CN216428547U - Tool type fixing device for suspender of lower suspended ceiling structure of spherical net rack - Google Patents

Tool type fixing device for suspender of lower suspended ceiling structure of spherical net rack Download PDF

Info

Publication number
CN216428547U
CN216428547U CN202123066561.6U CN202123066561U CN216428547U CN 216428547 U CN216428547 U CN 216428547U CN 202123066561 U CN202123066561 U CN 202123066561U CN 216428547 U CN216428547 U CN 216428547U
Authority
CN
China
Prior art keywords
steel pipe
spherical
fixing device
ceiling structure
net rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202123066561.6U
Other languages
Chinese (zh)
Inventor
徐巍松
姜雪岐
黄雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LONGXIN CONSTRUCTION GROUP CO Ltd
Original Assignee
LONGXIN CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LONGXIN CONSTRUCTION GROUP CO Ltd filed Critical LONGXIN CONSTRUCTION GROUP CO Ltd
Priority to CN202123066561.6U priority Critical patent/CN216428547U/en
Application granted granted Critical
Publication of CN216428547U publication Critical patent/CN216428547U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

本实用新型公开了一种球形网架下吊顶结构吊杆工具式固定装置,在圆形钢管内向上4/5处固定水平栓接板,水平栓接板中心设置圆孔,带有六角帽的螺栓由下向上从圆孔中穿过,螺栓尾部透过圆形钢管的上口,六角帽焊接固定在水平栓接板上,圆形钢管的下端固定盖板,盖板底面设置连接件。本实用新型采用螺栓连接球形网架,盖板转动旋紧,质量可控,连接固定牢固,操作简单。

Figure 202123066561

The utility model discloses a hanging rod tool-type fixing device of a ceiling structure under a spherical grid frame. A horizontal bolting plate is fixed at an upward 4/5 position in a circular steel pipe. A circular hole is arranged in the center of the horizontal bolting plate. The bolt passes through the round hole from bottom to top, the tail of the bolt passes through the upper opening of the round steel pipe, the hexagonal cap is welded and fixed on the horizontal bolting plate, the lower end of the round steel pipe is fixed to the cover plate, and the bottom surface of the cover plate is provided with a connecting piece. The utility model adopts bolts to connect the spherical grid, the cover plate is rotated and screwed tightly, the quality is controllable, the connection and fixation are firm, and the operation is simple.

Figure 202123066561

Description

一种球形网架下吊顶结构吊杆工具式固定装置A hanging rod tool type fixing device for a suspended ceiling structure under a spherical grid

技术领域technical field

本实用新型涉及钢结构球形连接点网架与其下方吊顶结构的转换层结构连接的技术领域,具体是一种球形网架下吊顶结构吊杆工具式固定装置。The utility model relates to the technical field of connection between a steel structure spherical connection point grid and the conversion layer structure of the suspended ceiling structure below it, in particular to a suspension rod tool type fixing device of a suspended ceiling structure under the spherical grid.

背景技术Background technique

由于目前建筑技术突飞猛进,钢结构技术发展较快,重量轻、跨度大的特点,使得其在建筑领域应用超来超广,特别是球形连接点的网形珩架在建筑屋盖结构中应用很多。珩架下需要吊顶装修,吊顶结构需要吊挂在一个可靠的转换层结构上,转换层结构需要通过一种连接装置将其固定到屋顶桁架上去。目前市场上也有许多固定装置,有的形式不美观,有的操用不顺手,有的防腐处理难,有的施工质量控制难,有的固定不可靠,等等;还有的直接将吊件焊接在球上,这种技术比较落后,首先高空焊接量大,其次焊接时影响球体质量,影响周边环境,大量现场焊接防腐比较难,质量不易控制,工作量大,工期长,安全隐患多,满堂架子搭设量大,周转材料用量大,经济成本大。Due to the rapid development of construction technology, the rapid development of steel structure technology, the characteristics of light weight and large span, it is widely used in the field of construction, especially the mesh truss with spherical connection points is widely used in building roof structures. . The ceiling decoration is required under the truss, and the suspended ceiling structure needs to be hung on a reliable transition layer structure, and the transition layer structure needs to be fixed to the roof truss through a connecting device. At present, there are many fixtures on the market, some of which are unsightly in form, some are not easy to use, some are difficult to handle with corrosion, some are difficult to control the quality of construction, some are unreliable, etc.; Welding on the ball, this technology is relatively backward, firstly, the amount of high-altitude welding is large, and secondly, the quality of the ball is affected during welding, affecting the surrounding environment, a large number of on-site welding is difficult to prevent corrosion, the quality is not easy to control, the workload is large, the construction period is long, and there are many potential safety hazards. The number of shelves in the hall is large, the amount of turnover materials is large, and the economic cost is large.

CN205777023U公开的转换层双曲面吊顶龙骨可移动定位器及吊顶系统,定位器包括挂板和位于挂板底部的连接板;挂板包括竖直段和由竖直段顶端向竖直段平行回弯的弯折段;连接板位于挂板竖直段的底端、且与挂板竖直段垂直,连接板与弯折段分别位于竖直段的两侧,连接板上开有连接吊杆的连接孔。施工时,在转换层龙骨骨架上安装定位器,然后先将定位器与吊杆的上端连接,再将吊杆的下端与装饰面板层吊顶龙骨连接,从而避免了错位情况的发生。但是未采用圆形钢管内安装设有螺栓的水平栓接板的结构,不能采用旋紧螺栓的形式将吊顶转换层结构与球形网架连接,不能确保连接稳固性。CN205777023U discloses a movable locator for a hyperboloid ceiling keel of a conversion layer and a ceiling system. The locator includes a hanging plate and a connecting plate at the bottom of the hanging plate; the hanging plate includes a vertical section and a parallel return from the top of the vertical section to the vertical section. The connecting plate is located at the bottom end of the vertical section of the hanging plate and is perpendicular to the vertical section of the hanging plate. connection hole. During construction, a locator is installed on the keel frame of the conversion layer, and then the locator is first connected to the upper end of the boom, and then the lower end of the boom is connected to the ceiling keel of the decorative panel layer, so as to avoid the occurrence of dislocation. However, the structure of the horizontal bolted plate with bolts installed in the circular steel pipe is not adopted, and the suspended ceiling transition layer structure cannot be connected with the spherical grid in the form of tightening bolts, and the connection stability cannot be ensured.

实用新型内容Utility model content

本实用新型所要解决的技术问题是提供一种各部件加工、切割、焊接、镀锌、防腐处理均在工厂内进行,采用螺栓连接球形网架,盖板转动旋紧,质量可控,连接固定牢固,操作简单,加快施工速度的一种球形网架下吊顶结构吊杆工具式固定装置。The technical problem to be solved by the utility model is to provide a kind of processing, cutting, welding, galvanizing, and anti-corrosion treatment of each component in the factory. Bolts are used to connect the spherical grid, the cover plate is rotated and tightened, the quality is controllable, and the connection is fixed. It is firm, simple to operate, and fastened to the construction speed of a hanging rod tool-type fixing device for a suspended ceiling structure under a spherical grid.

为了解决以上技术问题,本实用新型提供一种球形网架下吊顶结构吊杆工具式固定装置,包括圆形钢管,所述圆形钢管内向上4/5处固定连接圆形的水平栓接板,所述水平栓接板中心设置圆孔,带有六角帽的螺栓由下向上从所述圆孔中穿过,所述螺栓尾部透过圆形钢管的上口,所述六角帽固定在水平栓接板上,所述圆形钢管的下端固定设置圆形的盖板;所述盖板底面设置连接件。In order to solve the above technical problems, the utility model provides a hanging rod tool type fixing device of a ceiling structure under a spherical grid frame, comprising a circular steel pipe, and a circular horizontal bolting plate is fixedly connected to the upper 4/5 of the circular steel pipe. , the center of the horizontal bolting plate is provided with a circular hole, the bolt with the hexagonal cap passes through the circular hole from bottom to top, the tail of the bolt passes through the upper opening of the circular steel pipe, and the hexagonal cap is fixed on the horizontal On the bolting plate, a circular cover plate is fixedly arranged at the lower end of the circular steel pipe; a connecting piece is arranged on the bottom surface of the cover plate.

通过采用以上技术方案,采用将螺栓固定在圆形钢管内水平栓接板上的工具式固定装置连接球形网架,转动圆形钢管下端的盖板旋紧,操作简单,加快了施工速度。By adopting the above technical scheme, the spherical grid is connected by a tool-type fixing device that fixes the bolts on the horizontal bolting plate in the circular steel pipe, and the cover plate at the lower end of the circular steel pipe is rotated and tightened, so that the operation is simple and the construction speed is accelerated.

进一步的,圆形钢管、盖板相互垂直的两条边上设置梯形加强板。Further, trapezoidal reinforcing plates are arranged on the two sides of the round steel pipe and the cover plate which are perpendicular to each other.

通过采用上述技术方案,有效地增加装置强度。By adopting the above technical solutions, the strength of the device is effectively increased.

进一步的,球形网架上设有垂直向下的螺孔。Further, the spherical mesh frame is provided with vertical downward screw holes.

通过采用上述技术方案,便于和圆形钢管上的螺栓连接。By adopting the above technical scheme, it is convenient to connect with the bolts on the round steel pipe.

进一步的,圆形钢管的上端与球形网架的球面贴合连接。圆形钢管的上端与球形网架的球面连接处,加工成与球面同弯曲半径的内坡面。Further, the upper end of the round steel pipe is connected with the spherical surface of the spherical grid. The connection between the upper end of the round steel pipe and the spherical surface of the spherical grid is processed into an inner slope with the same bending radius as the spherical surface.

通过采用上述技术方案,有利于圆形钢管顶紧球面。By adopting the above technical scheme, it is beneficial for the round steel pipe to press against the spherical surface.

进一步的,连接件为型钢过渡板、钢梁或吊杆。转换层结构固定在所述连接件上。Further, the connecting piece is a section steel transition plate, a steel beam or a hanger rod. The conversion layer structure is fastened on the connecting piece.

通过采用上述技术方案,便于连接件和转换层结构相连接。By adopting the above technical solution, the connection between the connector and the conversion layer structure is facilitated.

本实用新型与现有技术相比,具有如下有益效果:Compared with the prior art, the utility model has the following beneficial effects:

1、本实用新型采用将螺栓固定在圆形钢管内水平栓接板上的工具式固定装置连接球形网架,转动圆形钢管下端的盖板旋紧,操作简单,加快了施工速度,经济适用,美观大方,若采用常规施工方法,6个人需要工作30天,采用本实用新型方法,6个人只需工作10天。1. The utility model adopts the tool type fixing device that fixes the bolts on the horizontal bolting plate in the circular steel pipe to connect the spherical grid, and the cover plate at the lower end of the circular steel pipe is rotated to tighten, the operation is simple, the construction speed is accelerated, and it is economical and applicable. , beautiful and elegant, if using the conventional construction method, 6 people need to work for 30 days, using the method of the utility model, 6 people only need to work for 10 days.

2、本实用新型在圆形钢管、盖板相互垂直的两条边上设置梯形加强板,增加装置强度。2. In the utility model, trapezoidal reinforcing plates are arranged on the two sides of the circular steel pipe and the cover plate which are perpendicular to each other to increase the strength of the device.

3、圆形钢管的上端与球形网架的球面连接处,加工成与球面同弯曲半径的内坡面,与球形网架的球面贴合连接,有利于圆形钢管顶紧球面。3. The connection between the upper end of the round steel pipe and the spherical surface of the spherical grid is processed into an inner slope with the same bending radius as the spherical surface, and is connected with the spherical surface of the spherical grid, which is beneficial for the round steel pipe to press against the spherical surface.

附图说明Description of drawings

图1为本实用新型连接器结构示意图。FIG. 1 is a schematic structural diagram of the connector of the present invention.

图2为本实用新型连接器连接示意图。FIG. 2 is a schematic diagram of the connection of the connector of the present invention.

图3为本实用新型图2中A-A向图。Fig. 3 is the A-A direction diagram in Fig. 2 of the utility model.

图4为本实用新型转换层结构连接示意图。FIG. 4 is a schematic diagram of the connection of the structure of the conversion layer of the present invention.

其中,1.球形网架,2.水平栓接板,3.螺栓,4.圆形钢管,5.盖板,6.梯形加强板,7.六角帽,8.圆孔,9.连接件,10.螺孔,11.转换层结构。Among them, 1. Spherical grid, 2. Horizontal bolting plate, 3. Bolt, 4. Round steel pipe, 5. Cover plate, 6. Trapezoidal reinforcing plate, 7. Hexagon cap, 8. Round hole, 9. Connecting piece , 10. Screw holes, 11. Conversion layer structure.

具体实施方式Detailed ways

下面结合附图对本实用新型作进一步详细叙述。The present utility model will be described in further detail below in conjunction with the accompanying drawings.

如图1所示,一种球形网架下吊顶结构吊杆工具式固定装置,在其圆形钢管4内向上4/5处,焊接圆形的水平栓接板2。水平栓接板2中心设置圆孔8,带有六角帽7的螺栓3由下向上从圆孔8中穿过,螺栓3尾部透过圆形钢管4的上口,六角帽7固定在水平栓接板2上,圆形钢管4的下端固定设置圆形的盖板5。盖板5底面设置连接件9。As shown in FIG. 1 , a suspender tool type fixing device of a suspended ceiling structure under a spherical grid frame is welded with a circular horizontal bolting plate 2 at the upward 4/5 position in the circular steel pipe 4 thereof. A circular hole 8 is set in the center of the horizontal bolting plate 2, the bolt 3 with the hexagonal cap 7 passes through the circular hole 8 from bottom to top, the tail of the bolt 3 passes through the upper opening of the circular steel pipe 4, and the hexagonal cap 7 is fixed on the horizontal bolt. On the connecting plate 2, a circular cover plate 5 is fixed at the lower end of the circular steel pipe 4. A connecting piece 9 is provided on the bottom surface of the cover plate 5 .

一种球形网架下吊顶结构吊杆工具式固定装置吊装方法,A hoisting method for a hanger tool type fixing device of a suspended ceiling structure under a spherical grid frame,

一、如图2所示,在工厂内预制下弦杆端球形网架1,在其下顶面上开一螺孔10,直径20mm,内铣螺纹丝槽,并做好镀锌防锈处理;螺孔10抗拔力不小于30000N。1. As shown in Figure 2, the lower chord end spherical mesh frame 1 is prefabricated in the factory, a screw hole 10 is opened on the lower top surface, the diameter is 20mm, the thread groove is internally milled, and the galvanized anti-rust treatment is done; The pullout resistance of the screw hole 10 is not less than 30000N.

二、安装时,螺孔10正对下方,其中心轴线与铅坠线平行;2. During installation, the screw hole 10 is facing downward, and its central axis is parallel to the plumb line;

三、在工厂内预制吊杆工具式固定装置,并对其各个部件进行镀锌防锈处理。吊杆工具式固定装置的圆形钢管4作为与球形网架1的接触件,为∅75.5×3.75mm厚钢管,其上端与球形网架1球面接触处,加工成与球面同弯曲半径的内坡面,使圆形钢管4的上端与球形网架1的球面贴合。水平栓接板2,板厚8mm,直径为68mm。水平栓接板2四周与圆形钢管4内侧满焊。用一长100mm直径20mm,一端带有六角帽7的10.9级高强螺栓3,穿过水平栓接板2,六角帽7与水平栓接板2进行焊接。在圆形钢管4的下端焊上盖板5,板厚6mm,直径为250mm。圆形钢管4与盖板5相互垂直的两条边上满焊焊接板厚6mm的梯形加强板6。将吊杆工具式固定装置通过螺栓3向上旋进螺孔10中,并转动盖板5拧紧,作为吊顶结构的转换层结构11与球形网架1的连接器。3. Prefabricate the boom tool type fixture in the factory, and carry out galvanized anti-rust treatment on each part. The circular steel pipe 4 of the hanger tool type fixture is used as the contact piece with the spherical grid 1, which is a ∅75.5×3.75mm thick steel pipe. The upper end of the steel pipe is in contact with the spherical surface of the spherical grid 1. Slope, so that the upper end of the round steel pipe 4 is in contact with the spherical surface of the spherical grid 1 . Horizontal bolted plate 2, plate thickness 8mm, diameter 68mm. The periphery of the horizontal bolting plate 2 is fully welded with the inner side of the circular steel pipe 4 . Use a 10.9-grade high-strength bolt 3 with a length of 100mm and a diameter of 20mm and a hexagonal cap 7 at one end to pass through the horizontal bolting plate 2, and the hexagonal cap 7 and the horizontal bolting plate 2 are welded. A cover plate 5 is welded on the lower end of the circular steel pipe 4, the plate thickness is 6mm, and the diameter is 250mm. The two sides of the round steel pipe 4 and the cover plate 5 that are perpendicular to each other are fully welded with a trapezoidal reinforcing plate 6 with a thickness of 6 mm. The hanger tool type fixing device is screwed upwards into the screw holes 10 through the bolts 3, and the cover plate 5 is rotated to be tightened to serve as the connector between the transition layer structure 11 of the suspended ceiling structure and the spherical grid 1.

四、如图3所示,吊杆工具式固定装置的盖板5底面焊接连接件9,利用连接件9吊住吊顶结构的转换层结构11;连接件9为型钢过渡板、钢梁或吊杆。型钢过渡板或吊杆预先在工厂内加工好螺栓孔。4. As shown in Figure 3, the bottom surface of the cover plate 5 of the boom tool type fixture is welded with a connecting piece 9, and the connecting piece 9 is used to hang the transition layer structure 11 of the ceiling structure; the connecting piece 9 is a section steel transition plate, a steel beam or a hanging rod. The steel transition plate or boom is pre-machined with bolt holes in the factory.

五、如图4所示,将已经拼装完成的吊顶结构的转换层结构11吊升到设计高度,采用镀锌螺栓、螺母将吊顶结构的转换层结构11固定在型钢过渡板、钢梁或吊杆上,并与先行吊装的转换层结构11连接拼装。5. As shown in Figure 4, lift the transition layer structure 11 of the assembled ceiling structure to the design height, and use galvanized bolts and nuts to fix the transition layer structure 11 of the ceiling structure on the steel transition plate, steel beam or hanging structure on the pole, and connected and assembled with the transition layer structure 11 hoisted in advance.

装修工作时,将本实用新型球形网架下吊顶结构的工具式连接器通过螺栓3固定在球形网架1的下方,并转动盖板5拧紧,连接件9与吊顶结构的转换层结构11连接。为了减少高空焊接量,在地面上分块拼装、焊接吊顶结构的转换层结构11。将已经拼装完成的转换层结构11吊升到设计高度,与型钢过渡板、钢梁或吊杆连接并固定,并与先行吊装的吊顶结构的转换层结构11连接拼装。During the decoration work, the tool connector of the suspended ceiling structure under the spherical grid of the present utility model is fixed under the spherical grid 1 through the bolts 3, and the cover plate 5 is rotated to tighten, and the connecting piece 9 is connected with the transition layer structure 11 of the suspended ceiling structure. . In order to reduce the amount of high-altitude welding, the transition layer structure 11 of the ceiling structure is assembled and welded on the ground. Lift the assembled transition layer structure 11 to the design height, connect and fix it with the profiled steel transition plate, steel beam or hanger rod, and connect and assemble with the transition layer structure 11 of the previously hoisted ceiling structure.

以上所述的实施方式仅仅是对本实用新型的优选实施方式进行描述,并非对本实用新型的范围进行限定,在不脱离本实用新型设计精神的前提下,本领域技术人员对本实用新型的技术方案做出的各种变形和改进,均应纳入本实用新型权利要求书确定的保护范围内。The above-mentioned embodiments are only to describe the preferred embodiments of the present invention, and do not limit the scope of the present invention. On the premise of not departing from the design spirit of the present invention, those skilled in the art can make the technical solutions of the present invention. The various deformations and improvements made should be included in the protection scope determined by the claims of the present utility model.

Claims (7)

1. The utility model provides a suspended ceiling structure jib instrument formula fixing device under spherical rack, includes circular steel pipe (4), its characterized in that: a round horizontal bolting plate (2) is fixedly connected to the position 4/5 above the inside of the round steel pipe (4), a round hole (8) is formed in the center of the horizontal bolting plate (2), a bolt (3) with a hexagonal cap (7) penetrates through the round hole (8) from bottom to top, the tail of the bolt (3) penetrates through the upper opening of the round steel pipe (4), the hexagonal cap (7) is fixed on the horizontal bolting plate (2), and a round cover plate (5) is fixedly arranged at the lower end of the round steel pipe (4); and the bottom surface of the cover plate (5) is provided with a connecting piece (9).
2. The tool-type fixing device for the hanger rods of the spherical net rack lower ceiling structure, according to claim 1, is characterized in that: two edges of the circular steel pipe (4) and the cover plate (5) which are vertical to each other are provided with trapezoidal reinforcing plates (6).
3. The tool-type fixing device for the hanger rods of the spherical net rack lower ceiling structure, according to claim 1, is characterized in that: the upper end of the round steel pipe (4) is connected with the spherical surface of the spherical net rack (1) in a fitting manner.
4. The tool-type fixing device for the hanger rods of the spherical net rack lower ceiling structure, according to claim 1, is characterized in that: the connecting piece (9) is a section steel transition plate, a steel beam or a suspender.
5. A spherical net underhung ceiling structure boom tool-type fixing device as claimed in claim 3, wherein: the spherical net rack (1) is provided with a vertically downward screw hole (10).
6. The tool-type fixing device for the hanger rods of the spherical net rack lower ceiling structure, according to claim 1, is characterized in that: the joint of the upper end of the round steel pipe (4) and the spherical surface of the spherical net rack (1) is processed into an inner slope surface with the same bending radius as the spherical surface.
7. The tool-type fixing device for the hanger rods of the spherical net rack lower ceiling structure, according to claim 1, is characterized in that: the conversion layer structure (11) is fixed on the connecting piece (9).
CN202123066561.6U 2021-12-08 2021-12-08 Tool type fixing device for suspender of lower suspended ceiling structure of spherical net rack Expired - Fee Related CN216428547U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123066561.6U CN216428547U (en) 2021-12-08 2021-12-08 Tool type fixing device for suspender of lower suspended ceiling structure of spherical net rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123066561.6U CN216428547U (en) 2021-12-08 2021-12-08 Tool type fixing device for suspender of lower suspended ceiling structure of spherical net rack

Publications (1)

Publication Number Publication Date
CN216428547U true CN216428547U (en) 2022-05-03

Family

ID=81343238

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123066561.6U Expired - Fee Related CN216428547U (en) 2021-12-08 2021-12-08 Tool type fixing device for suspender of lower suspended ceiling structure of spherical net rack

Country Status (1)

Country Link
CN (1) CN216428547U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114016603A (en) * 2021-12-08 2022-02-08 龙信建设集团有限公司 Tool-type connector for suspended ceiling transition layer structure under spherical grid and its hoisting method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114016603A (en) * 2021-12-08 2022-02-08 龙信建设集团有限公司 Tool-type connector for suspended ceiling transition layer structure under spherical grid and its hoisting method

Similar Documents

Publication Publication Date Title
CN101575892A (en) Large-area lower edge nested aluminum plate curved hung ceiling with high punching rate and construction method thereof
CN212478241U (en) Novel steel structure spherical net rack ceiling conversion layer connecting structure
CN107605090B (en) Combined type suspended ceiling suspension arrangement and installation method under a kind of tall and big curved surface steel structure
CN208965708U (en) Steel structure system and house
CN217299424U (en) Hoop mounting system for aluminum plate ceiling
CN209227877U (en) Hoop type ceiling system for steel structure truss roof
CN116220263A (en) A construction method of rapid assembly building exterior curtain wall
CN208056507U (en) A kind of waterproof system worn standing seam roof slabs and reinforce column
CN113585567A (en) Self-adjusting rotary type prefabricated concrete external wall panel connecting node and construction method
CN211286250U (en) Prefabricated ceiling conversion layer
CN211200882U (en) Steel construction conversion layer furred ceiling
CN215594561U (en) A super large curved surface furred ceiling structure for spatial grid structure
CN102864935A (en) Novel purline mounting method
CN223482012U (en) Door opening curtain wall mounting steel truss structure
CN110778095A (en) External protection frame of assembled structure
CN109931439A (en) Mounting bracket and construction method for steel building vertical pipe
CN211172708U (en) Column foot structure of channel steel column
CN219196445U (en) Simple installation system for indoor steel structure metal net suspended ceiling
CN211523732U (en) An adjustable decoration hanger applied to the connection between subway stations and embedded chutes
CN206091502U (en) Use concrete frame antidetonation reinforced structure of steel sheet net
CN115839147A (en) Embedded ceiling mounting structure and construction method thereof
CN116876737A (en) A ceiling installation system using steel wire ropes as force-bearing keels and its construction method
CN211423543U (en) An adjustable air duct hanger applied to the connection between subway stations and embedded chutes
CN213329442U (en) A type of suspension electrical equipment bracket with flexible DC back-to-back valve hall with conversion steel beam
CN114016603A (en) Tool-type connector for suspended ceiling transition layer structure under spherical grid and its hoisting method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220503