CN216839059U - Construction positioner for widening engineering embedded steel bars on one side of bridge under construction - Google Patents

Construction positioner for widening engineering embedded steel bars on one side of bridge under construction Download PDF

Info

Publication number
CN216839059U
CN216839059U CN202122391340.XU CN202122391340U CN216839059U CN 216839059 U CN216839059 U CN 216839059U CN 202122391340 U CN202122391340 U CN 202122391340U CN 216839059 U CN216839059 U CN 216839059U
Authority
CN
China
Prior art keywords
construction
locator
bar planting
bridge under
pier stud
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122391340.XU
Other languages
Chinese (zh)
Inventor
包特门白乙拉
杨伟光
姚景武
赵耀
吕鑫
郑永飞
王磊
郜俊平
赵远
赵建恒
任文豪
郝杰玉
蔚伟
顾鹏
刘云聪
刘鑫奇
谢万超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cccc Fourth Highway First Engineering Firms Co ltd
Original Assignee
Cccc Fourth Highway First Engineering Firms Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cccc Fourth Highway First Engineering Firms Co ltd filed Critical Cccc Fourth Highway First Engineering Firms Co ltd
Priority to CN202122391340.XU priority Critical patent/CN216839059U/en
Application granted granted Critical
Publication of CN216839059U publication Critical patent/CN216839059U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model belongs to the technical field of bridge engineering, especially, relate to a widen engineering bar planting construction locator at bridge construction unilateral, including the locator body, the back equidistance of locator body is equipped with a plurality of pier stud backup pads, and the front of locator body is equipped with hoist and mount board and support frame, and the support frame is located the below of hoist and mount board, and the equidistance is equipped with the preformed hole on the locator body, the preformed hole sets up according to size, quantity and the position of bar planting. The utility model provides an in the bar planting construction, the hole site is inaccurate, inclined to one side hole appears easily when constructor drills, and the progress is slow, the problem that the quality can't be guaranteed. Manpower and material resources are greatly reduced, the practicability of the positioner is effectively improved, the construction efficiency is improved, and the construction quality is ensured.

Description

Construction positioner for widening engineering embedded steel bars on one side of bridge under construction
Technical Field
The utility model belongs to the technical field of bridge engineering, especially, relate to a widen engineering bar planting construction locator at bridge construction unilateral.
Background
With the rapid development of national economy in China, most of the currently constructed four-lane highways cannot meet the increasing travel and business requirements of people, and even have the phenomena of traffic jam and the like. In order to improve the high traffic capacity of the expressway, a great number of reconstruction and extension projects appear in recent years in China, and original four lanes are widened to six lanes or eight lanes. The construction of the highway is bound to be carried out through the step of implanting the steel bars, for example, patent No. 201910047618.6 discloses an old pier column combined reinforcement system and a construction method, and discloses the step of implanting the steel bars as follows: drilling a hole on the pier stud by using a percussion drill, wherein the diameter of the drill bit is larger than that of the steel bar; the initial drilling needs to be slow, and full-speed drilling is carried out after the drill bit is stably positioned; forming a hole perpendicular to the plane of the bar planting structure, and changing the hole if the steel bar is a main bar in the drilling hole; then, steel bars are inserted into the drilled holes, and the redundant gaps are sealed by using bar planting glue. In the bar planting construction process, the characteristics of inaccurate and deviated hole positions, slow progress and incapability of guaranteeing the quality of hole positions are easy to appear when constructors drill holes, the requirements of site construction cannot be met in the reconstruction and expansion bridge construction, and meanwhile, the construction efficiency is greatly reduced.
SUMMERY OF THE UTILITY MODEL
The utility model provides a widen engineering bar planting construction locator at bridge construction unilateral, aim at improves the accuracy of drilling.
In order to achieve the above object, the utility model adopts the following technical scheme:
the utility model provides a widen engineering bar planting construction locator at bridge unilateral, includes the locator body, and the back equidistance of locator body is equipped with a plurality of pier stud backup pads, and the front of locator body is equipped with hoist and mount board and support frame, and the support frame is located the below of hoist and mount board, and the equidistance is equipped with the preformed hole on the locator body, the preformed hole sets up according to size, quantity and the position of bar planting.
Further, the locator body is the arc steel sheet, and equals with the radian of pier stud.
Furthermore, the pier stud supporting plate is made of steel.
Furthermore, the support frame is right triangle, and the quantity is two.
Furthermore, the number of the hoisting plates is two.
Furthermore, pier stud backup pad, hoist and mount board and support frame all weld on the locator body.
Compared with the prior art, the utility model discloses following beneficial effect has:
the utility model discloses a set up the backup pad on the locator body, can install the side at the pier stud with the locator body, through set up hoist and mount board on the locator body, can hoist and mount the locator body on construction operation platform, welding support frame on the locator body simultaneously, improve the stability of locator body on construction operation platform, set up the preformed hole on the locator body, the preformed hole is according to the bar planting size, quantity and position set up in advance, the accuracy nature that the rig punched when being favorable to improving the bar planting construction, in the bar planting construction has been solved, the hole site is inaccurate when constructor drills, the inclined to one side hole, the progress is slow, the problem that the quality can't be guaranteed. Manpower and material resources are greatly reduced, the practicability of the positioner is effectively improved, the construction efficiency is improved, and the construction quality is ensured.
Drawings
FIG. 1 is a front view of a steel bar planting construction positioner for a single-side widening project of a bridge under construction;
FIG. 2 is a side view of a construction locator for bar planting in a single-side widening project of a bridge under construction;
FIG. 3 is a schematic diagram of the construction locator for the bar planting of the single-side widening project of the bridge under construction.
Wherein: 1-a locator body; 2-pier stud supporting plate; 3-preparing a hole; 4-hoisting the plate; 5-a support frame; 6-pier stud.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
Example one
As shown in figures 1, 2 and 3, the engineering bar planting construction positioner for widening on one side of a bridge under construction comprises a positioner body 1, wherein a plurality of pier stud supporting plates 2 are arranged on the back face of the positioner body 1 at equal intervals, a hoisting plate 4 and a supporting frame 5 are arranged on the front face of the positioner body 1, the supporting frame 5 is positioned below the hoisting plate 4, preformed holes 3 are arranged on the positioner body 1 at equal intervals, and the preformed holes 3 are arranged according to the size, the number and the positions of bar planting.
Example two
As shown in figures 1, 2 and 3, the engineering bar planting construction positioner for widening on one side of a bridge under construction comprises a positioner body 1, wherein a plurality of pier stud supporting plates 2 are arranged on the back face of the positioner body 1 at equal intervals, a hoisting plate 4 and a supporting frame 5 are arranged on the front face of the positioner body 1, the supporting frame 5 is positioned below the hoisting plate 4, preformed holes 3 are arranged on the positioner body 1 at equal intervals, and the preformed holes 3 are arranged according to the size, the number and the positions of bar planting.
The locator body 1 is an arc-shaped steel plate and is equal to the radian of the pier stud 6.
The pier stud supporting plate 2 is made of steel.
The support frames 5 are right-angled triangles, and the number of the support frames is two.
The number of the hoisting plates 4 is two.
Pier stud backup pad 2, hoist and mount board 4 and support frame 5 all weld on locator body 1.
The using method comprises the following steps:
during the use, locator body 1 hoists on construction operation platform through hoisting plate 4, and locator body 1 maintains the balance through support frame 5, lays at construction operation platform, need not to stabilize with the help of external force, and locator body 1 is installed in the side of pier stud 6 through pier stud backup pad 2, and the operation of punching is accomplished through preformed hole 3 with the rig to constructor.
The preferred embodiments of the present invention disclosed above are intended to aid in the description of the invention. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise embodiments disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and its practical application, to thereby enable others skilled in the art to best understand and utilize the invention. The present invention is limited only by the claims and their full scope and equivalents.

Claims (6)

1. The utility model provides a widen engineering bar planting construction locator at bridge under construction unilateral which characterized in that: including locator body (1), the back equidistance of locator body (1) is equipped with a plurality of pier stud backup pads (2), the front of locator body (1) is equipped with hoist and mount board (4) and support frame (5), support frame (5) are located the below of hoist and mount board (4), the equidistance is equipped with preformed hole (3) on locator body (1), preformed hole (3) are according to size, quantity and the position setting of bar planting.
2. The locator of claim 1, for single-sided widening engineering bar planting construction of a bridge under construction, characterized in that: the positioner body (1) is an arc-shaped steel plate and is equal to the radian of the pier stud (6).
3. The locator for the bar planting construction of the single-side widening project of the bridge under construction according to claim 1, is characterized in that: the pier stud supporting plate (2) is made of steel.
4. The locator of claim 1, for single-sided widening engineering bar planting construction of a bridge under construction, characterized in that: the support frames (5) are right-angled triangles, and the number of the support frames is two.
5. The locator for the bar planting construction of the single-side widening project of the bridge under construction according to claim 1, is characterized in that: the number of the hoisting plates (4) is two.
6. The locator of claim 1, for single-sided widening engineering bar planting construction of a bridge under construction, characterized in that: pier stud backup pad (2), hoist and mount board (4) and support frame (5) all weld on locator body (1).
CN202122391340.XU 2021-09-30 2021-09-30 Construction positioner for widening engineering embedded steel bars on one side of bridge under construction Active CN216839059U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122391340.XU CN216839059U (en) 2021-09-30 2021-09-30 Construction positioner for widening engineering embedded steel bars on one side of bridge under construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122391340.XU CN216839059U (en) 2021-09-30 2021-09-30 Construction positioner for widening engineering embedded steel bars on one side of bridge under construction

Publications (1)

Publication Number Publication Date
CN216839059U true CN216839059U (en) 2022-06-28

Family

ID=82082328

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122391340.XU Active CN216839059U (en) 2021-09-30 2021-09-30 Construction positioner for widening engineering embedded steel bars on one side of bridge under construction

Country Status (1)

Country Link
CN (1) CN216839059U (en)

Similar Documents

Publication Publication Date Title
CN101570971B (en) Rock mass pile foundation pore-forming preboring construction method
CN216839059U (en) Construction positioner for widening engineering embedded steel bars on one side of bridge under construction
CN101975065A (en) Method for measuring mining stress of coal mine tunnel
CN113738374A (en) Sinking type vertical shaft tunneling equipment supporting ring beam and construction method thereof
CN214666475U (en) Bridge segmentation U ribbed hole crowd data measurement frock
CN206545159U (en) A kind of road deck concrete construction formwork
CN211007042U (en) Replaceable prefabricated column connecting joint
CN207878472U (en) Solid matter step type rotary digging pile supporting system
CN217327365U (en) Station tunnel temporary support device
CN106758818A (en) A kind of Bailey beam provision for disengagement
CN103243636B (en) Spatial panel point structure of steel truss and web PC (poly carbonate) combined bridge and construction method of spatial panel point
CN210315499U (en) Enclosure based on prefabricated H-shaped pile
CN211174153U (en) Supporting structure for underground space construction
CN103938877B (en) The installation method of crab-bolt stock
CN101864733B (en) Support for jacking road and bridge
CN217300604U (en) Coal mine tunnel temporary reinforcing and supporting device for coal mine engineering
CN112343063A (en) Foundation pit supporting device for civil engineering and construction method thereof
CN207092072U (en) A kind of steel reinforcement cage cage bar fixture
CN215860165U (en) Sinking type supporting ring beam of shaft tunneling equipment
CN212001152U (en) Steel structure support piece of deep foundation pit fender pile
CN214783849U (en) Pin-connected panel drilling bored concrete pile construction platform
CN214194565U (en) Civil engineering is safety support structure for excavation supporting
CN110725334A (en) Mid-partition wall of subway station group pit and construction method thereof
CN105178188B (en) Triangular frame supporting formwork
CN213571498U (en) Bridge is assembled in prefabricated of segment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant