四节点板以及第五节点板固定连接,所述加强斜杆的两端分别通过螺栓与第五节点板以及第六节点板固定连接。The reinforcing structure includes a reinforcing horizontal rod and a reinforcing inclined rod, the middle part of the vertical rod is provided with a fourth gusset plate, the middle part of the inclined rod is provided with a fifth gusset plate, and the middle part of the horizontal rod is provided with a sixth gusset plate, so the The two ends of the reinforcing horizontal rod are respectively fixedly connected to the fourth gusset plate and the fifth gusset plate through bolts, and the two ends of the reinforcing inclined rod are respectively fixedly connected to the fifth gusset plate and the sixth gusset plate through bolts. 4.根据权利要求3所述的一种地铁车站预制侧墙组合式侧向支撑装置,其特征在于:还包括安装定位板,安装定位板同时与所述加强水平杆、加强斜杆以及斜杆的一侧贴合设置,安装定位板上分别配合加强水平杆与加强斜杆设置有定位夹片,安装定位板上配合斜杆的侧面设置有连接部,连接部通过连接件与斜杆可拆卸的连接。4. A combined lateral support device for a prefabricated side wall of a subway station according to claim 3, characterized in that: it further comprises an installation positioning plate, and the installation positioning plate is simultaneously connected with the reinforced horizontal rod, the reinforced inclined rod and the inclined rod. One side of the installation and positioning plate is fitted with the reinforced horizontal rod and the reinforced inclined rod respectively, and there are positioning clips. Connection. 5.根据权利要求1所述的一种地铁车站预制侧墙组合式侧向支撑装置,其特征在于:所述接触支撑结构包括与预制侧墙件贴合设置的支撑板以及用于和竖向杆连接的连接架。5 . The combined lateral support device for a prefabricated side wall of a subway station according to claim 1 , wherein the contact support structure comprises a support plate fitted with the prefabricated side wall and a support plate for and vertical support. 6 . The connecting frame of the rod connection. 6.根据权利要求5所述的一种地铁车站预制侧墙组合式侧向支撑装置,其特征在于:所述接触支撑结构设置有两组,两组接触支撑结构分别位于竖向杆的顶部与中部。6 . The combined lateral support device for a prefabricated side wall of a subway station according to claim 5 , wherein the contact support structure is provided with two groups, and the two groups of contact support structures are respectively located on the top of the vertical rod and the contact support structure. 7 . middle. 7.根据权利要求1所述的一种地铁车站预制侧墙组合式侧向支撑装置,其特征在于:所述锚筋结构包括锚筋与拉件,拉件压在所述水平杆与竖向杆的连接位置,锚筋的一端与拉件可拆卸的连接,锚筋的另一端预埋固定在地板内。7 . The combined lateral support device for a prefabricated side wall of a subway station according to claim 1 , wherein the anchor bar structure comprises anchor bars and a tension member, and the tension member is pressed against the horizontal rod and the vertical rod. 8 . For the connection position of the rod, one end of the anchor bar is detachably connected to the pulling piece, and the other end of the anchor bar is pre-buried and fixed in the floor. 8.根据权利要求7所述的一种地铁车站预制侧墙组合式侧向支撑装置,其特征在于:所述拉件上配合锚筋设置有穿孔,所述锚筋的顶部螺接有锁紧套,锁紧套与拉件的顶部压接。8 . The combined lateral support device for a prefabricated side wall of a subway station according to claim 7 , wherein the tie member is provided with perforations in cooperation with the anchor bars, and the tops of the anchor bars are screwed with locking bolts. 9 . Sleeve, the locking sleeve is crimped to the top of the puller. 9.根据权利要求1所述的一种地铁车站预制侧墙组合式侧向支撑装置,其特征在于:所述顶托结构包括固定设置在水平杆两侧的支撑杆,支撑杆上固定设置有滑套,滑套内可上下活动的设置有螺杆,螺杆在滑套的上下两侧分别螺接有锁紧件,螺杆的底部固定设置有脚板。9 . The combined lateral support device for a prefabricated side wall of a subway station according to claim 1 , wherein the jacking structure comprises support rods fixedly arranged on both sides of the horizontal rod, and the support rods are fixedly provided with The sliding sleeve is provided with a screw rod which can move up and down, the screw rod is screwed with locking pieces on the upper and lower sides of the sliding sleeve, and the bottom of the screw rod is fixedly provided with a foot plate. 10.根据权利要求9所述的一种地铁车站预制侧墙组合式侧向支撑装置,其特征在于:所述水平杆的底部设置有移动轮组件。10 . The combined lateral support device for a prefabricated side wall of a subway station according to claim 9 , wherein the bottom of the horizontal rod is provided with a moving wheel assembly. 11 .
CN202122744491.9U 2021-11-10 2021-11-10 A combined lateral support device for prefabricated side walls of a subway station Expired - Fee Related CN216840729U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122744491.9U CN216840729U (en) 2021-11-10 2021-11-10 A combined lateral support device for prefabricated side walls of a subway station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122744491.9U CN216840729U (en) 2021-11-10 2021-11-10 A combined lateral support device for prefabricated side walls of a subway station

Publications (1)

Publication Number Publication Date
CN216840729U true CN216840729U (en) 2022-06-28

Family

ID=82101544

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122744491.9U Expired - Fee Related CN216840729U (en) 2021-11-10 2021-11-10 A combined lateral support device for prefabricated side walls of a subway station

Country Status (1)

Country Link
CN (1) CN216840729U (en)

Similar Documents

Publication Publication Date Title
CN103291065B (en) A kind of assembly concrete bracing or strutting arrangement and lifting localization method
CN203594213U (en) Flexible assembling and disassembling bearing truss
CN202248298U (en) Section steel concrete frame node
CN204019724U (en) Make the mold of prefabricated case beam framework of steel reinforcement
CN216840729U (en) A combined lateral support device for prefabricated side walls of a subway station
CN205617552U (en) Assembled integrated configuration
CN205224288U (en) Connection node of reinforced concrete superposed beam and steel pipe column
CN102454292A (en) Supporting steel frame of high altitude large-span cantilever structure mold frame
CN111593874B (en) Support system and construction method for super-high-rise residential transfer layer super-heavy cantilevered components
CN213204915U (en) Overweight overhanging suspended component supporting system of super high-rise residential conversion layer
CN202227255U (en) Cat anchor device for steel truss girder
CN209227834U (en) A prefabricated steel tube concrete frame shear wall structure
CN219451491U (en) Horizontal reserved hole plugging template
CN211312838U (en) Connection components of square steel and steel beams
CN201943350U (en) Supporting steel frame for die holder of high-altitude large span overhanging structure
CN217947286U (en) Construction elevator attached combined structure fixed on floor
CN204531180U (en) Control the stiff skeleton of large-scale component reinforcing bar binding precision
CN211973557U (en) An exposed rigid column foot node
CN208293585U (en) High strength fish belly sill support base
CN220150535U (en) Coating-free high-performance buckling restrained brace
CN216277052U (en) Construction device for additionally arranging supporting point column under splicing top supporting beam and beam
CN223032926U (en) Tower crane attaches wall structure
CN207512968U (en) A kind of splicing node of steel plate combined shear wall
CN223780938U (en) Ditch shaping template reinforcing apparatus
CN217632477U (en) Two lining support templates of small cross section tunnel plain type

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220628

CF01 Termination of patent right due to non-payment of annual fee