CN216766705U - Concrete placement workstation is built in room - Google Patents

Concrete placement workstation is built in room Download PDF

Info

Publication number
CN216766705U
CN216766705U CN202220217638.0U CN202220217638U CN216766705U CN 216766705 U CN216766705 U CN 216766705U CN 202220217638 U CN202220217638 U CN 202220217638U CN 216766705 U CN216766705 U CN 216766705U
Authority
CN
China
Prior art keywords
plate
sliding plate
fixedly connected
threaded rod
sliding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220217638.0U
Other languages
Chinese (zh)
Inventor
范小春
张澳
黄祎晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University of Technology WUT
Original Assignee
Wuhan University of Technology WUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University of Technology WUT filed Critical Wuhan University of Technology WUT
Priority to CN202220217638.0U priority Critical patent/CN216766705U/en
Application granted granted Critical
Publication of CN216766705U publication Critical patent/CN216766705U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to the technical field of concrete pouring, in particular to a concrete pouring workbench for a house building. Including sliding plate, elevating gear, roof and carrier plate, the roof passes through elevating gear and sets up on the sliding plate, and the carrier plate sets up in sliding plate bottom both sides, links firmly through the company board that is located the carrier plate tip between the carrier plate, and the carrier plate is fixed with ground and follows horizontal direction sliding fit with the sliding plate, links to be equipped with on the board and can drive the sliding plate along the gliding lead screw drive component of carrier plate, and the bottom of sliding plate is equipped with the end block that matches with lead screw drive component screw thread. Adjusting the lead screw drive member, can making the sliding plate round trip movement on the carrier plate to make things convenient for the staff to adjust the position at any time, combine elevating gear height-adjusting, make the staff can pour in suitable position, improve staff's the efficiency of pouring.

Description

一种房建混凝土浇筑工作台A concrete pouring workbench for housing construction

技术领域technical field

本实用新型涉及混凝土浇筑技术领域,具体涉及一种房建混凝土浇筑工作台。The utility model relates to the technical field of concrete pouring, in particular to a concrete pouring workbench for housing construction.

背景技术Background technique

混凝土浇筑指的是将混凝土浇筑入模直至塑化的过程,在土木建筑工程中指把混凝土等材料到模子里制成预定形体,混凝土已经成为现代建筑的主要材料,特别是对于房屋的建筑。Concrete pouring refers to the process of pouring concrete into the mold until plasticization. In civil construction engineering, it refers to putting concrete and other materials into the mold to make a predetermined shape. Concrete has become the main material of modern buildings, especially for the construction of houses.

目前在浇筑的混凝土的预制件的时候,需要用到浇筑工作台来供工作人员使用,而现有的工作台在使用的时候,难以随时调整工作人员的位置,从而使得浇筑的工作效率较低。At present, when pouring concrete prefabricated parts, it is necessary to use a pouring workbench for the staff to use, and when the existing workbench is in use, it is difficult to adjust the position of the staff at any time, which makes the work efficiency of pouring low. .

实用新型内容Utility model content

本实用新型的目的就是针对现有技术的缺陷,提供一种房建混凝土浇筑工作台,能够随时调整工作人员的位置,提高了浇筑工作效率。The purpose of the utility model is to provide a concrete pouring workbench for housing construction, which can adjust the positions of staff at any time and improve the pouring work efficiency in view of the defects of the prior art.

本实用新型一种房建混凝土浇筑工作台,其技术方案为:包括滑动板、升降装置、顶板和承板,所述顶板通过升降装置设置于所述滑动板上,所述承板设置于所述滑动板底部两侧,所述承板之间通过位于承板端部的连板固连,所述承板与地面固定并与所述滑动板沿水平方向滑动配合,所述连板上设有可驱动滑动板沿承板滑动的丝杠驱动构件,所述滑动板的底部设有与所述丝杠驱动构件螺纹匹配的底块。The utility model relates to a concrete pouring workbench for house construction, the technical scheme of which is that it comprises a sliding plate, a lifting device, a top plate and a supporting plate, the top plate is arranged on the sliding plate through the lifting device, and the supporting plate is arranged on the supporting plate. On both sides of the bottom of the sliding plate, the supporting plates are fixedly connected by connecting plates located at the ends of the supporting plates. The supporting plates are fixed to the ground and slidingly fit with the sliding plates in the horizontal direction. The connecting plates are provided with There is a lead screw driving member that can drive the sliding plate to slide along the support plate, and the bottom of the sliding plate is provided with a bottom block that is threadedly matched with the lead screw driving member.

较为优选的,所述丝杠驱动构件包括螺纹杆和把手,所述螺纹杆与承板平行设置,所述螺纹杆的一端与所述连板的中部转动连接,另一端与把手固连,所述底块与所述滑动板的底部固连,所述底块通过与所述螺纹杆匹配的内螺纹设置于所述螺纹杆上。Preferably, the screw drive member includes a threaded rod and a handle, the threaded rod is arranged in parallel with the support plate, one end of the threaded rod is rotatably connected to the middle of the connecting plate, and the other end is fixedly connected to the handle, so The bottom block is fixedly connected with the bottom of the sliding plate, and the bottom block is arranged on the threaded rod through an internal thread matched with the threaded rod.

较为优选的,所述升降装置包括液压缸和伸缩杆,所述顶板的底部中心通过液压缸与滑动板上表面中心固连,所述顶板在四角位置处通过伸缩杆与滑动板上表面四角位置固连。More preferably, the lifting device includes a hydraulic cylinder and a telescopic rod, the bottom center of the top plate is fixedly connected to the center of the upper surface of the sliding plate through the hydraulic cylinder, and the top plate is connected to the four corner positions of the upper surface of the sliding plate through the telescopic rod at the four corner positions. Solid connection.

较为优选的,所述顶板的上表面还固设有围栏组件。Preferably, a fence assembly is also fixed on the upper surface of the top plate.

较为优选的,所述围栏组件上设有供工作人员上/下工作台的侧向开口,所述侧向开口处设有活动的侧抽板。More preferably, the fence assembly is provided with a lateral opening for workers to get on/off the workbench, and a movable side drawer is provided at the lateral opening.

较为优选的,所述围栏组件包括竖杆、固定框和顶框,所述固定框与顶框均为水平设置的U型框,所述固定框、顶框分别与所述竖杆的中部、顶部固连,所述固定框与顶框的开口端共同形成围栏组件的侧向开口。More preferably, the fence assembly includes a vertical rod, a fixed frame and a top frame, the fixed frame and the top frame are both U-shaped frames arranged horizontally, and the fixed frame and the top frame are respectively connected to the middle part and the top frame of the vertical rod. The top is fixedly connected, and the fixed frame and the open end of the top frame together form a lateral opening of the fence assembly.

较为优选的,所述侧抽板的一侧设有磁铁板,另一侧设有拉手,所述侧向开口的一侧竖杆上设有限位槽,所述侧抽板穿设于所述限位槽内且可沿所述限位槽水平滑动,所述磁铁板可在侧抽板滑动至封闭所述侧向开口时与竖杆吸附。Preferably, one side of the side drawer is provided with a magnet plate, and the other side is provided with a handle, a limit slot is provided on the vertical rod on one side of the side opening, and the side drawer is penetrated through the side drawer. The magnet plate can be slid horizontally in the limiting slot and along the limiting slot, and the magnet plate can be attached to the vertical rod when the side drawer slides to close the side opening.

较为优选的,所述承板在两端位置设有向外侧延伸的侧板,所述侧板上设有供地脚螺栓穿过的螺栓过孔。Preferably, the support plate is provided with side plates extending outward at both ends, and the side plates are provided with bolt through holes through which the anchor bolts pass.

本实用新型的有益效果为:The beneficial effects of the present utility model are:

1、工作人员站上顶板,然后根据浇筑的需求慢慢升高顶板,从而使得工作人员可以达到合适的高度,同时调节丝杠驱动构件,使得滑动板可以在承板上来回移动,从而方便工作人员随时调整位置,使得工作人员可以在合适的位置进行浇筑,提高工作人员的浇筑效率。1. The staff stands on the top plate, and then slowly raises the top plate according to the requirements of pouring, so that the staff can reach the appropriate height, and at the same time adjust the screw drive member, so that the sliding plate can move back and forth on the support plate, so as to facilitate the work The staff can adjust the position at any time, so that the staff can pour in the appropriate position and improve the pouring efficiency of the staff.

2、围栏组件可以对工作人员起到保护的作用,待工作人员站上顶板后便可以滑动侧抽板并使得磁铁板吸附在铁竖杆上,从而将围栏组件的开口测封住,从而可以对工作人员起到保护的作用,从而提高工作人员施工的安全性。2. The fence assembly can protect the staff. After the staff stands on the top plate, they can slide the side puller plate and make the magnet plate adsorb on the iron vertical rod, so as to seal the opening of the fence assembly, so that it can be It plays a role in protecting the workers, thereby improving the safety of the workers in the construction.

附图说明Description of drawings

图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图2为本实用新型中限位槽和拉手拆分的结构示意图;Fig. 2 is the structural representation of the disassembly of the limiting groove and the handle in the utility model;

图3为本实用新型中承板和连板的结构示意图;Fig. 3 is the structural representation of the middle support plate and the connecting plate of the utility model;

图4为本实用新型中滑动板和的顶板处的结构示意图。FIG. 4 is a schematic structural diagram of the sliding plate and the top plate of the utility model.

图中:1、滑动板;2、承板;3、连板;4、底块;5、螺纹杆;6、顶板;7、伸缩杆;8、铁竖杆;9、顶框;10、固定框;11、侧抽板;12、把手;13、限位槽;14、拉手;15、磁铁板;16、梯型滑槽;17、梯型滑条;18、液压缸;19、侧板。In the figure: 1, sliding plate; 2, bearing plate; 3, connecting plate; 4, bottom block; 5, threaded rod; 6, top plate; 7, telescopic rod; 8, iron vertical rod; 9, top frame; 10, Fixed frame; 11, side drawer; 12, handle; 13, limit slot; 14, handle; 15, magnet plate; 16, trapezoidal chute; 17, trapezoidal slide; 18, hydraulic cylinder; 19, side plate.

具体实施方式Detailed ways

为了使本申请所要解决的技术问题、技术方案及有益效果更加清楚明白,以下结合附图及实施例,对本申请进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本申请,并不用于限定本申请。In order to make the technical problems, technical solutions and beneficial effects to be solved by the present application clearer, the present application will be described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application, but not to limit the present application.

需要说明的是,当元件被称为“固定于”或“设置于”另一个元件,它可以直接在另一个元件上或者间接在该另一个元件上。当一个元件被称为是“连接于”另一个元件,它可以是直接连接到另一个元件或间接连接至该另一个元件上。It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it can be directly on the other element or indirectly on the other element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or indirectly connected to the other element.

需要理解的是,术语“长度”、“宽度”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本申请和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本申请的限制。It is to be understood that the terms "length", "width", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top" , "bottom", "inside", "outside", etc. indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, which are only for the convenience of describing the application and simplifying the description, rather than indicating or implying the indicated device. Or elements must have a particular orientation, be constructed and operate in a particular orientation, and therefore should not be construed as a limitation of the present application.

此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括一个或者更多个该特征。在本申请的描述中,“多个”的含义是两个或两个以上,除非另有明确具体的限定。In addition, the terms "first" and "second" are only used for descriptive purposes, and should not be construed as indicating or implying relative importance or implying the number of indicated technical features. Thus, a feature defined as "first" or "second" may expressly or implicitly include one or more of that feature. In the description of the present application, "plurality" means two or more, unless otherwise expressly and specifically defined.

实施例一Example 1

图1~4示出了本申请较佳实施例(图1示出了本申请第一实施例)提供的房建混凝土浇筑工作台的结构示意图,为了便于说明,仅示出了与本实施例相关的部分,详述如下:1 to 4 show the structural schematic diagrams of the concrete pouring workbench for building construction provided by the preferred embodiment of the present application (Fig. 1 shows the first embodiment of the present application). The relevant parts are detailed as follows:

包括滑动板1,所述滑动板1的上表面的中部固定连接有液压缸18,且液压缸18的输出端与顶板6下表面的中部固定连接,所述顶板6的上表面固定连接有围栏组件,所述滑动板1下表面滑动连接有两个承板2,且滑动板1的下表面与承板2的上表面接触,且两个承板2之间固定连接有连板3,滑动板1的下表面固定连接有底块4,且底块4上螺纹连接有螺纹杆5,螺纹杆5的一端转动连接在连板3的一侧面,螺纹杆5的的另一端固定连接有把手12。Including a sliding plate 1, the middle part of the upper surface of the sliding plate 1 is fixedly connected with a hydraulic cylinder 18, and the output end of the hydraulic cylinder 18 is fixedly connected with the middle part of the lower surface of the top plate 6, and the upper surface of the top plate 6 is fixedly connected with a fence The lower surface of the sliding plate 1 is slidably connected with two bearing plates 2, and the lower surface of the sliding plate 1 is in contact with the upper surface of the bearing plate 2, and a connecting plate 3 is fixedly connected between the two bearing plates 2, and the sliding The lower surface of the plate 1 is fixedly connected with a bottom block 4, and the bottom block 4 is threadedly connected with a threaded rod 5, one end of the threaded rod 5 is rotatably connected to one side of the connecting plate 3, and the other end of the threaded rod 5 is fixedly connected with a handle. 12.

所述连板3的一端固定连接在承板2一侧面的一端,且连板3的另一端固定连接在另一个所述承板2一侧面的一端。One end of the connecting plate 3 is fixedly connected to one end of one side of the support plate 2 , and the other end of the connecting plate 3 is fixedly connected to one end of the other side of the support plate 2 .

所述承板2的一侧面的两端均固定连接有侧板19。Both ends of one side of the support plate 2 are fixedly connected with side plates 19 .

所述滑动板1下表面的两侧均固定连接有梯型滑条17,且承板2上开设有与梯型滑条17相匹配的梯型滑槽16,且梯型滑条17与梯型滑槽16滑动连接。Both sides of the lower surface of the sliding plate 1 are fixedly connected with ladder-shaped slide bars 17 , and the support plate 2 is provided with a ladder-shaped slide groove 16 matching the ladder-shaped slide bars 17 , and the ladder-shaped slide bars 17 are connected with the ladder. Type chute 16 for sliding connection.

需要说明的是:使用本装置的时候,首先在待浇筑的预制混凝土件旁修建一块水泥地,将本装置放置在待浇筑的预制混凝土件旁,然后通过螺栓将侧板19固定在水泥地上,此时启动液压缸18,液压缸18下降到最低处,工作人员站上顶板6,然后根据浇筑的需求慢慢升高顶板6,从而使得工作人员可以达到可浇筑的高度,同时转动螺纹杆5,使得滑动板1可以在承板2上来回移动,从而方便工作人员随时调整位置,使得工作人员可以在合适的位置进行浇筑,提高工作人员的浇筑效率。It should be noted that: when using the device, first build a cement floor next to the precast concrete to be poured, place the device beside the prefabricated concrete to be poured, and then fix the side plate 19 on the cement floor by bolts. At this time, the hydraulic cylinder 18 is activated, the hydraulic cylinder 18 is lowered to the lowest position, and the staff stands on the top plate 6, and then slowly raises the top plate 6 according to the requirements of pouring, so that the staff can reach the height that can be poured, while turning the threaded rod 5 , so that the sliding plate 1 can move back and forth on the support plate 2, so that it is convenient for the staff to adjust the position at any time, so that the staff can pour in a suitable position and improve the pouring efficiency of the staff.

所述滑动板1上表面的四角处均固定连接有伸缩杆7,且伸缩杆7的上端固定连接在顶板6的下表面;伸缩杆7可以对顶板6起到限位的作用。The four corners of the upper surface of the sliding plate 1 are fixedly connected with telescopic rods 7 , and the upper ends of the telescopic rods 7 are fixedly connected to the lower surface of the top plate 6 ;

所述围栏组件包括铁竖杆8、顶框9和固定框10,所述顶板6上表面的四角处均固定连接有铁竖杆8。围栏组件上设有供工作人员上/下工作台的侧向开口,所述侧向开口处设有活动的侧抽板11。固定框10与顶框9均为水平设置的U型框,所述顶框9和多个固定框10分别与所述竖杆8的顶部、中部固连,所述固定框10与顶框9的开口端共同形成围栏组件的侧向开口。侧抽板11的一侧设有磁铁板15,另一侧设有拉手14,所述侧向开口的一侧竖杆8上设有限位槽13,所述侧抽板11穿设于所述限位槽13内且可沿所述限位槽13水平滑动,所述磁铁板15可在侧抽板11滑动至封闭所述侧向开口时与竖杆8吸附。其中,铁竖杆8的上端固定连接在顶框9的下表面,且四个铁竖杆8之间固定连接有多个水平设置的固定框10,且固定框10的外侧面固定连接在铁竖杆8的侧面上。The fence assembly includes an iron vertical rod 8 , a top frame 9 and a fixed frame 10 , and the four corners of the upper surface of the top plate 6 are fixedly connected with the iron vertical rod 8 . The fence assembly is provided with a lateral opening for the staff to get on/off the workbench, and a movable side drawer 11 is provided at the lateral opening. The fixed frame 10 and the top frame 9 are both U-shaped frames arranged horizontally. The top frame 9 and the plurality of fixed frames 10 are respectively fixed to the top and the middle of the vertical rod 8 , and the fixed frame 10 and the top frame 9 are respectively fixed. The open ends of the together form the lateral opening of the fence assembly. One side of the side drawer 11 is provided with a magnet plate 15 , the other side is provided with a handle 14 , a limit slot 13 is provided on the side vertical rod 8 of the side opening, and the side drawer 11 is penetrated through the side drawer 11 . The magnet plate 15 can be slid horizontally in the limiting slot 13 and along the limiting slot 13 , and the magnet plate 15 can be attracted to the vertical rod 8 when the side drawer 11 slides to close the side opening. The upper ends of the iron vertical rods 8 are fixedly connected to the lower surface of the top frame 9, and a plurality of horizontally arranged fixed frames 10 are fixedly connected between the four iron vertical rods 8, and the outer sides of the fixed frames 10 are fixedly connected to the iron vertical rods 8. on the side of the vertical rod 8.

所述铁竖杆8上开设有限位槽13,且限位槽13内滑动连接有与限位槽13相匹配的侧抽板11,且侧抽板11的一侧面固定连接有磁铁板15,侧抽板11的另一侧面固定连接有拉手14。The iron vertical rod 8 is provided with a limit slot 13, and the limit slot 13 is slidably connected with a side drawer 11 matching the limit slot 13, and a side surface of the side drawer 11 is fixedly connected with a magnet plate 15. A handle 14 is fixedly connected to the other side of the side drawer 11 .

需要说明的是:围栏组件可以对工作人员起到保护的作用,在工作人员站上顶板6前,滑动侧抽板11,使得围栏组件的一侧面开口,待工作人员站上顶板6后便可以滑动侧抽板11并使得磁铁板15吸附在铁竖杆8上,从而将围栏组件的开口侧封住,从而可以对工作人员起到保护的作用,从而提高工作人员施工的安全性。It should be noted that the fence assembly can protect the staff. Before the staff stands on the top plate 6, slide the side drawer 11 so that one side of the fence assembly is open, and the staff can stand on the top plate 6. Slide the side pull-out plate 11 and make the magnet plate 15 adsorb on the iron vertical rod 8 to seal the open side of the fence assembly, so as to protect the workers and improve the safety of the workers during construction.

本实用新型中液压缸18为现有技术的常用设备,采用的型号等均可根据实际使用需求定制,且本实用中的用电设备的供电接口通过开关(图中未画出)和导线(图中未画出)连接供电系统,从而实现对其控制,其中涉及的电路以及控制均为现有技术,为当前领域技术公知,在此不进行过多赘述。The hydraulic cylinder 18 in the present invention is a common equipment in the prior art, and the model used can be customized according to the actual use requirements, and the power supply interface of the electrical equipment in the present invention is connected by a switch (not shown in the figure) and a wire ( (not shown in the figure) is connected to the power supply system, so as to realize its control, and the circuits and controls involved are all in the prior art, which are well known in the current field, and will not be repeated here.

以上所述实施例仅用以说明本申请的技术方案,而非对其限制;尽管参照前述实施例对本申请进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本申请各实施例技术方案的精神和范围,均应包含在本申请的保护范围之内。The above-mentioned embodiments are only used to illustrate the technical solutions of the present application, but not to limit them; although the present application has been described in detail with reference to the above-mentioned embodiments, those of ordinary skill in the art should understand that: it is still possible to implement the above-mentioned implementations. The technical solutions described in the examples are modified, or some technical features thereof are equivalently replaced; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions in the embodiments of the application, and should be included in the within the scope of protection of this application.

Claims (8)

1. The utility model provides a room building concrete placement workstation which characterized in that: the device comprises a sliding plate (1), a lifting device, a top plate (6) and bearing plates (2), wherein the top plate (6) is arranged on the sliding plate (1) through the lifting device, the bearing plates (2) are arranged on two sides of the bottom of the sliding plate (1), the bearing plates (2) are fixedly connected through connecting plates (3) located at the end parts of the bearing plates (2), the bearing plates (2) are fixed with the ground and are in sliding fit with the sliding plate (1) along the horizontal direction, screw driving components capable of driving the sliding plate (1) to slide along the bearing plates (2) are arranged on the connecting plates (3), and bottom blocks (4) matched with the screw driving components in a threaded mode are arranged at the bottom of the sliding plate (1).
2. The concrete casting work bench for house construction according to claim 1, characterized in that: the lead screw driving component comprises a threaded rod (5) and a handle (12), the threaded rod (5) is parallel to the bearing plate (2), one end of the threaded rod (5) is rotatably connected with the middle of the connecting plate (3), the other end of the threaded rod is fixedly connected with the handle (12), the bottom block (4) is fixedly connected with the bottom of the sliding plate (1), and the bottom block (4) is arranged on the threaded rod (5) through an internal thread matched with the threaded rod (5).
3. The concrete casting work bench for house construction according to claim 1, characterized in that: the lifting device comprises a hydraulic cylinder (18) and telescopic rods (7), the bottom center of the top plate (6) is fixedly connected with the center of the upper surface of the sliding plate (1) through the hydraulic cylinder (18), and the top plate (6) is fixedly connected with four corners of the upper surface of the sliding plate (1) through the telescopic rods (7) at the four corners.
4. The house building concrete pouring work bench of claim 1, characterized in that: the upper surface of the top plate (6) is also fixedly provided with a fence component.
5. The concrete casting work bench for house construction according to claim 4, wherein: the fence component is provided with a lateral opening for workers to go up/down the workbench, and the lateral opening is provided with a movable lateral drawing plate (11).
6. The house building concrete pouring work bench of claim 5, characterized in that: the fence component comprises a vertical rod (8), a fixed frame (10) and a top frame (9), wherein the fixed frame (10) and the top frame (9) are U-shaped frames which are horizontally arranged, the fixed frame (10) and the top frame (9) are fixedly connected with the middle part and the top of the vertical rod (8) respectively, and the open ends of the fixed frame (10) and the top frame (9) form a lateral opening of the fence component together.
7. The house building concrete pouring work bench of claim 6, characterized in that: one side of board (11) is taken out in the side is equipped with magnet board (15), and the opposite side is equipped with handle (14), be equipped with spacing groove (13) on side open-ended one side montant (8), board (11) are taken out in the side is worn to locate in spacing groove (13) and can be followed spacing groove (13) horizontal slip, magnet board (15) can be taken out board (11) in the side and slide to sealing adsorb with montant (8) during the side direction opening.
8. The house building concrete pouring work bench of claim 1, characterized in that: the bearing plate (2) is provided with side plates (19) extending outwards at two ends, and bolt through holes for foundation bolts to penetrate through are formed in the side plates (19).
CN202220217638.0U 2022-01-26 2022-01-26 Concrete placement workstation is built in room Active CN216766705U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220217638.0U CN216766705U (en) 2022-01-26 2022-01-26 Concrete placement workstation is built in room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220217638.0U CN216766705U (en) 2022-01-26 2022-01-26 Concrete placement workstation is built in room

Publications (1)

Publication Number Publication Date
CN216766705U true CN216766705U (en) 2022-06-17

Family

ID=81979729

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220217638.0U Active CN216766705U (en) 2022-01-26 2022-01-26 Concrete placement workstation is built in room

Country Status (1)

Country Link
CN (1) CN216766705U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116537590A (en) * 2023-06-13 2023-08-04 中国十七冶集团有限公司 Novel fabricated concrete building enclosure system and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116537590A (en) * 2023-06-13 2023-08-04 中国十七冶集团有限公司 Novel fabricated concrete building enclosure system and construction method thereof

Similar Documents

Publication Publication Date Title
JP3237648U (en) Hydraulic self-climbing placement boom that can be easily installed and fixed
CN216766705U (en) Concrete placement workstation is built in room
CN212249274U (en) Steel sheet shear force wall quick positioning connection structure in assembly type structure
CN112923136A (en) Concrete placement pipe end supports adjusting device for construction
CN216105701U (en) Hoisting device for engineering reinforcement construction
CN219509168U (en) Heat preservation template installation die carrier
CN107642246A (en) A kind of build concrete hollow brick masonry device
CN209250185U (en) A kind of electronic cover board of cable duct
CN220168741U (en) Underground pipeline laying device
CN220645508U (en) Building protection device for building engineering management
CN219587249U (en) Discharging platform for high-rise structure construction
CN214144786U (en) Rebar binding aids for construction sites
CN203701552U (en) Attached scaffold for lifted through worm, gear and screw rod
CN117090404A (en) Shear wall mounting device and construction process
CN215756040U (en) Mechanical lifting type engineering machinery transfer device
CN220889535U (en) Construction device for secondary structure tie bar embedded part
CN113738132A (en) Building prefabricated slab positioning device and using method
CN220976227U (en) Hoisting equipment for binding tubular piles
CN113700030A (en) Prefabricated formula installation basis
CN221680614U (en) A lifting device for construction engineering
CN217128034U (en) Bridge zero number piece bottom plate structure
CN216638755U (en) A hoisting structure for prefabricated columns of recycled coarse aggregate for concrete
CN220747846U (en) Civil air defense engineering strutting arrangement
CN219509120U (en) A safe high-rise building climbing frame
CN220182561U (en) Assembled superimposed sheet hoist device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant