CN216380245U - Building support steel beam structure - Google Patents
Building support steel beam structure Download PDFInfo
- Publication number
- CN216380245U CN216380245U CN202121813013.2U CN202121813013U CN216380245U CN 216380245 U CN216380245 U CN 216380245U CN 202121813013 U CN202121813013 U CN 202121813013U CN 216380245 U CN216380245 U CN 216380245U
- Authority
- CN
- China
- Prior art keywords
- chute
- secondary beam
- fixed
- main
- building support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及建筑技术领域,具体为一种建筑支撑钢梁结构。The utility model relates to the technical field of construction, in particular to a building supporting steel beam structure.
背景技术Background technique
建筑支撑组合结构,在建筑施工中普遍采用木杆、钢管、木方、扣件、U托、步步紧等连接作为混凝土成形过程的主要支撑体系,而且是经验化的、拼凑的、安装繁琐的,现有设计中的建筑支撑钢梁结构一般是将主梁和次梁进行安装,在安装过程中,两个次梁之间的连接是通过一种伸缩杆相似的结构进行连接,两个次梁之间的连接稳定性不高。The building support composite structure is generally used in the construction of wooden poles, steel pipes, wooden squares, fasteners, U brackets, step by step and other connections as the main support system in the concrete forming process, and it is experienced, patchwork, and complicated to install. In the existing design, the building support steel beam structure generally installs the main beam and the secondary beam. During the installation process, the connection between the two secondary beams is connected through a structure similar to a telescopic rod. The connection stability between the secondary beams is not high.
为此,我们提出一种建筑支撑钢梁结构。To this end, we propose a building-supporting steel beam structure.
实用新型内容Utility model content
本实用新型的目的在于提供一种建筑支撑钢梁结构,以解决上述背景技术中提出的问题。The purpose of the present invention is to provide a building supporting steel beam structure to solve the problems raised in the above background technology.
为实现上述目的,本实用新型提供如下技术方案:一种建筑支撑钢梁结构,包括:To achieve the above purpose, the present utility model provides the following technical solutions: a building support steel beam structure, comprising:
主梁,对称设置在楼面两侧;The main beam is symmetrically arranged on both sides of the floor;
第一次梁和第二次梁,对称设置在主梁的顶部;The first beam and the second beam are symmetrically arranged on the top of the main beam;
固定次梁,固定在两个所述主梁的一端;fixing the secondary beams, which are fixed at one end of the two main beams;
调节机构,滑动连接在第一次梁和第二次梁之间;Adjustment mechanism, slidingly connected between the first beam and the second beam;
所述调节机构包括:The adjustment mechanism includes:
第一滑槽,对称设置在固定次梁的两端;The first chute is symmetrically arranged at both ends of the fixed secondary beam;
第二滑槽,对称设置在所述第一次梁和所述第二次梁的两端;The second chute is symmetrically arranged at both ends of the first beam and the second beam;
连接杆,对称滑动连接在第一滑槽和第二滑槽之间,所述连接杆的两端的对称固定有限位柱,且限位柱与所述第一滑槽、或与所述第二滑槽滑动连接;A connecting rod is symmetrically slidably connected between the first chute and the second chute, limit posts are symmetrically fixed at both ends of the connecting rod, and the limit posts are connected to the first chute or the second chute. Chute sliding connection;
第一入口槽,设置在所述第一滑槽的一端,且所述第一入口槽与第一滑槽连通设置,用于所述连接杆连入所述第一滑槽内;a first inlet slot, arranged at one end of the first chute, and the first inlet slot is communicated with the first chute and is used for connecting the connecting rod into the first chute;
第二入口槽,设置在所述第二滑槽的一端,且所述第二入口槽与第二滑槽连通设置,用于所述连接杆连入所述第一滑槽内;A second inlet slot is arranged at one end of the second chute, and the second inlet slot is communicated with the second chute and is used for connecting the connecting rod into the first chute;
螺纹杆,通过轴承转动连接在固定次梁的中部,所述第一次梁的中部开设有螺纹孔,所述第一次梁通过螺纹孔与螺纹杆螺纹连接。The threaded rod is rotatably connected to the middle of the fixed secondary beam through the bearing, the middle of the primary beam is provided with a threaded hole, and the primary beam is threadedly connected to the threaded rod through the threaded hole.
优选的,所述第一次梁、第二次梁和所述固定次梁的两端设置有用于滑动包裹所述主梁的配对槽,所述第一次梁、第二次梁和所述固定次梁组成次梁总成。Preferably, two ends of the first secondary beam, the second secondary beam and the fixed secondary beam are provided with matching grooves for slidingly wrapping the main beam, the first secondary beam, the second secondary beam and the The fixed secondary beam forms the secondary beam assembly.
优选的,所述主梁的一侧等距开设有螺栓孔,所述固定次梁、所述第一次梁和所述第二次梁两端开设有安装通孔,所述螺栓孔和所述安装通孔之间通过螺栓固定连接。Preferably, one side of the main beam is equidistantly provided with bolt holes, the two ends of the fixed secondary beam, the first secondary beam and the second secondary beam are provided with mounting through holes, and the bolt holes and the The mounting through holes are fixedly connected by bolts.
优选的,所述固定次梁、所述第一次梁和所述第二次梁的两端均设置平行设置有两块弹性板,两块所述弹性板上均设置有所述安装通孔,且两个所述安装通孔对位。Preferably, both ends of the fixed secondary beam, the first primary beam and the second secondary beam are provided with two elastic plates arranged in parallel, and the two elastic plates are provided with the installation through holes , and the two mounting through holes are aligned.
优选的,所述第二次梁的中部开设有通孔,所述螺纹杆穿过通孔设置。Preferably, a through hole is opened in the middle of the second beam, and the threaded rod is arranged through the through hole.
优选的,所述螺纹杆靠近固定次梁的一端固定有转块。Preferably, a rotating block is fixed at one end of the threaded rod close to the fixed secondary beam.
优选的,所述连接杆的长度小于第一次梁和第二次梁之间的距离。Preferably, the length of the connecting rod is less than the distance between the first beam and the second beam.
优选的,所述主梁的两侧对称开设有固定槽。Preferably, two sides of the main beam are symmetrically provided with fixing grooves.
与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the present utility model are:
本实用新型使用时,通过吊机将吊线卡在安装通孔处,将第一次梁、第二次梁和固定次梁通过吊机移动至主梁的顶部,通过螺栓将固定次梁进行固定,通过第一次梁与螺纹杆的转动将带动第一次梁和第二次梁的同步移动,在第一次梁移动至螺栓孔和第二螺栓孔的重叠位置后通过螺栓对第一次梁进行固定,后顺着螺纹杆的方向移动第二次梁,带动第二次梁移动至螺栓孔和第二螺栓孔的重叠位置后通过螺栓对第二次梁进行固定,各个螺栓孔和安装通孔一一自动对位,操作便捷,省时省力的实现对装置的安装,提高了固定次梁、第一次梁、第二次梁和主梁之间的连接固定,提高装置的稳定性。When the utility model is used, the hanging wire is clamped at the installation through hole by the crane, the first beam, the second beam and the fixed secondary beam are moved to the top of the main beam by the crane, and the fixed secondary beam is fixed by bolts. , the rotation of the first beam and the threaded rod will drive the synchronous movement of the first beam and the second beam. After the first beam moves to the overlapping position of the bolt hole and the second bolt hole The beam is fixed, and then the second beam is moved in the direction of the threaded rod, and the second beam is moved to the overlapping position of the bolt hole and the second bolt hole, and the second beam is fixed by bolts. The through holes are automatically aligned one by one, which is convenient to operate, saves time and effort to install the device, improves the connection and fixation between the fixed secondary beam, the first beam, the second beam and the main beam, and improves the stability of the device .
附图说明Description of drawings
图1为本实用新型的整体结构示意图;Fig. 1 is the overall structure schematic diagram of the present utility model;
图2为本实用新型的调节机构的结构示意图。FIG. 2 is a schematic structural diagram of the adjusting mechanism of the present invention.
图中:1、主梁;2、第一次梁;3、第二次梁;4、固定次梁;5、调节机构;6、第一滑槽;7、第二滑槽;8、第一入口槽;9、第二入口槽;10、限位柱;11、螺纹杆;12、螺栓孔;13、安装通孔;14、通孔;15、转块;16、弹性板;17、连接杆;18、固定槽。In the figure: 1. Main beam; 2. First beam; 3. Second beam; 4. Fixed secondary beam; 5. Adjustment mechanism; 6. First chute; 7. Second chute; 8, No. an inlet slot; 9, the second inlet slot; 10, the limit post; 11, the threaded rod; 12, the bolt hole; 13, the installation through hole; 14, the through hole; 15, the turning block; 16, the elastic plate; 17, Connecting rod; 18. Fixing slot.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.
请参阅图1和图2,图示中的一种建筑支撑钢梁结构,包括主梁1、固定次梁4、第一次梁2、第二次梁3、以及调节机构5。Please refer to FIG. 1 and FIG. 2 , a building supporting steel beam structure in the illustration includes a
主梁1对称设置在楼面两侧,主梁1的两侧对称开设有固定槽18,用于进行固定安装。The
第一次梁2和第二次梁3对称设置在主梁1的顶部;The
固定次梁4固定在两个主梁1的一端,第一次梁2、第二次梁3和固定次梁4组成次梁总成,固定次梁4、第一次梁2和第二次梁3的两端对称开设有安装通孔13;The fixed secondary beam 4 is fixed at one end of the two
调节机构5滑动连接在第一次梁2和第二次梁3之间。The
请参阅图1和图2,调节机构5包括:第一滑槽6、第二滑槽7、连接杆17、第一入口槽8、第二入口槽9以及螺纹杆11。Please refer to FIG. 1 and FIG. 2 , the
第一滑槽6对称设置在固定次梁4的两端;The first chute 6 is symmetrically arranged at both ends of the fixed secondary beam 4;
第二滑槽7对称设置在所述第一次梁2和所述第二次梁3的两端;The
连接杆17对称滑动连接在第一滑槽6和第二滑槽7之间,所述连接杆17的两端的对称固定有限位柱10,且限位柱10与所述第一滑槽6、或与所述第二滑槽7滑动连接;The connecting
第一入口槽8设置在所述第一滑槽6的一端,且所述第一入口槽3与第一滑槽6连通设置,用于所述连接杆17连入所述第一滑槽6内;The
第二入口槽9设置在所述第二滑槽8的一端,且所述第二入口槽9与第二滑槽8连通设置,用于所述连接杆17连入所述第一滑槽6内;The second inlet slot 9 is provided at one end of the
螺纹杆11通过轴承转动连接在固定次梁4的中部,所述第一次梁2的中部开设有螺纹孔,所述第一次梁2通过螺纹孔与螺纹杆11螺纹连接。The threaded
第二次梁3的中部开设有通孔14,螺纹杆11穿过通孔14设置,螺纹杆11靠近固定次梁4的一端固定有转块15。A through
限位柱10靠近第一次梁2靠近螺纹杆11的距离小于限位柱10靠近第二次梁3靠近螺纹杆11的距离,方便对第二次梁3的拉动。The distance between the limiting
主梁1的一侧等距开设有螺栓孔12,固定次梁4、第一次梁2和第二次梁3两端对称开设有安装通孔13,螺栓孔12和安装通孔13之间通过螺栓固定连接。One side of the
另外,所述固定次梁4、所述第一次梁2和所述第二次梁3的两端均设置平行设置有两块弹性板16,两块所述弹性板16上均设置有所述安装通孔13,且两个所述安装通孔13对位,弹性板16能对螺栓形成弹性挤压使得连接更稳固,防松。In addition, two
工作原理:装置使用时,人们通过吊机将主梁1掉至安装处,对主梁1进行固定后,通过吊机将吊线卡在安装通孔13处,将第一次梁2、第二次梁3和固定次梁4通过吊机移动至主梁1的顶部,通过螺栓将固定次梁4进行固定,通过转动转块15进而将带动螺纹杆11转动,通过第一次梁2与螺纹杆11的转动将带动第一次梁2和第二次梁3的同步移动,在第一次梁2移动至螺栓孔12和第二螺栓孔13的重叠位置后通过螺栓对第一次梁2进行固定,后顺着螺纹杆11的方向移动第二次梁3,带动第二次梁3移动至螺栓孔12和第二螺栓孔13的重叠位置后,通过螺栓对第二次梁3进行固定,再次过程中,连接杆17将顺着第一入口槽8的方向移动,各个螺栓孔和安装通孔一一自动对位,操作便捷,省时省力的实现对装置的安装,提高了固定次梁4、第一次梁2、第二次梁3和主梁1之间的连接固定,提高装置的稳定性。Working principle: When the device is in use, people drop the
需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。It should be noted that, in this document, relational terms such as first and second are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any relationship between these entities or operations. any such actual relationship or sequence exists. Moreover, the terms "comprising", "comprising" or any other variation thereof are intended to encompass a non-exclusive inclusion such that a process, method, article or device comprising a list of elements includes not only those elements, but also includes not explicitly listed or other elements inherent to such a process, method, article or apparatus.
尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes and modifications can be made to these embodiments without departing from the principles and spirit of the present invention , alternatives and modifications, the scope of the present invention is defined by the appended claims and their equivalents.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202121813013.2U CN216380245U (en) | 2021-08-04 | 2021-08-04 | Building support steel beam structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202121813013.2U CN216380245U (en) | 2021-08-04 | 2021-08-04 | Building support steel beam structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN216380245U true CN216380245U (en) | 2022-04-26 |
Family
ID=81238988
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202121813013.2U Expired - Fee Related CN216380245U (en) | 2021-08-04 | 2021-08-04 | Building support steel beam structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN216380245U (en) |
-
2021
- 2021-08-04 CN CN202121813013.2U patent/CN216380245U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN207794609U (en) | One kind accurately adjusting compound jacking | |
| CN216380245U (en) | Building support steel beam structure | |
| CN207144474U (en) | A kind of reinforcement tools for oblique circular cylinder formwork reinforcement | |
| CN217759861U (en) | Adjustable platform for pipeline construction under platform beam | |
| CN211547392U (en) | Positioning device for mounting arch rib of tied arch bridge | |
| CN214384043U (en) | Scaffold frame of encorbelmenting of building engineering construction usefulness | |
| CN210878249U (en) | Steel pipe welding assembly platform | |
| CN112072581A (en) | Pipeline erecting device for assembled wall | |
| CN210002877U (en) | Back ridge external corner active diagonal pulling device in aluminum alloy template system | |
| CN201620592U (en) | Scaffold double steel pipe welding base | |
| CN219554515U (en) | Bridge structure | |
| CN209339327U (en) | A prefabricated node for building structure | |
| CN114232965A (en) | Combined supporting device for overhanging scaffold and using method | |
| CN223661064U (en) | A building support connector | |
| CN209384648U (en) | A kind of construction assembled supporting construction | |
| CN206073995U (en) | Detection tool for verticality of aluminum alloy template | |
| CN220848969U (en) | Adjustable steel diagonal column supporting device | |
| CN223706870U (en) | A steel structure support column that is easy to connect | |
| CN220580621U (en) | Reinforcing and connecting device for building structure | |
| CN206000167U (en) | Adjustable Alminum Project slab form support meanss | |
| CN223088888U (en) | Anti-overturning triangular bracket | |
| CN219471206U (en) | a building support | |
| CN224031499U (en) | Bridge temporary structure falsework system with retractable cross bracing | |
| CN223410480U (en) | Angle-adjustable scaffolding support structure | |
| CN222594880U (en) | Movable safety protection device on supporting beam |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220426 |
|