CN216239157U - A prefabricated gypsum board partition wall structure system - Google Patents
A prefabricated gypsum board partition wall structure system Download PDFInfo
- Publication number
- CN216239157U CN216239157U CN202121875068.6U CN202121875068U CN216239157U CN 216239157 U CN216239157 U CN 216239157U CN 202121875068 U CN202121875068 U CN 202121875068U CN 216239157 U CN216239157 U CN 216239157U
- Authority
- CN
- China
- Prior art keywords
- gypsum board
- board
- wallboard
- partition wall
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Building Environments (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及建筑领域,更具体地说,涉及一种装配式石膏板隔墙结构系统。The utility model relates to the field of construction, in particular to an assembled gypsum board partition wall structure system.
背景技术Background technique
传统轻质隔墙主要有骨架隔墙和板材隔墙。骨架隔墙大多为轻钢龙骨或木龙骨,饰面板有石膏板、埃特板、GRC板、PC板、胶合板等,第一种轻钢龙骨是在现场下料切割、龙骨安装工序,大量材料加工是在施工在现场完成,施工效率较低。第二种木龙骨容易弯曲变形,不符合有关防火规范要求。板材隔墙大多为加气混凝土条板,现在需要进湿作业,施工环境差,不利于节能环保,加气混凝土条板受应力作用,拼接缝位置容易开裂,且无法做到隔墙功能和装饰效果于一体。Traditional lightweight partitions mainly include skeleton partitions and sheet partitions. Most of the skeleton partition walls are light steel keels or wooden keels, and the decorative panels include gypsum board, Ette board, GRC board, PC board, plywood, etc. The first light steel keel is cut and installed on site. Processing is done on site during construction, and the construction efficiency is low. The second kind of wooden keel is easy to bend and deform, and does not meet the requirements of relevant fire protection regulations. Most of the board partition walls are aerated concrete slats, which now need to be wetted, and the construction environment is poor, which is not conducive to energy saving and environmental protection. Decorative effect in one.
实用新型内容Utility model content
本实用新型针对现有技术的上述缺陷,提供一种装配式石膏板隔墙结构系统。Aiming at the above-mentioned defects of the prior art, the utility model provides an assembled gypsum board partition wall structure system.
本实用新型解决其技术问题所采用的技术方案是:构造一种装配式石膏板隔墙结构系统,该隔墙包括第一墙板、第二墙板、设置于该第一墙板和第二墙板顶端并用于与建筑天花固定连接的第一天龙骨、设置于该第一墙板和第二墙板底端并用于与建筑地面固定连接的地龙骨,该第一墙板包括第一石膏板、第二石膏板、以及固定夹设于该第一石膏板和第二石膏板之间的第一防火隔声棉层,该第二墙板包括第三石膏板、第四石膏板、以及固定夹设于该第三石膏板和第四石膏板之间的第二防火隔声棉层,该第一墙板和第二墙板之间设有可供管线容置的中空隔层。The technical solution adopted by the present utility model to solve the technical problem is: constructing an assembled gypsum board partition wall structure system, the partition wall includes a first wall board, a second wall board, and a second wall board and a second wall board arranged on the first wall board and the second wall board. A first sky keel on the top of the wall panel and used for fixed connection with the building ceiling, and a ground keel arranged on the bottom end of the first wall panel and the second wall panel and used for fixed connection with the building ground, the first wall panel includes a first gypsum board, a second gypsum board, and a first fireproof and sound insulation cotton layer fixedly sandwiched between the first gypsum board and the second gypsum board, the second wallboard includes a third gypsum board, a fourth gypsum board, and The second fireproof and sound insulation cotton layer is fixedly sandwiched between the third gypsum board and the fourth gypsum board, and a hollow spacer for accommodating pipelines is arranged between the first wallboard and the second wallboard.
在本实用新型所述的装配式石膏板隔墙结构系统中,该第一天龙骨包括可供该第一墙板顶端嵌入连接的第一连接件、可供该第二墙板顶端嵌入连接的第二连接件、以及设置于该第一连接件和第二连接件之间固定连接该第一连接件和第二连接件的第一连接部。In the prefabricated gypsum board partition wall structure system of the present invention, the first keel includes a first connecting piece that can be embedded and connected to the top of the first wallboard, and a top of the second wallboard can be embedded to connect. A second connecting piece, and a first connecting portion disposed between the first connecting piece and the second connecting piece for fixedly connecting the first connecting piece and the second connecting piece.
在本实用新型所述的装配式石膏板隔墙结构系统中,该地龙骨包括可供该第一墙板底端嵌入连接的第三连接件、可供该第二墙板底端嵌入连接的第四连接件、以及设置于该第三连接件和第四连接件之间固定连接该第三连接件和第四连接件的第二连接部。In the prefabricated gypsum board partition wall structure system of the present invention, the ground joist includes a third connecting piece for the bottom end of the first wallboard to be embedded and connected, and a bottom end of the second wallboard to be embedded and connected. A fourth connecting piece, and a second connecting portion disposed between the third connecting piece and the fourth connecting piece for fixedly connecting the third connecting piece and the fourth connecting piece.
在本实用新型所述的装配式石膏板隔墙结构系统中,该第一连接件上设有可供螺栓穿过并连接的第一连接孔,该第二连接件上设有可供螺栓穿过并连接的第二连接孔,该第二连接部上设有可供螺栓穿过并连接的第三连接孔。In the prefabricated gypsum board partition wall structure system of the present invention, the first connecting member is provided with a first connecting hole for bolts to pass through and connect, and the second connecting member is provided with a bolt to pass through. The second connecting hole is provided with a third connecting hole for the bolt to pass through and connect.
在本实用新型所述的装配式石膏板隔墙结构系统中,该隔墙还包括设置于该第一墙板和建筑天花之间的第三墙板、设置于该第二墙板和建筑天花之间的第四墙板、以及设置于该第三墙板和第四墙板顶端并用于与建筑天花固定连接的第二天龙骨,该第三墙板包括第五石膏板、以及固设于该第五石膏板内侧面的第三防火隔声棉层,该第四墙板包括第六石膏板、以及固设于该第六石膏板内侧面的第四防火隔声棉层。In the prefabricated gypsum board partition wall structure system of the present invention, the partition wall further comprises a third wall panel arranged between the first wall panel and the building ceiling, and a third wall panel arranged between the second wall panel and the building ceiling The fourth wall board between, and the second keel arranged on the top of the third wall board and the fourth wall board and used for fixed connection with the building ceiling, the third wall board includes a fifth gypsum board, and is fixed on the The third fireproof and sound insulation cotton layer on the inner side of the fifth gypsum board, the fourth wallboard comprises a sixth gypsum board, and a fourth fireproof and sound insulation cotton layer fixed on the inner side of the sixth gypsum board.
在本实用新型所述的装配式石膏板隔墙结构系统中,该第二天龙骨包括顶抵该第一石膏板顶端的第五连接件、顶抵该第二石膏板顶端的第六连接件、以及设置于该第五连接件和第六连接件之间用于固定连接该第五连接件和第六连接件的第三连接部。In the prefabricated gypsum board partition wall structure system of the present invention, the second keel comprises a fifth connecting piece against the top of the first gypsum board and a sixth connecting piece against the top of the second gypsum board , and a third connecting portion disposed between the fifth connecting piece and the sixth connecting piece for fixedly connecting the fifth connecting piece and the sixth connecting piece.
在本实用新型所述的装配式石膏板隔墙结构系统中,该第一连接件外侧设有可供该第五石膏板底端嵌入连接的第一勾体,第二连接件外侧设有可供该第六石膏板底端嵌入连接的第二勾体;In the prefabricated gypsum board partition wall structure system of the present invention, the outer side of the first connecting piece is provided with a first hook body that can be embedded and connected to the bottom end of the fifth gypsum board, and the outer side of the second connecting piece is provided with a a second hook body for the bottom end of the sixth gypsum board to be embedded and connected;
该第五连接件外侧设有可供该第五石膏板顶端嵌入连接的第三勾体,第六连接件外侧设有可供该第六石膏板顶端嵌入连接的第四勾体。The outer side of the fifth connecting piece is provided with a third hook body for the top end of the fifth gypsum board to be embedded and connected, and the outer side of the sixth connecting piece is provided with a fourth hook body for the top end of the sixth gypsum board to be embedded and connected.
在本实用新型所述的装配式石膏板隔墙结构系统中,该第五连接件上与该第一连接孔相对应位置处设有可供螺栓穿过的第四连接孔,该第六连接件上与该第二连接孔相对应位置处设有可供螺栓穿过的第五连接孔,该隔墙还包括可穿过该第四连接孔和第一连接孔并与该第二天龙骨和第一天龙骨固定连接的第一吊筋、以及可穿过该第五连接孔和第二连接孔并与该第二天龙骨和第一天龙骨固定连接的第二吊筋。In the prefabricated gypsum board partition wall structure system of the present invention, the fifth connecting piece is provided with a fourth connecting hole at a position corresponding to the first connecting hole for bolts to pass through, and the sixth connecting piece is provided with a fourth connecting hole through which the bolt can pass through. A fifth connecting hole for bolts to pass through is provided on the part corresponding to the second connecting hole, and the partition wall also includes a connecting hole that can pass through the fourth connecting hole and the first connecting hole and is connected with the second keel A first hanging rib fixedly connected to the first day keel, and a second hanging rib that can pass through the fifth connecting hole and the second connecting hole and be fixedly connected with the second day keel and the first day keel.
在本实用新型所述的装配式石膏板隔墙结构系统中,该隔墙还包括可穿过该第三连接孔并与该地龙骨固定连接的膨胀螺栓。In the prefabricated gypsum board partition wall structure system of the present invention, the partition wall further includes an expansion bolt that can pass through the third connection hole and be fixedly connected to the ground keel.
在本实用新型所述的装配式石膏板隔墙结构系统中,该第一墙板包括设置于该设置于该第一防火隔声棉层第一端并固定夹设于该第一石膏板和第二石膏板之间的第一金属骨架、以及设置于该设置于该第一防火隔声棉层第二端并固定夹设于该第一石膏板和第二石膏板之间的第二金属骨架;In the prefabricated gypsum board partition wall structure system of the present invention, the first wall board includes a wall board disposed on the first end of the first fireproof and sound insulation cotton layer and fixedly clamped on the first gypsum board and The first metal skeleton between the second gypsum boards, and the second metal disposed on the second end of the first fireproof and sound insulation cotton layer and fixedly sandwiched between the first gypsum board and the second gypsum board skeleton;
该第二墙板包括设置于该设置于该第二防火隔声棉层第一端并固定夹设于该第三石膏板和第四石膏板之间的第三金属骨架、以及设置于该设置于该第二防火隔声棉层第二端并固定夹设于该第三石膏板和第四石膏板之间的第四金属骨架;The second wallboard includes a third metal frame disposed on the first end of the second fireproof and sound insulation cotton layer and fixedly sandwiched between the third gypsum board and the fourth gypsum board, and a third metal frame disposed on the first end of the second gypsum board a fourth metal frame sandwiched between the third gypsum board and the fourth gypsum board at the second end of the second fireproof and sound insulation cotton layer;
该第一金属骨架、第二金属骨架、第三金属骨架和第四金属骨架均包括固定板、垂直固设于该固定板第一端第一侧面的第一侧板、垂直固设于该固定板第二端第一侧面的第二侧板、垂直固设于该第一侧板端部并向该第二侧板方向延伸的第一支板、垂直固设于该第二侧板端部并向该第一侧板方向延伸的第二支板、以及固设于该第一支板端部并向该固定板第二端方向倾斜延伸的第一倾斜板、固设于该第二支板端部并向该固定板第一端方向倾斜延伸的第二倾斜板。The first metal frame, the second metal frame, the third metal frame and the fourth metal frame all include a fixing plate, a first side plate vertically fixed on the first side of the first end of the fixing plate, and a first side plate vertically fixed on the fixing plate. A second side plate on the first side of the second end of the plate, a first support plate vertically fixed on the end of the first side plate and extending in the direction of the second side plate, and vertically fixed on the end of the second side plate a second support plate extending in the direction of the first side plate, and a first inclined plate fixed on the end of the first support plate and extending obliquely toward the second end of the fixed plate, fixed on the second support A second inclined plate extending obliquely from the end of the plate toward the first end of the fixed plate.
实施本实用新型的装配式石膏板隔墙结构系统,具有以下有益效果:使用本实用新型的装配式石膏板隔墙结构系统时,将第一天龙骨通过吊筋等与建筑天花进行固定连接,将地龙骨通过膨胀螺栓与建筑地面进行固定连接,然后将第一墙板和第二墙板顶端与第一天龙骨进行固定连接,将第一墙板和第二墙板底端与地龙骨进行固定连接,实现对第一墙板和第二墙板的干式装配。本申请的隔墙与传统隔墙对比,具有快捷安装,自重轻、节约空间防火隔声等优点。且在施工时不需像骨架隔墙在施工现场进行大量材料加工,而是把材料加工转移到工厂进行,加工完出厂时为部品、部件、运至施工现场简单安装即可。Implementing the prefabricated gypsum board partition wall structure system of the present invention has the following beneficial effects: when using the prefabricated gypsum board partition wall structure system of the present invention, the first day keel is fixedly connected to the building ceiling through hanging bars, etc., The ground keel is fixedly connected to the building ground through expansion bolts, and then the top of the first wall panel and the second wall panel is fixedly connected to the first sky keel, and the bottom end of the first wall panel and the second wall panel is connected to the ground keel. The fixed connection enables dry assembly of the first wall panel and the second wall panel. Compared with the traditional partition wall, the partition wall of the present application has the advantages of quick installation, light weight, space saving, fireproof and sound insulation, and the like. And during construction, it is not necessary to process a large amount of materials at the construction site like a skeleton partition wall, but to transfer the material processing to the factory. After processing, the parts and components can be shipped to the construction site for simple installation.
附图说明Description of drawings
下面将结合附图及实施例对本实用新型作进一步说明,附图中:The utility model will be further described below in conjunction with the accompanying drawings and embodiments, in the accompanying drawings:
图1是本实用新型装配式石膏板隔墙的第一结构示意图;Fig. 1 is the first structural representation of the assembled gypsum board partition wall of the present utility model;
图2是本实用新型装配式石膏板隔墙的第二结构示意图;Fig. 2 is the second structural schematic diagram of the assembled gypsum board partition wall of the present invention;
图3是本实用新型装配式石膏板隔墙中第一墙板的结构示意图;Fig. 3 is the structural representation of the first wallboard in the assembled gypsum board partition wall of the present utility model;
图4是本实用新型装配式石膏板隔墙中第一墙板的拼接结构示意图。4 is a schematic diagram of the splicing structure of the first wallboard in the assembled gypsum board partition wall of the present invention.
具体实施方式Detailed ways
为使本实用新型的目的、技术方案和优点更加清楚,下面将结合附图对本实用新型实施方式作进一步地详细描述。In order to make the objectives, technical solutions and advantages of the present utility model more clear, the embodiments of the present utility model will be further described in detail below with reference to the accompanying drawings.
如图1所示,在本实用新型的装配式石膏板隔墙结构系统第一实施例中,该隔墙1包括第一墙板2、第二墙板3、设置于该第一墙板 2和第二墙板3顶端并用于与建筑天花100固定连接的第一天龙骨4、设置于该第一墙板2和第二墙板3底端并用于与建筑地面200固定连接的地龙骨5,该第一墙板2包括第一石膏板6、第二石膏板7、以及固定夹设于该第一石膏板6和第二石膏板7之间的第一防火隔声棉层8,该第二墙板3包括第三石膏板9、第四石膏板10、以及固定夹设于该第三石膏板9和第四石膏板10之间的第二防火隔声棉层 11,该第一墙板2和第二墙板3之间设有可供管线13容置的中空隔层12。As shown in FIG. 1 , in the first embodiment of the prefabricated gypsum board partition wall structure system of the present invention, the partition wall 1 includes a
使用本实用新型的装配式石膏板隔墙结构系统1时,将第一天龙骨4通过吊筋等与建筑天花100进行固定连接,将地龙骨5通过膨胀螺栓36与建筑地面200进行固定连接,然后将第一墙板2和第二墙板3顶端与第一天龙骨4进行固定连接,将第一墙板2和第二墙板3底端与地龙骨5进行固定连接,实现对第一墙板2和第二墙板3 的干式装配。本申请的隔墙1与传统隔墙1对比,具有快捷安装,自重轻、节约空间防火隔声等优点。且在施工时不需像骨架隔墙1 在施工现场进行大量材料加工,而是把材料加工转移到工厂进行,加工完出厂时为部品、部件、运至施工现场简单安装即可。When using the prefabricated gypsum board partition wall structure system 1 of the present invention, the
具体的,该第一天龙骨4包括可供该第一墙板2顶端嵌入连接的第一连接件14、可供该第二墙板3顶端嵌入连接的第二连接件15、以及设置于该第一连接件14和第二连接件15之间固定连接该第一连接件14和第二连接件15的第一连接部16。Specifically, the
同样的,该地龙骨5包括可供该第一墙板2底端嵌入连接的第三连接件17、可供该第二墙板3底端嵌入连接的第四连接件18、以及设置于该第三连接件17和第四连接件18之间固定连接该第三连接件17和第四连接件18的第二连接部19。Similarly, the
在安装第一墙板2和第二墙板3时,可将第一墙板2顶端和底端分别卡入至第一连接件14和第三连接件17内,将第二墙板3顶端和底端分别卡入至第二连接件15和第四连接件18内,实现对第一墙板2和第二墙板3的固定安装。When installing the
在本实施方式中,该第一连接件14上设有可供螺栓穿过并连接的第一连接孔,该第二连接件15上设有可供螺栓穿过并连接的第二连接孔,该第二连接部19上设有可供螺栓穿过并连接的第三连接孔。In this embodiment, the first connecting
如图2所示,该隔墙1还包括设置于该第一墙板2和建筑天花 100之间的第三墙板20、设置于该第二墙板3和建筑天花100之间的第四墙板21、以及设置于该第三墙板20和第四墙板21顶端并用于与建筑天花100固定连接的第二天龙骨22,该第三墙板20包括第五石膏板24、以及固设于该第五石膏板24内侧面的第三防火隔声棉层23,该第四墙板21包括第六石膏板26、以及固设于该第六石膏板26内侧面的第四防火隔声棉层25。As shown in FIG. 2 , the partition wall 1 further includes a
具体的,该第二天龙骨22包括顶抵该第一石膏板6顶端的第五连接件27、顶抵该第二石膏板7顶端的第六连接件28、以及设置于该第五连接件27和第六连接件28之间用于固定连接该第五连接件 27和第六连接件28的第三连接部29。Specifically, the
进一步的,该第一连接件14外侧设有可供该第五石膏板24底端嵌入连接的第一勾体30,第二连接件15外侧设有可供该第六石膏板 26底端嵌入连接的第二勾体31。该第五连接件27外侧设有可供该第五石膏板24顶端嵌入连接的第三勾体32,第六连接件28外侧设有可供该第六石膏板26顶端嵌入连接的第四勾体33。Further, the outer side of the
在装配第三墙板20和第四墙板21时,将第三防火隔声棉层23 顶端和底端分别抵紧第五连接件27和第一连接件14,将第四防火隔声棉层25顶端和底端分别抵紧第六连接件28和第二连接件15。同时,将第五石膏板24两端分别卡入至第三勾体32和第一勾体30内进行嵌入连接,将第六石膏板26两端分别卡入至第四勾体33和第二勾体31内进行嵌入连接,实现对第三墙板20和第四墙板21固定装配。When assembling the
优选的,该第五连接件27上与该第一连接孔相对应位置处设有可供螺栓穿过的第四连接孔,该第六连接件28上与该第二连接孔相对应位置处设有可供螺栓穿过的第五连接孔,该隔墙1还包括可穿过该第四连接孔和第一连接孔并与该第二天龙骨22和第一天龙骨4固定连接的第一吊筋34、以及可穿过该第五连接孔和第二连接孔并与该第二天龙骨22和第一天龙骨4固定连接的第二吊筋35。Preferably, the fifth connecting
在装配时,第一吊筋34竖向穿过第三防火隔声棉层23,第二吊筋35竖向穿过第四防火隔声棉层25。During assembly, the first hanging
进一步的,该隔墙1还包括可穿过该第三连接孔并与该地龙骨5 固定连接的膨胀螺栓36。Further, the partition wall 1 also includes an
优选的,第一连接件14、第二连接件15、第三连接件17、第四连接件18、第五连接件27和第六连接件28均为“U”形连接件。Preferably, the first connecting
如图3、4所示,为便于第一墙板2或第二墙板3进行拼接,该第一墙板2包括设置于该设置于该第一防火隔声棉层8第一端并固定夹设于该第一石膏板6和第二石膏板7之间的第一金属骨架37、以及设置于该设置于该第一防火隔声棉层8第二端并固定夹设于该第一石膏板6和第二石膏板7之间的第二金属骨架38。As shown in Figs. 3 and 4, in order to facilitate the splicing of the
该第二墙板3包括设置于该设置于该第二防火隔声棉层11第一端并固定夹设于该第三石膏板9和第四石膏板10之间的第三金属骨架、以及设置于该设置于该第二防火隔声棉层11第二端并固定夹设于该第三石膏板9和第四石膏板10之间的第四金属骨架。The
该第一金属骨架37、第二金属骨架38、第三金属骨架和第四金属骨架均包括固定板39、垂直固设于该固定板39第一端第一侧面的第一侧板40、垂直固设于该固定板39第二端第一侧面的第二侧板 41、垂直固设于该第一侧板40端部并向该第二侧板41方向延伸的第一支板42、垂直固设于该第二侧板41端部并向该第一侧板40方向延伸的第二支板43、以及固设于该第一支板42端部并向该固定板 39第二端方向倾斜延伸的第一倾斜板44、固设于该第二支板43端部并向该固定板39第一端方向倾斜延伸的第二倾斜板45。The
在将相邻的两块第一墙板2拼接时,可将铆接块46卡入至相邻的两块第一墙板2的第一金属骨架37和第二金属骨架38内,通过第一倾斜板44和第二倾斜板45夹紧铆接块46,实现相邻两块第一墙板2的固定拼接。When splicing the two adjacent
以上所述仅为本实用新型的实施例,并非因此限制本实用新型的专利范围,凡是利用本实用新型说明书及附图内容所作的等效结构或等效流程变换,或直接或间接运用在其他相关的技术领域,均同理包括在本实用新型的专利保护范围内。The above descriptions are only the embodiments of the present invention, and are not intended to limit the scope of the patent of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the description and drawings of the present invention, or directly or indirectly applied to other Relevant technical fields are similarly included in the scope of patent protection of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202121875068.6U CN216239157U (en) | 2021-08-11 | 2021-08-11 | A prefabricated gypsum board partition wall structure system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202121875068.6U CN216239157U (en) | 2021-08-11 | 2021-08-11 | A prefabricated gypsum board partition wall structure system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN216239157U true CN216239157U (en) | 2022-04-08 |
Family
ID=80981052
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202121875068.6U Expired - Fee Related CN216239157U (en) | 2021-08-11 | 2021-08-11 | A prefabricated gypsum board partition wall structure system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN216239157U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113530023A (en) * | 2021-08-11 | 2021-10-22 | 千钧鼎(吉林)建筑装配科技有限公司 | Design of a prefabricated gypsum board partition wall structure system |
| CN116180939A (en) * | 2022-12-21 | 2023-05-30 | 北京承达创建装饰工程有限公司 | Unit type partition wall assembly system on building indoor overhead building floor |
-
2021
- 2021-08-11 CN CN202121875068.6U patent/CN216239157U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113530023A (en) * | 2021-08-11 | 2021-10-22 | 千钧鼎(吉林)建筑装配科技有限公司 | Design of a prefabricated gypsum board partition wall structure system |
| CN113530023B (en) * | 2021-08-11 | 2025-08-05 | 千钧鼎(吉林)建筑装配科技有限公司 | An assembled gypsum board partition wall structure system |
| CN116180939A (en) * | 2022-12-21 | 2023-05-30 | 北京承达创建装饰工程有限公司 | Unit type partition wall assembly system on building indoor overhead building floor |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110469049B (en) | A building wall and its installation method | |
| US20180328019A1 (en) | Building assemblies and methods for constructing a building using pre-assembled floor-ceiling panels and walls | |
| CN113530023B (en) | An assembled gypsum board partition wall structure system | |
| CN107435394B (en) | A partition wall and its connecting structure | |
| CN109972765B (en) | Three-wall and two-space prefabricated wall system, wall main board and installation method | |
| CN105421818A (en) | Embedded steel structure assembling residence | |
| CN108824648A (en) | Space module house | |
| CN216239157U (en) | A prefabricated gypsum board partition wall structure system | |
| CN115110694B (en) | A light steel keel fireproof composite wall panel and wall that is easy to install | |
| CN111705969A (en) | A kind of prefabricated wall top packaging structure and installation method thereof | |
| CN205742723U (en) | Tail margin connecting device and precast wall body for precast wall body | |
| CN110306653B (en) | Prefabricated assembly structural unit and manufacturing method, house structure and construction method | |
| CN111075056A (en) | A multifunctional light steel keel and partition wall | |
| CN113530028A (en) | Structural system design of assembled fireproof sound insulation wall | |
| CN216239174U (en) | A prefabricated fire and sound insulation wall structure system | |
| CN109469230B (en) | Light steel partition wall with inward-folding type framework and assembling and mounting method thereof | |
| CN219241456U (en) | Steel construction assembled integral house | |
| US20250092675A1 (en) | A collaborating joist and suspended ceiling system and a method for assembling the system | |
| CN211817593U (en) | Fully bolted removable external energy-saving wall panel system | |
| CN211690983U (en) | Floor board frame and floor board structure | |
| CN211775445U (en) | Indoor light partition wall heat preservation sound insulation structure | |
| CN109779040B (en) | Prefabricated light wood structure and mounting method thereof | |
| CN209538584U (en) | A dry-type installation structure of self-insulating exterior wall panels | |
| CN219671856U (en) | Building wall | |
| CN219508915U (en) | Assembled sound insulation partition plate of fast-assembling connection |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220408 |