CN216765640U - Bridge midspan closure device - Google Patents
Bridge midspan closure device Download PDFInfo
- Publication number
- CN216765640U CN216765640U CN202220377944.0U CN202220377944U CN216765640U CN 216765640 U CN216765640 U CN 216765640U CN 202220377944 U CN202220377944 U CN 202220377944U CN 216765640 U CN216765640 U CN 216765640U
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- vertical rod
- basket bracket
- support rod
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本实用新型涉及桥梁领域,有效的解决了操作繁琐,操作难度大的问题;其解决的技术方案是,一种桥梁中跨合龙装置,包括挂篮支架,挂篮支架是夹角为锐角的菱形架,挂篮支架上侧的锐角处设置有竖直放置且能上下移动竖杆,竖杆下端设置有一个平板,平板与竖杆固定连接,平板板能够随竖杆上下移动,两个平板能够贴合;挂篮支架的下端设置有竖直放置的支撑杆,支撑杆能够上下移动,支撑杆下端装有楔形块,楔形块的上端面为斜面,挂篮支架的下端位于支撑杆的一侧装有导链手拉葫芦;本实用新型通过两个挂篮支架既可以单独作业,也能够结合后合龙作业,操作简单,且实施方便,提高了合龙作业的效率。
The utility model relates to the field of bridges, and effectively solves the problems of cumbersome and difficult operations; the technical scheme of the utility model is that a bridge mid-span closing device comprises a hanging basket bracket, and the hanging basket bracket is a rhombus with an acute angle. The upper side of the hanging basket bracket is provided with a vertical rod that can be placed vertically and can move up and down. The lower end of the vertical rod is provided with a flat plate. The flat plate is fixedly connected with the vertical rod. Fitting; the lower end of the hanging basket bracket is provided with a vertically placed support rod, the support rod can move up and down, the lower end of the support rod is equipped with a wedge-shaped block, the upper end surface of the wedge-shaped block is inclined, and the lower end of the hanging basket bracket is located on one side of the support rod The chain hoist is equipped with a guide chain; the utility model can operate independently through the two hanging basket supports, and can also be combined with the rear closing operation, the operation is simple, the implementation is convenient, and the efficiency of the closing operation is improved.
Description
技术领域technical field
本实用新型涉及桥梁领域,具体是一种桥梁中跨合龙装置。The utility model relates to the field of bridges, in particular to a bridge mid-span closing device.
背景技术Background technique
桥梁,一般指架设在江河湖海上,使车辆行人等能顺利通行的构筑物,为适应现代高速发展的交通行业,桥梁亦引申为跨越山涧、不良地质或满足其他交通需要而架设的使通行更加便捷的建筑物;在悬浇连续梁的挂篮悬臂法施工时,传统中跨合龙施工工艺常拆除其中一端挂篮,另一端挂篮改装成托架;在第n节段(悬浇段共n个)施工张拉完成后,先施工边跨合拢段,边跨合拢段施工完成且张拉后,拆除中跨其中一套挂篮,将中跨侧另一套挂篮整体前移至另一悬臂端,在悬臂端预留孔内穿入钢丝绳吊起挂篮前横梁及滑梁的前横梁,拆除挂篮前吊杆,用卷扬机使底篮及滑梁移到相应位置,安装锚杆、吊杆和联接器,将吊架及模板系统锚固稳定,主桁系统拆除;传统施工工艺工周期比较长,需要等边跨合拢段施工完成且张拉后,后退其中一套挂篮,另一台挂篮行走到位后利用其托架施工;前横梁受力点由吊杆转换为钢丝绳,再由钢丝绳转换为吊杆,工序较为繁琐且转换过程中的操作风险较大。Bridges generally refer to structures that are erected on rivers, lakes and seas to enable vehicles and pedestrians to pass smoothly. In order to adapt to the modern high-speed development of the transportation industry, bridges are also extended to cross mountain streams, bad geology or to meet other traffic needs. In the construction of the hanging basket cantilever method of the cantilevered continuous beam, the traditional mid-span closure construction process often removes one end of the hanging basket, and the other end of the hanging basket is converted into a bracket; in the nth section (a total of n 1) After the construction tension is completed, first construct the side span closed section, after the construction of the side span closed section is completed and tensioned, remove one set of hanging baskets in the mid-span, and move the other set of hanging baskets on the mid-span side to the other side as a whole. At the cantilever end, insert the wire rope into the reserved hole at the cantilever end to hoist the front beam of the hanging basket and the front beam of the sliding beam, remove the front hanging rod of the hanging basket, use the winch to move the bottom basket and the sliding beam to the corresponding position, install the anchor rod, The hanger and the coupling are used to anchor and stabilize the hanger and the formwork system, and the main truss system is removed; the traditional construction process has a relatively long construction period, and after the construction of the equilateral span closing section is completed and tensioned, one set of hanging baskets is retreated, and the other After the platform hanging basket is in place, the bracket is used for construction; the force point of the front beam is converted from the boom to the wire rope, and then from the wire rope to the boom, the process is more complicated and the operation risk during the conversion process is relatively large.
发明内容SUMMARY OF THE INVENTION
针对上述情况,为克服现有技术之缺陷,本实用新型提供了一种桥梁中跨合龙装置,有效的解决了操作繁琐,操作难度大的问题。In view of the above situation, in order to overcome the defects of the prior art, the utility model provides a bridge mid-span closing device, which effectively solves the problems of cumbersome and difficult operation.
其解决的技术方案是,一种桥梁中跨合龙装置,包括挂篮支架,挂篮支架是夹角为锐角的菱形架,挂篮支架上侧的锐角处设置有竖直放置且能上下移动竖杆,竖杆下端设置有一个平板,平板与竖杆固定连接,平板板能够随竖杆上下移动,两个平板能够贴合;Its technical solution is that a bridge mid-span closing device includes a hanging basket bracket, the hanging basket bracket is a rhombus frame with an acute angle, and the upper side of the hanging basket bracket is provided with a vertical vertical position and can move up and down at the acute angle. The lower end of the vertical rod is provided with a flat plate, the flat plate is fixedly connected with the vertical rod, the flat plate can move up and down with the vertical rod, and the two flat plates can fit together;
挂篮支架的下端设置有竖直放置的支撑杆,支撑杆能够上下移动,支撑杆下端装有楔形块,楔形块的上端面为斜面,挂篮支架的下端位于支撑杆的一侧装有导链手拉葫芦。The lower end of the hanging basket bracket is provided with a vertically placed support rod. The support rod can move up and down. The lower end of the support rod is equipped with a wedge block. Chain chain hoist.
所述的竖杆穿过挂篮支架,竖杆的上端设有螺纹槽,螺纹槽上装有螺母,竖杆经螺母置于挂篮支架上,并经螺母使竖杆的上下移动。The vertical rod passes through the hanging basket bracket, the upper end of the vertical rod is provided with a threaded groove, the threaded groove is provided with a nut, the vertical rod is placed on the hanging basket bracket through the nut, and the vertical rod is moved up and down through the nut.
所述的竖杆材质为高强度精轧螺纹钢。The material of the vertical rod is high-strength precision-rolled thread steel.
所述的支撑杆穿过挂篮支架的下端,支撑杆的上端有螺纹槽,螺纹槽上装有螺母,支撑杆经螺母置于挂篮支架下端,螺母使支撑杆上下移动。The supporting rod passes through the lower end of the hanging basket bracket, the upper end of the supporting rod is provided with a threaded groove, and the threaded groove is provided with a nut, the supporting rod is placed at the lower end of the hanging basket bracket through the nut, and the nut makes the supporting rod move up and down.
所述的支撑杆的数量有多个,多个支撑杆左右放置,支撑杆的材质为高强度精轧螺纹钢。The number of the support rods is multiple, the support rods are placed left and right, and the material of the support rods is high-strength precision-rolled thread steel.
本实用新型通过两个挂篮支架既可以单独作业,也能够结合后合龙作业,操作简单,且实施方便,提高了合龙作业的效率。The utility model can operate independently through the two hanging basket supports, and can also be combined with the rear closing operation, the operation is simple, the implementation is convenient, and the efficiency of the closing operation is improved.
附图说明Description of drawings
图1为本实用新型的主视图。Fig. 1 is the front view of the utility model.
图2为本实用新型的A处放大图。Fig. 2 is the enlarged view of A of the utility model.
图3为本实用新型的竖杆与螺母配合的放大图。FIG. 3 is an enlarged view of the vertical rod and the nut of the present invention.
具体实施方式Detailed ways
以下结合附图对本实用新型的具体实施方式作出进一步详细说明。The specific embodiments of the present utility model will be further described in detail below with reference to the accompanying drawings.
由图1至图3给出,本实用新型包括挂篮支架1,挂篮支架1是夹角为锐角的菱形架,挂篮支架1上侧的锐角处设置有竖直放置且能上下移动竖杆2,竖杆2下端设置有一个平板3,平板3与竖杆2固定连接,平板3板能够随竖杆2上下移动,两个平板3能够贴合;As shown in Figures 1 to 3, the present utility model includes a hanging basket bracket 1, the hanging basket bracket 1 is a rhombus frame with an acute angle, and the upper side of the hanging basket bracket 1 is provided with a vertical position at the acute angle and can move up and down. The
挂篮支架1的下端设置有竖直放置的支撑杆4,支撑杆4能够上下移动,支撑杆4下端装有楔形块5,楔形块5的上端面为斜面,挂篮支架1的下端位于支撑杆4的一侧装有导链手拉葫芦6。The lower end of the hanging basket bracket 1 is provided with a vertically placed supporting rod 4, the supporting rod 4 can move up and down, the lower end of the supporting rod 4 is equipped with a wedge-
所述的竖杆2穿过挂篮支架1,竖杆2的上端设有螺纹槽,螺纹槽上装有螺母,竖杆2经螺母置于挂篮支架1上,并经螺母使竖杆2的上下移动。The
所述的竖杆2材质为高强度精轧螺纹钢。The
所述的支撑杆4穿过挂篮支架1的下端,支撑杆4的上端有螺纹槽,螺纹槽上装有螺母,支撑杆4经螺母置于挂篮支架1下端,螺母使支撑杆4上下移动。The supporting rod 4 passes through the lower end of the hanging basket bracket 1, the upper end of the supporting rod 4 is provided with a threaded groove, and a nut is installed on the threaded groove, the supporting rod 4 is placed at the lower end of the hanging basket bracket 1 through the nut, and the nut makes the supporting rod 4 move up and down .
所述的支撑杆4的数量有多个,多个支撑杆4左右放置,支撑杆4的材质为高强度精轧螺纹钢。The number of the support rods 4 is multiple, the support rods 4 are placed left and right, and the material of the support rods 4 is high-strength finish-rolled threaded steel.
本实用新型使用时,当需要浇筑合龙前侧的连续浇筑梁段7时,先将两个挂篮支架1分别置于连续浇筑梁段7对应侧的梁9上,且两个挂篮支架1上侧的锐角相邻;When the utility model is used, when the continuous pouring beam section 7 on the front side of the closure needs to be poured, the two hanging basket supports 1 are respectively placed on the beam 9 on the corresponding side of the continuous pouring beam section 7, and the two hanging basket supports 1 The acute angles on the upper side are adjacent;
挂篮支架1的固定:将支撑杆4的下端置于梁9下侧,旋转支撑杆4上的螺母,使楔形块5的上端面与梁9的下端面接触,由于楔形块5上端面为斜面,楔形块5的上端面与梁9的下端面能够紧密贴合,防止挂篮支架1的晃动;然后使导链手拉葫芦6的下端与梁9的下端连接,拉动导链手拉葫芦6使其绷紧,能够使挂篮支架1更加稳定;Fixing of the hanging basket bracket 1: place the lower end of the support rod 4 on the lower side of the beam 9, and rotate the nut on the support rod 4 to make the upper end face of the
平板3的调整:在挂篮支架1固定完成之后,调节竖杆2上端的螺母,使竖杆2上下移动,带动平板3上下移动,直到平板3达到指定的高度后,停止旋转螺母;Adjustment of the plate 3: After the hanging basket bracket 1 is fixed, adjust the nut on the upper end of the
然后对连续浇筑梁段7进行浇筑即可;Then the continuous pouring beam section 7 can be poured;
完成连续浇筑梁段7之后,移动两个挂篮支架1,使两个挂篮支架1上的竖杆2位于合龙段8的中部,且竖杆2下端固定的两个平板3贴合;之后再进行挂篮支架1的固定和平板3的调整,且两平板3的上端面调整至平齐;最后完成合龙段8的浇筑;After completing the continuous pouring of the beam section 7, move the two hanging basket supports 1 so that the
由于两个挂篮支架1不是固定在一起,当需要拆除时,将两个挂篮支架1相互远离方向移动,当移至方便拆卸处再进行拆卸。Since the two hanging basket supports 1 are not fixed together, when they need to be removed, move the two hanging basket supports 1 away from each other, and then remove them when they are moved to a place that is convenient for removal.
1、本实用新型通过两个挂篮支架1单独对一侧的连续浇筑梁段7进行作业,并且当对合龙段8进行合龙时,只需移动两个挂篮支架1,使两个挂篮支架1上的竖杆2位于合龙段8的中部,竖杆2下端固定的两个平板3贴合,就能进行浇筑作业;与传统挂篮施工相比不用再中跨合龙前拆除一侧挂篮,工序简单,且合理、有效的节约了工期。1. In the present invention, the continuous casting beam section 7 on one side is independently operated by two hanging basket brackets 1, and when the closing section 8 is closed, only the two hanging basket brackets 1 need to be moved to make the two hanging baskets. The
2、本实用新型通过竖杆2和支撑杆4采用高强度精轧螺纹钢,并通过螺母对竖杆2和支撑杆4的调节操作单一,可实施性强;并通过导链手拉葫芦6使挂篮支架1更加稳定;使本装置与传统挂篮相比安装、拆卸方便,适用性强,替代性强,且可以重复利用。2. The utility model adopts high-strength precision-rolled threaded steel through the
3、本实用新型通过两个挂篮支架1相互移动,当进行拆卸时,只需要单独将挂篮支架1移至方便拆卸处进行拆卸即可,为后期拆卸提供了便捷,同时减轻了工人的工作负担。3. The present utility model uses two hanging basket supports 1 to move each other. When disassembling, it is only necessary to move the hanging basket support 1 to a convenient disassembly place for disassembly, which provides convenience for later disassembly and reduces the labor of workers. work load.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202220377944.0U CN216765640U (en) | 2022-02-24 | 2022-02-24 | Bridge midspan closure device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202220377944.0U CN216765640U (en) | 2022-02-24 | 2022-02-24 | Bridge midspan closure device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN216765640U true CN216765640U (en) | 2022-06-17 |
Family
ID=81958449
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202220377944.0U Active CN216765640U (en) | 2022-02-24 | 2022-02-24 | Bridge midspan closure device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN216765640U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115821800A (en) * | 2023-01-03 | 2023-03-21 | 中国十九冶集团有限公司 | Construction method for closure pouring of closure section of continuous beam bridge |
-
2022
- 2022-02-24 CN CN202220377944.0U patent/CN216765640U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115821800A (en) * | 2023-01-03 | 2023-03-21 | 中国十九冶集团有限公司 | Construction method for closure pouring of closure section of continuous beam bridge |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109944170A (en) | Integrated construction system and construction method of cast-in-place section and closed section of high pier continuous beam side span | |
| CN100590266C (en) | Reverse sequence demolition method of prestressed concrete tied arch bridge | |
| CN211369536U (en) | A cast-in-place box girder formwork system | |
| CN110528402A (en) | A kind of construction method of the more purlin piece combination Hanging Baskets of ultra-wide box beam | |
| CN107905111B (en) | A kind of construction technology of rigid frame continuous beam side span | |
| CN110644371A (en) | Prefabricated cover beam installation method and system | |
| CN110453613A (en) | A kind of cantilever method construction of Large span girder bridge box beam tunneling boring | |
| CN111749140A (en) | A truss integral lift bridge high pier climbing formwork device and construction method | |
| CN216765640U (en) | Bridge midspan closure device | |
| CN111893889A (en) | A construction method for the closing section of the main bridge | |
| CN108914776B (en) | A construction hanging basket for municipal engineering and housing construction | |
| CN107227690A (en) | Leg structure in a kind of upstroke movable framework | |
| CN105256728B (en) | A kind of cantilever erection method of the Chinese human relations formula steel truss girder of cable-stayed bridge | |
| CN218748426U (en) | Prefabricated form is changed into to cast-in-place T roof beam of bridge superstructure | |
| CN106042173A (en) | bridge production system | |
| CN210151596U (en) | Integrated construction system for side-span cast-in-place section and closure section of high-pier continuous beam | |
| CN110043035A (en) | A kind of novel post empiricism method for supporting | |
| CN113279337B (en) | A wet joint formwork installation and disassembly system and installation and disassembly construction method | |
| CN209066293U (en) | Elastic hanging bracket for construction of large-span arch bridge girder | |
| CN110438906A (en) | A kind of deck type box arch bridge arch rib construction method | |
| CN217104777U (en) | Interim landing stage demolishs device | |
| CN116853963A (en) | A hoisting device and hoisting method for the main beam of a cable-stayed bridge | |
| CN210087319U (en) | A large-section special-shaped shaft steel strand suspension intelligent hydraulic lifting sliding module | |
| CN212128879U (en) | A mobile formwork for bridge construction | |
| CN207073074U (en) | A kind of box-like bracket of Hanging Basket assisted group |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |