High-efficient integration buries formula sewage treatment device Download PDFInfo
- Publication number
- CN216106443U CN216106443U CN202122204811.1U CN202122204811U CN216106443U CN 216106443 U CN216106443 U CN 216106443U CN 202122204811 U CN202122204811 U CN 202122204811U CN 216106443 U CN216106443 U CN 216106443U
- Authority
- CN
- China
- Prior art keywords
- fixedly arranged
- sludge
- disinfection
- pipe
- partition plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Treatment Of Sludge (AREA)
Abstract
The utility model discloses efficient integrated buried sewage treatment equipment which comprises a sludge discharge pump machine, wherein a sludge discharge pump pipe is fixedly arranged on one side of the sludge discharge pump machine, the output end of the sludge discharge pump machine is fixedly connected with a sludge suction port of the sludge discharge pump pipe, a through body sealing tank is fixedly arranged on one side of the sludge discharge pump pipe, a sludge through hole is formed in one side, close to the sludge suction port of the sludge discharge pump pipe, of the through body sealing tank, a settling box crushing pipe is fixedly arranged on one side of the through body sealing tank, a settling box filter disc is fixedly arranged on one side of the settling box crushing pipe, and a filter residue crushing mechanism is fixedly arranged on one side of the settling box filter disc. Has the advantages that: the sludge discharging pump machine buried underground can be used for pumping out the deposited sludge deposited between the whole body sealing tank and the sludge discharging partition plate from the sludge through hole through the sludge discharging pump pipe, manual cleaning is needed when later-stage use is avoided, cost is saved, and efficiency is improved.
Description
Technical Field
The utility model relates to the field of sewage treatment, in particular to a high-efficiency integrated buried sewage treatment device.
Background
With the rapid development of national economy in China, the requirement on domestic sewage treatment of houses, restaurants, hospitals, factories, mines, universities and the like is higher and higher. At present, domestic sewage treatment mainly comprises dispersed small septic tanks and buried combined sewage treatment equipment taking biological contact oxidation as a core besides centralized treatment of large sewage treatment plants, and has the characteristics of small influence on the environment, high land utilization rate, attractive appearance, process use and the like.
Conventional formula sewage treatment device that buries, because bury underground for a long time, the box surface causes the corruption easily, then can reduce the life of equipment, the inconvenient clearance of granule precipitate such as silt in the equipment, long-time also can block up equipment, and occupation space, and slow to sewage treatment effect, very easily cause various impurity to get into in the equipment, reach the load easily to subsequent processing facility, and sewage disinfection also can't reach the standard of going out water, consequently, need explore one kind and bury formula sewage treatment device and solve above problem.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide efficient and integrated buried sewage treatment equipment to solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme:
a high-efficiency integrated buried sewage treatment device comprises a sludge discharge pump machine, a sludge discharge pump pipe is fixedly arranged on one side of the sludge discharge pump machine, the output end of the sludge discharge pump machine is fixedly connected with a sludge suction port of the sludge discharge pump pipe, a through body seal tank is fixedly arranged on one side of the sludge discharge pump pipe, a sludge through hole is formed in one side, close to the sludge suction port of the sludge discharge pump pipe, of the through body seal tank, a settling box crushing pipe is fixedly arranged on one side of the through body seal tank, a settling box filter disc is fixedly arranged on one side of the settling box crushing pipe, a filter residue crushing mechanism is fixedly arranged on one side of the settling box filter disc, a sludge discharge partition plate is fixedly arranged on one side of the sludge discharge partition plate, two filter water through nets are fixedly arranged on one side of the filter water through net, a deodorization cavity, a disinfection cavity is fixedly arranged on one side of the deodorization cavity, a water purification cavity is fixedly arranged on one side of the disinfection cavity, and a deodorization cavity, The disinfection cavity and the purified water cavity are both arranged on the inner side of the whole sealed tank, and a purified water discharge mechanism is fixedly arranged on one side of the purified water cavity.
The sludge discharging pump machine buried underground can be used for pumping out the deposited sludge deposited between the whole body sealing tank and the sludge discharging partition plate from the sludge through hole through the sludge discharging pump pipe, manual cleaning is needed when later-stage use is avoided, cost is saved, and efficiency is improved. In addition at first utilize the setting tank filter disc to carry out prefiltration on the whole, then utilize the further granule of impurity in rubbing crusher constructs with the sewage to smash and come to deposit the layering, then the processing water of preliminary layering enters into in proper order and removes flavor chamber, disinfection chamber, purifies the water chamber and removes flavor, disinfection, the discharge of the last rethread water purification discharge mechanism of stewing. The whole process from sewage entering to pure water discharge is divided into chambers and divided into flow paths for operation, so that the device has higher integration level, the device realizes the integrated treatment of sewage, and the comprehensive performance is enhanced.
Furthermore, rubbing crusher constructs including tertiary crushing flabellum, and tertiary crushing flabellum one side is fixed to be equipped with crushing motor, and the fixed foundation of motor that is equipped with in crushing motor one side.
The motor is fixed through the motor fixing bottom column, the motor is fixed firmly, the high-speed rotary motion of the three-level crushing fan blades is driven by the rotation of the crushing motor, the tissues entering the equipment are further crushed through the three-level crushing fan blades layer by layer, the pumping operation of a later stage pump can be simpler, the blockage is not easy, the service cycle of the equipment is longer, and the equipment is more durable.
Further, remove the flavor cavity including removing the flavor baffle, remove the fixed three electrolysis stick that is equipped with in flavor baffle one side, electrolysis stick one side is fixed to be equipped with removes the flavor mount, removes the fixed flavor that is equipped with in flavor mount one side and clears up the case, removes the flavor and clears up the fixed deodorant conveyer pipe that is equipped with in case one side, and the fixed flavor release pipe of arranging that is equipped with in deodorant conveyer pipe one side, and the one side of removing the flavor baffle and keeping away from the electrolysis stick is equipped with the limbers.
The electrolysis deodorization is carried out to the processing water that enters into the chamber of removing the flavor through the net is led to through straining water from blowdown mud baffle through utilizing the electrolysis stick, cooperates again to remove the flavor and clears up the pungent smell of incasement and can play the absorption and remove the effect to sewage, carries out final smell of inhaling through the active carbon that arranges in the odor discharge release pipe at last and handles and then discharge to the above-ground sky. The deodorant delivery pipe is arranged, so that the deodorant inside the device can be directly added to the device from the ground without being disassembled by adding the deodorant into the delivery pipe. The operation of adding the odor removing agent in the later maintenance of the equipment can be simpler and easier.
Further, the disinfection cavity includes the disinfection baffle, and disinfection baffle one side is equipped with the disinfect box, and disinfection support is fixed to be equipped with in disinfect box one side, and disinfection support one side is equipped with the support that disinfects, and the fixed case that disinfects that is equipped with in support one side of disinfecting, and the disinfection support all fixes on removing the flavor baffle with the support that disinfects, and the one side that the disinfection baffle is close to the case that disinfects is equipped with the limbers.
The disinfection and sterilization operation is carried out on the treated water entering from the limber hole of the smell removal partition plate by utilizing the disinfection materials in the disinfection box and the sterilization materials in the disinfection box, and the whole disinfection chamber is sealed isolated air so that the disinfection and sterilization effect of the equipment on the water is further strengthened.
Furthermore, the purified water discharge mechanism comprises a purified water outlet pump pipe, and a purified water pump is fixedly arranged on one side of the purified water outlet pump pipe.
Through utilizing the water purification pump machine to obtain the purified water behind the sewage through handling and discharging subaerial via water purification play water pump line, avoided because of long-time retaining and to the volumetric requirement of equipment retaining, can make equipment can in time discharge the purified water, save the equipment space more.
Furthermore, the water purifying cavity comprises a water purifying partition plate, and a water through hole is formed in one side, close to the water inlet of the water purifying outlet pump pipe, of the water purifying partition plate.
Through the standing and storing operation of the purified water chamber on the treated water entering through the limber hole of the disinfection partition plate, the purified water can be smoothly discharged through the purified water discharge mechanism after being stored for a short time in a standing way by matching with the limber hole formed in the purified water partition plate. The sewage treatment capacity range of the equipment can be adjusted, the accurate operation is facilitated, and the efficiency is higher.
Compared with the prior art, the utility model has the following beneficial effects:
(1) the sediment sludge deposited between the whole body sealing tank and the sewage sludge baffle plate can be pumped out from the sludge through hole through the sludge discharge pump pipe by utilizing the sludge discharge pump machine buried underground, so that the later-stage use is avoided, the cost is saved, and the efficiency is improved.
(2) The whole process of the device is that sewage enters into the purified water discharge chamber and is divided into the chambers for flow division operation, so that the integration level of the device is higher, the device realizes the integrated treatment of sewage, and the comprehensive performance is strengthened.
(3) The motor is fixed through the motor fixing bottom column, the motor is fixed firmly, the high-speed rotary motion of the three-level crushing fan blades is driven by the rotation of the crushing motor, the tissues entering the equipment are further crushed through the three-level crushing fan blades layer by layer, the pumping operation of a later stage pump can be simpler, the blockage is not easy, the service cycle of the equipment is longer, and the equipment is more durable.
(4) The deodorant conveying pipe is arranged, so that the deodorant inside the device can be directly added to the device from the ground without being disassembled by adding the deodorant into the conveying pipe. The operation of adding the odor removing agent in the later maintenance of the equipment can be simpler and easier.
(5) The disinfection operation is carried out on the treated water entering from the limbers of the smell removal partition plate by utilizing the disinfection materials in the disinfection box and the sterilization materials in the disinfection box, and the whole disinfection chamber is sealed isolated air so that the disinfection and sterilization effect of the equipment on the water is further strengthened.
(6) The sewage is treated by the water purifying pump machine and then purified water is discharged to the ground through the water purifying water outlet pump pipe, the requirement for the water storage volume of the equipment due to long-time water storage is avoided, the equipment can discharge the purified water in time, and the equipment space is saved more.
(7) Through the standing and storing operation of the purified water chamber on the treated water entering through the limber hole of the disinfection partition plate, the purified water can be smoothly discharged through the purified water discharge mechanism after being stored for a short time in a standing way by matching with the limber hole formed in the purified water partition plate. The sewage treatment capacity range of the equipment can be adjusted, the accurate operation is facilitated, and the efficiency is higher.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings without creative efforts.
FIG. 1 is a schematic structural diagram of a box body of a high-efficiency integrated buried sewage treatment device according to an embodiment of the utility model;
FIG. 2 is a schematic diagram of the internal structure of a high-efficiency integrated buried sewage treatment device according to an embodiment of the utility model;
FIG. 3 is a schematic structural diagram of an odor elimination chamber of a highly efficient integrated underground sewage treatment device according to an embodiment of the utility model;
fig. 4 is a schematic structural diagram of a purified water discharge mechanism of a high-efficiency integrated buried sewage treatment device according to an embodiment of the utility model.
Reference numerals:
1. the whole body is sealed; 2. a sludge discharge pump machine; 3. a sludge discharge pump pipe; 4. a filter disc of the settling tank; 5. a settling tank crushing pipe; 6. three-stage crushing fan blades; 7. a grinding motor; 8. the motor fixes the bottom pillar; 9. a mud hole is formed; 10. a sludge discharge partition plate; 11. filtering water and passing through a net; 12. a deodorizing fixing frame; 13. a deodorizing and digesting box; 14. a deodorant delivery pipe; 15. a smell discharge and release pipe; 16. an electrolytic rod; 17. a deodorizing partition plate; 18. sterilizing the bracket; 19. a sterilization box; 20. sterilizing the stent; 21. a sterilizing box; 22. sterilizing the partition board; 23. a purified water partition plate; 24. a purified water outlet pump pipe; 25. a water purification pump; 26. a water hole.
Detailed Description
The following, with reference to the drawings and the detailed description, further description of the present invention is made:
a high-efficiency integrated buried sewage treatment device comprises a sludge discharge pump machine 2, a sludge discharge pump pipe 3 is fixedly arranged on one side of the sludge discharge pump machine 2, the output end of the sludge discharge pump machine 2 is fixedly connected with a sludge suction port of the sludge discharge pump pipe 3, a whole body seal tank 1 is fixedly arranged on one side of the sludge discharge pump pipe 3, a sludge through hole 9 is formed in one side of the whole body seal tank 1 close to the sludge suction port of the sludge discharge pump pipe 3, a settling box crushing pipe 5 is fixedly arranged on one side of the whole body seal tank 1, a settling box filter disc 4 is fixedly arranged on one side of the settling box crushing pipe 5, a residue crushing mechanism is fixedly arranged on one side of the settling box filter disc 4, a sludge discharge partition plate 10 is fixedly arranged on one side of the sludge discharge partition plate 10 close to the crushing mechanism, two water filtering through nets 11 are fixedly arranged on one side of the water filtering through nets 11, a deodorizing chamber is fixedly arranged on one side of the deodorizing chamber, a disinfecting chamber is fixedly arranged on one side of the disinfecting chamber, a purified water chamber is fixedly arranged on one side of the disinfecting chamber, and the smell removing chamber, the disinfecting chamber and the water purifying chamber are all arranged on the inner side of the whole sealing tank 1, and a purified water discharging mechanism is fixedly arranged on one side of the water purifying chamber.
The sludge discharging pump machine 2 buried underground can be used for pumping out the deposited sludge deposited between the whole body sealing tank 1 and the sludge discharging partition plate 10 from the sludge through hole 9 through the sludge discharging pump pipe 3, manual cleaning is needed when later-stage use is avoided, cost is saved, and efficiency is improved. In addition at first utilize precipitation case filter disc 4 to carry out prefiltration on the whole, then utilize the further granule of impurity in rubbing crusher constructs with the sewage to smash and come to deposit the layering, then the processing water of preliminary layering enters into in proper order and removes flavor chamber, disinfection chamber, purifies the water chamber and removes flavor, disinfection, the discharge of the last rethread water purification discharge mechanism of stewing. The whole process from sewage entering to pure water discharge is divided into chambers and divided into flow paths for operation, so that the device has higher integration level, the device realizes the integrated treatment of sewage, and the comprehensive performance is enhanced.
Further, rubbing crusher constructs including tertiary crushing flabellum 6, and the fixed crushing motor 7 that is equipped with in tertiary crushing flabellum 6 one side smashes, and the fixed motor of being equipped with in crushing motor 7 one side is fixed 8.
The motor 7 is fixed firmly through the motor fixing bottom column 8, the motor 7 is rotated to drive the three-level crushing fan blade 6 to rotate at high speed, the three-level crushing fan blade 6 is further crushed by the tissue entering the equipment layer by layer, the later-stage pumping operation is simpler, the blockage is not easy, the service cycle of the equipment is longer, and the equipment is more durable.
Further, remove the flavor cavity and including removing the flavor baffle 17, remove the fixed three electrolysis stick 16 that is equipped with in flavor baffle 17 one side, electrolysis stick 16 one side is fixed to be equipped with removes flavor mount 12, remove the fixed flavor that is equipped with in flavor mount 12 one side and remove case 13, remove the fixed deodorant conveyer pipe 14 that is equipped with in flavor remove case 13 one side, deodorant conveyer pipe 14 one side is fixed to be equipped with arranges flavor release pipe 15, and the one side of removing the flavor baffle 17 and keeping away from electrolysis stick 16 is equipped with limbers 26.
The treated water entering the odor removing chamber from the sewage sludge partition plate 10 through the water filtering through net 11 is electrolyzed and odor removed by the electrolytic rod 16, then the odor removing agent in the odor removing digestion box 13 is matched to absorb and remove the pungent odor of the sewage, and finally the final odor absorbing treatment is carried out through the activated carbon arranged in the odor removing release pipe 15 and then the treated water is discharged to the ground. The provision of the deodorant delivery tube 14 allows the device to be filled with deodorant from the ground directly without disassembly by adding the deodorant to the interior of the tube. The operation of adding the odor removing agent in the later maintenance of the equipment can be simpler and easier.
Further, the disinfection cavity includes disinfection baffle 22, and disinfection baffle 22 one side is equipped with disinfect box 21, and disinfection 21 one side is fixed to be equipped with disinfection support 20, and disinfection support 20 one side is equipped with sterilization support 18, and the fixed case 19 that disinfects that is equipped with in 18 one side of sterilization support, and disinfection support 20 and sterilization support 18 all fix on removing the flavor baffle 17, and one side that disinfection baffle 22 is close to sterilization case 19 is equipped with limbers 26.
The sterilizing effect of the apparatus on water is further enhanced by sterilizing the treated water entering from the water passage hole 26 of the partition 17 for removing odor by using the sterilizing material in the sterilizing compartment 21 and the sterilizing material in the sterilizing compartment 19, together with the whole sterilizing compartment being hermetically sealed from air.
Further, the purified water discharge mechanism comprises a purified water outlet pump pipe 24, and a purified water pump 25 is fixedly arranged on one side of the purified water outlet pump pipe 24.
The purified water obtained after the sewage is treated by the water purifying pump machine 25 is discharged to the ground through the water purifying water outlet pump pipe 24, so that the requirement on the water storage volume of the equipment due to long-time water storage is avoided, the equipment can discharge the purified water in time, and the equipment space is saved more.
Further, the purified water chamber comprises a purified water partition plate 23, and a water through hole 26 is formed in one side of the purified water partition plate 23, which is close to the water inlet of the purified water outlet pump pipe 24.
Through the standing and storing operation of the purified water chamber on the treated water entering through the limber holes 26 of the disinfection clapboard 22, the purified water can be smoothly discharged through the purified water discharging mechanism after being temporarily kept standing and stored by matching with the limber holes 26 arranged on the purified water clapboard 23. The sewage treatment capacity range of the equipment can be adjusted, the accurate operation is facilitated, and the efficiency is higher.
For the convenience of understanding the technical solutions of the present invention, the following detailed description will be made on the working principle or the operation mode of the present invention in the practical process.
In practical application, the sludge discharging pump machine 2 buried underground can be used for pumping out the deposited sludge deposited between the whole sealing tank 1 and the sludge discharging partition plate 10 from the sludge through hole 9 through the sludge discharging pump pipe 3, manual cleaning is needed when later-stage use is avoided, cost is saved, and efficiency is improved. In addition at first utilize precipitation case filter disc 4 to carry out prefiltration on the whole, then utilize the further granule of impurity in rubbing crusher constructs with the sewage to smash and come to deposit the layering, then the processing water of preliminary layering enters into in proper order and removes flavor chamber, disinfection chamber, purifies the water chamber and removes flavor, disinfection, the discharge of the last rethread water purification discharge mechanism of stewing. The whole process from sewage entering to pure water discharge is divided into chambers and divided into flow paths for operation, so that the device has higher integration level, the device realizes the integrated treatment of sewage, and the comprehensive performance is enhanced.
The motor 7 is fixed firmly through the motor fixing bottom column 8, the motor 7 is rotated to drive the three-level crushing fan blade 6 to rotate at high speed, the three-level crushing fan blade 6 is further crushed by the tissue entering the equipment layer by layer, the later-stage pumping operation is simpler, the blockage is not easy, the service cycle of the equipment is longer, and the equipment is more durable.
The treated water entering the odor removing chamber from the sewage sludge partition plate 10 through the water filtering through net 11 is electrolyzed and odor removed by the electrolytic rod 16, then the odor removing agent in the odor removing digestion box 13 is matched to absorb and remove the pungent odor of the sewage, and finally the final odor absorbing treatment is carried out through the activated carbon arranged in the odor removing release pipe 15 and then the treated water is discharged to the ground. The provision of the deodorant delivery tube 14 allows the device to be filled with deodorant from the ground directly without disassembly by adding the deodorant to the interior of the tube. The operation of adding the odor removing agent in the later maintenance of the equipment can be simpler and easier.
The sterilizing effect of the apparatus on water is further enhanced by sterilizing the treated water entering from the water passage hole 26 of the partition 17 for removing odor by using the sterilizing material in the sterilizing compartment 21 and the sterilizing material in the sterilizing compartment 19, together with the whole sterilizing compartment being hermetically sealed from air.
The purified water obtained after the sewage is treated by the water purifying pump machine 25 is discharged to the ground through the water purifying water outlet pump pipe 24, so that the requirement on the water storage volume of the equipment due to long-time water storage is avoided, the equipment can discharge the purified water in time, and the equipment space is saved more.
Through the standing and storing operation of the purified water chamber on the treated water entering through the limber holes 26 of the disinfection clapboard 22, the purified water can be smoothly discharged through the purified water discharging mechanism after being temporarily kept standing and stored by matching with the limber holes 26 arranged on the purified water clapboard 23. The sewage treatment capacity range of the equipment can be adjusted, the accurate operation is facilitated, and the efficiency is higher.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The efficient integrated buried sewage treatment equipment is characterized by comprising a sludge discharge pump machine (2), wherein a sludge discharge pump pipe (3) is fixedly arranged on one side of the sludge discharge pump machine (2), the output end of the sludge discharge pump machine (2) is fixedly connected with a sludge suction port of the sludge discharge pump pipe (3), a through body seal tank (1) is fixedly arranged on one side of the sludge discharge pump pipe (3), a sludge through hole (9) is formed in one side, close to the sludge suction port of the sludge discharge pump pipe (3), of the through body seal tank (1), a settling box crushing pipe (5) is fixedly arranged on one side of the through body seal tank (1), a settling box filter disc (4) is fixedly arranged on one side of the settling box crushing pipe (5), a filter residue crushing mechanism is fixedly arranged on one side of the settling box filter disc (4), a sewage discharge sludge partition plate (10) is fixedly arranged on one side of the crushing mechanism, and fixed two drainage that are equipped with of one side that is close to rubbing crusher constructs of blowdown mud baffle (10) leads to net (11), drainage leads to net (11) one side and is fixed to be equipped with and removes the flavor cavity, remove the fixed disinfection cavity that is equipped with in flavor cavity one side, the fixed water purification cavity that is equipped with in disinfection cavity one side, just remove flavor cavity, disinfection cavity, water purification cavity and all be in lead to body seal pot (1) inboard, water purification cavity one side is fixed and is equipped with water purification discharge mechanism.
2. The efficient integrated buried sewage treatment equipment according to claim 1, wherein the crushing mechanism comprises three-level crushing blades (6), a crushing motor (7) is fixedly arranged on one side of the three-level crushing blades (6), and a motor fixing bottom column (8) is fixedly arranged on one side of the crushing motor (7).
3. The efficient integrated buried sewage treatment equipment as claimed in claim 1, wherein the odor removal chamber comprises an odor removal partition plate (17), three electrolysis rods (16) are fixedly arranged on one side of the odor removal partition plate (17), an odor removal fixing frame (12) is fixedly arranged on one side of the electrolysis rods (16), an odor removal digestion box (13) is fixedly arranged on one side of the odor removal fixing frame (12), an odor removal conveying pipe (14) is fixedly arranged on one side of the odor removal digestion box (13), an odor discharge and release pipe (15) is fixedly arranged on one side of the odor removal conveying pipe (14), and a water through hole (26) is formed in one side of the odor removal partition plate (17) far away from the electrolysis rods (16).
4. The efficient integrated buried sewage treatment equipment according to claim 3, wherein the disinfection chamber comprises a disinfection partition plate (22), a disinfection box (21) is arranged on one side of the disinfection partition plate (22), a disinfection support (20) is fixedly arranged on one side of the disinfection box (21), a sterilization support (18) is arranged on one side of the disinfection support (20), a sterilization box (19) is fixedly arranged on one side of the sterilization support (18), the disinfection support (20) and the sterilization support (18) are both fixed on the odor removal partition plate (17), and a water through hole (26) is arranged on one side, close to the sterilization box (19), of the disinfection partition plate (22).
5. The efficient integrated buried sewage treatment equipment according to claim 1, wherein the purified water discharge mechanism comprises a purified water outlet pump pipe (24), and a purified water pump (25) is fixedly arranged on one side of the purified water outlet pump pipe (24).
6. The efficient and integrated buried sewage treatment equipment according to claim 5, wherein the purified water chamber comprises a purified water partition plate (23), and a water through hole (26) is arranged on one side of the purified water partition plate (23) close to the water inlet of the purified water outlet pump pipe (24).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122204811.1U CN216106443U (en) | 2021-09-13 | 2021-09-13 | High-efficient integration buries formula sewage treatment device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122204811.1U CN216106443U (en) | 2021-09-13 | 2021-09-13 | High-efficient integration buries formula sewage treatment device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216106443U true CN216106443U (en) | 2022-03-22 |
Family
ID=80732897
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122204811.1U Active CN216106443U (en) | 2021-09-13 | 2021-09-13 | High-efficient integration buries formula sewage treatment device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216106443U (en) |
-
2021
- 2021-09-13 CN CN202122204811.1U patent/CN216106443U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210457778U (en) | Sewage treatment device capable of reducing odor emission | |
CN110104841A (en) | A kind of hospital falls environmentally friendly water purification pot with centrifugation diffusion is vertical | |
CN216106443U (en) | High-efficient integration buries formula sewage treatment device | |
CN213652227U (en) | Domestic sewage treatment is with high-efficient deodorant environmental protection septic tank | |
CN211497264U (en) | Purification tank for sewage treatment | |
CN211932131U (en) | Micropterus salmoides industrial aquaculture circulating water system | |
CN219010070U (en) | Sewage treatment device provided with multistage filtering mechanism and used for pig farm | |
CN208949086U (en) | A kind of small towns single household compact sewage treatment equipment | |
CN208440417U (en) | A kind of municipal wastewater processing unit | |
CN215559752U (en) | Energy-saving environment-friendly water purifying device for tap water plant | |
CN207243644U (en) | A kind of municipal works sewage-treatment plant | |
CN216837473U (en) | Environmental engineering sewage treatment plant | |
CN210287066U (en) | Sewage treatment system | |
CN213038474U (en) | Afforestation rainwater collection device | |
CN205884415U (en) | Closed fish pond circulation clean system | |
CN210945183U (en) | Energy-concerving and environment-protective type domestic sewage special treatment device | |
CN212315860U (en) | Buried sewage treatment equipment | |
CN216377785U (en) | Chemical spices production tail end sewage treatment pond | |
CN217418413U (en) | Disinfecting equipment for sewage treatment | |
CN214531046U (en) | Intelligent tank-pump integrated pump station | |
CN219507725U (en) | Multistage sewage filtering device | |
CN221522194U (en) | Sewage deodorization device | |
CN113501601A (en) | Rural domestic sewage treatment and purification device and use method thereof | |
CN213771749U (en) | Energy-concerving and environment-protective sewage treatment plant | |
CN218811111U (en) | Green energy-conserving building in wisdom city |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |