CN215760661U - Force-transferring top cap device - Google Patents
Force-transferring top cap device Download PDFInfo
- Publication number
- CN215760661U CN215760661U CN202122333516.6U CN202122333516U CN215760661U CN 215760661 U CN215760661 U CN 215760661U CN 202122333516 U CN202122333516 U CN 202122333516U CN 215760661 U CN215760661 U CN 215760661U
- Authority
- CN
- China
- Prior art keywords
- steel sheet
- hole
- steel
- bolt
- pipe support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 102
- 239000010959 steel Substances 0.000 claims abstract description 102
- 238000003466 welding Methods 0.000 abstract description 4
- 230000005540 biological transmission Effects 0.000 abstract description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
Images
Landscapes
- Actuator (AREA)
Abstract
The utility model belongs to the technical field of building jacking, and particularly relates to a force transmission top cap device which comprises a steel pipe support frame, wherein the top of the steel pipe support frame is connected with a first steel plate, and the force transmission top cap device is characterized in that: the top of first steel sheet is connected with the second steel sheet, the top of second steel sheet is provided with the third steel sheet, the top of third steel sheet is connected with the fourth steel sheet, the top of second steel sheet is provided with the fifth steel sheet, the top of second steel sheet is provided with the centre bore, the surface connection of first steel sheet has the bolt hole, the top of first steel sheet is provided with the hole. Through being provided with a plurality of bolt hole align to grid on first steel sheet, and be provided with a plurality of third steel sheet align to grid on the second steel sheet, the hood is formed by the steel sheet component welding of five different grade types, makes things convenient for between hood and the steel pipe support to use the bolt fastening, and the bottom of centre bore is provided with the hole, and the bottom in hole is provided with down the hole, can be through bolt and jack piston connection.
Description
Technical Field
The utility model belongs to the technical field of building jacking, and particularly relates to a force-transferring top cap device.
Background
Jacking refers to a construction method for jacking a roof structure assembled or poured on the ground on site to a designed elevation step by using a jack and alternately-filled column blocks, and when a hydraulic jack is used for jacking a building, a steel pipe is often used as a supporting structure.
However, because the diameter of the piston of the jack is generally small, and the diameter of the steel pipe is generally large, in order to solve the problem that the jacking force of the jack can be uniformly transmitted to the wall of the steel pipe by the piston of the jack, a jacking special top cap is designed.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a force transmission top cap device, which solves the problem that the jacking force of a jack can be uniformly transmitted to a steel pipe wall by a piston of the jack.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides a pass power hood device, includes the steel pipe support frame, the top of steel pipe support frame is connected with first steel sheet, its characterized in that: the top of first steel sheet is connected with the second steel sheet, the top of second steel sheet is provided with the third steel sheet, the top of third steel sheet is connected with the fourth steel sheet, the top of second steel sheet is provided with the fifth steel sheet, the top of second steel sheet is provided with the centre bore, the surface connection of first steel sheet has the bolt hole, the top of first steel sheet is provided with the hole, the bottom of first steel sheet is provided with down the hole, the bottom in hole is connected with connecting bolt down, the top of fourth steel sheet is connected with hydraulic jack, hydraulic jack's top is connected with by the jacking thing.
Preferably, the bolt holes are provided in plurality, and the plurality of bolt holes are uniformly arranged on the first steel plate.
Preferably, the third steel plate is provided in plurality, and the plurality of third steel plates are uniformly arranged on the second steel plate.
Preferably, the bottom of the central hole is provided with an upper hole, and the bottom of the upper hole is provided with a lower hole.
Compared with the prior art, the utility model has the beneficial effects that:
through being provided with a plurality of bolt hole align to grid on first steel sheet, and be provided with a plurality of third steel sheet align to grid on the second steel sheet, the hood is formed by the steel sheet component welding of five different grade types, makes things convenient for between hood and the steel pipe support to use the bolt fastening, and the bottom of centre bore is provided with the hole, and the bottom in hole is provided with down the hole, can be through bolt and jack piston connection.
Drawings
The accompanying drawings, which are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this specification, illustrate embodiments of the utility model and together with the description serve to explain the principles of the utility model and not to limit the utility model. In the drawings:
FIG. 1 is a schematic view of the complete structure of the present invention;
FIG. 2 is a plan view of the top hat of the present invention;
fig. 3 is a view showing the elevation of the top hat of the present invention.
In the figure: 1 a first steel plate; 2 a second steel plate; 3 a third steel plate; 4 a fourth steel plate; 5 a fifth steel plate; 6, a central hole; 7 bolt holes; 8, forming a hole; 9, drilling a hole; 10, a steel pipe support frame; 11 connecting bolts; 12 hydraulic jacks; 13 the object to be jacked.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides the following technical solutions: the utility model provides a biography power hood device, including steel pipe support frame 10, the top of steel pipe support frame 10 is connected with first steel sheet 1, the top of first steel sheet 1 is connected with second steel sheet 2, the top of second steel sheet 2 is provided with third steel sheet 3, the top of third steel sheet 3 is connected with fourth steel sheet 4, the top of second steel sheet 2 is provided with fifth steel sheet 5, the top of second steel sheet 2 is provided with centre bore 6, the surface of first steel sheet 1 is connected with bolt hole 7, the top of first steel sheet 1 is provided with hole 8, the bottom of first steel sheet 1 is provided with down hole 9, the bottom of lower hole 9 is connected with connecting bolt 11, the top of fourth steel sheet 4 is connected with hydraulic jack 12, the top of hydraulic jack 12 is connected with by the jacking thing.
In the embodiment, the top cap is formed by welding five different types of steel plate components, and a bolt hole 7 is formed in the contact surface of the top cap and the steel pipe flange plate and is fixed with the steel pipe support through a bolt; the center of the top cap is provided with a center hole 6 which can be connected with a jack piston through a bolt.
In one aspect of the embodiment, a plurality of bolt holes 7 are uniformly arranged on the first steel plate 1, a plurality of third steel plates 3 are uniformly arranged on the second steel plate 2, the top cap is formed by welding five different types of steel plate members, the top cap and the steel pipe support are fixed through bolts, an upper hole 8 is formed in the bottom of the central hole 6, a lower hole 9 is formed in the bottom of the upper hole 8, and the top cap can be connected with a jack piston through bolts.
The working principle and the using process of the utility model are as follows: after the jack is installed, when the jack is used, the jack is uniformly arranged on the first steel plate 1 through the plurality of bolt holes 7, and the plurality of third steel plates 3 are uniformly arranged on the second steel plate 2, so that the top cap and the steel pipe support can be conveniently fixed through bolts, the bottom of the central hole 6 is provided with an upper hole 8, the bottom of the upper hole 8 is provided with a lower hole 9, and the jack can be connected with a jack piston through bolts.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that changes may be made in the embodiments and/or equivalents thereof without departing from the spirit and scope of the utility model. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (4)
1. The utility model provides a biography power hood device, includes steel pipe support frame (10), the top of steel pipe support frame (10) is connected with first steel sheet (1), its characterized in that: the top of first steel sheet (1) is connected with second steel sheet (2), the top of second steel sheet (2) is provided with third steel sheet (3), the top of third steel sheet (3) is connected with fourth steel sheet (4), the top of second steel sheet (2) is provided with fifth steel sheet (5), the top of second steel sheet (2) is provided with centre bore (6), the surface of first steel sheet (1) is connected with bolt hole (7), the top of first steel sheet (1) is provided with hole (8), the bottom of first steel sheet (1) is provided with down hole (9), the bottom of hole (9) is connected with connecting bolt (11) down, the top of fourth steel sheet (4) is connected with hydraulic jack (12), the top of hydraulic jack (12) is connected with by the jacking thing.
2. A force-transmitting overcap device as claimed in claim 1, wherein: the bolt holes (7) are arranged in a plurality, and the bolt holes (7) are uniformly arranged on the first steel plate (1).
3. A force-transmitting overcap device as claimed in claim 1, wherein: the number of the third steel plates (3) is multiple, and the third steel plates (3) are uniformly arranged on the second steel plate (2).
4. A force-transmitting overcap device as claimed in claim 1, wherein: an upper hole (8) is formed in the bottom of the central hole (6), and a lower hole (9) is formed in the bottom of the upper hole (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122333516.6U CN215760661U (en) | 2021-09-26 | 2021-09-26 | Force-transferring top cap device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122333516.6U CN215760661U (en) | 2021-09-26 | 2021-09-26 | Force-transferring top cap device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215760661U true CN215760661U (en) | 2022-02-08 |
Family
ID=80091044
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122333516.6U Active CN215760661U (en) | 2021-09-26 | 2021-09-26 | Force-transferring top cap device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215760661U (en) |
-
2021
- 2021-09-26 CN CN202122333516.6U patent/CN215760661U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203049635U (en) | Static loading test quick linking device by anchor pile method | |
CN215760661U (en) | Force-transferring top cap device | |
CN101736907A (en) | Jacking cushion block for building | |
CN113738156A (en) | Temporary support structure in limited space and dismantling method thereof | |
CN203229963U (en) | Concrete precast and assembled multipurpose tower crane foundation | |
CN203361170U (en) | Supporting upright column pile for building foundation pit support | |
CN202689489U (en) | Frame column construction operation frame | |
CN215595147U (en) | A kind of transmission tower foot uneven settlement lifting adjustment device | |
CN111188373B (en) | Device and method for recovering pile bearing capacity of building after pile cutting and deviation correcting | |
CN209976068U (en) | Connectable steel cushion block for jacking and storey-adding | |
CN212317541U (en) | Steel corbel shear key structure for jacking and storey adding | |
CN220578699U (en) | Hoisting lengthening device for vertical member | |
CN210151938U (en) | Column top supporting device for low-position jacking formwork system | |
CN222410796U (en) | Lifting mechanism overhead type sleeve frame device for unmanned area | |
CN217437595U (en) | Simple vertical wall-attached seat of tower crane | |
CN205894075U (en) | A pull -out ware for steel pipe retaining pile retrieves | |
CN110552504A (en) | rapid installation device and construction method for welding-free lifting lug of H-shaped steel beam | |
CN218757028U (en) | Temporary buttress structure and approach bridge | |
CN213329138U (en) | Loading device and test equipment for foundation pile pulling-resistant static load test | |
CN216275718U (en) | Movable steel support suspension device | |
CN219010956U (en) | Bracket for assisting hanging and installing of hinged support | |
CN221481492U (en) | Core section of thick bamboo wall body reinforcing apparatus | |
CN206173994U (en) | Tower crane foundation conversion equipment | |
CN218778665U (en) | Jacking sleeve frame and tower crane | |
CN222879355U (en) | A reinforced transmission line angle steel tower leg structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |