CN215717186U - Building engineering construction is with hanging mould device - Google Patents
Building engineering construction is with hanging mould device Download PDFInfo
- Publication number
- CN215717186U CN215717186U CN202120967277.7U CN202120967277U CN215717186U CN 215717186 U CN215717186 U CN 215717186U CN 202120967277 U CN202120967277 U CN 202120967277U CN 215717186 U CN215717186 U CN 215717186U
- Authority
- CN
- China
- Prior art keywords
- frame
- self
- engineering construction
- groove
- building engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 claims abstract description 19
- 238000009415 formwork Methods 0.000 claims description 8
- 230000003014 reinforcing effect Effects 0.000 claims description 6
- 230000000694 effects Effects 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000008093 supporting effect Effects 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model relates to the technical field of constructional engineering equipment, in particular to a mould hanging device for constructional engineering construction, which comprises frames, side moulds, connecting pieces and adjusting devices, wherein the frames are arranged into two groups and are symmetrically arranged, the side moulds are arranged between the frames, the frames are connected with the side moulds through the connecting pieces, the adjusting devices are arranged on the side surfaces of the frames, one ends of the adjusting devices are connected with the frames, and the other ends of the adjusting devices are connected with a wall.
Description
Technical Field
The utility model relates to the technical field of constructional engineering equipment, in particular to a mould hanging device for constructional engineering construction.
Background
As is known, a suspended form is a form suspended in the air without a lower support and can be fixed in various ways, for example by being carried by a water-stop tie rod. The suspended formwork construction is widely applied to various civil engineering, such as large-scale equipment foundations, valve well pouring and the like.
For example, the patent publication "CN 208884564U" is named as: the utility model discloses a mould hanging device for building engineering construction, which belongs to the technical field of building construction and comprises an upper mould frame and a lower mould frame, wherein the front side and the rear side of the bottom of the upper mould frame and the top of the lower mould frame are respectively provided with a transverse clamping groove, the left side and the right side of the bottom of the upper mould frame and the left side and the right side of the top of the lower mould frame are respectively provided with a longitudinal clamping groove, reinforcing ribs are welded at four corners of inner cavities of the upper mould frame and the lower mould frame, and a transverse side plate is inserted into the two transverse clamping grooves formed in the upper mould frame and the lower mould frame.
The existing mould hanging device for building engineering construction is found in use that the equipment is inconvenient to adjust integrally, the equipment is unstable in connection, safety accidents occur easily, and the equipment is inconvenient to assemble and disassemble, so that the use limitation is high.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Aiming at the defects of the prior art, the utility model provides the formwork hanging device for the building engineering construction, which is stable in connection, convenient to disassemble and convenient to integrally adjust.
(II) technical scheme
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides a building engineering construction is with hanging mould device, includes frame, side form, connecting piece and adjusting device, the frame sets up to two sets of symmetrical arrangement, be provided with between the frame the side form, the frame with the side form passes through the connecting piece is connected, the frame side is provided with adjusting device, adjusting device one end with the frame is connected, the adjusting device other end and wall connection.
In order to adjust the telescopic length of the connecting rod conveniently, the utility model improves that the adjusting device comprises a fixed frame, a sliding frame, a connecting rod, a connecting frame and a fastening screw, wherein the fixed frame is connected with the wall body, the sliding frame is arranged on the fixed frame, the connecting rod is arranged in the sliding frame, the fastening screw is arranged at one end of the connecting rod, a sliding groove is arranged on the sliding frame, the fastening screw is matched with the sliding groove, the other end of the connecting rod extends out of the sliding frame to be connected with the connecting frame, and the connecting frame is connected with the frame.
In order to conveniently and synchronously adjust the telescopic length of the connecting rod, the utility model has the improvement that the connecting rod is provided with scale marks which are arranged into a plurality of groups.
In order to facilitate the connection between the side frame and the side die, the utility model improves that the connecting piece comprises a connecting plate, a limiting rod and an inclined block, one end of the limiting rod is connected with the connecting plate, the inclined block is arranged at the other end of the limiting rod, the limiting rod and the inclined block are arranged in two groups of symmetrical arrangements, a first longitudinal hole is arranged on the side frame, first connecting grooves are arranged at two ends of the first longitudinal hole, a first self-locking device is arranged in the first connecting grooves, the first self-locking device comprises a spring and an L baffle, the first self-locking device is matched with one group of limiting rod and the inclined block on the connecting piece, the L baffle is arranged in the first connecting grooves, one end of the L baffle penetrates through the first longitudinal hole, the other end of the L baffle extends out of the first connecting grooves, the spring is arranged in the first connecting grooves, and one end of the spring is connected with the first connecting grooves, the spring other end with the L baffle is connected, the side form both ends are provided with the vertical hole of second, the vertical hole both ends of second are provided with the second spread groove, be provided with second self-lock device in the second spread groove, first self-lock device with the second self-lock device structure is the same, second self-lock device with another group's gag lever post and sloping block phase-match on the connecting piece.
In order to ensure the connection strength of the device, the utility model improves that a reinforcing rib is arranged at the joint of the connecting frame and the connecting rod.
In order to enhance the stability of the device, the utility model is improved in that a first transverse groove is arranged on the side surface of the frame, a second transverse groove is arranged on the side surface of the side die, the first transverse groove is matched with the second transverse groove, a transverse rod is arranged on the side surface of the frame, one end of the transverse rod is connected with the first transverse groove, and the other end of the transverse rod is connected with the second transverse groove.
(III) advantageous effects
Compared with the prior art, the utility model provides a formwork hanging device for building engineering construction, which has the following beneficial effects:
this building engineering construction is with hanging mould device can automatic adjustment device holistic position through adjusting device.
This mould hanging device is used in building engineering construction, frame and side form pass through the connecting piece to be connected, and the connecting piece is convenient to be dismantled, convenient to use, and the device is convenient to be assembled.
This building engineering construction is with hanging mould device is provided with the horizontal pole between frame and the side form, and the supporting effect is good, and the device is stable in utilization.
Drawings
FIG. 1 is a bottom view of the present invention;
FIG. 2 is a schematic structural view of the present invention;
fig. 3 is a partially enlarged view of the structure of fig. 2.
In the figure: 1. a frame; 2. side mould; 3. a connecting member; 4. an adjustment device; 5. a wall body; 6. a fixed mount; 7. a sliding frame; 8. a connecting rod; 9. a connecting frame; 10. fastening screws; 11. a chute; 12. scale lines; 13. a connecting plate; 14. a limiting rod; 15. a sloping block; 16. a first longitudinal bore; 17. a first connecting groove; 18. a spring; 19. an L baffle plate; 20. a second longitudinal bore; 21. a second connecting groove; 22. a first self-locking device; 23. a second self-locking device; 24. reinforcing ribs; 25. a first transverse slot; 26. a second transverse groove; 27. a cross bar.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-3, a formwork hanging device for building engineering construction comprises frames 1, side forms 2, connecting pieces 3 and adjusting devices 4, wherein the frames 1 are arranged in two groups and are symmetrically arranged, the side forms 2 are arranged between the frames 1, the frames 1 are connected with the side forms 2 through the connecting pieces 3, the adjusting devices 4 are arranged on the side surfaces of the frames 1, one ends of the adjusting devices 4 are connected with the frames 1, and the other ends of the adjusting devices 4 are connected with a wall body 5.
In this embodiment, the adjusting device 4 includes a fixing frame 6, a sliding frame 7, a connecting rod 8, a connecting frame 9 and a fastening screw 10, the fixing frame 6 is connected to the wall 5, the fixing frame 6 is provided with the sliding frame 7, the connecting rod 8 is arranged in the sliding frame 7, one end of the connecting rod 8 is provided with the fastening screw 10, the sliding frame 7 is provided with a chute 11, the fastening screw 10 is matched with the chute 11, the other end of the connecting rod 8 extends out of the sliding frame 7 and the connecting frame 9, the connecting frame 9 is connected to the frame 1, and the telescopic length of the connecting rod 8 is adjusted conveniently.
In this embodiment, through 12 supplementary regulations of scale mark, convenient synchronous adjustment connecting rod 8's flexible length, be provided with scale mark 12 on the connecting rod 8, scale mark 12 sets up to the multiunit.
In this embodiment, the connecting member 3 includes a connecting plate 13, a limiting rod 14 and an oblique block 15, one end of the limiting rod 14 is connected to the connecting plate 13, the other end of the limiting rod 14 is provided with the oblique block 15, the limiting rod 14 and the oblique block 15 are arranged in two groups of symmetrical arrangements, the frame 1 is provided with a first longitudinal hole 16, two ends of the first longitudinal hole 16 are provided with first connecting grooves 17, a first self-locking device 22 is arranged in the first connecting groove 17, the first self-locking device 22 includes a spring 18 and an L baffle 19, the first self-locking device 22 is matched with one group of limiting rods 14 and the oblique block 15 on the connecting member 3, the L baffle 19 is arranged in the first connecting groove 17, one end of the L baffle 19 penetrates through the first longitudinal hole 16, the other end of the L baffle 19 extends out of the first connecting groove 17, the spring 18 is arranged in the first connecting groove 17, spring 18 one end with first connecting groove 17 is connected, the spring 18 other end with L baffle 19 is connected, 2 both ends of side form are provided with the vertical hole of second 20, the vertical hole of second 20 both ends are provided with second connecting groove 21, be provided with second self-lock device 23 in the second connecting groove 21, first self-lock device 22 with second self-lock device 23 structure is the same, second self-lock device 23 with another group's gag lever post 14 and sloping block 15 phase-match on connecting piece 3, for the convenience of frame 1 and side form 2's connection.
In this embodiment, a reinforcing rib 24 is arranged at the joint of the connecting frame 9 and the connecting rod 8, so as to ensure the connection strength of the device.
In this embodiment, frame 1 side is provided with first cross slot 25, side form 2 side is provided with second cross slot 26, first cross slot 25 and second cross slot 26 phase-match, frame 1 side is provided with horizontal pole 27, horizontal pole 27 one end with first cross slot 25 is connected, the horizontal pole 27 other end with second cross slot 26 is connected, for the stability of reinforcing device.
In this embodiment, the side forms can set up to a plurality of groups, connect through the connecting piece between the side forms, are provided with the crossbeam between the side forms, guarantee the stability that equipment supported.
To sum up, this mould hanging device for building engineering construction, when using, be connected through horizontal pole 27 between frame 1 and the side form 2, horizontal pole 27 one end is connected with first transverse groove 25, the horizontal pole 27 other end is connected with second transverse groove 26, frame 1 is connected with side form 2 through connecting piece 3, two sets of gag lever posts 14 of connecting piece 3 take sloping block 15 to insert the first longitudinal hole 16 of frame 1 and the second longitudinal hole 20 of side form 2 respectively, after sloping block 15 misplaced with L baffle 19, under the effect of spring 18, first self-lock device 22 and second self-lock device 23 reset, mount 6 is connected with wall body 5, link 9 is connected with frame 1, through the position of adjusting connecting rod 8 in sliding frame 7 and through fastening screw 10, make things convenient for the holistic position of adjustment equipment.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. The utility model provides a building engineering construction is with hanging mould device, includes frame (1), side form (2), connecting piece (3) and adjusting device (4), its characterized in that: the frame (1) is arranged into two groups of symmetrical arrangements, the side molds (2) are arranged between the frames (1), the frames (1) are connected with the side molds (2) through the connecting pieces (3), the adjusting devices (4) are arranged on the side faces of the frames (1), one ends of the adjusting devices (4) are connected with the frames (1), the other ends of the adjusting devices (4) are connected with the wall body (5), each adjusting device (4) comprises a fixing frame (6), a sliding frame (7), a connecting rod (8), a connecting frame (9) and fastening screws (10), the fixing frame (6) is connected with the wall body (5), the sliding frame (7) is arranged on the fixing frame (6), the connecting rod (8) is arranged in the sliding frame (7), and the fastening screws (10) are arranged at one end of the connecting rod (8), the sliding frame (7) is provided with a sliding groove (11), the fastening screw (10) is matched with the sliding groove (11), the other end of the connecting rod (8) extends out of the sliding frame (7) to be connected with the connecting frame (9), and the connecting frame (9) is connected with the frame (1).
2. The formwork hanging device for building engineering construction according to claim 1, characterized in that: the connecting rod (8) is provided with scale marks (12), and the scale marks (12) are arranged into a plurality of groups.
3. The formwork hanging device for building engineering construction according to claim 2, characterized in that: the connecting piece (3) comprises a connecting plate (13), a limiting rod (14) and an oblique block (15), one end of the limiting rod (14) is connected with the connecting plate (13), the other end of the limiting rod (14) is provided with the oblique block (15), the limiting rod (14) and the oblique block (15) are arranged in two groups of symmetrical arrangements, a first longitudinal hole (16) is arranged on the frame (1), first connecting grooves (17) are arranged at two ends of the first longitudinal hole (16), a first self-locking device (22) is arranged in the first connecting groove (17), the first self-locking device (22) comprises a spring (18) and an L baffle (19), the first self-locking device (22) is matched with one group of the limiting rod (14) and the oblique block (15) on the connecting piece (3), the L baffle (19) is arranged in the first connecting groove (17), one end of the L baffle (19) penetrates through the first longitudinal hole (16), the L baffle (19) other end extends first connecting groove (17), be provided with in first connecting groove (17) spring (18), spring (18) one end with first connecting groove (17) are connected, spring (18) other end with L baffle (19) are connected, side form (2) both ends are provided with the vertical hole of second (20), the vertical hole of second (20) both ends are provided with second connecting groove (21), be provided with second self-lock device (23) in second connecting groove (21), first self-lock device (22) with second self-lock device (23) structure is the same, second self-lock device (23) with another group spacing pole (14) and sloping block (15) phase-match on connecting piece (3).
4. The formwork hanging device for building engineering construction according to claim 3, characterized in that: and a reinforcing rib (24) is arranged at the joint of the connecting frame (9) and the connecting rod (8).
5. The formwork hanging device for building engineering construction according to claim 4, wherein: frame (1) side is provided with first cross slot (25), side form (2) side is provided with second cross slot (26), first cross slot (25) and second cross slot (26) phase-match, frame (1) side is provided with horizontal pole (27), horizontal pole (27) one end with first cross slot (25) are connected, horizontal pole (27) other end with second cross slot (26) are connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120967277.7U CN215717186U (en) | 2021-05-07 | 2021-05-07 | Building engineering construction is with hanging mould device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120967277.7U CN215717186U (en) | 2021-05-07 | 2021-05-07 | Building engineering construction is with hanging mould device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215717186U true CN215717186U (en) | 2022-02-01 |
Family
ID=80031099
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120967277.7U Active CN215717186U (en) | 2021-05-07 | 2021-05-07 | Building engineering construction is with hanging mould device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215717186U (en) |
-
2021
- 2021-05-07 CN CN202120967277.7U patent/CN215717186U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN215717186U (en) | Building engineering construction is with hanging mould device | |
CN210888068U (en) | Combined building template | |
CN218509001U (en) | Flower basket type overhanging I-beam | |
CN217581295U (en) | But reuse's assembled post positioner | |
CN214785939U (en) | Concatenation template suspension type fixing device | |
CN210737388U (en) | Novel template support frame is used in public road bridge roof beam construction | |
CN210316538U (en) | Aluminum mold supporting system for floor lower extension lintel | |
CN211286749U (en) | Prefabricated building construction edge protection structure | |
CN210880147U (en) | Prefabricated template of concrete arch-shaped T beam | |
CN210887997U (en) | Building scaffold with adjustable height | |
CN216831485U (en) | Adjustable type concrete prefabricated component template | |
CN219909917U (en) | Detachable steel pipe scaffold wall connecting device for constructional engineering | |
CN222295685U (en) | Adjustable support frame for building template | |
CN219387182U (en) | Building cantilever plate construction support frame | |
CN221298198U (en) | Concrete placement steel constructs structure | |
CN219158335U (en) | A Stable Scaffold Reinforced Support Structure | |
CN219157424U (en) | T-shaped beam longitudinal wet joint cast-in-situ die carrier | |
CN211369514U (en) | Assembled construction formwork | |
CN216664661U (en) | Curtain wall rigid hanging plate adjustable system | |
CN215717199U (en) | Steel backing is consolidated with template support of being convenient for adjust to building stand is stupefied | |
CN209779681U (en) | Combined steel mold support device at the corner | |
CN216893523U (en) | Strutting arrangement for building engineering | |
CN218406470U (en) | Adjustable bank platform hangs mould | |
CN220978802U (en) | Concrete construction template for structural column between hydropower house installations | |
CN214696858U (en) | Windowsill bears template device of encorbelmenting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |