CN216812670U - Damping device of electric power engineering foundation treatment equipment - Google Patents

Damping device of electric power engineering foundation treatment equipment Download PDF

Info

Publication number
CN216812670U
CN216812670U CN202220442853.0U CN202220442853U CN216812670U CN 216812670 U CN216812670 U CN 216812670U CN 202220442853 U CN202220442853 U CN 202220442853U CN 216812670 U CN216812670 U CN 216812670U
Authority
CN
China
Prior art keywords
fixedly installed
plates
shock
treatment equipment
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220442853.0U
Other languages
Chinese (zh)
Inventor
张思涛
华朋
魏秋堂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hui Yang
Original Assignee
Shandong Shangong Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Shangong Construction Co ltd filed Critical Shandong Shangong Construction Co ltd
Priority to CN202220442853.0U priority Critical patent/CN216812670U/en
Application granted granted Critical
Publication of CN216812670U publication Critical patent/CN216812670U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Vibration Prevention Devices (AREA)

Abstract

本实用新型涉及电力工程地基处理技术领域,特别是涉及一种电力工程地基处理设备的减震装置,包括底板,底板下端部四角处均固定安装有万向轮,底板上端部均匀等距固定安装有弹力条,弹力条两两之间固定安装有第一减震弹簧,底板上端部中心处设置有调节机构,两个挤压板分别与第二减震弹簧固定连接,两个挤压板侧壁上均对称固定安装有插板,两组插板分别活动内设在两组插槽中,两个挤压板远离插板的一端上均对称固定安装有隔板,工作台上端部对称固定安装有固定板,两个固定板内部均螺纹安装有螺纹柱,两个螺纹柱相对端上均固定安装有限位盘,使得该设备在使用时可对地基处理设备进行有效固定,保证了稳固性的同时还具备缓冲能力。

Figure 202220442853

The utility model relates to the technical field of electric power engineering foundation treatment, in particular to a shock absorbing device for electric power engineering foundation treatment equipment. There are elastic strips, first shock-absorbing springs are fixedly installed between the elastic strips, an adjusting mechanism is arranged at the center of the upper end of the bottom plate, and the two extruding plates are respectively fixedly connected with the second shock-absorbing springs. The wall is symmetrically and fixedly installed with plug-in boards, and the two sets of plug-in boards are respectively movably arranged in the two sets of slots, and the two extruded plates are symmetrically fixed on one end away from the plug-in board. A fixing plate is installed, threaded columns are installed inside the two fixing plates, and a limit plate is fixedly installed on the opposite ends of the two threaded columns, so that the equipment can effectively fix the ground treatment equipment when it is in use, ensuring the stability. It also has buffering capacity.

Figure 202220442853

Description

一种电力工程地基处理设备的减震装置A shock absorption device for power engineering foundation treatment equipment

技术领域technical field

本实用新型涉及电力工程地基处理技术领域,特别是涉及一种电力工程地基处理设备的减震装置。The utility model relates to the technical field of electric power engineering foundation treatment, in particular to a shock absorbing device for electric power engineering foundation treatment equipment.

背景技术Background technique

在电力工程施工过程中,需要进行地基的基础设计,这关系到电力工程是否能够成功且安全运行,针对于一些软地基或采空区等地区,通常需要对该处地基进行加固处理,现有的加固处理方法通常是用注浆泵、注浆管等设备将水泥浆等可以固化的浆液注入到地下,最终使电力工程的地基坚固、能防渗、防漏、平整,保证电力工程的安全建设和安全运行。In the process of power engineering construction, the foundation design of the foundation needs to be carried out, which is related to the successful and safe operation of the power project. For some areas such as soft foundations or goafs, the foundations usually need to be reinforced. The existing The reinforcement treatment method is usually to use grouting pump, grouting pipe and other equipment to inject solidified slurry such as cement slurry into the ground, and finally make the foundation of the power project firm, seepage-proof, leak-proof and smooth, so as to ensure the safety of the power project. Construction and safe operation.

如中国专利公开了:一种地基稳定处理设备,公开号:CN205576893U,其包括压力输送罐车、动力源装置、储气罐、固化物质搅拌机构和挖掘机,所述动力源装置、所述储气罐和所述固化物质搅拌机构均设置于所述压力输送罐车上,所述固化物质搅拌机构包括固化物质搅拌罐及与所述固化物质搅拌罐连通的储存罐,所述挖掘机的输出端设置有强力搅拌头,所述强力搅拌头的中部设置有喷头,所述喷头通过管道与所述储存罐连通,通过上述结构的设置,本实用新型能够在滩涂上自由行走,无需另外搭建平台,不仅施工成本低,而且施工效率高,但该地基处理设备在使用时容易产生较大的震动,该设备减震效果差,容易影响其使用效果,导致其工作状态不稳定。For example, a Chinese patent discloses: a ground stabilization treatment equipment, publication number: CN205576893U, which includes a pressure conveying tanker, a power source device, an air storage tank, a solidified substance stirring mechanism and an excavator. The power source device, the gas storage Both the tank and the solidified material stirring mechanism are arranged on the pressure conveying tanker, and the solidified material stirring mechanism includes a solidified material stirring tank and a storage tank communicated with the solidified material stirring tank, and the output end of the excavator is provided with There is a strong stirring head, the middle part of the strong stirring head is provided with a spray head, and the spray head is communicated with the storage tank through a pipeline. The construction cost is low and the construction efficiency is high, but the foundation treatment equipment is prone to large vibrations during use.

实用新型内容Utility model content

为了克服现有技术的不足,本实用新型提供一种电力工程地基处理设备的减震装置。In order to overcome the deficiencies of the prior art, the utility model provides a shock absorbing device for electric power engineering foundation treatment equipment.

为解决上述技术问题,本实用新型提供如下技术方案:一种电力工程地基处理设备的减震装置,包括底板,所述底板下端部四角处均固定安装有万向轮,所述底板上端部均匀等距固定安装有弹力条,所述弹力条两两之间固定安装有第一减震弹簧,所述弹力条和第一减震弹簧远离底板的一端固定安装有工作台,所述工作台上端部开设有滑槽;In order to solve the above technical problems, the present utility model provides the following technical solutions: a shock absorbing device for power engineering foundation treatment equipment, comprising a bottom plate, universal wheels are fixedly installed at the four corners of the lower end of the bottom plate, and the upper end of the bottom plate is uniform The elastic strips are fixedly installed at equal distances, the first shock-absorbing springs are fixedly installed between the elastic strips, the end of the elastic strips and the first shock-absorbing springs away from the bottom plate is fixedly installed with a worktable, and the upper end of the worktable is fixedly installed. The part is provided with a chute;

所述滑槽内部对称活动安装有减震机构;A damping mechanism is installed symmetrically inside the chute;

所述底板上端部中心处设置有调节机构。An adjustment mechanism is arranged at the center of the upper end of the bottom plate.

所述减震机构包括滑块,两个所述滑块均活动内设在滑槽中,两个所述滑块上端部均固定安装有L形板,两个所述L形板相背离的一端上均开设有圆槽,两个所述圆槽内部均开设有限位槽,两个所述L形板侧壁上均对称开设有插槽,两个所述L形板相对端上均固定安装有第二减震弹簧。The shock absorption mechanism includes a sliding block, two sliding blocks are movably arranged in the sliding groove, and L-shaped plates are fixedly installed on the upper ends of the two sliding blocks, and the two L-shaped plates are away from each other. One end is provided with a circular groove, both of the circular grooves are provided with limiting grooves, the side walls of the two L-shaped plates are symmetrically provided with slots, and the opposite ends of the two L-shaped plates are fixed A second shock spring is installed.

所述调节机构包括挤压板,两个所述挤压板分别与第二减震弹簧固定连接,两个所述挤压板侧壁上均对称固定安装有插板,两组所述插板分别活动内设在两组插槽中,两个所述挤压板远离插板的一端上均对称固定安装有隔板。The adjustment mechanism includes a squeeze plate, two of the squeeze plates are respectively fixedly connected with the second shock-absorbing spring, the side walls of the two squeeze plates are symmetrically and fixedly installed with insert plates, and two sets of the insert plates are installed. They are respectively movably arranged in two sets of slots, and partition plates are symmetrically and fixedly installed on one end of the two extruding plates away from the inserting plate.

优选的,所述工作台上端部对称固定安装有固定板,两个所述固定板内部均螺纹安装有螺纹柱,两个所述螺纹柱相对端上均固定安装有限位盘。Preferably, a fixing plate is symmetrically fixed on the upper end of the worktable, a threaded column is threadedly installed inside the two fixing plates, and a limit plate is fixedly installed on the opposite ends of the two threaded columns.

优选的,两个所述限位盘分别活动内设在限位槽中,两个所述挤压板之间活动安装有地基处理设备。Preferably, the two limiting disks are respectively movably arranged in the limiting grooves, and ground treatment equipment is movably installed between the two pressing plates.

优选的,所述底板上端部中心处开设有注料口,所述工作台上端部固定安装有把手。Preferably, a material injection port is provided at the center of the upper end of the bottom plate, and a handle is fixedly installed at the upper end of the worktable.

与现有技术相比,本实用新型能达到的有益效果是:Compared with the prior art, the beneficial effects that the utility model can achieve are:

其一,通过L形板、插槽、第二减震弹簧、挤压板、插板和地基处理设备的设计,在两个挤压板相对发生移动挤压地基处理设备,对其进行固定,此时在两个挤压板的移动下带动两个插板在插槽内部移动,此时在挤压板的移动下挤压第二减震弹簧发生形变,当地基处理设备滑动至两个L形板内部时完成固定,使得该设备在使用时可对地基处理设备进行有效固定,保证了稳固性的同时还具备缓冲能力;First, through the design of the L-shaped plate, the slot, the second shock-absorbing spring, the extrusion plate, the plug-in plate and the foundation treatment equipment, the two extrusion plates move relative to each other to squeeze the foundation treatment equipment and fix it. At this time, the movement of the two extruding plates drives the two plug-in boards to move inside the slot. At this time, the second shock-absorbing spring is deformed under the movement of the extruding plates, and the ground treatment equipment slides to the two L The fixing is completed inside the shape plate, so that the equipment can effectively fix the ground treatment equipment when it is in use, which ensures the stability and also has the buffering capacity;

其二,通过弹力条、第一减震弹簧和工作台的设计,当地基处理设备受到冲击力时,此时工作台挤压弹力条和第一减震弹簧发生形变对其进行再次缓冲,使得该设备在使用时可从各角度对地基处理设备进行缓冲减震,缓冲减震的效果更好。Second, through the design of the elastic strip, the first shock-absorbing spring and the worktable, when the ground treatment equipment is subjected to an impact force, the worktable squeezes the elastic strip and the first shock-absorbing spring to deform to buffer it again, so that the The equipment can buffer and shock the ground treatment equipment from all angles when in use, and the effect of buffering and shock absorption is better.

附图说明Description of drawings

图1为本实用新型的立体结构示意图;Fig. 1 is the three-dimensional structure schematic diagram of the present utility model;

图2为本实用新型的工作台连接爆炸结构示意图;Fig. 2 is the workbench connection explosion structure schematic diagram of the present invention;

图3为本实用新型的L形板连接爆炸结构示意图;Fig. 3 is the L-shaped plate connection explosion structure schematic diagram of the present invention;

图4为本实用新型的挤压板连接爆炸结构示意图。FIG. 4 is a schematic diagram of the explosion structure of the extruded plate connection of the present invention.

其中:11、底板;12、万向轮;13、弹力条;14、第一减震弹簧;15、工作台;16、滑槽;17、注料口;18、把手;21、滑块;22、L形板;23、圆槽;24、限位槽;25、插槽;26、第二减震弹簧;31、挤压板;32、插板;33、隔板;34、固定板;35、螺纹柱;36、限位盘;37、地基处理设备。Among them: 11, bottom plate; 12, universal wheel; 13, elastic strip; 14, first shock spring; 15, worktable; 16, chute; 17, injection port; 18, handle; 21, slider; 22, L-shaped plate; 23, circular groove; 24, limit groove; 25, slot; 26, second shock spring; 31, squeeze plate; 32, plug-in plate; 33, partition plate; 34, fixed plate ; 35, threaded column; 36, limit plate; 37, foundation treatment equipment.

具体实施方式Detailed ways

为了使本实用新型实现的技术手段、创作特征、达成目的与功效易于明白了解,下面结合具体实施例,进一步阐述本实用新型,但下述实施例仅仅为本实用新型的优选实施例,并非全部。基于实施方式中的实施例,本领域技术人员在没有做出创造性劳动的前提下所获得其它实施例,都属于本实用新型的保护范围。下述实施例中的实验方法,如无特殊说明,均为常规方法,下述实施例中所用的材料、试剂等,如无特殊说明,均可从商业途径得到。In order to make the technical means, creative features, goals and effects realized by the present utility model easy to understand, the present utility model will be further described below in conjunction with specific embodiments, but the following embodiments are only preferred embodiments of the present utility model, not all . Based on the examples in the implementation manner, other examples obtained by those skilled in the art without creative work are all within the protection scope of the present invention. The experimental methods in the following examples are conventional methods unless otherwise specified, and the materials, reagents, etc. used in the following examples can be obtained from commercial sources unless otherwise specified.

实施例:Example:

如图1、图2、图3和图4所示,一种电力工程地基处理设备的减震装置,包括底板11,底板11下端部四角处均固定安装有万向轮12,底板11上端部均匀等距固定安装有弹力条13,弹力条13两两之间固定安装有第一减震弹簧14,弹力条13和第一减震弹簧14远离底板11的一端固定安装有工作台15,工作台15上端部开设有滑槽16,底板11上端部中心处开设有注料口17,工作台15上端部固定安装有把手18;As shown in Fig. 1, Fig. 2, Fig. 3 and Fig. 4, a shock absorbing device for power engineering foundation treatment equipment includes a bottom plate 11, universal wheels 12 are fixedly installed at the four corners of the lower end of the bottom plate 11, and the upper end of the bottom plate 11 is fixedly installed The elastic bars 13 are fixedly installed evenly and equidistantly, the first shock-absorbing springs 14 are fixedly installed between the elastic bars 13, and the working table 15 is fixedly installed at the end of the elastic bars 13 and the first shock-absorbing springs 14 away from the bottom plate 11, and the working table 15 is installed. The upper end of the table 15 is provided with a chute 16, the center of the upper end of the bottom plate 11 is provided with a material injection port 17, and the upper end of the work table 15 is fixedly installed with a handle 18;

滑槽16内部对称活动安装有减震机构;A damping mechanism is installed symmetrically inside the chute 16;

底板11上端部中心处设置有调节机构。An adjustment mechanism is provided at the center of the upper end of the bottom plate 11 .

减震机构包括滑块21,两个滑块21均活动内设在滑槽16中,两个滑块21上端部均固定安装有L形板22,两个L形板22相背离的一端上均开设有圆槽23,两个圆槽23内部均开设有限位槽24,两个L形板22侧壁上均对称开设有插槽25,两个L形板22相对端上均固定安装有第二减震弹簧26。The damping mechanism includes a sliding block 21. Both sliding blocks 21 are movably arranged in the chute 16. The upper ends of the two sliding blocks 21 are fixedly installed with L-shaped plates 22. Both are provided with circular grooves 23, the interior of the two circular grooves 23 are provided with limiting grooves 24, the side walls of the two L-shaped plates 22 are symmetrically provided with slots 25, and the opposite ends of the two L-shaped plates 22 are fixedly installed. The second damping spring 26 .

调节机构包括挤压板31,两个挤压板31分别与第二减震弹簧26固定连接,两个挤压板31侧壁上均对称固定安装有插板32,两组插板32分别活动内设在两组插槽25中,两个挤压板31远离插板32的一端上均对称固定安装有隔板33,工作台15上端部对称固定安装有固定板34,两个固定板34内部均螺纹安装有螺纹柱35,两个螺纹柱35相对端上均固定安装有限位盘36,两个限位盘36分别活动内设在限位槽24中,两个挤压板31之间活动安装有地基处理设备37,使用时可将地基处理设备37放置在两个挤压板31之间,然后转动螺纹柱35,在螺纹柱35的转动下带动与之固定的限位盘36在限位槽24内部发生转动,由于螺纹柱35和固定板34螺纹连接,因此在螺纹柱35的转动下将挤压两个L形板22相对发生移动,在L形板22的移动下带动与之固定的滑块21在滑槽16内部发生移动,此时两个挤压板31相对发生移动挤压地基处理设备37,对其进行固定,此时在两个挤压板31的移动下带动两个插板32在插槽25内部移动,此时在挤压板31的移动下挤压第二减震弹簧26发生形变,当地基处理设备37滑动至两个L形板22内部时完成固定,使得该设备在使用时可对地基处理设备37进行有效固定,保证了稳固性的同时还具备缓冲能力。The adjustment mechanism includes an extruding plate 31, the two extruding plates 31 are respectively fixedly connected with the second shock-absorbing spring 26, and the side walls of the two extruding plates 31 are symmetrically fixedly installed with inserting plates 32, and the two groups of inserting plates 32 are respectively movable Inside the two sets of slots 25, the two extruded plates 31 are symmetrically fixed with a partition plate 33 on one end away from the insert plate 32, the upper end of the workbench 15 is symmetrically fixed with a fixed plate 34, and two fixed plates 34. A threaded column 35 is threadedly installed inside, and a limit disk 36 is fixedly installed on the opposite ends of the two threaded columns 35 . The foundation treatment equipment 37 is movably installed. When in use, the foundation treatment equipment 37 can be placed between the two extrusion plates 31, and then the threaded column 35 is rotated. The interior of the limiting groove 24 rotates. Since the threaded post 35 and the fixing plate 34 are threadedly connected, the two L-shaped plates 22 will be squeezed to move relative to each other under the rotation of the threaded post 35. The fixed slider 21 moves inside the chute 16. At this time, the two pressing plates 31 move relative to each other and squeeze the ground treatment equipment 37 to fix it. At this time, the two pressing plates 31 are driven by the movement of the two pressing plates 31. The two plug-in boards 32 move inside the slot 25 . At this time, the second shock-absorbing spring 26 is deformed under the movement of the pressing board 31 . When the ground treatment equipment 37 slides into the two L-shaped boards 22 , the fixing is completed. , so that the equipment can effectively fix the ground treatment equipment 37 when in use, which ensures the stability and also has the buffering ability.

工作原理:working principle:

第一步,使用时可将地基处理设备37放置在两个挤压板31之间,然后转动螺纹柱35,在螺纹柱35的转动下带动与之固定的限位盘36在限位槽24内部发生转动,由于螺纹柱35和固定板34螺纹连接,因此在螺纹柱35的转动下将挤压两个L形板22相对发生移动,在L形板22的移动下带动与之固定的滑块21在滑槽16内部发生移动,此时两个挤压板31相对发生移动挤压地基处理设备37,对其进行固定,此时在两个挤压板31的移动下带动两个插板32在插槽25内部移动,此时在挤压板31的移动下挤压第二减震弹簧26发生形变,当地基处理设备37滑动至两个L形板22内部时完成固定,使得该设备在使用时可对地基处理设备37进行有效固定,保证了稳固性的同时还具备缓冲能力;In the first step, the foundation treatment equipment 37 can be placed between the two pressing plates 31 during use, and then the threaded column 35 can be rotated to drive the limit disk 36 fixed to it in the limit groove 24 under the rotation of the threaded column 35. Internal rotation occurs, because the threaded column 35 and the fixed plate 34 are threadedly connected, so the two L-shaped plates 22 will be squeezed to move relative to each other under the rotation of the threaded column 35, and the movement of the L-shaped plate 22 will drive the fixed slider. The block 21 moves inside the chute 16. At this time, the two pressing plates 31 move relative to each other to squeeze the ground treatment equipment 37 and fix it. At this time, the two pressing plates 31 are moved to drive the two inserting plates. 32 moves inside the slot 25. At this time, the second damping spring 26 is deformed under the movement of the pressing plate 31. When the ground treatment equipment 37 slides to the inside of the two L-shaped plates 22, the fixing is completed, so that the equipment 32 is fixed. When in use, the ground treatment equipment 37 can be effectively fixed, which ensures the stability and also has the buffering capacity;

第二步,当地基处理设备37受到冲击力时,此时工作台15挤压弹力条13和第一减震弹簧14发生形变对其进行再次缓冲,使得该设备在使用时可从各角度对地基处理设备37进行缓冲减震,缓冲减震的效果更好。In the second step, when the ground treatment equipment 37 is subjected to an impact force, the table 15 squeezes the elastic strip 13 and the first shock-absorbing spring 14 deforms to buffer it again, so that the equipment can be used from various angles during use. The ground treatment equipment 37 performs buffering and shock absorption, and the effect of buffering and shock absorption is better.

上面结合附图对本实用新型的实施方式作了详细说明,但是本实用新型并不限于此,在所属技术领域的技术人员所具备的知识范围内,在不脱离本实用新型宗旨的前提下还可以作出各种变化。The embodiments of the present utility model are described in detail above in conjunction with the accompanying drawings, but the present utility model is not limited thereto, within the scope of knowledge possessed by those skilled in the art, without departing from the purpose of the present utility model. make various changes.

Claims (6)

1.一种电力工程地基处理设备的减震装置,包括底板(11),所述底板(11)下端部四角处均固定安装有万向轮(12),其特征在于:所述底板(11)上端部均匀等距固定安装有弹力条(13),所述弹力条(13)两两之间固定安装有第一减震弹簧(14),所述弹力条(13)和第一减震弹簧(14)远离底板(11)的一端固定安装有工作台(15),所述工作台(15)上端部开设有滑槽(16);1. A shock absorbing device for power engineering foundation treatment equipment, comprising a base plate (11), and universal wheels (12) are fixedly installed at the four corners of the lower end of the base plate (11), characterized in that: the base plate (11) ) elastic strips (13) are fixedly installed at the upper end evenly and equidistantly, and first shock-absorbing springs (14) are fixedly installed between the elastic strips (13), the elastic strips (13) and the first shock-absorbing springs (14) are fixedly installed A workbench (15) is fixedly installed at one end of the spring (14) away from the bottom plate (11), and a chute (16) is provided on the upper end of the workbench (15); 所述滑槽(16)内部对称活动安装有减震机构;A shock-absorbing mechanism is installed symmetrically inside the chute (16); 所述底板(11)上端部中心处设置有调节机构。An adjustment mechanism is arranged at the center of the upper end of the bottom plate (11). 2.根据权利要求1所述的一种电力工程地基处理设备的减震装置,其特征在于,所述减震机构包括滑块(21),两个所述滑块(21)均活动内设在滑槽(16)中,两个所述滑块(21)上端部均固定安装有L形板(22),两个所述L形板(22)相背离的一端上均开设有圆槽(23),两个所述圆槽(23)内部均开设有限位槽(24),两个所述L形板(22)侧壁上均对称开设有插槽(25),两个所述L形板(22)相对端上均固定安装有第二减震弹簧(26)。2 . The shock absorbing device of electric power engineering foundation treatment equipment according to claim 1 , wherein the shock absorbing mechanism comprises a sliding block ( 21 ), and the two sliding blocks ( 21 ) are both movable and internally provided. 3 . In the chute (16), L-shaped plates (22) are fixedly installed on the upper ends of the two sliding blocks (21), and circular grooves are formed on the opposite ends of the two L-shaped plates (22). (23), the two circular grooves (23) are provided with limiting grooves (24), and the side walls of the two L-shaped plates (22) are symmetrically provided with slots (25). Second shock springs (26) are fixedly installed on opposite ends of the L-shaped plate (22). 3.根据权利要求2所述的一种电力工程地基处理设备的减震装置,其特征在于,所述调节机构包括挤压板(31),两个所述挤压板(31)分别与第二减震弹簧(26)固定连接,两个所述挤压板(31)侧壁上均对称固定安装有插板(32),两组所述插板(32)分别活动内设在两组插槽(25)中,两个所述挤压板(31)远离插板(32)的一端上均对称固定安装有隔板(33)。3 . The shock absorbing device for power engineering foundation treatment equipment according to claim 2 , wherein the adjusting mechanism comprises a pressing plate ( 31 ), and the two pressing plates ( 31 ) are respectively connected with the first pressing plate ( 31 ). 4 . The two shock-absorbing springs (26) are fixedly connected, the side walls of the two extruding plates (31) are symmetrically and fixedly installed with inserting plates (32), and the two sets of the inserting plates (32) are respectively movably arranged in the two groups. In the slot (25), a partition plate (33) is symmetrically and fixedly installed on one end of the two pressing plates (31) away from the inserting plate (32). 4.根据权利要求3所述的一种电力工程地基处理设备的减震装置,其特征在于,所述工作台(15)上端部对称固定安装有固定板(34),两个所述固定板(34)内部均螺纹安装有螺纹柱(35),两个所述螺纹柱(35)相对端上均固定安装有限位盘(36)。4. A shock absorbing device for power engineering foundation treatment equipment according to claim 3, characterized in that, a fixed plate (34) is symmetrically fixed on the upper end of the worktable (15), and two of the fixed plates (34) Threaded posts (35) are threadedly installed inside, and limit plates (36) are fixedly installed on opposite ends of the two threaded posts (35). 5.根据权利要求4所述的一种电力工程地基处理设备的减震装置,其特征在于,两个所述限位盘(36)分别活动内设在限位槽(24)中,两个所述挤压板(31)之间活动安装有地基处理设备(37)。5 . The shock absorbing device for power engineering foundation treatment equipment according to claim 4 , wherein the two limit disks ( 36 ) are respectively movably set in the limit grooves ( 24 ), and the two limit disks ( 36 ) Ground treatment equipment (37) is movably installed between the pressing plates (31). 6.根据权利要求1所述的一种电力工程地基处理设备的减震装置,其特征在于,所述底板(11)上端部中心处开设有注料口(17),所述工作台(15)上端部固定安装有把手(18)。6. A shock absorbing device for power engineering foundation treatment equipment according to claim 1, characterized in that a material injection port (17) is opened at the center of the upper end of the bottom plate (11), and the workbench (15) ) a handle (18) is fixedly installed on the upper end.
CN202220442853.0U 2022-03-02 2022-03-02 Damping device of electric power engineering foundation treatment equipment Active CN216812670U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220442853.0U CN216812670U (en) 2022-03-02 2022-03-02 Damping device of electric power engineering foundation treatment equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220442853.0U CN216812670U (en) 2022-03-02 2022-03-02 Damping device of electric power engineering foundation treatment equipment

Publications (1)

Publication Number Publication Date
CN216812670U true CN216812670U (en) 2022-06-24

Family

ID=82043886

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220442853.0U Active CN216812670U (en) 2022-03-02 2022-03-02 Damping device of electric power engineering foundation treatment equipment

Country Status (1)

Country Link
CN (1) CN216812670U (en)

Similar Documents

Publication Publication Date Title
CN216812670U (en) Damping device of electric power engineering foundation treatment equipment
CN210946478U (en) A road bridge expansion joint structure
CN207997387U (en) A kind of fixing device for hollow brick dies
CN216713354U (en) A steel structure column connection structure
CN210831109U (en) Anti-vibration base for mining machinery
CN111342699B (en) A galloping energy harvesting device based on dynamic magnetic coupling
CN220521467U (en) Cabinet type non-negative pressure water supply equipment
CN117657577A (en) Stable transport base
CN219772858U (en) Water conservancy retaining wall
CN218297972U (en) A concrete vibrating table
CN219096763U (en) Positioning device for structural engineering
CN217352458U (en) Constructional engineering pile device
CN116778802A (en) Reinforced structure house body antidetonation mechanism demonstration platform
CN211548338U (en) An earthquake-resistant building block
CN211203350U (en) Vortex mixer fixed bolster
CN110438971B (en) A ramming device for gardens local construction
CN217267440U (en) Constructional engineering pile device
CN222207245U (en) A concrete building template for civil construction
CN217717373U (en) Resiliometer for engineering supervision
CN211031281U (en) High-strength quartz stone press
CN218688460U (en) Production device of composite flocculant
CN218777582U (en) An aerated block handling device
CN215368710U (en) A building support device
CN211778719U (en) Buffer structure of concrete pump
CN218714065U (en) Anti-seismic structure of detachable composite wallboard

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230706

Address after: Room 1, No. 80 (2-3-2), Beihai Street, Dadong District, Shenyang, 110000 Liaoning Province

Patentee after: Shenyang Shengzhong Mechanical and Electrical Equipment Installation Co.,Ltd.

Address before: 252000 No. 1, Huayu Road, Liaocheng Economic and Technological Development Zone, Shandong Province

Patentee before: Shandong Shangong Construction Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20250828

Address after: 712039 Shaanxi Province Xianyang City Sanyuan County Cuoe Township Dapancun Village 246.NO

Patentee after: Hui Yang

Country or region after: China

Address before: Room 1, No. 80 (2-3-2), Beihai Street, Dadong District, Shenyang, 110000 Liaoning Province

Patentee before: Shenyang Shengzhong Mechanical and Electrical Equipment Installation Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right