CN216839018U - High-speed railway pier stone backing template - Google Patents

High-speed railway pier stone backing template Download PDF

Info

Publication number
CN216839018U
CN216839018U CN202220079401.0U CN202220079401U CN216839018U CN 216839018 U CN216839018 U CN 216839018U CN 202220079401 U CN202220079401 U CN 202220079401U CN 216839018 U CN216839018 U CN 216839018U
Authority
CN
China
Prior art keywords
template
connecting piece
speed railway
stone
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220079401.0U
Other languages
Chinese (zh)
Inventor
赵思涵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Chenhong Metal Products Co ltd
Original Assignee
Nanjing Institute of Mechatronic Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Institute of Mechatronic Technology filed Critical Nanjing Institute of Mechatronic Technology
Priority to CN202220079401.0U priority Critical patent/CN216839018U/en
Application granted granted Critical
Publication of CN216839018U publication Critical patent/CN216839018U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a high-speed railway pier stone setting template, including stone setting external mold, support, the support includes the foundation post that 4 root length are the same, 4 vertical range square structures of foundation post, be equipped with preformed hole template in the middle of the foundation post, it is fixed through the plug pin between preformed hole template and the foundation post, through horizontal channel-section steel connection between 4 foundation posts, the channel-section steel below is equipped with the connecting piece, the connecting piece both ends are equipped with waist shape hole one, the stone setting external mold includes mount and link, the link sets up in the mount below, the connecting piece passes through waist shape hole one and connects on the mount, the link both ends are equipped with waist shape hole two, the stone setting template, set up on the pier in advance on one's body, stone setting and pier shaft are under construction simultaneously, and the location is accurate, and the security is high, and construction cost is low.

Description

一种高铁桥墩垫石模板A kind of high-speed rail bridge pier cushion stone template

技术领域technical field

本实用新型属于高铁施工技术领域,具体涉及一种高铁桥墩垫石模板。The utility model belongs to the technical field of high-speed railway construction, in particular to a high-speed railway bridge pier cushion stone formwork.

背景技术Background technique

高铁桥墩采用钢筋混凝土盖梁及垫石是普遍采用的一种施工方法,高铁桥墩的垫石模板要求是:表面平整、形状准确、不漏浆,有足够的强度与刚性,模板一般采用木模,中间绑扎钢筋,施工时先浇筑盖梁,再混凝土浇筑垫石,存在几个缺陷:1、利用木板容易变形;2、墩身施工完成后到现场绑扎钢筋,单独施工,危险性大;3、成本大。It is a commonly used construction method to use reinforced concrete cover beams and cushion stones for high-speed railway piers. The requirements of the cushion stone formwork for high-speed railway piers are: smooth surface, accurate shape, no leakage, sufficient strength and rigidity, and the formwork generally adopts wood formwork There are several defects: 1. The use of wooden boards is easy to deform; 2. After the construction of the pier body is completed, the steel bars are bound on site, and it is constructed separately, which is very dangerous; 3. , the cost is large.

发明内容SUMMARY OF THE INVENTION

为解决上述问题,本实用新型公开了一种高铁桥墩垫石模板,垫石和墩身同时施工,定位准确,安全性高,施工成本低。In order to solve the above problems, the utility model discloses a high-speed rail bridge pier cushion stone formwork, the cushion stone and the pier body are constructed at the same time, the positioning is accurate, the safety is high, and the construction cost is low.

为达到上述目的,本实用新型的技术方案如下:For achieving the above object, the technical scheme of the present utility model is as follows:

一种高铁桥墩垫石模板,其特征在于:包括垫石外模、支架,所述支架包括4根长度相同的基柱,所述4根基柱竖直排列成方形结构,基柱中间设有预留孔模板,预留孔模板与基柱之间通过插拔销子固定,4根基柱之间通过水平槽钢连接,槽钢下方设有连接件,所述连接件两端设有腰形孔一,所述垫石外模包括固定架与连接架,所述连接架设置在固定架下方,所述连接件通过腰形孔一连接在固定架上,所述连接架两端设有腰形孔二。A high-speed rail bridge pier cushion stone formwork is characterized in that: it includes an outer cushion stone mold and a bracket, the bracket includes 4 foundation columns with the same length, the 4 foundation columns are vertically arranged in a square structure, and there is a prefab in the middle of the foundation columns. Hole-reserved formwork, the reserved-hole formwork and the base column are fixed by plugging pins, and the four base columns are connected by horizontal channel steel. There are connecting pieces under the channel steel, and waist-shaped holes are arranged at both ends of the connecting piece. First, the outer form of the cushion stone includes a fixing frame and a connecting frame, the connecting frame is arranged below the fixing frame, the connecting piece is connected to the fixing frame through a waist-shaped hole, and the two ends of the connecting frame are provided with waist-shaped holes. hole two.

作为本实用新型的一种改进,所述槽钢之间设有加强筋。As an improvement of the present utility model, reinforcing ribs are arranged between the channel steels.

作为本实用新型的一种改进,所述预留孔模板高度高于槽钢高度。As an improvement of the present invention, the height of the reserved hole template is higher than the height of the channel steel.

作为本实用新型的一种改进,所述基柱为无缝钢管。As an improvement of the present utility model, the base column is a seamless steel pipe.

本实用新型的有益效果是:The beneficial effects of the present utility model are:

本实用新型所述的一种高铁桥墩垫石模板,事先设置在墩身上,垫石和墩身同时施工,定位准确,安全性高,施工成本低。The high-speed rail bridge pier cushion stone template of the utility model is pre-arranged on the pier body, the cushion stone and the pier body are constructed at the same time, the positioning is accurate, the safety is high, and the construction cost is low.

附图说明Description of drawings

图1为本实用新型的安装示意图。Fig. 1 is the installation schematic diagram of the utility model.

图2为本实用新型的安装俯视图。Figure 2 is an installation top view of the utility model.

图3为本实用新型所述的支架主视图。FIG. 3 is a front view of the bracket according to the utility model.

图4为本实用新型所述的支架俯视图。FIG. 4 is a top view of the bracket according to the present invention.

图5为本实用新型所述的支架左视图。Fig. 5 is the left side view of the bracket according to the utility model.

图6为本实用新型所述的垫石外模主视图。FIG. 6 is a front view of the pad rock outer mold according to the utility model.

图7为本实用新型所述的垫石外模俯视图。FIG. 7 is a top view of the pad stone outer mold according to the utility model.

附图标记列表:List of reference numbers:

1、垫石外模,2、支架,3、基柱,4、预留孔模板,5、插拔销子,6、槽钢,7、连接件,8、腰形孔一,9、连接架,10、固定架,11、腰形孔二,12、加强筋,13、安装架,14、桥墩。1. Outer mould for cushion stone, 2. Bracket, 3. Base column, 4. Template for reserved holes, 5. Plug-in pin, 6. Channel steel, 7. Connecting piece, 8. Waist hole 1, 9. Connection Frame, 10, Fixed frame, 11, Waist hole II, 12, Reinforcing rib, 13, Mounting frame, 14, Bridge pier.

具体实施方式Detailed ways

下面结合附图和具体实施方式,进一步阐明本实用新型,应理解下述具体实施方式仅用于说明本实用新型而不用于限制本实用新型的范围。需要说明的是,下面描述中使用的词语“前”、“后”、“左”、“右”、“上”和“下”指的是附图中的方向,词语“内”和“外”分别指的是朝向或远离特定部件几何中心的方向。The present invention will be further clarified below with reference to the accompanying drawings and specific embodiments. It should be understood that the following specific embodiments are only used to illustrate the present invention and not to limit the scope of the present invention. It should be noted that the words "front", "rear", "left", "right", "upper" and "lower" used in the following description refer to the directions in the drawings, and the words "inner" and "outer" ” refer to directions towards or away from the geometric center of a particular part, respectively.

如图所示,本实用新型所述的一种高铁桥墩垫石模板,包括垫石外模1、支架2,所述支架2包括4根长度相同的基柱3,所述4根基柱3竖直排列成方形结构,基柱3中间设有预留孔模板4,预留孔模板4与基柱3之间通过插拔销子5固定,4根基柱3之间通过水平槽钢6连接,槽钢6下方设有连接件7,所述连接件7两端设有腰形孔一8,所述垫石外模包括固定架10与连接架9,所述连接架设置在固定架下方,所述连接件7通过腰形孔一8连接在固定架10上,所述连接架9两端设有腰形孔二11,可以连接安装架13。As shown in the figure, a high-speed rail bridge pier cushion stone formwork according to the present invention includes an outer cushion stone mold 1 and a bracket 2. The bracket 2 includes four base columns 3 with the same length, and the four base columns 3 are vertical Straightly arranged into a square structure, there is a reserved hole template 4 in the middle of the base column 3, the reserved hole template 4 and the base column 3 are fixed by plugging pins 5, and the four base columns 3 are connected by a horizontal channel steel 6, A connecting piece 7 is arranged below the channel steel 6, and both ends of the connecting piece 7 are provided with a waist-shaped hole 8. The outer form of the pad stone includes a fixing frame 10 and a connecting frame 9, and the connecting frame is arranged below the fixing frame. The connecting piece 7 is connected to the fixing frame 10 through the waist-shaped hole one 8 , and the two ends of the connecting frame 9 are provided with the waist-shaped hole two 11 , which can be connected to the mounting frame 13 .

本实用新型所述的一种高铁桥墩垫石模板,事先将模板通过安装架13设置在桥墩14上,垫石和墩身同时施工,垫石尺寸标准,定位准确且可微调,而且与墩身同时施工,养护方便,质量能保证;安全性高,施工成本低。For the high-speed railway bridge pier cushion stone formwork described in the present invention, the formwork is set on the bridge pier 14 through the mounting frame 13 in advance, and the cushion stone and the pier body are constructed at the same time. Construction, maintenance is convenient, quality can be guaranteed; high safety, low construction cost.

本实用新型所述槽钢6之间设有加强筋12,增加强度,保证施工质量。Reinforcing ribs 12 are arranged between the channel steels 6 of the utility model to increase the strength and ensure the construction quality.

本实用新型所述预留孔模板4高度高于槽钢6高度,施工方便。The height of the reserved hole template 4 of the utility model is higher than the height of the channel steel 6, and the construction is convenient.

本实用新型所述基柱3为无缝钢管,刚性好,延长使用寿命。The base column 3 of the utility model is a seamless steel pipe, which has good rigidity and prolongs the service life.

本实用新型方案所公开的技术手段不仅限于上述实施方式所公开的技术手段,还包括由以上技术特征任意组合所组成的技术方案。The technical means disclosed by the solution of the present invention are not limited to the technical means disclosed in the above-mentioned embodiments, but also include technical solutions composed of any combination of the above-mentioned technical features.

Claims (4)

1. The utility model provides a high-speed railway pier stone setting template which characterized in that: including stone external mold, support, the support includes 4 foundation columns that the length is the same, 4 vertical range square structures of foundation column, be equipped with preformed hole template in the middle of the foundation column, it is fixed through the plug pin between preformed hole template and the foundation column, connect through horizontal channel-section steel between 4 foundation columns, and the channel-section steel below is equipped with the connecting piece, the connecting piece both ends are equipped with waist shape hole one, the stone external mold includes mount and link, the link sets up in the mount below, the connecting piece passes through waist shape hole one and connects on the mount, the link both ends are equipped with waist shape hole two.
2. The high-speed railway pier pad stone template of claim 1, characterized in that: and reinforcing ribs are arranged between the channel steels.
3. The high-speed railway pier pad stone template of claim 1, characterized in that: the height of the preformed hole template is higher than that of the channel steel.
4. The high-speed railway pier pad stone template of claim 1, characterized in that: the foundation column is a seamless steel pipe.
CN202220079401.0U 2022-01-13 2022-01-13 High-speed railway pier stone backing template Active CN216839018U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220079401.0U CN216839018U (en) 2022-01-13 2022-01-13 High-speed railway pier stone backing template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220079401.0U CN216839018U (en) 2022-01-13 2022-01-13 High-speed railway pier stone backing template

Publications (1)

Publication Number Publication Date
CN216839018U true CN216839018U (en) 2022-06-28

Family

ID=82084142

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220079401.0U Active CN216839018U (en) 2022-01-13 2022-01-13 High-speed railway pier stone backing template

Country Status (1)

Country Link
CN (1) CN216839018U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115506257A (en) * 2022-10-10 2022-12-23 中铁上海工程局集团有限公司 Auxiliary tool for overall prefabrication of railway bridge support pad stone and its operation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115506257A (en) * 2022-10-10 2022-12-23 中铁上海工程局集团有限公司 Auxiliary tool for overall prefabrication of railway bridge support pad stone and its operation method

Similar Documents

Publication Publication Date Title
CN205778910U (en) A kind of outer mould trolley of cut-and-cover tunnel lining cutting
CN105625186A (en) Method for constructing large-section concrete Y-shaped column
CN103469735B (en) The installation method of the formwork of the solid section of the pier top of the hollow column and slab pier with curved superelevation
CN205314539U (en) Large -scale cantilever type combination steel form
CN202954299U (en) Template support structure for large-angle V-shaped pier and No.0 block of continuous rigid framework bridge
CN216839018U (en) High-speed railway pier stone backing template
CN207987958U (en) A kind of pedestal of the tablet formula power equipment assembly foundation structure
CN216920355U (en) Be used for affiliated shaped steel of subway station to support and trade and prop device
CN206070404U (en) Oblique formwork support structure at the section haunch of box culvert top
CN211228923U (en) Fixing device for pre-buried steel plate under shock insulation support
CN109025259A (en) One kind can turnover type hydraulic climbing formwork wall-attaching equipment
CN219604164U (en) Variable cross-section special-shaped steel tower crown mounting device
CN116104018B (en) Construction method of variable-section special-shaped steel tower crown installation device
CN207583391U (en) One kind two serves as a contrast plug steel end mould
CN202689585U (en) Ground fitting up assembly mould of large steel truss
CN207847086U (en) A kind of tall and big beam form support frame
CN202165091U (en) Lining template trolley for baffle wall in tunnel
CN210316538U (en) Aluminum mold supporting system for floor lower extension lintel
CN212024566U (en) Quick easy detachable steel pipe concrete gantry crane track beam stand
CN202577138U (en) Integrated support suitable for mounting precast beams
CN211948026U (en) Cast-in-place splayed wall template system of apron culvert
CN201620419U (en) Steel support structure
CN219101353U (en) Novel steel construction is from walking piping lane template platform truck
CN207121758U (en) A kind of gutter formwork for placing
CN206693513U (en) A kind of concrete mats block assembly for spacer bar

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240701

Address after: 071106 No. 475, Houlangying Village, Yanzhuang Township, Qingyuan District, Baoding City, Hebei Province

Patentee after: Zhang Xincai

Country or region after: China

Address before: No.33, Luming Avenue, Gaochun District, Nanjing City, Jiangsu Province

Patentee before: NANJING VOCATIONAL INSTITUTE OF MECHATRONIC TECHNOLOGY

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240929

Address after: 072556 Liangjiaying Village, Caohe Town, Xushui District, Baoding City, Hebei Province

Patentee after: Hebei Chenhong Metal Products Co.,Ltd.

Country or region after: China

Address before: 071106 No. 475, Houlangying Village, Yanzhuang Township, Qingyuan District, Baoding City, Hebei Province

Patentee before: Zhang Xincai

Country or region before: China