CN215798201U - High-low voltage power distribution cabinet installation and debugging equipment for electric power construction - Google Patents

High-low voltage power distribution cabinet installation and debugging equipment for electric power construction Download PDF

Info

Publication number
CN215798201U
CN215798201U CN202122148277.7U CN202122148277U CN215798201U CN 215798201 U CN215798201 U CN 215798201U CN 202122148277 U CN202122148277 U CN 202122148277U CN 215798201 U CN215798201 U CN 215798201U
Authority
CN
China
Prior art keywords
distribution cabinet
power distribution
low voltage
sides
wire rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122148277.7U
Other languages
Chinese (zh)
Inventor
莫申环
张林永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Shenghua Power Engineering Co ltd
Original Assignee
Anhui Shenghua Power Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Shenghua Power Engineering Co ltd filed Critical Anhui Shenghua Power Engineering Co ltd
Priority to CN202122148277.7U priority Critical patent/CN215798201U/en
Application granted granted Critical
Publication of CN215798201U publication Critical patent/CN215798201U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Distribution Board (AREA)

Abstract

The application relates to high-low voltage power distribution cabinet installation and debugging equipment for power construction, which comprises a base, support guide rods and a top plate, wherein the support guide rods are fixedly installed on two sides of the top of the base; through setting up winder, rolling wheel, wire rope and elevating platform, consequently the winder work drives the rolling wheel of pivot and one end and begins the rolling wire rope, consequently drives the elevating platform and rises to the height that the switch board need be installed along supporting the guide arm under the wire rope rolling, then loosens splint and installs the switch board on installation mechanism, makes that it can be light convenient send the switch board to appointed height, fixed back alright remove simple to use convenience with removing the switch board.

Description

High-low voltage power distribution cabinet installation and debugging equipment for electric power construction
Technical Field
The application relates to the technical field of power distribution cabinet installation, in particular to high-low voltage power distribution cabinet installation and debugging equipment for power construction.
Background
The distribution cabinet (case) is a final-stage device of a distribution system and is divided into a power distribution cabinet (case), a lighting distribution cabinet (case) and a metering cabinet (case). The power distribution cabinet is a general name of a motor control center. The power distribution cabinet is used in the occasions with dispersed loads and less loops; the motor control center is used for occasions with concentrated loads and more loops. The power distribution cabinet distributes the electric energy of a certain circuit of the upper-level power distribution equipment to the nearby load, the equipment provides protection, monitoring and control for the load, and the installation position of the power distribution cabinet can be different according to different environments when the power distribution cabinet is installed.
However, when the existing power distribution cabinet is installed, the installation position is high, and the power distribution cabinet is inconvenient to lift to a high position manually. Therefore, the technical personnel in the field provide a high-low voltage power distribution cabinet installation and debugging device for power construction, so as to solve the problems in the background technology.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem provided in the background art, the application provides a high-low voltage power distribution cabinet installation and debugging device for power construction.
The application provides a pair of high-low voltage power distribution cabinet installation and debugging equipment for electric power construction adopts following technical scheme:
the utility model provides an electric power construction is with high-low voltage distribution cabinet installation and debugging equipment, includes base, support guide arm and roof, the equal fixed mounting in top both sides of base has the support guide arm, the top fixed mounting who supports the guide arm has the roof, the top movable mounting elevating platform of base, and the both sides that the guide arm activity runs through the elevating platform, the top fixed mounting of roof has quick-witted case, the inner chamber fixed mounting of machine case has the winder, the equal fixed mounting in both ends of winder has the pivot, the rolling wheel is installed to the one end of pivot, the outside winding of rolling wheel has wire rope, the wire rope bottom is connected with the elevating platform.
Through adopting above-mentioned technical scheme, through setting up winder, rolling wheel, wire rope and elevating platform, consequently the winder work drives the rolling wheel of pivot and one end and begins the rolling wire rope, consequently drives the elevating platform and rises to the height that the switch board need be installed along supporting guide arm under the wire rope rolling, then unclamps splint and install the switch board on installation mechanism, makes it can be light convenient send the switch board to appointed height, fixed back alright remove simple to use convenience with removing the switch board.
Preferably, the top both sides of elevating platform all fixedly connected with mounting bracket, the inboard of mounting bracket runs through the activity and runs through the grafting threaded rod, the one end fixedly connected with splint of threaded rod.
Through adopting above-mentioned technical scheme, setting up of threaded rod and splint makes it carry out the centre gripping to the switch board that goes up and down, improves the security.
Preferably, the top both sides of roof all fixed mounting have the installation end plate, and the both ends of pivot are passed through the bearing frame and are installed in one side of installation end plate.
Through adopting above-mentioned technical scheme, the installation end plate is used for the installation of pivot to be fixed.
Preferably, the two sides of the top of the lifting platform are fixedly provided with hanging rings, and the bottom end of the steel wire rope is fixedly connected with the lifting platform through the hanging rings.
By adopting the technical scheme, the hanging ring facilitates the fixed connection of the steel wire rope and the lifting platform.
Preferably, the movable grooves are fixedly arranged in the two sides of the top plate in a penetrating mode, and the steel wire rope movably penetrates through the inner cavities of the movable grooves.
Through adopting above-mentioned technical scheme, the activity groove is used for running through of wire rope, makes things convenient for the wire rope activity.
To sum up, the application comprises the following beneficial technical effects:
through setting up winder, rolling wheel, wire rope and elevating platform, consequently the winder work drives the rolling wheel of pivot and one end and begins the rolling wire rope, consequently drives the elevating platform and rises to the height that the switch board need be installed along supporting the guide arm under the wire rope rolling, then loosens splint and installs the switch board on installation mechanism, makes that it can be light convenient send the switch board to appointed height, fixed back alright remove simple to use convenience with removing the switch board.
Drawings
Fig. 1 is a schematic overall structure diagram of a high-low voltage power distribution cabinet installation and debugging device for power construction in an embodiment of the present application;
fig. 2 is a schematic side view of a high-low voltage power distribution cabinet installation and debugging device for power construction in the embodiment of the present application.
Description of reference numerals: 1. a base; 2. a support guide rod; 3. a top plate; 4. a lifting platform; 5. a chassis; 6. a winder; 7. a rotating shaft; 8. a winding wheel; 9. a wire rope; 10. mounting an end plate; 11. a mounting frame; 12. a threaded rod; 13. a splint; 14. hanging a ring; 15. a movable groove.
Detailed Description
The present application is described in further detail below with reference to figures 1-2.
The embodiment of the application discloses high-low voltage power distribution cabinet installation and debugging equipment for power construction. Referring to fig. 1-2, a high-low voltage power distribution cabinet installation and debugging device for power construction comprises a base 1, support guide rods 2 and a top plate 3, wherein the support guide rods 2 are fixedly installed on both sides of the top of the base 1, the top of the support guide rods 2 is fixedly installed with the top plate 3, an elevating platform 4 is movably installed on the top of the base 1, the support guide rods 2 movably penetrate through both sides of the elevating platform 4, mounting frames 11 are fixedly connected on both sides of the top of the elevating platform 4, threaded rods 12 are movably inserted through the inner sides of the mounting frames 11, one ends of the threaded rods 12 are fixedly connected with clamping plates 13, the threaded rods 12 and the clamping plates 13 are arranged to clamp a lifting power distribution cabinet, so as to improve safety, a cabinet 5 is fixedly installed on the top of the top plate 3, a winder 6 is fixedly installed in an inner cavity of the cabinet 5, rotating shafts 7 are fixedly installed on both ends of the winder 6, and mounting end plates 10 are fixedly installed on both sides of the top plate 3, two ends of a rotating shaft 7 are arranged on one side of an installation end plate 10 through bearing seats, the installation end plate 10 is used for installing and fixing the rotating shaft 7, one end of the rotating shaft 7 is provided with a winding wheel 8, the outer side of the winding wheel 8 is wound with a steel wire rope 9, two sides of the top of the lifting platform 4 are both fixedly provided with hanging rings 14, the bottom end of the steel wire rope 9 is fixedly connected with the lifting platform 4 through the hanging rings 14, the hanging rings 14 are convenient for the steel wire rope 9 to be fixedly connected with the lifting platform 4, the bottom end of the steel wire rope 9 is connected with the lifting platform 4, two sides of the top plate 3 are both fixedly penetrated with movable grooves 15, the steel wire rope 9 movably penetrates through the inner cavity of the movable grooves 15, the movable grooves 15 are used for the penetration of the steel wire rope 9 and are convenient for the movement of the steel wire rope 9, and the winding wheel 7 and the winding wheel 8 at one end start to wind the steel wire rope 9 through the arrangement of a winder 6, the winder 8, therefore, the steel wire rope 9 is wound to drive the lifting platform 4 to ascend to the height required to be installed by the power distribution cabinet along the supporting guide rod 2, then the power distribution cabinet is installed on the installation mechanism by loosening the clamping plate 13, the power distribution cabinet can be easily and conveniently conveyed to the specified height, and the power distribution cabinet can be moved away after being fixed, so that the use is simple and convenient.
The implementation principle of the installation and debugging equipment of the high-low voltage power distribution cabinet for power construction is as follows: during installation, the power distribution cabinet is placed on the surface of the lifting platform 4, then the clamping plates 13 at one end of the power distribution cabinet are clamped on two sides of the lifting platform 4 for fixed clamping through rotating the threaded rod 12, the fixed winder 6 works to drive the rotating shaft 7 and the winding wheel 8 at one end to start winding the steel wire rope 9, so that the steel wire rope 9 is wound to drive the lifting platform 4 to ascend to the height of the power distribution cabinet to be installed along the supporting guide rod 2, and then the clamping plates 13 are loosened to install the power distribution cabinet on the installation mechanism; through setting up coiler 6, wind-up pulley 8, wire rope 9 and elevating platform 4, make that it can be light convenient deliver to appointed height with the switch board, the switch board fixed back alright with removing, convenience simple to use, threaded rod 12 and splint 13 set up and make it carry out the centre gripping to the switch board that goes up and down, improve the security.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (5)

1. The utility model provides an electric power construction is with high-low voltage distribution cabinet installation and debugging equipment, includes base (1), support guide arm (2) and roof (3), the equal fixed mounting in top both sides of base (1) has support guide arm (2), the top fixed mounting who supports guide arm (2) has roof (3), its characterized in that: the top movable mounting elevating platform (4) of base (1), and support guide arm (2) activity and run through the both sides of elevating platform (4), the top fixed mounting of roof (3) has quick-witted case (5), the inner chamber fixed mounting of machine case (5) has winder (6), the equal fixed mounting in both ends of winder (6) has pivot (7), wind-up pulley (8) are installed to the one end of pivot (7), the outside winding of wind-up pulley (8) has wire rope (9), wire rope (9) bottom is connected with elevating platform (4).
2. The high-low voltage power distribution cabinet installation and debugging equipment for power construction according to claim 1, characterized in that: the lifting platform is characterized in that mounting frames (11) are fixedly connected to two sides of the top of the lifting platform (4), threaded rods (12) are movably inserted into the inner sides of the mounting frames (11) in a penetrating mode, and clamping plates (13) are fixedly connected to one ends of the threaded rods (12).
3. The high-low voltage power distribution cabinet installation and debugging equipment for power construction according to claim 1, characterized in that: the top both sides of roof (3) all fixed mounting have installation end plate (10), and the both ends of pivot (7) are passed through the bearing frame and are installed in one side of installation end plate (10).
4. The high-low voltage power distribution cabinet installation and debugging equipment for power construction according to claim 1, characterized in that: hanging rings (14) are fixedly mounted on two sides of the top of the lifting platform (4), and the bottom end of the steel wire rope (9) is fixedly connected with the lifting platform (4) through the hanging rings (14).
5. The high-low voltage power distribution cabinet installation and debugging equipment for power construction according to claim 1, characterized in that: the inner parts of the two sides of the top plate (3) are fixedly penetrated with movable grooves (15), and the steel wire ropes (9) movably penetrate through the inner cavities of the movable grooves (15).
CN202122148277.7U 2021-09-07 2021-09-07 High-low voltage power distribution cabinet installation and debugging equipment for electric power construction Active CN215798201U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122148277.7U CN215798201U (en) 2021-09-07 2021-09-07 High-low voltage power distribution cabinet installation and debugging equipment for electric power construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122148277.7U CN215798201U (en) 2021-09-07 2021-09-07 High-low voltage power distribution cabinet installation and debugging equipment for electric power construction

Publications (1)

Publication Number Publication Date
CN215798201U true CN215798201U (en) 2022-02-11

Family

ID=80156912

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122148277.7U Active CN215798201U (en) 2021-09-07 2021-09-07 High-low voltage power distribution cabinet installation and debugging equipment for electric power construction

Country Status (1)

Country Link
CN (1) CN215798201U (en)

Similar Documents

Publication Publication Date Title
CN112141917B (en) Smart power grids transformer system transformer installation auxiliary device
CN213171204U (en) Construction equipment hoisting device
CN114629056B (en) Mobile distribution network live working robot
CN114152828B (en) Flexible direct-current transmission converter valve submodule power overhaul test device and test method
CN117361345A (en) Gas tank top hoisting system and hoisting method
CN210480670U (en) Automatic disassembly and maintenance device for pay-off pulley
CN211343235U (en) Maintenance tool on gearbox tower of wind driven generator
CN215798201U (en) High-low voltage power distribution cabinet installation and debugging equipment for electric power construction
CN210683030U (en) Weaving workshop is with weaving roller shallow
CN220886833U (en) Lifting equipment for maintenance of power equipment
CN213171220U (en) Vehicle accessory changes hoisting accessory
CN214141331U (en) Good heavy object hoisting accessory for construction of stability
CN212076191U (en) Special beam lifting machine for intercity light rail
CN215516332U (en) A cable trench cover lift trolley
CN210366659U (en) Tower crane
CN221988024U (en) Building board lifting machine
CN210825172U (en) Hoist device is used in engineering machine tool maintenance
CN221545294U (en) Bridge girder erection machine tail end lifting tool
CN216945836U (en) Assembled building wallboard hoist device
CN214989988U (en) Power equipment installs and lifts device
CN113666274A (en) A kind of building intelligent lifting equipment
CN211813141U (en) Lifting device with stabilizing effect for aircraft maintenance
CN220182613U (en) Spherical rack installation handling equipment in concentration workshop
CN216711415U (en) Hoisting device for logistics transportation of mechanical equipment
CN215946560U (en) Aerogenerator main shaft upset lifting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant