CN216740592U - Building wall assistor is built in room - Google Patents
Building wall assistor is built in room Download PDFInfo
- Publication number
- CN216740592U CN216740592U CN202120854596.7U CN202120854596U CN216740592U CN 216740592 U CN216740592 U CN 216740592U CN 202120854596 U CN202120854596 U CN 202120854596U CN 216740592 U CN216740592 U CN 216740592U
- Authority
- CN
- China
- Prior art keywords
- roof
- supporting frame
- motor
- building
- containing box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model belongs to the technical field of construction equipment, especially, be a building wall assistor for building in room, including the roof, the bottom both ends of roof are installed with the pole setting, a supporting frame is installed to one side of roof, the supporting frame with rotate through the pivot between the roof and be connected, a motor is installed to the bottom of supporting frame, the output of motor is installed the lead screw; when the roof of fragment of brick above scaffold frame is placed to needs, can make the carriage keep vertical under the pivot cooperation, then rotate the locating lever of locating sleeve inside wall, make the slipmat hug closely subaerial, place the fragment of brick in the inside of containing box, switch on the motor power, can make even board up remove along the lead screw under the cooperation of traveller through the motor, and then drive the containing box and remove roof department, then the staff take out the inside fragment of brick of containing box can, through the step that can avoid the staff to hand like this, make things convenient for the staff to place the scaffold frame to the fragment of brick.
Description
Technical Field
The utility model belongs to the technical field of the architectural equipment, concretely relates to wall building assistor is built in room.
Background
When carrying out housing construction, need the staff to build a wall, pile into the wall with the fragment of brick through the concrete, make the main body frame in house to be built out, then just can carry out further construction to the house, so building a wall is the basis of housing construction, and many times, the height in house will be than building staff's height still more than a lot, need use the scaffold frame this moment, the staff climbs and carries out the house of eminence on the scaffold frame and builds a wall, when the staff needs the fragment of brick on the scaffold frame, the staff that needs the below hand with the fragment of brick hand give the staff of top, the condition that can lead to staff's hand ache for a long time, the functionality of scaffold frame has been reduced like this, can not bring more facilities for the staff.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a wall building assistor is built in room has transportation equipment, makes things convenient for the staff to place the fragment of brick characteristics on the scaffold frame.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building wall assistor is built in room, includes the roof, the pole setting is installed at the bottom both ends of roof, the carriage is installed to one side of roof, the carriage with rotate through the pivot between the roof and connect, the motor is installed to the bottom of carriage, the lead screw is installed to the output of motor, the lateral wall meshing of lead screw is connected with even board, the both sides of lead screw still are connected with the traveller, just even the board is followed sliding connection about the traveller, even the board is kept away from the containing box is installed to the one end of carriage, the position sleeve is installed to the bottom of carriage, the inside wall threaded connection of position sleeve has the locating lever, the slipmat is installed to the bottom of locating lever, motor and external power source electric connection.
As the utility model discloses a preferred technical scheme of wall building assistor is built in room, the operation panel is installed to the bottom of containing box, the bull stick is installed at the top of operation panel, the diaphragm is installed to the other end of bull stick, the diaphragm is located the inside of containing box.
As the utility model discloses a preferred technical scheme of wall building assistor is built in room, the protrusion pole is installed to the lateral wall of operation panel.
As the utility model discloses a preferred technical scheme of assistor is built a wall in room, the bottom intermediate position department of roof still installs and inserts the ring, insert the inside wall of ring and install the inserted bar.
As the utility model discloses a preferred technical scheme of wall building assistor is built in room, inserted bar front surface to rear surface distance with the front surface of roof is the same to the rear surface distance.
As the utility model discloses a preferred technical scheme of wall building assistor is built in room, the traveller the lead screw with even the board is located the groove of carriage is seted up.
As the utility model discloses a preferred technical scheme of wall building assistor is built in room, traveller length is less than the length of roof.
Compared with the prior art, the beneficial effects of the utility model are that: when the roof of putting the fragment of brick above the scaffold frame is placed to needs, can make the carriage keep vertical under the pivot cooperation, then the locating lever of the interior lateral wall of rotation positioning sleeve, make the slipmat hug closely subaerial, place the fragment of brick in the inside of containing box, the switch-on motor power, can make even board up move along the lead screw under the cooperation of traveller through the motor, and then drive the containing box and remove roof department, then the staff take out the fragment of brick of containing box inside can, through the step that can avoid the staff to hand like this, make things convenient for the staff to place the scaffold frame to the fragment of brick.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a rotation structure of the support frame of FIG. 1 according to the present invention;
FIG. 3 is a schematic view of the internal structure of the storage box of FIG. 1 according to the present invention;
in the figure: 1. a top plate; 2. a traveler; 3. a screw rod; 4. a storage box; 5. connecting plates; 6. a positioning sleeve; 7. An electric motor; 8. positioning a rod; 9. a non-slip mat; 10. a support frame; 11. a rotating shaft; 12. inserting a ring; 13. erecting a rod; 14. a rod is inserted; 15. a transverse plate; 16. a rotating rod; 17. an operation panel; 18. a projecting rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a building wall assistor is built in room, including roof 1, pole setting 13 is installed through the bolt in the bottom both ends of roof 1, one side of roof 1 is connected with carriage 10, rotate through pivot 11 between carriage 10 and the roof 1 and be connected, motor 7 is installed through the bolt in the bottom of carriage 10, lead screw 3 is installed through the bolt in motor 7's output, the lateral wall meshing of lead screw 3 is connected with even board 5, there is slide post 2 still through bolted connection in the both sides of lead screw 3, and slide connection about even board 5 along 2 axle center directions of slide post, connecting board 5 and keeping away from the one end of carriage 10 and installing containing box 4 through the bolt, position sleeve 6 is installed through the bolt in the bottom of carriage 10, the inside wall threaded connection of position sleeve 6 has locating lever 8, the bottom of locating lever 8 is connected with slipmat 9, motor 7 and external power source electric connection.
In this embodiment, motor 7's model is YL7114, and when needs were built a wall, the staff can stand in roof 1 department, through can increase staff's height like this, makes things convenient for the staff to build a wall.
In this embodiment, when the fragment of brick is placed roof 1 of scaffold frame top as required, can make carriage 10 keep vertical under the cooperation of pivot 11, then rotate the locating lever 8 of 6 inside walls of position sleeve, make slipmat 9 hug closely subaerial, place the fragment of brick in the inside of containing box 4, switch on motor 7 power, can make even board 5 up remove along lead screw 3 under the cooperation of traveller 2 through motor 7, and then drive containing box 4 and remove roof 1 department, then the staff take out the inside fragment of brick of containing box 4 can.
Specifically, the bottom of the storage box 4 is connected with an operating panel 17, a rotating rod 16 is mounted at the top of the operating panel 17, a transverse plate 15 is mounted at the other end of the rotating rod 16, and the transverse plate 15 is located inside the storage box 4.
In this embodiment, when the fragment of brick of less volume is placed to needs, can rotate operation panel 17 and make the diaphragm 15 at bull stick 16 top up remove, through the degree of depth that can reduce containing box 4 like this, make things convenient for the staff to take out the fragment of brick.
Specifically, the protruding rod 18 is welded to the outer side wall of the operation panel 17.
In this embodiment, the protruding rod 18 is welded on the outer side wall of the operation panel 17, so that a worker can place a hand at the protruding rod 18 and then rotate the protruding rod 18, thereby facilitating the worker to rotate the operation panel 17.
Specifically, an insert ring 12 is further installed at the middle position of the bottom of the top plate 1, and an insert rod 14 is installed on the inner side wall of the insert ring 12.
In this embodiment, when the bricks are not required to be transported, the supporting frame 10 can be closely attached to the top of the top plate 1 by the cooperation of the rotating shaft 11, and then the inserting rod 14 is inserted into the inserting ring 12, so that the supporting frame 10 can be blocked by the inserting rod 14.
Specifically, the distance from the front surface to the rear surface of the insert rod 14 is the same as the distance from the front surface to the rear surface of the top plate 1.
In this embodiment, the distance from the front surface to the rear surface of the insertion rod 14 is the same as the distance from the front surface to the rear surface of the top plate 1, so that the insertion rod 14 can be inserted into the insertion ring 12 on the rear surface of the top plate 1, and the insertion rod 14 can be more firmly fixed to the support frame 10.
Specifically, the sliding column 2, the screw rod 3 and the connecting plate 5 are positioned at a groove formed in the supporting frame 10.
In this embodiment, the slide post 2, the screw rod 3, and the connecting plate 5 are located in the groove formed in the support frame 10, so that the volume of the support frame 10 can be reduced.
Specifically, the length of the support frame 10 is smaller than that of the top plate 1.
In this embodiment, when the supporting frame 10 is rotated to be closely attached to the bottom of the top plate 1, the supporting frame 10 is prevented from protruding from one end of the top plate 1.
The utility model discloses a theory of operation and use flow: the utility model discloses after installing, when needs place the fragment of brick in the roof 1 of scaffold frame top, can make carriage 10 keep vertical fixed, place the fragment of brick in the inside of containing box 4, can make even board 5 up move along lead screw 3 under the cooperation of traveller 2 through motor 7, and then drive containing box 4 and remove roof 1 department, then the staff take out the inside fragment of brick of containing box 4 can.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (7)
1. The utility model provides a wall building assistor is built in room, includes roof (1), pole setting (13), its characterized in that are installed to the bottom both ends of roof (1): a supporting frame (10) is arranged on one side of the top plate (1), the supporting frame (10) is rotatably connected with the top plate (1) through a rotating shaft (11), the bottom of the supporting frame (10) is provided with a motor (7), the output end of the motor (7) is provided with a screw rod (3), the outer side wall of the screw rod (3) is connected with a connecting plate (5) in a meshing way, two sides of the screw rod (3) are also connected with sliding columns (2), the connecting plate (5) is connected with the sliding column (2) in a sliding way up and down, one end of the connecting plate (5) far away from the supporting frame (10) is provided with a containing box (4), a positioning sleeve (6) is arranged at the bottom of the supporting frame (10), a positioning rod (8) is connected with the inner side wall of the positioning sleeve (6) in a threaded manner, and the bottom of the positioning rod (8) is provided with an anti-slip pad (9), and the motor (7) is electrically connected with an external power supply.
2. The building wall assistor of claim 1, characterized in that: operating panel (17) are installed to the bottom of containing box (4), bull stick (16) is installed at the top of operating panel (17), diaphragm (15) are installed to the other end of bull stick (16), diaphragm (15) are located the inside of containing box (4).
3. The building walling assistor of claim 2, wherein: the outer side wall of the operating panel (17) is provided with a protruding rod (18).
4. The building walling aid of claim 1, wherein: insert ring (12) are still installed to the bottom intermediate position department of roof (1), inserted bar (14) are installed to the inside wall of insert ring (12).
5. The building walling aid of claim 4, wherein: the distance from the front surface to the rear surface of the inserted rod (14) is the same as that from the front surface to the rear surface of the top plate (1).
6. The building walling aid of claim 1, wherein: the sliding column (2), the screw rod (3) and the connecting plate (5) are positioned in a groove formed in the supporting frame (10).
7. The building walling aid of claim 1, wherein: the length of the supporting frame (10) is less than that of the top plate (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120854596.7U CN216740592U (en) | 2021-04-25 | 2021-04-25 | Building wall assistor is built in room |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120854596.7U CN216740592U (en) | 2021-04-25 | 2021-04-25 | Building wall assistor is built in room |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216740592U true CN216740592U (en) | 2022-06-14 |
Family
ID=81909231
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120854596.7U Active CN216740592U (en) | 2021-04-25 | 2021-04-25 | Building wall assistor is built in room |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216740592U (en) |
-
2021
- 2021-04-25 CN CN202120854596.7U patent/CN216740592U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210164199U (en) | Light prefabricated wallboard plate turnover | |
CN214834923U (en) | Wall body erection equipment for assembly type structure | |
WO2021208469A1 (en) | Cart for civil construction | |
CN216740592U (en) | Building wall assistor is built in room | |
CN219217279U (en) | Assembled building wallboard hoist device | |
CN217495865U (en) | Wall-hanging electric pile installation component that fills | |
CN213980263U (en) | Enclosure for civil engineering | |
CN210286677U (en) | Assembled steel construction is with ladder frame convenient to remove | |
CN216272932U (en) | House building engineering outer wall equipment platform | |
CN215055239U (en) | Combined type supporting template for constructional engineering | |
CN207260604U (en) | A kind of assembled architecture wall board installation tool | |
CN214194978U (en) | Structure is built in quick detachable interim room | |
CN214884987U (en) | High-strength assembled outer wall | |
CN214306236U (en) | Remote monitoring device for building engineering supervision | |
CN216075776U (en) | GRC exterior plate curtain wall installation construction structures | |
CN221002155U (en) | Assembled canopy that charges | |
CN219892853U (en) | Electrical construction cable frame convenient to adjust | |
CN219012076U (en) | Structure is built in quick detachable interim room | |
CN219365339U (en) | Scaffold for plastering house wall surfaces | |
CN216190895U (en) | Assembled construction hoisting platform | |
CN211172601U (en) | Reinforced structure for building curtain wall | |
CN221823338U (en) | Scaffold for construction engineering | |
CN214696440U (en) | Steel frame crossbeam for steel structure factory building | |
CN216600450U (en) | Movable electrical cabinet mounting bracket | |
CN214279529U (en) | Planning board based on building economy |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |