CN215670914U - Building electromechanical engineering assembled installation device - Google Patents
Building electromechanical engineering assembled installation device Download PDFInfo
- Publication number
- CN215670914U CN215670914U CN202122283537.1U CN202122283537U CN215670914U CN 215670914 U CN215670914 U CN 215670914U CN 202122283537 U CN202122283537 U CN 202122283537U CN 215670914 U CN215670914 U CN 215670914U
- Authority
- CN
- China
- Prior art keywords
- rod
- base
- installation device
- electromechanical engineering
- block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 title claims abstract description 21
- 238000010276 construction Methods 0.000 claims description 8
- 230000003028 elevating effect Effects 0.000 abstract description 4
- 238000004870 electrical engineering Methods 0.000 abstract description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
Images
Landscapes
- Invalid Beds And Related Equipment (AREA)
Abstract
The utility model discloses an assembly type mounting device for building electromechanical engineering, and relates to the field of mounting devices. This building machine electrical engineering assembled installation device, the gyro wheel is all installed to the both sides of base, the internal connection of base bracing piece has the second bracing piece, wherein install a plurality of connecting rods between two first bracing pieces, supporting mechanism includes four spacing grooves, four the spacing groove is seted up in the inside of base, and supporting mechanism passes through the spacing groove and installs the inside at the base, elevating system includes the mount, the mount is installed in one side of first bracing piece, and elevating system passes through the mount and installs the one side at first bracing piece. This building electromechanical engineering assembled installation device increases area, and is convenient for remove, increases the stability and the steadiness of device.
Description
Technical Field
The utility model relates to the technical field of mounting devices, in particular to a building electromechanical engineering assembly type mounting device.
Background
The electromechanical installation project has the characteristics of strong systematicness, multiple professional categories, wide knowledge range and large influence range, and as an important component of the building project, whether the electromechanical installation is reasonable or not directly influences the overall quality of the project, meanwhile, the attention of people on green and energy conservation of the building is higher and higher, and the prefabricated assembly type provides a good way for solving the problems;
need many people to cooperate when installation such as pipeline at present and just can accomplish, hold up the pipeline alone, install alone, this kind of mode is in the pipeline of installation eminence, and the device requirement to supplementary installation is very high, and present device stability and mobility can not have concurrently, and the frame of standing is the stationarity limited, therefore we have provided a building electromechanical engineering assembled installation device.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Aiming at the defects of the prior art, the utility model discloses a building electromechanical engineering assembling type mounting device, which aims to solve the problems in the background technology.
(II) technical scheme
In order to achieve the purpose, the utility model is realized by the following technical scheme: a construction machine electrical engineering fabricated mounting device comprising:
the roller type folding table comprises a base, wherein rollers are arranged on two sides of the base, first supporting rods are arranged at four edges of the upper surface of the base, a second supporting rod is connected inside the supporting rods of the base, a standing frame is arranged at the top of the second supporting rod, and a plurality of connecting rods are arranged between the two first supporting rods;
the supporting mechanism comprises four limiting grooves, the four limiting grooves are formed in the base, and the supporting mechanism is installed in the base through the limiting grooves;
the lifting mechanism comprises a fixing frame, the fixing frame is installed on one side of the first supporting rod, and the lifting mechanism is installed on one side of the first supporting rod through the fixing frame.
Preferably, the supporting mechanism further comprises a first elastic piece, the first elastic piece is installed on the inner side wall of the limiting groove, a moving block is installed at one end, away from the limiting groove, of the first elastic piece, one end, away from the first elastic piece, of the moving block penetrates through the outer surface of the base, an air pump is installed on the lower surface of the moving block, a supporting block is installed on the lower surface of the air pump, and two limiting holes are formed in the upper surface of the moving block.
Preferably, the supporting mechanism further comprises a limiting rod, the limiting rod is inserted into the upper surface of the base, and one end of the limiting rod is inserted into one limiting hole.
Preferably, the upper surface of the limiting rod is provided with a circular block, the outer surface of the limiting rod is sleeved with a second elastic part, and two ends of the second elastic part are respectively arranged on the upper surface of the base and the lower surface of the circular block.
Preferably, elevating system still includes the motor, the motor is installed at the lower surface of mount, and the upper surface of mount is run through to the output of motor, the threaded rod is installed to the output of motor, and the upper surface mounting of mount has a plurality of first fixed blocks.
Preferably, the inside of every two first fixed blocks is all pegged graft and is had the dwang, and the both ends of dwang run through one side of two first fixed blocks respectively, the geometric center department of dwang all installs the gear, and the surface of gear meshes with the surface of threaded rod mutually.
Preferably, the second fixed block has all been cup jointed at the both ends of dwang, and the second fixed block all installs the upper surface at the mount, the telescopic link is all installed at the both ends of dwang, and the telescopic link is kept away from the one end of dwang and is connected the lower surface at the second bracing piece, the spout has been seted up to the inside of second bracing piece, and the inside at the spout is connected to the telescopic link.
The utility model discloses a building electromechanical engineering assembled installation device, which has the following beneficial effects:
1. this building electromechanical engineering assembled installation device can stimulate the movable block out through supporting mechanism to make the air pump extension, thereby make the lower surface and the ground contact of supporting shoe, consequently can increase area of contact, thereby make the device more firm, and can make four second bracing pieces reciprocate simultaneously through elevating system, consequently can adjust the height of standing the frame, and first bracing piece and second bracing piece set up at four edges and corners, thereby increased the stability of standing the frame.
2. This building machine electrical engineering assembled installation device through upwards pulling circular block, drives the gag lever post rebound and tensile second elastic component to make the movable block can remove, the movable block outwards removes, makes the gag lever post peg graft with another spacing hole, thereby fixes the position of movable rod, then air pump work drives the bracing piece and moves down, thereby can increase with the area of contact on ground, increase stability.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a base structure according to the present invention;
FIG. 3 is an enlarged view of the structure at A of the present invention;
FIG. 4 is a schematic view of the internal structure of the base of the present invention;
FIG. 5 is a schematic view of the lifting structure of the present invention;
FIG. 6 is an enlarged view of the structure at B of the present invention.
In the figure: 1. a base; 101. a roller; 102. a moving block; 103. an air pump; 104. a support block; 105. a limiting groove; 106. a first elastic member; 107. a limiting hole; 108. a limiting rod; 109. a circular block; 110. a second elastic member; 2. a first support bar; 201. standing the frame; 202. a chute; 203. a fixed mount; 204. a motor; 205. a threaded rod; 206. a first fixed block; 207. a gear; 208. rotating the rod; 209. a second fixed block; 210. a telescopic rod; 211. a second support bar; 212. a connecting rod.
Detailed Description
The embodiment of the utility model discloses a building electromechanical engineering assembled installation device,
according to the attached drawing 1, rollers 101 are fixedly connected to two sides of a base 1, four corners of the upper surface of the base 1 are fixedly connected with first support rods 2, second support rods 211 are slidably connected to the inner portions of the support rods of the base 1, a standing frame 201 is fixedly connected to the top of each second support rod 211, and a plurality of connecting rods 212 are fixedly connected between two first support rods 2;
the supporting mechanism comprises four limiting grooves 105, the four limiting grooves 105 are formed in the base 1, and the supporting mechanism is installed in the base 1 through the limiting grooves 105;
the lifting mechanism comprises a fixed frame 203, the fixed frame 203 is fixedly connected to one side of the first supporting rod 2, and the lifting mechanism is arranged on one side of the first supporting rod 2 through the fixed frame 203;
the moving block 102 can be pulled out through the supporting mechanism, the air pump 103 is extended, the lower surface of the supporting block 104 is in contact with the ground, the contact area can be increased, the device is more stable, the four second supporting rods 211 can be moved up and down through the lifting mechanism, the height of the standing frame 201 can be adjusted, the first supporting rods 2 and the second supporting rods 211 are arranged at the four edges, and the stability of the standing frame 201 is improved.
As shown in fig. 2, 3 and 4, the supporting mechanism further includes a first elastic member 106, the first elastic member 106 is fixedly connected to the inner side wall of the limiting groove 105, and one end of the first elastic member 106, which is far away from the limiting groove 105, is fixedly connected with a moving block 102, one end of the moving block 102, which is far away from the first elastic member 106, penetrates through the outer surface of the base 1, an air pump 103 is fixedly connected to the lower surface of the moving block 102, a supporting block 104 is fixedly connected to the lower surface of the air pump 103, and two limiting holes 107 are formed in the upper surface of the moving block 102;
the supporting mechanism further comprises a limiting rod 108, the limiting rod 108 is movably inserted into the upper surface of the base 1, one end of the limiting rod 108 is movably inserted into one limiting hole 107, the upper surface of the limiting rod 108 is fixedly connected with a circular block 109, the outer surface of the limiting rod 108 is movably sleeved with a second elastic piece 110, and two ends of the second elastic piece 110 are respectively and fixedly connected to the upper surface of the base 1 and the lower surface of the circular block 109;
through upwards pulling circular block 109, drive gag lever post 108 rebound and tensile second elastic component 110 to make movable block 102 can remove, movable block 102 outwards removes, makes gag lever post 108 peg graft with another spacing hole 107, thereby fixes the position of movable rod, then air pump 103 work drives the bracing piece downstream, thereby can increase with the area of contact on ground, increase stability.
As shown in fig. 5 and fig. 6, the lifting mechanism further includes a motor 204, the motor 204 is fixedly connected to the lower surface of the fixing frame 203, an output end of the motor 204 penetrates through the upper surface of the fixing frame 203, an output end of the motor 204 is fixedly connected with a threaded rod 205, and the upper surface of the fixing frame 203 is fixedly connected with a plurality of first fixing blocks 206;
a rotating rod 208 is movably inserted into each of the two first fixing blocks 206, two ends of the rotating rod 208 respectively penetrate through one side of each of the two first fixing blocks 206, a gear 207 is fixedly connected to the geometric center of the rotating rod 208, and the outer surface of the gear 207 is meshed with the outer surface of the threaded rod 205;
the two ends of the rotating rod 208 are movably sleeved with second fixing blocks 209, the second fixing blocks 209 are fixedly connected to the upper surface of the fixing frame 203, the two ends of the rotating rod 208 are fixedly connected with telescopic rods 210, one ends of the telescopic rods 210, far away from the rotating rod 208, are rotatably connected to the lower surface of the second supporting rod 211, a sliding groove 202 is formed in the second supporting rod 211, and the telescopic rods 210 are slidably connected to the inside of the sliding groove 202;
drive threaded rod 205 through motor 204 work and rotate, threaded rod 205 rotates and drives gear 207 and rotate, and gear 207 rotates and drives dwang 208 and rotate, and dwang 208 rotates the one end that drives telescopic link 210 and rotates, and the other end of telescopic link 210 is upper and lower surrounding motion to can drive second bracing piece 211 and reciprocate, consequently can adjust the height of standing frame 201.
The working principle is as follows: when the assembly type mounting device for the building electromechanical engineering is used, the device is moved to a required place, then the circular block 109 is pulled upwards, the circular block 109 moves to drive the limiting rod 108 to move and stretch the second elastic piece 110, and the limiting rod 108 is separated from the limiting hole 107;
then the moving block 102 is pulled, the moving block 102 stretches the first elastic piece 106, then the circular block 109 is loosened, the second elastic piece 110 rebounds to enable the limiting rod 108 to be inserted into the other limiting hole 107, so that the position of the moving block 102 can be fixed, and then the air pump 103 works to drive the supporting block 104 to move downwards and contact with the ground, so that the contact area is increased;
then, after the person climbs the standing frame 201 through the plurality of connecting rods 212, the motor 204 works, the output end rotates to drive the threaded rod 205 to rotate, the threaded rod 205 rotates to drive the two gears 207 to rotate, the rotating rod 208 rotates to drive the rotating rod 208 to rotate, the rotating rod 208 rotates to drive one end of the telescopic rod 210 to rotate, and the two ends of the telescopic rod 210 do surrounding motion, so that the second supporting rod 211 is driven to move upwards, and the height of the standing frame 201 can be adjusted;
after the use, the same operation as above is carried out, firstly the height of the standing frame 201 is lowered to enable a person to get off, then the working supporting block 104 of the air pump 103 moves upwards to pull the circular block 109, and the first elastic element 106 rebounds to enable the moving block 102 to retract.
The foregoing shows and describes the general principles and broad features of the present invention and advantages thereof. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the utility model as claimed. The scope of the utility model is defined by the appended claims and equivalents thereof.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202122283537.1U CN215670914U (en) | 2021-09-22 | 2021-09-22 | Building electromechanical engineering assembled installation device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202122283537.1U CN215670914U (en) | 2021-09-22 | 2021-09-22 | Building electromechanical engineering assembled installation device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN215670914U true CN215670914U (en) | 2022-01-28 |
Family
ID=79964912
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202122283537.1U Active CN215670914U (en) | 2021-09-22 | 2021-09-22 | Building electromechanical engineering assembled installation device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN215670914U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116675138A (en) * | 2023-04-21 | 2023-09-01 | 中建八局第二建设有限公司 | A prefabricated installation device for building mechanical and electrical engineering |
-
2021
- 2021-09-22 CN CN202122283537.1U patent/CN215670914U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116675138A (en) * | 2023-04-21 | 2023-09-01 | 中建八局第二建设有限公司 | A prefabricated installation device for building mechanical and electrical engineering |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103938722B (en) | A kind of have that width height is adjustable and the GIS dw of flexible ceiling function | |
| CN208137383U (en) | A kind of liftable architectural engineering scaffold | |
| CN215670914U (en) | Building electromechanical engineering assembled installation device | |
| CN109252652B (en) | Hanging basket device for building curtain wall construction | |
| CN113067282B (en) | Building electromechanical installation auxiliary device and working method thereof | |
| CN207209904U (en) | A kind of portable power maintenance unit | |
| CN217791924U (en) | Supporting leg lifting structure and lifting table | |
| CN209931871U (en) | Manual drawing device for indoor design | |
| CN116357930A (en) | Supporting device for stage lamp and stage lamp | |
| CN111749449A (en) | A convenient combined building shelf | |
| CN221917322U (en) | Lifting device for building construction | |
| CN116492657B (en) | An adjustable electric cantilever basketball hoop | |
| CN220297315U (en) | Environment-friendly punching equipment | |
| CN112681701A (en) | Scaffold for building construction | |
| CN108481752A (en) | A kind of novel mobile phone screen mounting device for screen | |
| CN212311326U (en) | Intermediate-deep geothermal well screen pipe repairing device | |
| CN209094303U (en) | A kind of perforating press | |
| CN222632926U (en) | Temporary supporting structure for building | |
| CN220534527U (en) | Lofting device is used in processing of reinforced concrete spiral case template preparation | |
| CN220645362U (en) | Supporting frame | |
| CN218620139U (en) | Fixed lifting device for building curtain wall machining | |
| CN221664298U (en) | A curtain wall installation auxiliary equipment | |
| CN223634395U (en) | Miniature pile for building reinforcement | |
| CN220116171U (en) | EPC assembled super high-rise building is built interlude and is under construction with lifting support | |
| CN220295169U (en) | Precoated sand screening device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20241126 Address after: Unit 2506, Building 6, Changfengguan Garden, Xinzhuang North Street, Wanbailin District, Taiyuan City, Shanxi Province 030000 Patentee after: Shanxi Hongchang Construction Engineering Co.,Ltd. Country or region after: China Address before: 277100 9-2-701, Donghu Haoting, Shizhong District, Zaozhuang City, Shandong Province Patentee before: Gao Lin Country or region before: China |
|
| TR01 | Transfer of patent right |