CN216202175U - Water conservancy water and electricity construction is with surveying equipment - Google Patents

Water conservancy water and electricity construction is with surveying equipment Download PDF

Info

Publication number
CN216202175U
CN216202175U CN202122745713.9U CN202122745713U CN216202175U CN 216202175 U CN216202175 U CN 216202175U CN 202122745713 U CN202122745713 U CN 202122745713U CN 216202175 U CN216202175 U CN 216202175U
Authority
CN
China
Prior art keywords
plate
surveying
water conservancy
instrument body
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122745713.9U
Other languages
Chinese (zh)
Inventor
段朝华
吴中有
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Shenhui Water Conservancy And Hydropower Engineering Co ltd
Original Assignee
Yunnan Shenhui Water Conservancy And Hydropower Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Shenhui Water Conservancy And Hydropower Engineering Co ltd filed Critical Yunnan Shenhui Water Conservancy And Hydropower Engineering Co ltd
Priority to CN202122745713.9U priority Critical patent/CN216202175U/en
Application granted granted Critical
Publication of CN216202175U publication Critical patent/CN216202175U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Details Of Measuring And Other Instruments (AREA)

Abstract

The utility model provides surveying equipment for water conservancy and hydropower construction. The surveying equipment for water conservancy and hydropower construction comprises a surveying instrument body; the mounting table is arranged below the surveying instrument body, and an arc-shaped groove is formed in the top of the mounting table; the rotating shaft is rotatably arranged at the top of the mounting table; the rotating plate is fixedly arranged at the top end of the rotating shaft; the side plate is fixedly arranged at the top of the rotating plate, and one side of the rotating plate is provided with a mounting groove and a placing groove; the transparent plate is fixedly arranged at the top of the rotating plate; the vertical rod is hinged to the bottom of the mounting platform. The surveying equipment for water conservancy and hydropower construction provided by the utility model has the advantages of convenience in stable installation, convenience in lifting, positioning and adjustment and convenience in arm support.

Description

Water conservancy water and electricity construction is with surveying equipment
Technical Field
The utility model relates to the technical field of surveying, in particular to surveying equipment for water conservancy and hydropower construction.
Background
Surveying means surveying and surveying in the field before construction, and a surveying and mapping device is an important device in surveying.
After retrieval, the device for auxiliary mapping of urban three-dimensional terrain with the authorized notice number CN212226473U, which comprises a base, wherein the left side and the right side above the base are symmetrically provided with two support rods, the middle part of the front side of each support rod is provided with a plurality of positioning holes at equal intervals in a linear way, a moving component is arranged between the middle parts of the two support rods, two connecting plates are symmetrically arranged on two sides of the front end of the moving component, positioning components are arranged on the connecting plates, supports are arranged in the middle of the peripheral surface of the base, although the positioning assembly is arranged to be matched with the positioning hole arranged on the supporting rod, the surveying instrument can be effectively supported through the matching relation between the positioning column and the positioning hole, simultaneously also conveniently adjust the height of surveying instrument, the staff's of the work of convenient different heights use, improve surveying device's practicality, and then improve surveying device's work.
It can survey at the aquatic water electricity in-process, but in the use, user's arm is in the stiff state of holding, leads to user's arm to be stiff for a long time and holds too aching pain, brings inconvenience for the user, moreover to some relatively poor environment on ground when using, lead to equipment fixing unstable, influence the use of surveying instrument.
Therefore, there is a need for a new surveying device for water conservancy and hydropower construction to solve the above technical problems.
SUMMERY OF THE UTILITY MODEL
The utility model solves the technical problem of providing the surveying equipment for water conservancy and hydropower construction, which is convenient to stably install, lift, position and adjust and support arms.
In order to solve the technical problem, the surveying equipment for water conservancy and hydropower construction provided by the utility model comprises: a surveying instrument body; the mounting table is arranged below the surveying instrument body, and an arc-shaped groove is formed in the top of the mounting table; the rotating shaft is rotatably arranged at the top of the mounting table; the rotating plate is fixedly arranged at the top end of the rotating shaft; the side plate is fixedly arranged at the top of the rotating plate, and one side of the rotating plate is provided with a mounting groove and a placing groove; the transparent plate is fixedly arranged at the top of the rotating plate; the vertical rod is hinged to the bottom of the mounting table; the base is slidably mounted on the vertical rod, and four universal wheels are fixedly mounted at the bottom of the base; the two through holes are formed in the vertical rod; the limiting plate is slidably mounted in one of the through holes, the limiting plate is matched with the two through holes, and the top of the limiting plate is in contact with the bottom of the base; the two adjusting pipes are hinged and installed at the bottom of the installation platform; the two inserting rods are respectively installed in the two adjusting pipes in a sliding mode; the two positioning mechanisms are respectively arranged on the two adjusting pipes and the two inserting rods; the lifting mechanism is arranged on the side plate; and the rotating mechanism is arranged on the mounting table.
Preferably, positioning mechanism includes a plurality of constant head tanks, concave piece, spring and location angle pole, and is a plurality of the constant head tank is all seted up on the inserted bar, concave piece fixed mounting be in one side of control tube, spring fixed mounting be in on the inner wall of concave piece, location angle pole fixed mounting be in the one end of spring, the one end and a plurality of location angle pole the constant head tank looks adaptation.
Preferably, elevating system includes motor, screw rod, slider, slide bar and pilot lever, motor fixed mounting be in the standing groove on the curb plate, screw rod fixed mounting be in on the output shaft of motor, the screw rod is located in the mounting groove, the slider thread bush is established on the screw rod, one side of slider with one side fixed connection of surveying instrument body, slide bar fixed mounting be in one side of transparent plate, pilot lever slidable mounting be in on the slide bar, the pilot lever with surveying instrument body fixed connection.
Preferably, the rotating mechanism comprises two auxiliary blocks, two placing plates and two fixing pins, the two auxiliary blocks are respectively and fixedly installed on two sides of the installation table, the two placing plates are respectively and fixedly installed on the two auxiliary blocks, and the two fixing pins are respectively and slidably installed on the two placing plates.
Preferably, a plurality of fixed grooves are formed in the rotating plate, the fixed grooves are matched with the two fixed pins, two balls are fixedly nested at the bottom of the rotating plate, and the two balls are connected with the arc-shaped groove in a rolling mode.
Preferably, the transparent plate is provided with scale marks.
Compared with the related art, the surveying equipment for water conservancy and hydropower construction provided by the utility model has the following beneficial effects:
the utility model provides a surveying device for water conservancy and hydropower construction, which is convenient for mounting a surveying instrument body through a mounting table, a vertical rod, two adjusting pipes and two inserting rods, is convenient for adjusting the angle transparent plate of the surveying instrument body through a rotating shaft so as to facilitate the arrangement of scale marks, is convenient for moving the surveying instrument body through a base, is convenient for adjusting the base through two through holes and a limiting plate, is convenient for adjusting the vertical distance of the two adjusting pipes and the two inserting rods through two positioning mechanisms so as to adjust the unbalance of the mounting table, is further beneficial to the use of the subsequent surveying instrument body, is more stable in mounting, is convenient for adjusting the surveying instrument body at different heights through a lifting mechanism, is combined with the indication of the indicating rods on the scale marks so as to be convenient for recording data, is convenient for adjusting the surveying instrument body at different angles through a rotating mechanism so as to ensure that the surveying instrument body is more flexible in use, and combine two auxiliary blocks, two to place the assistance of board and two fixed pins, can more conveniently take user's arm to put two and place the aching pain that the board alleviateed user's arm, improve user's comfort, through the roll of two balls in the arc wall, be convenient for rotate in a flexible way, conveniently support, be convenient for highly mark the lift through the scale on the transparent plate.
Drawings
FIG. 1 is a schematic structural view of a preferred embodiment of the surveying apparatus for water conservancy and hydropower construction according to the present invention;
FIG. 2 is an enlarged schematic view of portion A shown in FIG. 1;
FIG. 3 is an enlarged schematic view of a portion B shown in FIG. 1;
FIG. 4 is an enlarged schematic view of a portion C shown in FIG. 1;
FIG. 5 is an enlarged schematic view of a portion D shown in FIG. 1;
fig. 6 is an enlarged schematic view of a portion E shown in fig. 1.
Reference numbers in the figures: 1. a surveying instrument body; 2. an installation table; 3. a rotating shaft; 4. a rotating plate; 5. a side plate; 6. a transparent plate; 7. a vertical rod; 8. a base; 9. a through hole; 10. a limiting plate; 11. an adjusting tube; 12. inserting a rod; 13. positioning a groove; 14. a concave block; 15. a spring; 16. positioning an angle bar; 17. a motor; 18. a screw; 19. a slider; 20. a slide bar; 21. an indication lever; 22. an auxiliary block; 23. placing the plate; 24. and fixing the pin.
Detailed Description
The utility model is further described with reference to the following figures and embodiments.
Referring to fig. 1-6, fig. 1 is a schematic structural diagram of a surveying apparatus for water conservancy and hydropower construction according to a preferred embodiment of the present invention; FIG. 2 is an enlarged schematic view of portion A shown in FIG. 1; FIG. 3 is an enlarged schematic view of a portion B shown in FIG. 1; FIG. 4 is an enlarged schematic view of a portion C shown in FIG. 1; FIG. 5 is an enlarged schematic view of a portion D shown in FIG. 1; fig. 6 is an enlarged schematic view of a portion E shown in fig. 1. Water conservancy water and electricity construction includes with surveying equipment: a surveying instrument body 1; the mounting table 2 is arranged below the surveying instrument body 1, and an arc-shaped groove is formed in the top of the mounting table 2; the rotating shaft 3 is rotatably arranged at the top of the mounting table 2; the rotating plate 4 is fixedly arranged at the top end of the rotating shaft 3; the side plate 5 is fixedly arranged at the top of the rotating plate 4, and one side of the rotating plate 4 is provided with a mounting groove and a placing groove; the transparent plate 6 is fixedly arranged at the top of the rotating plate 4; the vertical rod 7 is hinged to the bottom of the mounting table 2; the base 8 is slidably mounted on the vertical rod 7, and four universal wheels are fixedly mounted at the bottom of the base 8; the two through holes 9 are formed in the vertical rod 7; the limiting plate 10 is slidably installed in one of the through holes 9, the limiting plate 10 is matched with the two through holes 9, and the top of the limiting plate 10 is in contact with the bottom of the base 8; the two adjusting pipes 11 are hinged to the bottom of the mounting table 2; the two inserting rods 12 are respectively installed in the two adjusting pipes 11 in a sliding mode; the two positioning mechanisms are respectively arranged on the two adjusting pipes 11 and the two inserting rods 12; the lifting mechanism is arranged on the side plate 5; slewing mechanism, slewing mechanism sets up on the mount table 2, through mount table 2, montant 7, two regulating tubes 11 and two inserted bars 12 the surveying instrument body 1's of being convenient for installation, the angle transparent plate 6 of surveying instrument body 1 is convenient for adjust in pivot 3 is convenient for the setting of graduation mark, and the removal of the surveying instrument body 1 of being convenient for of base 8 is convenient, and two through-holes 9 and limiting plate 10 are convenient for the regulation of base 8.
Positioning mechanism includes a plurality of constant head tanks 13, concave piece 14, spring 15 and location angle pole 16, and is a plurality of constant head tank 13 is all seted up on the inserted bar 12, concave piece 14 fixed mounting be in one side of regulating tube 11, spring 15 fixed mounting be in on the inner wall of concave piece 14, location angle pole 16 fixed mounting be in the one end of spring 15, the one end and a plurality of location angle pole 16 constant head tank 13 looks adaptation is convenient for adjust the upper and lower distance of two regulating tubes 11 and two inserted bars 12 through two positioning mechanism to can adjust the unbalance of mount table 2, and then be favorable to follow-up mapping appearance body 1's use to provide conveniently, the installation is comparatively steady.
Elevating system includes motor 17, screw rod 18, slider 19, slide bar 20 and indicator lever 21, motor 17 fixed mounting is in the standing groove on the curb plate 5, screw rod 18 fixed mounting be in on motor 17's the output shaft, screw rod 18 is located in the mounting groove, 19 threaded sleeve of slider are established on the screw rod 18, one side of slider 19 with one side fixed connection of surveying instrument body 1, slide rod 20 fixed mounting be in one side of transparent plate 6, indicator lever 21 slidable mounting be in on the slide rod 20, indicator lever 21 with surveying instrument body 1 fixed connection is convenient for carry out the not regulation of co-altitude to surveying instrument body 1 through elevating system to combine indicator lever 21 to the instruction of scale mark, the record of the data of being convenient for.
Slewing mechanism includes two auxiliary blocks 22, two places board 23 and two fixed pins 24, two auxiliary block 22 fixed mounting respectively is in the both sides of mount table 2, two place board 23 fixed mounting respectively two on the auxiliary block 22, two fixed pin 24 slidable mounting respectively is two place on the board 23, be convenient for carry out the regulation of different angles to surveying instrument body 1 through slewing mechanism, make surveying instrument body 1 use comparatively nimble to combine two auxiliary blocks 22, two to place board 23 and two fixed pin 24's assistance, can more conveniently take user's arm to place two boards 23 of placing and alleviate the aching pain of user's arm, improve user's comfort.
A plurality of fixed slots have been seted up on the rotor plate 4, and is a plurality of the fixed slot all with two 24 looks adaptations of fixed pin, the bottom of rotor plate 4 is fixed nested has two balls, two the ball all with the arc wall roll connection, through the roll of two balls in the arc wall, the rotation of being convenient for is nimble, convenient support.
The transparent plate 6 is provided with scale marks, and the lifting height can be conveniently marked by the scale on the transparent plate 6.
The working principle of the surveying equipment for water conservancy and hydropower construction provided by the utility model is as follows:
when the device is used, the device is moved to a proper position through four universal wheels on the base 8, the vertical rod 7 is inserted into the ground, then the two positioning angle rods 16 are pulled, the two positioning angle rods 16 stretch the two springs 15 to enable the two inserting rods 12 to slide out of the two adjusting tubes 11, then the two positioning angle rods 16 are loosened, the two springs 15 automatically return and drive one ends of the two positioning angle rods 16 to be inserted into the two corresponding positioning grooves 13 to complete positioning, then the base 8 slides on the vertical rod 7, then the limiting plate 10 is inserted into the through hole 9 below, if one side of the mounting table 2 is uneven, the positioning grooves 13 on the two adjusting tubes 11 can be adjusted through the two positioning mechanisms, the vertical distance between the two adjusting tubes 11 and the two inserting rods 12 can be conveniently adjusted, so that the unbalance of the mounting table 2 can be adjusted, and the convenience is further provided for the use of the subsequent surveying instrument body 1, the installation is stable;
then starting the motor 17, driving the screw rod 18 to rotate by the motor 17, driving the sliding block 19 to lift by the screw rod 18, driving the surveying instrument body 1 to lift by the sliding block 19, simultaneously enabling the indicating rod 21 to slide on the sliding rod 20, after adjustment, enabling the indicating rod 21 to be marked on the corresponding scale mark, enabling the lifting mechanism to conveniently adjust the surveying instrument body 1 at different heights, and combining the indication of the indicating rod 21 to the scale mark to facilitate data recording;
finally, the rotating shaft 3 is rotated, the rotating shaft 3 drives the rotating plate 4 to rotate, the rotating plate 4 drives the surveying instrument body 1 to rotate to a proper angle, then, the two fixing pins 24 are pulled out from the two fixing grooves and rotated to proper positions, when the user uses the utility model, the double arms can be put on the two placing plates 23, but also can move, when the surveying instrument body 1 is not used, the two placing plates 23 are rotated, the two fixing pins 24 are inserted into the corresponding fixing grooves, thereby positioning the rotating angle of the rotating plate 4, facilitating the adjustment of different angles of the surveying instrument body 1 through the rotating mechanism, leading the surveying instrument body 1 to be more flexible in use, and in combination with the aid of two auxiliary blocks 22, two resting plates 23 and two fixing pins 24, the arms of the user can be more conveniently placed on the two placing plates 23, so that the aching pain of the arms of the user is relieved, and the comfort of the user is improved.
Compared with the related art, the surveying equipment for water conservancy and hydropower construction provided by the utility model has the following beneficial effects:
the utility model provides a surveying device for water conservancy and hydropower construction, which is convenient for installing a surveying instrument body 1 through an installation platform 2, a vertical rod 7, two adjusting pipes 11 and two inserting rods 12, is convenient for adjusting the angle transparent plate 6 of the surveying instrument body 1 through a rotating shaft 3, is convenient for arranging scale marks, is convenient for moving the surveying instrument body 1 through a base 8, is convenient for adjusting the base 8 through two through holes 9 and a limiting plate 10, is convenient for adjusting the vertical distance between the two adjusting pipes 11 and the two inserting rods 12 through two positioning mechanisms, can adjust the unbalance of the installation platform 2, is further beneficial to providing convenience for the use of the subsequent surveying instrument body 1, is relatively stable in installation, is convenient for adjusting the surveying instrument body 1 at different heights through a lifting mechanism, is convenient for recording data by combining the indication of the scale marks through an indicating rod 21, and is convenient for adjusting the surveying instrument body 1 at different angles through a rotating mechanism, make surveying instrument body 1 use comparatively nimble to combine two auxiliary blocks 22, two to place board 23 and two fixed pins 24 supplementary, can more conveniently take user's arm to place two and place the aching pain that board 23 alleviateed user's arm, improve user's comfort, through the roll of two balls in the arc wall, be convenient for rotate in a flexible way, conveniently support, be convenient for highly mark the lift through the scale on the transparent plate 6.
It should be noted that the device structure and the accompanying drawings of the present invention mainly describe the principle of the present invention, and in the technology of the design principle, the arrangement of the power mechanism, the power supply system, the control system, and the like of the device is not completely described, but on the premise that those skilled in the art understand the principle of the present invention, the details of the power mechanism, the power supply system, and the control system can be clearly known.
The above description is only an embodiment of the present invention, and not intended to limit the scope of the present invention, and all modifications of equivalent structures and equivalent processes, which are made by using the contents of the present specification and the accompanying drawings, or directly or indirectly applied to other related technical fields, are included in the scope of the present invention.

Claims (6)

1. A water conservancy water and electricity construction is with surveying equipment which characterized in that includes:
a surveying instrument body;
the mounting table is arranged below the surveying instrument body, and an arc-shaped groove is formed in the top of the mounting table;
the rotating shaft is rotatably arranged at the top of the mounting table;
the rotating plate is fixedly arranged at the top end of the rotating shaft;
the side plate is fixedly arranged at the top of the rotating plate, and one side of the rotating plate is provided with a mounting groove and a placing groove;
the transparent plate is fixedly arranged at the top of the rotating plate;
the vertical rod is hinged to the bottom of the mounting table;
the base is slidably mounted on the vertical rod, and four universal wheels are fixedly mounted at the bottom of the base;
the two through holes are formed in the vertical rod;
the limiting plate is slidably mounted in one of the through holes, the limiting plate is matched with the two through holes, and the top of the limiting plate is in contact with the bottom of the base;
the two adjusting pipes are hinged and installed at the bottom of the installation platform;
the two inserting rods are respectively installed in the two adjusting pipes in a sliding mode;
the two positioning mechanisms are respectively arranged on the two adjusting pipes and the two inserting rods;
the lifting mechanism is arranged on the side plate;
and the rotating mechanism is arranged on the mounting table.
2. The water conservancy and hydropower construction surveying equipment of claim 1, wherein the positioning mechanism comprises a plurality of positioning grooves, concave blocks, springs and positioning angle rods, the positioning grooves are all arranged on the inserted rods, the concave blocks are fixedly arranged on one sides of the adjusting pipes, the springs are fixedly arranged on the inner walls of the concave blocks, the positioning angle rods are fixedly arranged at one ends of the springs, and one ends of the positioning angle rods are matched with the positioning grooves.
3. The water conservancy water and electricity construction is with surveying equipment of claim 1, characterized in that, elevating system includes motor, screw rod, slider, slide bar and pilot lever, motor fixed mounting in the standing groove on the curb plate, screw rod fixed mounting in on the output shaft of motor, the screw rod is located in the mounting groove, slider thread bush is established on the screw rod, one side of slider with one side fixed connection of surveying instrument body, slide bar fixed mounting in one side of transparent plate, pilot lever slidable mounting in on the slide bar, the pilot lever with surveying instrument body fixed connection.
4. The surveying equipment for water conservancy and hydropower construction according to claim 1, wherein the rotating mechanism comprises two auxiliary blocks, two placing plates and two fixing pins, the two auxiliary blocks are respectively and fixedly installed on two sides of the installation platform, the two placing plates are respectively and fixedly installed on the two auxiliary blocks, and the two fixing pins are respectively and slidably installed on the two placing plates.
5. The water conservancy water and electricity construction is with surveying equipment of claim 4, characterized in that, seted up a plurality of fixed slots on the rotor plate, it is a plurality of the fixed slot all with two fixed pin looks adaptation, the fixed nestification in bottom of rotor plate has two balls, two the ball all with arc wall rolling connection.
6. The surveying equipment for water conservancy and hydropower construction according to claim 1, wherein the transparent plate is provided with scale marks.
CN202122745713.9U 2021-11-10 2021-11-10 Water conservancy water and electricity construction is with surveying equipment Active CN216202175U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122745713.9U CN216202175U (en) 2021-11-10 2021-11-10 Water conservancy water and electricity construction is with surveying equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122745713.9U CN216202175U (en) 2021-11-10 2021-11-10 Water conservancy water and electricity construction is with surveying equipment

Publications (1)

Publication Number Publication Date
CN216202175U true CN216202175U (en) 2022-04-05

Family

ID=80909071

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122745713.9U Active CN216202175U (en) 2021-11-10 2021-11-10 Water conservancy water and electricity construction is with surveying equipment

Country Status (1)

Country Link
CN (1) CN216202175U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115164051A (en) * 2022-07-06 2022-10-11 国网山东省电力公司莱阳市供电公司 Geographic information surveying and mapping tool for power grid planning
CN118564792A (en) * 2024-08-05 2024-08-30 山东省地质矿产勘查开发局第八地质大队(山东省第八地质矿产勘查院) Geological survey azimuth mapping instrument and mapping method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115164051A (en) * 2022-07-06 2022-10-11 国网山东省电力公司莱阳市供电公司 Geographic information surveying and mapping tool for power grid planning
CN118564792A (en) * 2024-08-05 2024-08-30 山东省地质矿产勘查开发局第八地质大队(山东省第八地质矿产勘查院) Geological survey azimuth mapping instrument and mapping method

Similar Documents

Publication Publication Date Title
CN216202175U (en) Water conservancy water and electricity construction is with surveying equipment
CN210757360U (en) Electromechanical positioning tool for electromechanical maintenance
CN216079095U (en) Outdoor land planning information acquisition device
CN214470945U (en) Measuring device for building intelligent engineering
CN110542007A (en) Mapping device for irrigation and water conservancy projects
CN212131911U (en) Measuring tool is used in installation of portable building machine electricity
CN221204489U (en) Drawing design table convenient to adjust inclination
CN221802902U (en) Level measurement auxiliary assembly
CN220851582U (en) Topography mapping equipment crane
CN117870494B (en) High-precision measuring device for rural planning and design
CN219177369U (en) Self-control instrument
CN221463302U (en) Can self-interacting angle's outdoor mapping equipment of engineering cost
CN221196873U (en) Tripod for portable measuring instrument
CN219473204U (en) Site mapping device
CN221402582U (en) Hydraulic intelligent surveying instrument with adjustable angle
CN217875049U (en) Level gauge placed on field uneven ground
CN220647547U (en) Measuring marker post fixing device
CN221630747U (en) Land survey and drawing marks positioner
CN217273163U (en) Supplementary mapping device of three-dimensional topography in city
CN219161308U (en) Positioning mapping table
CN219510441U (en) Marking device for building decoration design
CN221825068U (en) Portable mapping device of land management
CN221548188U (en) Surveying instrument survey and drawing support
CN220851557U (en) Engineering surveying instrument intelligent regulation device
CN221801108U (en) Novel surveying instrument rack

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant