CN216421160U - Long-arm electric hammer - Google Patents
Long-arm electric hammer Download PDFInfo
- Publication number
- CN216421160U CN216421160U CN202122179858.7U CN202122179858U CN216421160U CN 216421160 U CN216421160 U CN 216421160U CN 202122179858 U CN202122179858 U CN 202122179858U CN 216421160 U CN216421160 U CN 216421160U
- Authority
- CN
- China
- Prior art keywords
- long
- electric hammer
- upper ejector
- bar
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Percussive Tools And Related Accessories (AREA)
Abstract
本实用新型公开了一种长臂电锤,包括增高架本体,增高架本体的顶端与固定罩的下部连接,固定罩与电锤固定连接,增高架本体包括上顶杆,上顶杆的顶端与所述固定罩下部固定连接;上顶杆的中部与长横杆的一端铰接;上顶杆的底端与短横杆的一端连接;短横杆的一端与力撑杆的中部铰接;力撑杆的顶端与所述长横杆的中部铰接;力撑杆的底端置地。按压长横杆外端,以短横杆的一端与力撑杆的中部铰接处和上顶杆的中部与长横杆的一端铰接处为轴带动上顶杆向上移动,从而使带动电锤向上移动,达到了高空操作电锤的效果。本实用新型有效的解决了借助梯子或堆积物搭建的平台进行高空作业,前期准备耗时多,登高爬梯常有安全事故发生,工作效率低的问题。
The utility model discloses a long-arm electric hammer, comprising a heightening frame body, the top of the heightening frame body is connected with the lower part of a fixing cover, the fixing cover is fixedly connected with the electric hammer, the heightening frame body comprises an upper ejector rod, and the top end of the upper ejector rod It is fixedly connected with the lower part of the fixed cover; the middle part of the upper ejector bar is hinged with one end of the long horizontal bar; the bottom end of the upper ejector bar is connected with one end of the short horizontal bar; one end of the short horizontal bar is hinged with the middle part of the force strut; The top end of the strut is hinged with the middle of the long horizontal bar; the bottom end of the force strut is placed on the ground. Press the outer end of the long cross bar, and drive the upper ejector bar to move upward with the hinge between one end of the short bar and the middle part of the force strut and the hinge between the middle part of the upper ejector bar and one end of the long bar as the axis to drive the electric hammer upward. Move to achieve the effect of high-altitude operation of the electric hammer. The utility model effectively solves the problems of high-altitude operation by means of a platform built by ladders or piles, the time-consuming preliminary preparation, the frequent occurrence of safety accidents and low work efficiency when climbing the ladder.
Description
技术领域technical field
本实用新型涉及建筑增高的技术领域,具体来说,涉及一种长臂电锤。The utility model relates to the technical field of building height, in particular to a long-arm electric hammer.
背景技术Background technique
目前随着建筑行业的发展,高层和超高层建筑不断闯入人们的生活,在建筑高层作业中作为基础建设必备产品电锤用途非常广泛,使用频繁,针对施工中施工人员因高度原因无法进行作业时,多借助梯子或堆积物搭建的平台解决这一问题,前期准备耗时多,登高爬梯,常有事故发生,安全隐患较大,携带梯子穿梭工地效率低。一直是一个令人头痛的问题。At present, with the development of the construction industry, high-rise and super-high-rise buildings continue to break into people's lives. As a necessary product for infrastructure construction in high-rise buildings, the electric hammer is widely used and frequently used. It is impossible for the construction personnel to carry out due to height reasons. During the operation, the platform built by ladders or piles is often used to solve this problem. It takes a lot of time to prepare in the early stage. When climbing the ladder, accidents often occur, and the safety hazard is relatively large. The efficiency of carrying the ladder to and from the construction site is low. It's always been a headache.
发明内容SUMMARY OF THE INVENTION
针对上述技术问题,本实用新型提出一种长臂电锤,能够解决上述问题。为实现上述技术目的,本实用新型的技术方案是这样实现的:In view of the above technical problems, the utility model proposes a long-arm electric hammer, which can solve the above problems. For realizing the above-mentioned technical purpose, the technical scheme of the present utility model is realized like this:
一种长臂电锤,包括增高架本体,所述增高架本体的顶端与固定罩的下部连接,所述固定罩与电锤固定连接,其特征在于,所述增高架本体包括上顶杆,所述上顶杆的顶端与所述固定罩下部固定连接;所述上顶杆的中部与长横杆的一端铰接;所述上顶杆的底端与短横杆的一端连接;所述短横杆的一端与力撑杆的中部铰接;所述力撑杆的顶端与所述长横杆的中部铰接;所述力撑杆的底端置地。A long-arm electric hammer includes a height-increasing frame body, the top of the height-increasing frame body is connected with the lower part of a fixed cover, and the fixing cover is fixedly connected with the electric hammer, characterized in that the height-increasing frame body includes an upper ejector rod, The top end of the upper ejector bar is fixedly connected with the lower part of the fixed cover; the middle part of the upper ejector bar is hinged with one end of the long horizontal bar; the bottom end of the upper ejector bar is connected with one end of the short horizontal bar; One end of the cross bar is hinged with the middle part of the force stay; the top end of the force stay is hinged with the middle part of the long cross bar; the bottom end of the force stay is placed on the ground.
进一步的,所述固定罩上部两侧设置有三个通孔,所述固定罩下部两侧设置有四个通孔。Further, three through holes are arranged on both sides of the upper part of the fixing cover, and four through holes are arranged on both sides of the lower part of the fixing cover.
进一步的,三个螺栓分别穿过所述固定罩的上部两侧的三个通孔并螺纹连接螺母。Further, the three bolts respectively pass through the three through holes on both sides of the upper part of the fixing cover and are screwed to the nuts.
进一步的,所述上顶杆顶端设置有四个通孔,所述上顶杆的通孔间距尺寸与所述固定罩下部四个通孔间距尺寸一致。Further, the top end of the upper ejector rod is provided with four through holes, and the size of the spacing between the through holes of the upper ejector rod is the same as the spacing size of the four through holes in the lower part of the fixing cover.
进一步的,四个螺栓分别穿过所述固定罩的下部两侧四个通孔及上顶杆顶端的通孔并螺纹连接螺母。Further, the four bolts respectively pass through the four through holes on both sides of the lower part of the fixing cover and the through holes at the top end of the upper ejector rod, and are threaded to connect the nuts.
进一步的,所述上顶杆与所述力撑杆平行,所述长横杆与所述短横杆平行。Further, the upper ejector bar is parallel to the force strut, and the long horizontal bar is parallel to the short horizontal bar.
本实用新型的有益效果:本实用新型的一种长臂电锤,可以有效的替代梯子的作用,帮助施工人员使用电锤很好的完成高空作业的工作任务,提高了工作效率,也大大降低了施工人员的事故隐患,组装简单,携带方便,不论是在降本增效的方面,还是安全施工方面,都有显著的效果。The beneficial effects of the present utility model: the long-arm electric hammer of the present utility model can effectively replace the role of a ladder, help the construction personnel to use the electric hammer to complete the work task of high-altitude work well, improve the work efficiency, and greatly reduce the It avoids the hidden dangers of accidents of construction workers, is simple to assemble, and is easy to carry. It has significant effects in terms of cost reduction and efficiency improvement and safe construction.
附图说明Description of drawings
为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the accompanying drawings required in the embodiments will be briefly introduced below. Obviously, the drawings in the following description are only of the present invention. For some embodiments of the present invention, for those of ordinary skill in the art, other drawings can also be obtained from these drawings without any creative effort.
图1是长臂电锤的结构示意图;Fig. 1 is the structure schematic diagram of long arm electric hammer;
图2是固定罩7的放大图;FIG. 2 is an enlarged view of the
图3是上顶杆顶部的结构示意图;Fig. 3 is the structural representation of the top of the upper ejector rod;
图4是铰接处的示意图;Fig. 4 is the schematic diagram of the hinge;
图5是螺栓、螺母示意图;Figure 5 is a schematic diagram of a bolt and a nut;
图中:1、增高架本体;2、上顶杆;3、长横杆;4、短横杆;5、力撑杆;6、螺栓;7、固定罩;8、螺母;9、电锤。In the picture: 1. The body of the elevated frame; 2. The top rod; 3. The long cross rod; 4. The short cross rod; 5. The force strut; 6. The bolt; 7. The fixed cover; .
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. All other embodiments obtained by those of ordinary skill in the art based on the embodiments of the present invention belong to the protection scope of the present invention.
如图1-5所示,一种长臂电锤,包括增高架本体1,所述增高架本体1的顶端与固定罩7的下部连接,所述固定罩7与电锤9固定连接,所述增高架本体1包括上顶杆2,所述上顶杆2的顶端与所述固定罩7下部固定连接;所述上顶杆2的中部与长横杆3的一端铰接;所述上顶杆2的底端与短横杆4的一端连接;所述短横杆4的一端与力撑杆5的中部铰接;所述力撑杆5的顶端与所述长横杆3的中部铰接;所述力撑杆5的底端置地。在本实用新型的一个具体实施例中,所述固定罩7上部两侧设置有三个通孔,所述固定罩7下部两侧设置有四个通孔;三个螺栓6分别穿过所述固定罩7的上部两侧的三个通孔并螺纹连接螺母 8;所述上顶杆2顶端设置有四个通孔,所述上顶杆2的通孔间距尺寸与所述固定罩7下部四个通孔间距尺寸一致;四个螺栓6分别穿过所述固定罩7的下部两侧四个通孔及上顶杆2 顶端的通孔并螺纹连接螺母8;所述上顶杆2与所述力撑杆5平行,所述长横杆3与所述短横杆4平行。As shown in Figures 1-5, a long-arm electric hammer includes an elevated frame body 1, the top of the elevated frame body 1 is connected to the lower part of a
为了方便理解本实用新型的上述技术方案,以下通过具体使用方式上对本实用新型的上述技术方案进行详细说明。In order to facilitate understanding of the above-mentioned technical solutions of the present invention, the above-mentioned technical solutions of the present invention will be described in detail below through specific usage modes.
一种长臂电锤,包括增高架本体1,所述增高架本体1的顶端与固定罩7的下部连接,所述固定罩7与电锤9固定连接,其特征在于,所述增高架本体1包括上顶杆2,所述上顶杆2的顶端与所述固定罩7下部固定连接;所述上顶杆2的中部与长横杆3的一端铰接;所述上顶杆2的底端与短横杆4的一端连接;所述短横杆4的一端与力撑杆5的中部铰接;所述力撑杆5的顶端与所述长横杆3的中部铰接;所述力撑杆5的底端置地。通过施工者用手按住所述长横杆3的外端向下用力,所述增高架本体1根据杠杆原理以力撑杆5置地点为支撑,以所述上顶杆2的中部与长横杆3的一端铰接处、所述上顶杆2的底端与短横杆 4的一端铰接处、所述短横杆4的一端与力撑杆5的中部铰接处、力撑杆5的顶端与所述长横杆3的中部铰接处为轴带动所述上顶杆2及固定罩7向上移动,从而带动电锤向上移动;所述上顶杆2的顶端插入所述固定罩7下部,所述四个所述螺栓6分别穿过所述固定罩7的下部两侧四个通孔及上顶杆2顶端的通孔并螺纹连接螺母8;三个所述螺栓6分别穿过所述固定罩7的上部两侧的三个通孔并螺纹连接螺母8;固定罩7内侧受到螺纹连接的加持力及上顶杆2的顶端面支撑力,电锤主体与固定罩7固定一体,确保电锤主体牢固稳定,使电锤工作顺利。A long-arm electric hammer includes an elevated frame body 1, the top of the elevated frame body 1 is connected to the lower part of a
综上所述:本实用新型的一种长臂电锤,可以有效替代梯子的作用,帮助施工人员在没有梯子的情况下使用长臂电锤就能够很好的完成高空作业中的电锤任务,大大提高了工作效率,同时也减少了施工人员的安全隐患,就地取材,组装简单,携带方便,不论是在降本增效的方面,还是在安全施工方面,都有显著的效果。To sum up: the long-arm electric hammer of the present utility model can effectively replace the role of a ladder, and help the construction personnel to use the long-arm electric hammer to complete the task of the electric hammer in high-altitude operations without a ladder. , greatly improve the work efficiency, but also reduce the safety hazards of construction workers, local materials, simple assembly, easy to carry, both in terms of cost reduction and efficiency improvement, or in terms of safe construction, there are significant effects.
以上所述仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included in the within the scope of protection of the present invention.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202122179858.7U CN216421160U (en) | 2021-09-09 | 2021-09-09 | Long-arm electric hammer |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202122179858.7U CN216421160U (en) | 2021-09-09 | 2021-09-09 | Long-arm electric hammer |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN216421160U true CN216421160U (en) | 2022-05-03 |
Family
ID=81321910
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202122179858.7U Active CN216421160U (en) | 2021-09-09 | 2021-09-09 | Long-arm electric hammer |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN216421160U (en) |
-
2021
- 2021-09-09 CN CN202122179858.7U patent/CN216421160U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201003287Y (en) | A template support frame | |
| CN206088920U (en) | Construction scaffold | |
| CN204934670U (en) | A kind of electric drill auxiliary stand | |
| CN2255468Y (en) | External hanging basket for building construction | |
| CN216421160U (en) | Long-arm electric hammer | |
| CN211164702U (en) | Beam slab bar planting drilling tool | |
| CN209429487U (en) | A kind of scaffold of architectural engineering | |
| CN206942120U (en) | A kind of pre-embedded device of builder's jack | |
| CN111424945A (en) | Safe good scaffold with many supporting legs | |
| CN214117504U (en) | Portable steel concrete composite beam construction formwork support device | |
| CN204609259U (en) | A kind of traveling stage | |
| CN211341671U (en) | Scaffold frame for spraying convenient to height-adjusting | |
| CN211572682U (en) | Mechanical protection device for building site construction | |
| CN201937204U (en) | Portable power maintenance bracket | |
| CN211201128U (en) | A wall-attached support for an attached lifting scaffold | |
| CN211037746U (en) | Device for mounting climbing frame | |
| CN209210183U (en) | fixed system | |
| CN206266130U (en) | A kind of hoisting bracket on power transmission tower bar | |
| CN204645590U (en) | A kind of tool-type builder's jack diagonal supporting member | |
| CN222435797U (en) | A combined scaffolding for construction engineering | |
| CN221799152U (en) | A new type of structural column template positioning equipment | |
| CN221168600U (en) | Construction platform with protection structure for building construction | |
| CN211644515U (en) | Elevator for building engineering | |
| CN223074208U (en) | Auxiliary device for overhauling converter body | |
| CN205873773U (en) | Jack support seat |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| PP01 | Preservation of patent right | ||
| PP01 | Preservation of patent right |
Effective date of registration: 20250808 Granted publication date: 20220503 |
