CN215671052U - Frame post template is to drawing structure - Google Patents
Frame post template is to drawing structure Download PDFInfo
- Publication number
- CN215671052U CN215671052U CN202121559357.5U CN202121559357U CN215671052U CN 215671052 U CN215671052 U CN 215671052U CN 202121559357 U CN202121559357 U CN 202121559357U CN 215671052 U CN215671052 U CN 215671052U
- Authority
- CN
- China
- Prior art keywords
- sleeve
- pair
- pull rods
- rods
- formwork
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a frame column template split structure which comprises a template batten, a first side die, a first pair of pull rods, a second side die and a second pair of pull rods, wherein the first side die and the second side die are arranged on two sides of the template batten respectively and are parallel and opposite, through holes are formed in the middle positions of the inner parts of the first side die and the second side die and are opposite, and the first pair of pull rods and the second pair of pull rods penetrate through the inner parts of the template batten. According to the utility model, the support rod, the foam sleeve, the PVC sleeve and the soft rubber sleeve are arranged, the foam sleeve is sleeved outside the PVC sleeve, the soft rubber sleeve is sleeved outside the foam sleeve, and after the wall body is poured and bent, the PVC sleeve can be completely reserved without being damaged by directly damaging the external soft rubber sleeve and the foam sleeve, and can be recycled, so that resources are effectively saved.
Description
Technical Field
The utility model relates to the technical field of building construction, in particular to a frame column formwork opposite-pulling structure.
Background
The technology has important influence on improving the engineering quality, accelerating the engineering construction progress, reducing the engineering construction cost and realizing civilized construction, so that the building templates can be prefabricated in the building construction process, the connection between the pull-out structures and the fixed templates can be used in the building template process, and then the pouring can be carried out.
The template counter-pulling structure on the market is various and can basically meet the use requirements of people, but still has certain problems: the existing template split structure is inconvenient to dismantle after the PVC is demolished.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a frame column template split structure, which solves the problem that PVC is inconvenient to disassemble after a template is disassembled in the template split structure in the background technology.
The utility model provides a frame column template opposite-pulling structure, which adopts the following technical scheme;
the utility model provides a frame post template is to drawing structure, includes template flitch, first side form, first pair of pull rod, second side form and second pair of pull rod, the both sides of template flitch are provided with first side form and second side form respectively, and first side form and second side form are parallel and relative, the inside intermediate position of first side form and second side form is provided with the through-hole, and the through-hole is relative, first pair of pull rod and second are all run through in the inside of template flitch, be provided with support sleeve between the both sides wall of first side form and second side form, the inside of template flitch is provided with the bracing piece, and the inside of bracing piece is provided with the flexible glue sleeve pipe, and the sheathed tube inside of flexible glue is provided with the foam sleeve pipe, and the sheathed tube inside of foam is provided with the PVC sleeve pipe.
Optionally, the first side mold and the second side mold both adopt metal formworks, which is beneficial to improving the stability of wall body pouring.
Optionally, the top end and the bottom end of the first pair of pull rods are both provided with a first connecting block, the top end and the bottom end of the second pair of pull rods are both provided with a second connecting block, the outer side walls of the first pair of pull rods and the second pair of pull rods are provided with connecting rods, one side of each of the first connecting block and the second connecting block is connected with a supporting diagonal rod, one end of each supporting diagonal rod is connected with one side of each connecting rod, one side of the outer side wall of each first pair of pull rods horizontally close to the connecting rods is provided with a first rubber sealing ring, one side of each first rubber sealing ring horizontally close to the connecting rods is fixedly connected with one side of the outer wall of the formwork batten, one side of each second pair of pull rods horizontally close to the connecting rods is provided with a second rubber sealing ring, one side of each second rubber sealing ring is fixedly connected with the other side of the outer wall of the formwork, both ends of one side of each first rubber sealing ring are both connected with a first sleeve, and both ends of one side of each second rubber sealing ring are both connected with a second sleeve, the moving is facilitated, and the labor degree is reduced.
Optionally, the first connecting block and the second connecting block are in a barb shape, and the first connecting block and the second connecting block are in a symmetrical structure with respect to a center line of the formwork batten.
Optionally, the top and the bottom of first pair of pull rod and second pair of pull rod inside all are provided with the flexible glue sleeve pipe, and flexible glue sheathed tube inside is provided with outer recess, the inside of outer recess is provided with the inner groovy, the inside of inner groovy is run through and is installed the lag, is favorable to improving the rational utilization of resource.
Optionally, the first pair of pull rods and the second pair of pull rods are arranged inside the protective sleeve, and the surface of the protective sleeve is coated with an asphalt waterproof material, so that the improvement of the waterproof effect on the inside is facilitated.
Optionally, the inner wall of the first sleeve is provided with an internal thread, and the outer side wall of the second sleeve is provided with an external thread.
Optionally, the second sleeve is arranged between two side walls of the first sleeve, and the second sleeve and the first sleeve are connected with each other, so that the use flexibility is improved.
In summary, the present invention includes at least one of the following advantages;
(1) by arranging the support rod, the foam sleeve, the PVC sleeve and the soft rubber sleeve, the foam sleeve is sleeved outside the PVC sleeve, the soft rubber sleeve is sleeved outside the foam sleeve, and after the wall body is poured and bent, the PVC sleeve can be completely reserved without being damaged by directly damaging the external soft rubber sleeve and the foam sleeve, and can be recycled, so that resources are effectively saved;
(2) the first rubber sealing ring, the second rubber sealing ring, the first sleeve and the second sleeve are arranged, the first sleeve and the second sleeve are adjusted, the supporting and positioning of the shear wall templates with different thicknesses can be realized, and the first sleeve and the second sleeve can be taken out from two sides after the pouring is finished, so that the first sleeve and the second sleeve can be reused, and the flexibility of the counter-pulling structure in the using process is improved;
(3) through being provided with lag, outer recess and inner groovy, through inserting the both ends of lag to the inside of inner groovy, establish the inside at the lag with a pot head of first pair pull rod and second pair pull rod to at the in-process that carries out shear force wall and pour, can effectually avoid the one end of first pair pull rod and second pair pull rod to receive the damage, improved the protectiveness to first pair pull rod and second pair pull rod.
Drawings
FIG. 1 is a schematic view of the overall internal structure of the present invention;
FIG. 2 is a schematic view of a support bar according to the present invention;
FIG. 3 is an enlarged schematic view of the structure at A in FIG. 1 according to the present invention;
fig. 4 is a schematic view of the external structure of the formwork batten of the utility model.
In the figure: 1. template battens; 2. a support sleeve; 3. a first side mold; 4. a first rubber seal ring; 5. a connecting rod; 6. a first connection block; 7. a first pair of tie rods; 8. supporting the diagonal rods; 9. a first sleeve; 10. a support bar; 11. a second sleeve; 12. a second side mold; 13. a second rubber seal ring; 14. a protective sleeve; 15. a second pair of tie rods; 16. a second connecting block; 17. a foam sleeve; 18. PVC sleeves; 19. a soft rubber sleeve; 20. an outer groove; 21. an inner groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The utility model is described in further detail below with reference to figures 1-4.
The utility model discloses a frame column template opposite-pulling structure. Including template flitch 1, first side form 3, first pair of pull rod 7, second side form 12 and second pair pull rod 15, the both sides of template flitch 1 are provided with first side form 3 and second side form 12 respectively, and first side form 3 and second side form 12 all adopt metal formwork, and first side form 3 and second side form 12 are convenient for pour through fixing the back to drawing the structure.
The first side die 3 and the second side die 12 are parallel and opposite, through holes are formed in the middle of the inner portions of the first side die 3 and the second side die 12 and are opposite, a first pair of pull rods 7 and a second pair of pull rods 15 penetrate through the inner portions of the formwork batten 1, a supporting sleeve 2 is arranged between two side walls of the first side die 3 and the second side die 12, first connecting blocks 6 are arranged at the top ends and the bottom ends of the first pair of pull rods 7, second connecting blocks 16 are arranged at the top ends and the bottom ends of the second pair of pull rods 15, connecting rods 5 are arranged on the outer side walls of the first pair of pull rods 7 and the second pair of pull rods 15, outer grooves 20 are arranged at the top ends and the bottom ends of the inner portions of the first pair of pull rods 7 and the second pair of pull rods 15, outer grooves 21 are formed in the inner grooves 20, a protecting sleeve 14 penetrates through the inner portions of the inner grooves 21, and the first pair of pull rods 7 and the second pair of pull rods 15 are arranged in the protecting sleeve 14, and the surface of lag 14 scribbles pitch waterproof material, through inserting first pair of pull rod 7 and second pair pull rod 15 to first side mould 3 and second sleeve pipe 11 in the through-hole, realize the fixed of first side mould 3 and second side mould 12 to through inserting lag 14 to the inside of inner groovy 21, accomplish the installation to lag 14, make lag 14 establish the pot head of first pair pull rod 7 and second pair pull rod 15 inside, protect it.
The first connecting block 6 and the second connecting block 16 are in a barb shape, the first connecting block 6 and the second connecting block 16 are in a symmetrical structure about the center line of the template batten 1, one side of the first connecting block 6 and one side of the second connecting block 16 are both connected with a supporting diagonal rod 8, one end of the supporting diagonal rod 8 is connected with one side of a connecting rod 5, one side of the outer side wall of a first pair of pull rods 7 horizontally close to the connecting rod 5 is provided with a first rubber sealing ring 4, one side of the first rubber sealing ring 4 is fixedly connected with one side of the outer wall of the template batten 1, one side of the outer side wall of a second pair of pull rods 15 horizontally close to the connecting rod 5 is provided with a second rubber sealing ring 13, one side of the second rubber sealing ring 13 is fixedly connected with the other side of the outer wall of the template batten 1, both ends of one side of the first rubber sealing ring 4 are connected with a first sleeve 9, both ends of one side of the second rubber sealing ring 13 are both connected with a second sleeve 11, the inner wall of first sleeve pipe 9 is provided with the internal thread, and the lateral wall of second sleeve pipe 11 is provided with the external screw thread, and second sleeve pipe 11 sets up between the both sides wall of first sleeve pipe 9, and interconnect between second sleeve pipe 11 and the first sleeve pipe 9, can make corresponding adjustment to the different thickness with the shear force wall through with second sleeve pipe 11 and first sleeve pipe 9, improves the practicality.
The implementation principle of the frame column template opposite-pulling structure is as follows:
firstly, a first sleeve 9 and a second sleeve 11 are inserted into through holes of a first side mold 3 and a second side mold 12, the positions of the first sleeve 9 and the second sleeve 11 are adjusted by aiming at different thicknesses of a shear wall, a foam sleeve 17 is sleeved outside a PVC sleeve 18, a soft rubber sleeve 19 is sleeved outside the foam sleeve 17, the first sleeve 9 and the second sleeve 11 are pulled out when a pull bolt is disassembled, the foam sleeve 17, the PVC sleeve 18 and the soft rubber sleeve 19 are still left in a hole, the PVC sleeve 18 is completely taken out by directly damaging the soft rubber sleeve 19 and the foam sleeve 17, the PVC sleeve 18 can be repeatedly used conveniently, resources are effectively saved, in the process of pouring a wall body, a protective sleeve 14 is sleeved at one end of a first pair of pull rods 7 and a second pair of pull rods 15, and two ends of the protective sleeve 14 are inserted into an inner groove 21, the installation of the protective sleeve 14 is completed, and the disassembly is simple, and only the pulling-out is needed.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Claims (8)
1. The utility model provides a frame post template is to drawing structure, includes template flitch (1), first side form (3), first pair of pull rod (7), second side form (12) and second pair pull rod (15), its characterized in that: the utility model discloses a formwork batten's (1) and formwork support structure, including formwork batten's (1) both sides are provided with first side form (3) and second side form (12) respectively, and first side form (3) and second side form (12) are parallel and relative, the intermediate position of first side form (3) and second side form (12) inside is provided with the through-hole, and the through-hole is relative, first pair pull rod (7) and second are all run through in the inside of formwork batten's (1) to pull rod (15), be provided with between the both sides wall of first side form (3) and second side form (12) support sleeve pipe (2), the inside of formwork batten's (1) is provided with bracing piece (10), and the inside of bracing piece (10) is provided with flexible glue sleeve pipe (19), and the inside of flexible glue sleeve pipe (19) is provided with foam sleeve pipe (17), and the inside of foam sleeve pipe (17) is provided with PVC sleeve pipe (18).
2. The framework column formwork split structure of claim 1, wherein: the first side die (3) and the second side die (12) both adopt metal templates.
3. The framework column formwork split structure of claim 1, wherein: the top and the bottom of the first pair of pull rods (7) are provided with first connecting blocks (6), the top and the bottom of the second pair of pull rods (15) are provided with second connecting blocks (16), the outer side walls of the first pair of pull rods (7) and the second pair of pull rods (15) are provided with connecting rods (5), one sides of the first connecting blocks (6) and the second connecting blocks (16) are connected with supporting inclined rods (8), one ends of the supporting inclined rods (8) are connected with one sides of the connecting rods (5), one sides of the outer side walls of the first pair of pull rods (7) horizontally close to the connecting rods (5) are provided with first rubber sealing rings (4), one sides of the first rubber sealing rings (4) are fixedly connected with one sides of the outer walls of the formwork battens (1), one sides of the outer side walls of the second pair of pull rods (15) horizontally close to the connecting rods (5) are provided with second rubber sealing rings (13), and one side of the second rubber sealing ring (13) is fixedly connected with the other side of the outer wall of the template batten (1), the two ends of one side of the first rubber sealing ring (4) are both connected with the first sleeve (9), and the two ends of one side of the second rubber sealing ring (13) are both connected with the second sleeve (11).
4. The framework column formwork split structure of claim 3, wherein: the first connecting block (6) and the second connecting block (16) are in a barb shape, and the first connecting block (6) and the second connecting block (16) are in a symmetrical structure relative to the center line of the formwork batten (1).
5. The framework column formwork split structure of claim 1, wherein: the top end and the bottom end of the interior of the first pair of pull rods (7) and the second pair of pull rods (15) are both provided with soft rubber sleeves (19), outer grooves (20) are formed in the interior of the soft rubber sleeves (19), inner grooves (21) are formed in the interior of the outer grooves (20), and protective sleeves (14) are installed in the interior of the inner grooves (21) in a penetrating mode.
6. The framework column formwork split structure of claim 1, wherein: the first pair of pull rods (7) and the second pair of pull rods (15) are arranged inside the protective sleeve (14), and asphalt waterproof materials are coated on the surface of the protective sleeve (14).
7. The framework column formwork split structure of claim 3, wherein: the inner wall of the first sleeve (9) is provided with internal threads, and the outer side wall of the second sleeve (11) is provided with external threads.
8. The framework column formwork split structure of claim 3, wherein: the second sleeve (11) is arranged between two side walls of the first sleeve (9), and the second sleeve (11) is connected with the first sleeve (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121559357.5U CN215671052U (en) | 2021-07-09 | 2021-07-09 | Frame post template is to drawing structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121559357.5U CN215671052U (en) | 2021-07-09 | 2021-07-09 | Frame post template is to drawing structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215671052U true CN215671052U (en) | 2022-01-28 |
Family
ID=79979286
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121559357.5U Active CN215671052U (en) | 2021-07-09 | 2021-07-09 | Frame post template is to drawing structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215671052U (en) |
-
2021
- 2021-07-09 CN CN202121559357.5U patent/CN215671052U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110700319A (en) | Comprehensive pipe gallery is with unilateral formwork frock | |
CN215671052U (en) | Frame post template is to drawing structure | |
CN211923525U (en) | Constructional column combined template at right-angle corner and wall joint of wall | |
CN210563363U (en) | Pouring template without tie bar hole | |
CN216689370U (en) | Pile-forming construction device for drilling secant pile | |
CN206844638U (en) | A kind of house and its construction mould | |
CN213773957U (en) | Cast-in-place concrete wall structure with built-in insulation board | |
CN215926708U (en) | Regularization prefabricated two-sided superimposed shear wall bottom mold sealing device | |
CN203129572U (en) | Prefabricated concrete formwork and prefabricated building formed by same | |
CN217054366U (en) | Basement outer wall split screw | |
CN213926929U (en) | Outer wall TC heat preservation integration template installation location bearing structure | |
CN213890454U (en) | Quick concatenation reinforcing plastic steel template system | |
CN212689559U (en) | Concrete pouring template with thin-wall structure | |
CN211369523U (en) | Template system of expansion joint shear force wall | |
CN207003720U (en) | A kind of assembled integral concrete shear force wall attachment structure | |
CN111576879A (en) | Construction method for plugging screw hole of outer vertical face shear wall | |
CN213476966U (en) | Novel assembled post-cast strip template system | |
CN211037338U (en) | Reinforcing apparatus of movement joint | |
CN216099543U (en) | Concrete box culvert forming die | |
CN215368880U (en) | Vertical hole plugging combined device | |
CN211007654U (en) | Fence post combination steel form | |
CN217581189U (en) | Arc erects line bamboo mould clear water concrete construction structures | |
CN214462514U (en) | Sewage treatment plant's construction connection structure | |
CN209837700U (en) | Brace structure for building template system | |
CN215443104U (en) | A device for reinforced (rfd) of waterproof concrete's template |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |