CN216616168U - Novel overflow drainage system for reservoir - Google Patents
Novel overflow drainage system for reservoir Download PDFInfo
- Publication number
- CN216616168U CN216616168U CN202122629357.4U CN202122629357U CN216616168U CN 216616168 U CN216616168 U CN 216616168U CN 202122629357 U CN202122629357 U CN 202122629357U CN 216616168 U CN216616168 U CN 216616168U
- Authority
- CN
- China
- Prior art keywords
- overflow
- pipe
- reservoir
- water
- drainage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
- Y02A20/20—Controlling water pollution; Waste water treatment
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses a novel overflow drainage system for a reservoir, which comprises an overflow pipe, a blow-off pipe, a drainage ditch and a water collection pit, wherein the upper end of the overflow pipe is provided with a water inlet and is arranged in the reservoir, and the height of the overflow pipe is flush with the overflow water level of the reservoir; the lower end of the overflow pipe is a water outlet and is arranged right above the drainage ditch; the blow-off pipe communicates the bottom of the reservoir and the lower part of the overflow pipe, and a blow-off valve for controlling the blow-off pipe to be opened and closed is arranged on the blow-off pipe. The utility model provides a novel overflow drainage system for a reservoir, which combines the overflow drainage system with a sewage discharge system, reduces the arrangement of pipelines and is convenient to overhaul.
Description
Technical Field
The utility model relates to a reservoir, in particular to a reservoir overflow drainage system.
Background
With the continuous strengthening of the comprehensive national power of China and the continuous development of the urbanization process in recent years, the construction of the pool type structure engineering is increased year by year according to the requirements of life, industrial production and environmental protection. In order to prevent water pollution, the reservoir is provided with an overflow water pipe, and the overflow water pipe is generally indirectly drained by methods such as arranging an overflow well and the like. If the pond is independent building, or the bottom of the pool sets up the drain pipe and buries deeply and is difficult for discharging, or need the maintenance personnel to adopt portable stealthily dirty pump to go to draw water when overhauing, it is more troublesome.
SUMMERY OF THE UTILITY MODEL
In view of the above-mentioned shortcomings, the present invention provides a novel overflow drainage system for a reservoir, which combines the overflow drainage system with a drainage system, reduces the arrangement of pipelines, and facilitates the maintenance.
In order to achieve the above purpose, the embodiment of the utility model adopts the following technical scheme:
a novel overflow drainage system for a reservoir comprises an overflow pipe, a drain pipe, a drainage ditch and a water collection pit, wherein the upper end of the overflow pipe is provided with a water inlet and is arranged in the reservoir, and the height of the water inlet is flush with the overflow water level of the reservoir; the lower end of the overflow pipe is a water outlet and is arranged right above the drainage ditch; the sewage discharge pipe is communicated with the bottom of the reservoir and the lower part of the overflow pipe, and a sewage discharge valve used for controlling the on-off of the sewage discharge pipe is arranged on the sewage discharge pipe.
According to an aspect of the utility model, the drainage ditch is arranged obliquely, and the lower end of the drainage ditch is communicated with the water collecting pit.
According to one aspect of the utility model, a submersible sewage pump is arranged in the sump, the submersible sewage pump is connected with a submersible sewage pump water outlet pipe, and the submersible sewage pump water outlet pipe is connected to an external drainage system.
According to one aspect of the utility model, an overflow bell is connected to the water inlet of the overflow pipe.
According to one aspect of the utility model, the outlet of the overflow pipe is provided with an insect net.
According to one aspect of the utility model, the submersible sewage pump is provided with a check valve on the water outlet pipe.
The implementation of the utility model has the advantages that: the novel overflow drainage system for the water reservoir comprises an overflow pipe, a drain pipe, a drainage ditch and a water collection pit, wherein the overflow pipe penetrates through the side wall of the water reservoir, the upper end of the overflow pipe is a water inlet, and the overflow pipe is arranged in the water reservoir and is level to the overflow water level of the water reservoir; the lower end of the overflow pipe is a water outlet and is arranged right above the drainage ditch; the drainage pipe is communicated with the bottom of the reservoir and the overflow pipe, and a drainage valve for controlling the drainage pipe to be opened and closed is arranged on the drainage pipe, so that the drainage is performed through a water outlet at the upper end of the overflow pipe, the upper end of the overflow pipe is arranged at the overflow water level, and when the water level in the reservoir exceeds the overflow water level, the drainage is started; through the bottom of blow off pipe intercommunication overflow pipe and cistern, open the blowoff valve that sets up on the blow off pipe and can follow the cistern bottom and begin the drainage blowdown, combine overflow system and drainage as an organic whole, reduced the pipeline and arranged, convenient the maintenance.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic diagram of a novel overflow drain system for a water reservoir according to the present invention.
Fig. 2 is a schematic view of a sump of a novel overflow drain system for a retention reservoir in accordance with the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1 and 2, the novel overflow drainage system for the water reservoir comprises an overflow pipe, a sewage discharge pipe 1, a drainage ditch 2 and a water collection pit, wherein the upper end of the overflow pipe is a water inlet and is arranged in the water reservoir and the height of the overflow pipe is flush with the overflow water level of the water reservoir; the lower end of the overflow pipe is a water outlet and is arranged right above the drainage ditch; in the embodiment, the overflow pipe comprises an upper-section pipe body 3, a middle-section pipe body 4 and a lower-section pipe body 5 which are connected with each other, the upper-section pipe body, the middle-section pipe body and the lower-section pipe body are straight pipes, the upper-section pipe body is arranged in the reservoir, the upper end of the upper-section pipe body is flush with the overflow water level, and the upper-section pipe body is fixedly arranged on the side wall of the reservoir through a pipe hoop; the middle section pipe body is communicated with the lower end of the upper section pipe body and the upper end of the lower section pipe body, and the middle section pipe body penetrates through the wall of the reservoir; the lower section pipe body is arranged outside the water storage tank, and the lower end of the lower section pipe body is arranged above the drainage ditch.
The blow-off pipe communicates the bottom of the reservoir with the lower section pipe body, and a blow-off valve for controlling the blow-off pipe to be opened and closed is arranged on the blow-off pipe. In practical application, the blowoff valve can adopt valves such as a gate valve, a butterfly valve and the like, and generally adopts a manually opened and closed valve, so that the blowoff valve is used during maintenance.
When the water in the water storage tank exceeds the overflow water level, the overflow water enters the overflow pipe from the water inlet at the upper end of the overflow pipe and is discharged to the drainage ditch from the water outlet at the lower end. The blow off pipe intercommunication cistern bottom and hypomere body, open the blowoff valve after, the blow off pipe discharge is followed to the water and the filth etc. at the bottom of the cistern, directly gets into the escape canal.
The drainage ditch is obliquely arranged, and the lower end of the drainage ditch is communicated with the water collecting pit. And water and sewage drained from the drainage ditch enter the water collecting pit for unified treatment.
And a submersible sewage pump 6 is arranged in the sump, the submersible sewage pump is connected with a submersible sewage pump water outlet pipe, and the submersible sewage pump water outlet pipe is connected to an external drainage system 7. The submersible sewage pump senses that the water level in the sump reaches a certain height, and then starts to work, and water and sewage in the sump are discharged to an external drainage system through the submersible sewage pump water outlet pipe.
The water inlet of the overflow pipe is connected with an overflow bell mouth (the function of the overflow bell mouth).
And the water outlet of the overflow pipe is provided with an insect-proof net. Preventing insects from entering the overflow pipe to pollute the water body.
A spherical sewage check valve is arranged on the water outlet pipe of the submersible sewage pump to prevent sewage from flowing back.
The implementation of the utility model has the advantages that: the novel overflow drainage system for the water reservoir comprises an overflow pipe, a drain pipe, a drainage ditch and a water collection pit, wherein the overflow pipe penetrates through the side wall of the water reservoir, the upper end of the overflow pipe is a water inlet, and the overflow pipe is arranged in the water reservoir and is level to the overflow water level of the water reservoir; the lower end of the overflow pipe is a water outlet and is arranged right above the drainage ditch; the drainage pipe is communicated with the bottom of the reservoir and the overflow pipe, and a drainage valve for controlling the opening and closing of the drainage pipe is arranged on the drainage pipe, so that the drainage is performed through a water outlet at the upper end of the overflow pipe, the upper end of the overflow pipe is arranged at the overflow water level, and when the water level in the reservoir exceeds the overflow water level, the drainage is started; through the bottom of blow off pipe intercommunication overflow pipe and cistern, open the blowoff valve that sets up on the blow off pipe and can follow the cistern bottom and begin the drainage blowdown, combine overflow system and drainage as an organic whole, reduced the pipeline and arranged, convenient the maintenance.
The above description is only an embodiment of the present invention, but the scope of the present invention is not limited thereto, and any changes or substitutions that can be easily conceived by those skilled in the art within the technical scope of the present invention disclosed herein are intended to be covered by the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202122629357.4U CN216616168U (en) | 2021-10-30 | 2021-10-30 | Novel overflow drainage system for reservoir |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202122629357.4U CN216616168U (en) | 2021-10-30 | 2021-10-30 | Novel overflow drainage system for reservoir |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN216616168U true CN216616168U (en) | 2022-05-27 |
Family
ID=81693929
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202122629357.4U Expired - Fee Related CN216616168U (en) | 2021-10-30 | 2021-10-30 | Novel overflow drainage system for reservoir |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN216616168U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119531477A (en) * | 2024-11-27 | 2025-02-28 | 中国能源建设集团广东省电力设计研究院有限公司 | Coupling type drainage system |
-
2021
- 2021-10-30 CN CN202122629357.4U patent/CN216616168U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119531477A (en) * | 2024-11-27 | 2025-02-28 | 中国能源建设集团广东省电力设计研究院有限公司 | Coupling type drainage system |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204662649U (en) | A kind of integral intelligent pumping plant | |
| CN110670818A (en) | Urban rainfall drainage processing system and rainfall drainage processing method thereof | |
| CN201635168U (en) | Basement bathroom sewage automatic lifting equipment | |
| CN203173911U (en) | Precipitation device | |
| CN202073172U (en) | On-pump type sewage lifting device | |
| CN201671181U (en) | An underground toilet sewage lifting equipment with automatic backwashing | |
| CN209798980U (en) | Silt-proof device for sewage lifting | |
| CN205369408U (en) | One -storey house drainage is towards lavatory system | |
| CN201687078U (en) | A single-pump basement sewage lifting equipment | |
| CN202250890U (en) | Ball float valve type automatic sealed water tank water filling equipment for pump station | |
| CN206034619U (en) | Bury formula sewage lifting device | |
| CN216360756U (en) | Multipurpose irrigation gate-control integrated pump station | |
| CN201850642U (en) | Villa-type underground sewage hoisting equipment with double pumps | |
| CN211621821U (en) | Novel sewer line with major-minor check valve | |
| CN209490519U (en) | A kind of irrigation channel water rinses the device of deposit in storage pond | |
| CN207295964U (en) | A kind of horizontal prefabricated pumping plant of integration | |
| CN222796669U (en) | External sewage lifting device of double pump | |
| CN209482446U (en) | Closed sewage lifter | |
| CN224200005U (en) | Water seal well for sewage drain | |
| CN202081456U (en) | Rotational flow compensation tank without negative pressure | |
| CN207469424U (en) | A kind of Novel sewage lifting system | |
| CN222822494U (en) | An integrated pump station | |
| CN215858160U (en) | Just, tear formula sewage hoisting device open | |
| CN221823073U (en) | Siphon flushing pool | |
| CN2609978Y (en) | Multifunction water-saving apparatus |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220527 |