CN216810425U - Shear wall convenient to location installation - Google Patents
Shear wall convenient to location installation Download PDFInfo
- Publication number
- CN216810425U CN216810425U CN202121892135.5U CN202121892135U CN216810425U CN 216810425 U CN216810425 U CN 216810425U CN 202121892135 U CN202121892135 U CN 202121892135U CN 216810425 U CN216810425 U CN 216810425U
- Authority
- CN
- China
- Prior art keywords
- installation
- shear wall
- frame
- assembly frame
- assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 title claims abstract description 84
- 239000011150 reinforced concrete Substances 0.000 claims description 20
- 239000011248 coating agent Substances 0.000 claims description 19
- 238000000576 coating method Methods 0.000 claims description 19
- 239000004567 concrete Substances 0.000 claims description 16
- 239000000463 material Substances 0.000 claims description 13
- 239000002994 raw material Substances 0.000 claims description 5
- 239000003085 diluting agent Substances 0.000 claims description 3
- 239000000945 filler Substances 0.000 claims description 3
- 239000000049 pigment Substances 0.000 claims description 3
- 239000000126 substance Substances 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 3
- 229920003002 synthetic resin Polymers 0.000 claims description 2
- 239000000057 synthetic resin Substances 0.000 claims description 2
- 238000004519 manufacturing process Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 2
- 230000009471 action Effects 0.000 description 2
- 229910052799 carbon Inorganic materials 0.000 description 2
- 238000011065 in-situ storage Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 239000000758 substrate Substances 0.000 description 2
- 241001391944 Commicarpus scandens Species 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000010521 absorption reaction Methods 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 238000010923 batch production Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007123 defense Effects 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 230000013011 mating Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 229920006186 water-soluble synthetic resin Polymers 0.000 description 1
- 239000012866 water-soluble synthetic resin Substances 0.000 description 1
Images
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The utility model discloses a shear wall convenient for positioning and installation, which comprises an assembly frame, wherein an installation frame is fixed on one side of the assembly frame, four installation blocks are uniformly distributed on one side of the installation frame, four installation grooves are formed in the other side of the assembly frame, the installation grooves are matched with the installation blocks, the cross sections of the installation blocks are in a trapezoidal shape, the boundary lines of the installation blocks are coincided with the horizontal central axis of the installation frame, an installation plate is fixed on one side of the assembly frame, which is close to the installation grooves, internal threads are formed in the installation plate, internal threads are formed in the installation frame, an installation screw is connected with the internal threads of the installation plate, the installation plate is movably connected with the installation frame through the installation screw, and is matched with a positioning column and the installation frame through a positioning matching groove, the two shear wall bodies can be positioned and installed, and convenience is brought to workers.
Description
Technical Field
The utility model relates to the technical field of shear walls, in particular to a shear wall convenient to position and install.
Background
Shear wall is also called wind-resistant wall, earthquake-resistant wall or structural wall, wall body mainly bearing horizontal load and vertical load caused by wind load or earthquake action in house or structure, also called earthquake-resistant wall, is generally made of reinforced concrete, and is divided into plane shear wall and barrel shear wall, the plane shear wall is used in reinforced concrete frame structure, lifting plate structure and flat slab system, in order to increase rigidity, strength and collapse-resistant capability of structure, the reinforced concrete shear wall can be cast in situ or prefabricated in some parts, the cast-in-situ shear wall, the peripheral beams and the columns are simultaneously cast, the integrity is good, the barrel shear wall is used in high-rise buildings, high-rise structures and suspension structures, the wall of the elevator room, the staircase room, the equipment and the auxiliary room are all cast-in-place reinforced concrete walls, and the wall has higher rigidity and strength than a plane shear wall and can bear larger horizontal load.
The wall can be divided into a bearing wall and a shear wall according to the stress characteristics, wherein the bearing wall mainly bears vertical load, such as a masonry wall, the shear wall mainly bears horizontal load, and the shear wall mainly bears horizontal earthquake action in an earthquake-proof defense area, so the shear wall is also called as an earthquake-proof wall at times, and can be divided into a steel plate shear wall, a reinforced concrete shear wall and a reinforced building block shear wall according to structural materials, wherein the reinforced concrete shear wall is most commonly used, a reinforced concrete wallboard is used for replacing a beam column in a frame structure, the internal force caused by various loads can be borne, and the horizontal force of the structure can be effectively controlled, the structure which uses the reinforced concrete wallboard to bear the vertical force and the horizontal force is called as a shear wall structure, but the existing shear wall has complicated assembly process, is not convenient for positioning, brings inconvenience for installation of workers, and accordingly reduces the whole work progress, and the problems of troublesome mounting and dismounting, inconvenient use, poor fixing effect and poor stability.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a shear wall convenient to position and install, and aims to solve the problems that the assembly process is complicated, the positioning is inconvenient, and the installation of workers is inconvenient, so that the whole working progress is reduced, the installation and the disassembly are troublesome, the use is inconvenient, the fixing effect is poor, and the stability is poor in the background art.
In order to achieve the purpose, the utility model provides the following technical scheme: a shear wall convenient to locate and install comprises an assembly frame, wherein an installation frame is fixed on one side of the assembly frame, four installation blocks are uniformly distributed on one side of the installation frame, four installation grooves are formed in the other side of the assembly frame, the installation grooves are matched with the installation blocks, the cross sections of the installation blocks are in a trapezoid shape, the boundary line of the installation blocks is overlapped with the horizontal central axis of the installation frame, an installation plate is fixed on one side of the assembly frame, which is close to the installation grooves, an internal thread is formed in the installation plate, an internal thread is formed in the installation frame, an installation screw is connected to the internal thread of the installation plate, the installation plate is movably connected with the installation frame through the installation screw, a locating groove is fixed at the top end of the assembly frame, four locating columns are fixed at the bottom end of the assembly frame, the positioning column is connected with the assembling frame in a clamping manner.
Preferably, limiting sleeves are symmetrically installed at the top ends of the assembling frames, limiting rods are symmetrically installed at the bottom ends of the assembling frames, the limiting sleeves are connected with the limiting rods in a clamping mode, and threaded holes are formed in the limiting sleeves and the limiting rods.
Preferably, both ends of the assembling frame are fixed with elastic springs, connecting plates are fixed outside the elastic springs, and the connecting plates are in threaded connection with fixing screws.
Preferably, an assembly groove is formed in the assembly frame, a shear wall body is fixed in the assembly groove, and an organic coating wallboard, an aerated concrete wallboard and a reinforced concrete wallboard are sequentially arranged in the shear wall body.
Preferably, the top end of the organic coating wallboard is contacted with the inner wall of the top end of the shear wall body, and the organic coating wallboard is formed by coating water-soluble coating which is formed by taking soluble synthetic resin as a main film forming substance, taking water as a diluent, adding a proper amount of pigment, filler and auxiliary materials and grinding.
Preferably, the top end of the aerated concrete wallboard is contacted with the bottom end of the organic coating wallboard, and the aerated concrete wallboard is prepared by taking a siliceous material and a calcareous material as main raw materials and adding a gas former.
Preferably, the top end of the reinforced concrete wallboard is contacted with the bottom end of the aerated concrete wallboard, and the bottom end of the reinforced concrete wallboard is contacted with the inner wall of the bottom end of the shear wall body.
The utility model provides a shear wall convenient to position and install, which has the following beneficial effects: the utility model ensures that two shear wall bodies can be positioned and installed by mutually matching the positioning matching groove, the positioning column, the mounting plate and the mounting frame, brings convenience to workers, is convenient for fixing two groups of shear wall bodies again after being assembled, ensures the stability of the shear wall when in use, realizes convenient batch production and on-site assembly while ensuring the rigidity of the shear wall, improves the on-site construction efficiency, effectively solves the problems of difficult assembly positioning, unreliable node connection and the like in the assembly type connection, ensures the reliability of the node connection, can buffer the stress degree of the shear wall bodies when being vibrated by the assembly type spring, further effectively relieves the impact on the shear wall bodies, reduces the damage probability of the shear wall bodies, and is convenient for auxiliary installation and limiting of the shear wall bodies by mutually matching the limiting sleeve and the limiting rod, the reinforced concrete wallboard has higher rigidity, is not easy to break, has higher carbon content and lower manufacturing cost, the organic coating wallboard has excellent performance of protecting a substrate and can keep the aesthetic feeling of the natural materials of the raw materials, the shear wall body formed by the three materials has excellent performance, the manufacturing cost is not expensive, the aerated concrete wallboard is suitable for large-area production, and the aerated concrete wallboard has certain aesthetic feeling when being applied to an external wall body.
Drawings
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is a front view of the connection between two assembly frames of the present invention;
FIG. 3 is a perspective view of the assembly frame of the present invention;
FIG. 4 is an enlarged view of a portion of FIG. 1;
fig. 5 is an enlarged structural schematic view of the interior of the shear wall body of the utility model.
In the figure: 1. a limiting sleeve; 2. a mounting frame; 3. mounting blocks; 4. a connecting plate; 5. assembling the frame; 6. positioning and matching the groove; 7. mounting a plate; 8. a limiting rod; 9. an elastic spring; 10. a positioning column; 11. a shear wall body; 12. mounting grooves; 13. installing a screw rod; 14. assembling a groove; 15. Fixing the screw rod; 16. an organic-coated wallboard; 17. an aerated concrete wall panel; 18. a reinforced concrete wall panel.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
As shown in fig. 1 to 5, the present invention provides a technical solution: the utility model provides a shear force wall convenient to location installation, including assembly frame 5, one side of assembly frame 5 is fixed with mounting bracket 2, one side evenly distributed of mounting bracket 2 has four installation pieces 3, four mounting grooves 12 have been seted up to assembly frame 5's opposite side, mutually support between mounting groove 12 and the installation piece 3, the transversal trapezoidal form of personally submitting of installation piece 3, the boundary line of installation piece 3 coincides with the horizontal axis of mounting bracket 2 mutually, one side that assembly frame 5 is close to mounting groove 12 is fixed with mounting panel 7, the internal thread has been seted up to mounting panel 7's inside, the internal thread has been seted up to mounting bracket 2's inside, the internal thread of mounting panel 7 is connected with installation screw 13, mounting panel 7 is swing joint through between installation screw 13 and the mounting bracket 2, assembly frame 5's top is fixed with location mating groove 6, assembly frame 5's bottom mounting has four reference columns 10, be connected for the block between reference column 10 and the assembly frame 5.
In order to assist installation and limiting, in this embodiment, preferably, the top end of the assembly frame 5 is symmetrically provided with limiting sleeves 1, the bottom end of the assembly frame 5 is symmetrically provided with limiting rods 8, the limiting sleeves 1 and the limiting rods 8 are connected in a clamping manner, and threaded holes are formed in the limiting sleeves 1 and the limiting rods 8.
In order to buffer the stress degree of the present invention when the present invention is subjected to vibration, in this embodiment, the two ends of the preferred assembly frame 5 are both fixed with the elastic springs 9, the exterior of the elastic springs 9 is fixed with the connecting plate 4, and the interior of the connecting plate 4 is connected with the fixing screw 15 by screw threads.
In order to facilitate mass production and field assembly, in this embodiment, an assembly groove 14 is preferably formed in the assembly frame 5, a shear wall 11 is fixed in the assembly groove 14, and an organic coating wallboard 16, an aerated concrete wallboard 17 and a reinforced concrete wallboard 18 are sequentially arranged in the shear wall 11.
In order to provide the present invention with excellent performance for protecting the substrate and maintain the aesthetic feeling of natural materials of the raw materials, in this embodiment, the top end of the organic coating wallboard 16 preferably contacts with the inner wall of the top end of the shear wall body 11, and the organic coating wallboard 16 is coated by a water-soluble coating prepared by grinding a water-soluble synthetic resin as a main film-forming substance, water as a diluent, and an appropriate amount of pigment, filler and auxiliary materials.
In order to make the present invention have the advantages of light volume weight, high thermal insulation performance and good sound absorption effect, in this embodiment, the top end of the preferred aerated concrete wall panel 17 is in contact with the bottom end of the organic coating wall panel 16, and the aerated concrete wall panel 17 is made of siliceous materials and calcareous materials as main raw materials, and is doped with a gas generating agent.
In order to make the present invention have the advantages of large rigidity, difficult fracture, high carbon content and low cost, in this embodiment, the top end of the reinforced concrete wall plate 18 is preferably in contact with the bottom end of the aerated concrete wall plate 17, and the bottom end of the reinforced concrete wall plate 18 is preferably in contact with the inner wall of the bottom end of the shear wall body 11.
It should be noted that, when the shear wall convenient for positioning and installation is used, the shear wall 11 is firstly assembled into the assembly groove 14, the shear wall 11 is composed of an organic coating wall plate 16, an aerated concrete wall plate 17 and a reinforced concrete wall plate 18, the performance is excellent, the shear wall is convenient to carry and install, when the side edge installation is carried out, the installation block 3 at the outer side of the installation frame 2 is firstly clamped in the installation groove 12, then the installation screw 13 is inserted into the installation plate 7 and the installation frame 2 and is screwed tightly, when the upper and lower installation is carried out, the limiting rod 8 is inserted into the limiting sleeve 1 and fixed by a screw, then the two groups of elastic springs 9 are used for screwing the fixed screw rods 15 in the connecting plate 4 to fix the two groups of elastic springs together, and finally, the positioning column 10 is inserted into the positioning matching groove 6, so that the two assembling frames 5 are prevented from being deflected when being assembled.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (7)
1. A shear wall convenient to location installation, includes assembly frame (5), its characterized in that: one side of the assembly frame (5) is fixed with an installation frame (2), four installation blocks (3) are uniformly distributed on one side of the installation frame (2), four installation grooves (12) are formed in the other side of the assembly frame (5), the installation grooves (12) are matched with the installation blocks (3), the cross section of each installation block (3) is in a trapezoidal shape, the boundary line of each installation block (3) is coincided with the horizontal central axis of the installation frame (2), one side of the assembly frame (5), which is close to the installation grooves (12), is fixed with an installation plate (7), internal threads are formed in the installation frame (2), the internal threads of the installation plate (7) are connected with an installation screw (13), and the installation plate (7) is movably connected with the installation screw (13) and the installation frame (2), the top of assembly frame (5) is fixed with location joining in marriage groove (6), the bottom mounting of assembly frame (5) has four reference columns (10), reference column (10) with be the block connection between assembly frame (5).
2. The shear wall facilitating positioning and installation according to claim 1, wherein: spacing sleeve (1) is installed to the top symmetry of assembly frame (5), gag lever post (8) are installed to the bottom symmetry of assembly frame (5), spacing sleeve (1) with connect for the block between gag lever post (8), spacing sleeve (1) with the inside of gag lever post (8) all sets up threaded hole.
3. A shear wall to facilitate location-mounting according to claim 2, wherein: and elastic springs (9) are fixed at two ends of the assembling frame (5), a connecting plate (4) is fixed outside the elastic springs (9), and a fixing screw (15) is connected to the inner threads of the connecting plate (4).
4. A shear wall to facilitate location-based installation according to claim 1, wherein: an assembly groove (14) is formed in the assembly frame (5), a shear wall body (11) is fixed in the assembly groove (14), and an organic coating wall plate (16), an aerated concrete wall plate (17) and a reinforced concrete wall plate (18) are sequentially arranged in the shear wall body (11).
5. A shear wall facilitating location and installation according to claim 4, wherein: the top end of the organic coating wallboard (16) is contacted with the inner wall of the top end of the shear wall body (11), the organic coating wallboard (16) is formed by coating water-soluble coating which is formed by grinding and taking soluble synthetic resin as a main film forming substance, taking water as a diluent and adding a proper amount of pigment, filler and auxiliary materials.
6. A shear wall facilitating location and installation according to claim 4, wherein: the top end of the aerated concrete wallboard (17) is contacted with the bottom end of the organic coating wallboard (16), and the aerated concrete wallboard (17) is prepared by taking a siliceous material and a calcareous material as main raw materials and adding a gas former.
7. A shear wall facilitating location and installation according to claim 4, wherein: the top end of the reinforced concrete wallboard (18) is contacted with the bottom end of the aerated concrete wallboard (17), and the bottom end of the reinforced concrete wallboard (18) is contacted with the inner wall of the bottom end of the shear wall body (11).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202121892135.5U CN216810425U (en) | 2021-08-13 | 2021-08-13 | Shear wall convenient to location installation |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202121892135.5U CN216810425U (en) | 2021-08-13 | 2021-08-13 | Shear wall convenient to location installation |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN216810425U true CN216810425U (en) | 2022-06-24 |
Family
ID=82038697
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202121892135.5U Active CN216810425U (en) | 2021-08-13 | 2021-08-13 | Shear wall convenient to location installation |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN216810425U (en) |
-
2021
- 2021-08-13 CN CN202121892135.5U patent/CN216810425U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107190877A (en) | A kind of structures with semi-rigid joints friction energy dissipation device | |
| CN211873325U (en) | Steel construction prefabricated formula building coupling assembling | |
| CN108547396B (en) | Prefabricated truss light steel frame-reinforced mesh-foamed concrete composite wall | |
| CN114000619A (en) | An all-steel structure building interior high-stability fireproof partition wall assembled skeleton | |
| CN220058844U (en) | Beam template support structure of building main body | |
| CN108277904B (en) | Prefabricated sash type light steel frame-reinforced mesh-foamed concrete composite wall | |
| CN218406429U (en) | A triangular supports device for outer cantilever frame of shear force wall | |
| CN117468581A (en) | A gathered and covered steel-wood energy-consuming combination node and its installation method | |
| CN2339648Y (en) | Connecting device for beam and column of industriatized constructed reinforced concrete building structural frame | |
| CN212153693U (en) | Assembled building overall structure | |
| CN116856571A (en) | A prefabricated beam-column flexible shock-absorbing node component, node structure and construction method | |
| CN211037283U (en) | Prefabricated steel beam-column joint system with built-in removable energy dissipation elements | |
| CN211037307U (en) | Connecting structure for preventing fault at building joint | |
| CN115559460A (en) | Outer wallboard splicing and positioning device for assembly type building | |
| CN211922978U (en) | Assembly type node for building structure and assembly type frame thereof | |
| CN218990437U (en) | A prefabricated building frame | |
| CN221143630U (en) | Supporting clamp for mounting assembled concrete laminated slab | |
| CN221973116U (en) | Building bottom steel structure supports anti-seismic system | |
| CN217815391U (en) | Internal support type assembly supporting and hanging frame suitable for electromechanical installation of wood structure | |
| CN112726839A (en) | Combined beam joint for detachable assembly type concrete-filled steel tube column and construction method | |
| CN222500920U (en) | A metal bracket used for decoration of ancient buildings | |
| CN218990476U (en) | Connection structure of steel column and enclosure wall | |
| CN112814005A (en) | Light batten prefabricated part assembling system for foundation bearing platform | |
| CN223293158U (en) | A prefabricated reinforced steel beam-column node | |
| CN214220083U (en) | A prefabricated shear wall |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |