CN216275524U - Water conservancy is opened and close gate for hydraulic engineering construction - Google Patents

Water conservancy is opened and close gate for hydraulic engineering construction Download PDF

Info

Publication number
CN216275524U
CN216275524U CN202123074338.6U CN202123074338U CN216275524U CN 216275524 U CN216275524 U CN 216275524U CN 202123074338 U CN202123074338 U CN 202123074338U CN 216275524 U CN216275524 U CN 216275524U
Authority
CN
China
Prior art keywords
gate
water conservancy
basket
chute
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123074338.6U
Other languages
Chinese (zh)
Inventor
王志鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Linshu County Water Conservancy Bureau
Original Assignee
Linshu County Water Conservancy Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Linshu County Water Conservancy Bureau filed Critical Linshu County Water Conservancy Bureau
Priority to CN202123074338.6U priority Critical patent/CN216275524U/en
Application granted granted Critical
Publication of CN216275524U publication Critical patent/CN216275524U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a water conservancy opening and closing gate for water conservancy engineering construction, which comprises gate piers arranged at two sides of a river channel, wherein a gate frame is arranged between the gate piers, the gate frame is connected with a gate plate in a sliding manner, the top of the gate frame is connected with a gate frame, and a power mechanism for driving the gate plate to move up and down is arranged on the gate frame; a collecting basket is further arranged on one side of the flashboard, the collecting basket is integrally of a rectangular structure and comprises side plates arranged in the front and at the back, the bottoms of the side plates are connected with a bottom plate, and the bottom plate is arranged in an inverted V shape; the basket door is movably connected with the side plate and is fixedly connected with the side plate through a fixing piece; the top of the collecting basket is connected with a steel wire rope, the top of the portal frame is connected with a winch, and the steel wire rope is connected with the winch. A chute is arranged below the collecting basket and is in relative sliding connection with the collecting basket; the bottom of the basket door is connected with a baffle which is supported at the end part of the chute. The device has simple structure and convenient operation, and can realize the salvage and cleaning of the floating objects on the water surface of the river channel.

Description

Water conservancy is opened and close gate for hydraulic engineering construction
Technical Field
The utility model belongs to the technical field of hydraulic engineering, and particularly relates to a hydraulic opening and closing gate for hydraulic engineering construction.
Background
River course gate is called water gate for short, and is built on river courses and channels, and low-water-head hydraulic buildings for controlling flow and adjusting water level are built by using the water gate; closing the gate can block flood, keep off the tide or raise the upper reaches water level, opening the gate, can dredge flood, waterlogging, abandon water or waste water, also can supply water for the low reaches river course, sluice application is extensive in some river courses's ramuscule.
With the increasing of domestic garbage, most of river surfaces can float garbage, and the existing gate is not provided with a garbage cleaning device in the using process, so that the garbage, branches and other floating objects are accumulated at the gate, and the using effect of the gate is greatly reduced; if the sluice is opened and the water is discharged, the overwater garbage floating objects flow to a downstream river channel along with the channel, so that the downstream river channel is polluted, and once the garbage of the branch flows into the downstream, the garbage is not easy to clean.
SUMMERY OF THE UTILITY MODEL
In order to solve the problems in the prior art, a water conservancy opening and closing gate for hydraulic engineering construction is provided.
The technical scheme adopted by the utility model for solving the technical problems is as follows:
the technical scheme provides a water conservancy opening and closing gate for water conservancy engineering construction, which comprises gate piers arranged at two sides of a river channel, wherein a gate frame is arranged between the gate piers, the gate frame is connected with a gate plate in a sliding manner, the top of the gate frame is connected with a gate frame, and a power mechanism for driving the gate plate to move up and down is arranged on the gate frame; a collecting basket is further arranged on one side of the flashboard, the collecting basket is integrally rectangular, the collecting basket comprises side plates arranged in the front and at the back, the bottoms of the side plates are connected with a bottom plate, and the bottom plate is arranged in an inverted V shape; the basket door is movably connected with the side plate and is fixedly connected with the side plate through a fixing piece; the top of the collecting basket is connected with a steel wire rope, the top of the portal frame is connected with a winch, and the steel wire rope is connected with the winch.
The fixing piece is a fixing bolt, and the basket door is bolted with the side plate through the fixing bolt.
The top of the basket door is connected with the side plates through hinges.
A chute is further arranged below the collecting basket and is in relative sliding connection with the collecting basket; the bottom of the basket door is connected with a baffle which is supported at the end part of the chute.
The quantity of chute is provided with two, the chute is the slope setting, and two chutes are the symmetry setting.
The chute lateral wall is connected with the slide rail, the bottom of collecting the basket is connected with the track, the slide rail with track sliding connection.
The chute is arc-shaped.
The side wall of the top of the portal frame is provided with a mounting seat, a winch is mounted on the mounting seat, the mounting seat is provided with a through hole, and a steel wire rope penetrates through the through hole.
The power mechanism comprises a hoist screw, the bottom of the hoist screw is connected with the top of the flashboard, and a hoist hand wheel is connected to the hoist screw in a matching manner.
Compared with the prior art, the utility model has the following advantages:
1. through being provided with the collection basket in flashboard one side in this device, can salvage the collection to the levitate rubbish of surface of water, the bottom of collecting the basket is and falls "V" style of calligraphy setting, and the left and right sides of collecting the basket is provided with the basket door, after salvaging rubbish and promoting collection basket to the take the altitude, opens the basket door, because the bottom of collecting the basket is the slope setting, can make rubbish discharge from both sides basket door fast, and the follow-up staff of being convenient for transports, clears up the rubbish of collecting.
2. The bottom of the collecting basket is also provided with a movable chute, the chute can be stored at the bottom of the collecting basket when not in use, when in use, the basket door is opened, the chute is drawn out from the bottom of the collecting basket, and the garbage discharged from the basket door is guided by the chute and then discharged; because the collection basket sets up between the gate pier, when rubbish was discharged from the basket door, probably had partial rubbish to drop again to the river course in, and the setting of chute plays the extension, this problem of solution that can be fine makes things convenient for the staff to transport, clear up rubbish more.
Drawings
The above and/or additional aspects and advantages of the present invention will become apparent and readily appreciated from the following description of the embodiments, taken in conjunction with the accompanying drawings of which:
FIG. 1 is a schematic diagram of the present invention.
Fig. 2 is a schematic view of a collecting basket structure.
Fig. 3 is a schematic view of the fitting structure of the collecting basket and the chute (chute-received state).
Figure 4 is a schematic view of the collection basket and chute configuration (chute deployed).
Figure 5 is a side view of the chute structure.
Description of reference numerals:
1, gate piers; 2, a gate frame; 3, a gate plate; 4, a door frame; 5, a hoist screw; 6 opening and closing a hand wheel; 7, mounting seats; 8, a winch; 9 steel wire ropes; 10 a collection basket; 101 side plates; 102 a backplane; 103 basket doors; 104 a baffle plate; 105 fixing bolts; 106 a hinged seat; 11 chute; 12, a slide rail; 13 tracks; 14 a hanger; 15 positioning the jackscrew.
Detailed Description
Reference will now be made in detail to embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the accompanying drawings are illustrative only for the purpose of explaining the present invention, and are not to be construed as limiting the present invention.
Example one
As shown in fig. 1-5, the embodiment provides a water conservancy opening and closing gate for water conservancy engineering construction, which includes gate piers 1 arranged at two sides of a river channel, wherein gate frames 2 are installed between the gate piers 1, and the gate frames 2 are fixedly connected with the gate piers 1; the gate frame 2 is connected with a gate plate 3 in a sliding mode, and the gate plate 3 can move up and down along the gate frame 2 to achieve the functions of water retaining and water discharging. The top of the gate frame 2 is connected with a portal 4, and the portal 4 is provided with a power mechanism for driving the gate 3 to move up and down; the power mechanism can adopt various methods in the prior art, such as a method of driving a steel rope by a motor, and the like, and in this embodiment, in order to save cost, the following method is adopted: the power mechanism comprises a hoist screw rod 5, the bottom of the hoist screw rod 5 is connected with the top of the flashboard 3, and a hoist hand wheel 6 is connected to the hoist screw rod 5 in a matching manner. When the lifting device is used, the gate plate 3 can be lifted by rotating the opening and closing hand wheel 6.
A collecting basket 10 is further arranged on one side of the gate plate 3, the collecting basket 10 is integrally rectangular, the collecting basket 10 comprises side plates 101 arranged in front and back, the bottom of each side plate 101 is connected with a bottom plate 102, and the bottom plates 102 are arranged in an inverted V shape, so that garbage can be poured conveniently; the basket door 103 is movably connected with the side plate 101, and the basket door 103 is fixedly connected with the side plate 101 through a fixing piece; the top of the collecting basket 10 is connected with a steel wire rope 9, the top of the gantry 4 is connected with a winch 8, and the steel wire rope 9 is connected with the winch 8.
For convenience in installation, the side wall of the top of the gantry 4 is provided with an installation seat 7, a winch 8 is installed on the installation seat 7, the installation seat 7 is provided with a through hole, and the steel wire rope 9 penetrates through the through hole without affecting movement of the steel wire rope 9.
The top of the basket door 103 is connected with the side plate 101 through a hinge or a hinge seat 106, the basket door 103 can rotate around the hinge or the hinge seat 106, and the basket door 103 adopts an upturning type structure form. The fixing piece can adopt a fixing bolt, the basket door 103 is bolted with the side plate 101 through the fixing bolt, threaded holes are formed in the side plate 101 and the basket door 103, and after the basket door 103 is closed, the basket door 103 is fixed by screwing the fixing bolt into the threaded holes.
The working principle is as follows:
through being provided with collection basket 10 in 3 one sides of flashboard in this device, can salvage the collection to the levitate rubbish of surface of water, the bottom of collecting basket 10 is down "V" style of calligraphy setting, the left and right sides of collecting basket 10 is provided with basket door 103, after salvaging rubbish and promoting collection basket 10 to a take the altitude, open basket door 103, because the bottom of collecting basket 10 is the slope setting, can make rubbish discharge from both sides basket door 103 fast, the follow-up staff of being convenient for transports the rubbish of collecting, the clearance.
Example two
With continued reference to fig. 1-5, on the basis of the first embodiment, a chute 11 is further arranged below the collecting basket 10, the chute 11 is in relative sliding connection with the collecting basket 10, and the chute 11 can move left and right relative to the collecting basket 10, so that the storage and the expansion are realized; the bottom of the basket door 103 is connected with a baffle 104, the baffle 104 is blocked and supported at the end part of the chute 11, and when the chute 11 is stored at the bottom of the collecting basket 10, the baffle 104 can block and support the chute 11 to prevent the chute from sliding downwards.
The quantity of chute 11 is provided with two, and chute 11 is the slope setting, and two chutes 11 are the symmetry setting.
The side wall of the chute 11 is connected with a slide rail 12, the bottom of the collecting basket 10 is connected with a track 13, and the track 13 is connected with the collecting basket 10 through a hanging bracket 14; the slide rail 12 is slidably connected to the rail 13.
The chute 11 is arc-shaped.
The outer wall of the chute 11 is further connected with a positioning jackscrew 15 in a threaded manner, so that the limiting effect is achieved, and the chute 11 and the track 13 are prevented from slipping.
The bottom of the collecting basket 10 is also provided with a movable chute 11, the chute 11 can be stored at the bottom of the collecting basket 10 when not in use, when in use, the basket door 103 is opened, the chute 11 is drawn out from the bottom of the collecting basket 10, and the garbage discharged from the basket door 103 is guided by the chute 11 and then discharged; because collection basket 10 sets up between gate pier 1, when rubbish was discharged from basket door 103, probably had partial rubbish to drop again to the river course in, and chute 11's setting plays the extension, and this problem of solution that can be fine makes things convenient for the staff to transport, clear up rubbish more.
While embodiments of the utility model have been shown and described, it will be understood by those of ordinary skill in the art that: various changes, modifications, substitutions and alterations can be made to the embodiments without departing from the principles and spirit of the utility model, the scope of which is defined by the claims and their equivalents.

Claims (9)

1. A water conservancy opening and closing gate for water conservancy engineering construction comprises gate piers arranged on two sides of a river channel, and is characterized in that a gate frame is arranged between the gate piers, the gate frame is connected with a gate plate in a sliding mode, the top of the gate frame is connected with a gate frame, and a power mechanism for driving the gate plate to move up and down is arranged on the gate frame; a collecting basket is further arranged on one side of the flashboard, the collecting basket is integrally rectangular, the collecting basket comprises side plates arranged in the front and at the back, the bottoms of the side plates are connected with a bottom plate, and the bottom plate is arranged in an inverted V shape; the basket door is movably connected with the side plate and is fixedly connected with the side plate through a fixing piece; the top of the collecting basket is connected with a steel wire rope, the top of the portal frame is connected with a winch, and the steel wire rope is connected with the winch.
2. The water conservancy project construction water conservancy start-stop gate of claim 1, characterized in that, the mounting is fixing bolt, the basket door passes through fixing bolt and the curb plate bolt joint.
3. The water conservancy opening and closing gate for the water conservancy engineering construction according to claim 1, wherein the top of the basket door is connected with the side plate through a hinge.
4. The water conservancy opening and closing gate for the water conservancy engineering construction according to claim 1, wherein a chute is further arranged below the collecting basket and is in relative sliding connection with the collecting basket; the bottom of the basket door is connected with a baffle which is supported at the end part of the chute.
5. The water conservancy opening and closing gate for water conservancy project construction according to claim 4, wherein the number of the chutes is two, the chutes are arranged in an inclined manner, and the two chutes are symmetrically arranged.
6. The water conservancy opening and closing gate for the water conservancy engineering construction according to claim 4, wherein a slide rail is connected to the side wall of the chute, a track is connected to the bottom of the collecting basket, and the slide rail is slidably connected with the track.
7. The water conservancy opening and closing gate for the water conservancy engineering construction according to claim 4, wherein the chute is arc-shaped.
8. The water conservancy opening and closing gate for the water conservancy engineering construction according to claim 4, wherein a mounting seat is arranged on the side wall of the top of the portal frame, a winch is mounted on the mounting seat, a through hole is formed in the mounting seat, and the steel wire rope penetrates through the through hole.
9. The hydraulic starting and stopping gate for hydraulic engineering construction according to claim 1, wherein the power mechanism comprises a hoist screw, the bottom of the hoist screw is connected with the top of the gate plate, and a starting and stopping hand wheel is connected to the hoist screw in a matching manner.
CN202123074338.6U 2021-12-08 2021-12-08 Water conservancy is opened and close gate for hydraulic engineering construction Active CN216275524U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123074338.6U CN216275524U (en) 2021-12-08 2021-12-08 Water conservancy is opened and close gate for hydraulic engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123074338.6U CN216275524U (en) 2021-12-08 2021-12-08 Water conservancy is opened and close gate for hydraulic engineering construction

Publications (1)

Publication Number Publication Date
CN216275524U true CN216275524U (en) 2022-04-12

Family

ID=81057188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123074338.6U Active CN216275524U (en) 2021-12-08 2021-12-08 Water conservancy is opened and close gate for hydraulic engineering construction

Country Status (1)

Country Link
CN (1) CN216275524U (en)

Similar Documents

Publication Publication Date Title
CN108468291A (en) A kind of bridge pavement cleaning equipment
CN211080161U (en) Antifouling fishing device for hydropower station
CN216275524U (en) Water conservancy is opened and close gate for hydraulic engineering construction
CN218540604U (en) Water conservancy construction opens and close gate
CN210238449U (en) Split type gate
CN107178143B (en) Municipal administration rain, sewage sludge lifting system for pump station
CN217203902U (en) Gate structure for hydraulic engineering of convenient operation
CN213173603U (en) Over-and-under type water sluicegate for hydraulic engineering
CN113431000B (en) Hydraulic dirt-removing flap gate with diversion trench and dirt-removing operation method thereof
CN109653168B (en) Multifunctional landscape gate and sewage draining, intercepting and water draining method thereof
CN212641385U (en) Flexible opening and closing bidirectional control gate for urban municipal drainage
CN110485378B (en) Two-stage river water impoundment system
CN210737473U (en) Sectional type drainage gate
CN211621520U (en) Dam convenient to surface of water rubbish clearance
CN110820699B (en) Scrubbing device is used to reservoir drain pipe department
CN209603076U (en) It is provided with the gravity dam of surface spillways
CN214363349U (en) Water sluicegate device convenient to clearance
CN113136841A (en) Prevent accumulational water sluicegate of debris
CN207436227U (en) First rain storage pond flap type flusher and first rain storage pond
CN216108365U (en) Lifting type water conservancy valve for water conservancy project
CN213358535U (en) Gate for hydraulic engineering
CN217759152U (en) Initial rain discarding device
CN220266471U (en) Be applied to garbage collection device and river dam in river course
CN218175765U (en) Manual two-way cut-off equipment
CN219992691U (en) Novel unpowered weir gate based on hydraulic drive

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant