CN215631469U - Construction engineering site operation platform - Google Patents

Construction engineering site operation platform Download PDF

Info

Publication number
CN215631469U
CN215631469U CN202122016585.4U CN202122016585U CN215631469U CN 215631469 U CN215631469 U CN 215631469U CN 202122016585 U CN202122016585 U CN 202122016585U CN 215631469 U CN215631469 U CN 215631469U
Authority
CN
China
Prior art keywords
fixedly connected
rod
workbench
construction
threaded rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122016585.4U
Other languages
Chinese (zh)
Inventor
臧伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122016585.4U priority Critical patent/CN215631469U/en
Application granted granted Critical
Publication of CN215631469U publication Critical patent/CN215631469U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forklifts And Lifting Vehicles (AREA)

Abstract

The utility model relates to the technical field of construction platforms, in particular to a construction platform for construction engineering on site, which comprises a base, wherein a rectangular rod is fixedly connected to the upper surface of the base, a motor is installed at the top of the rectangular rod, a transmission rod is connected to the output end of the motor in a spline mode, a threaded rod is fixedly connected to the bottom of the transmission rod, a rotating shaft is fixedly connected to the bottom of the threaded rod, a supporting rod is connected to the surface of the threaded rod in a threaded mode, a workbench is fixedly connected to one side of the supporting rod, and a box door is hinged to one side of the workbench. This building engineering site construction platform sets up through the cooperation of motor, threaded rod, bracing piece and workstation, during the use, and the staff opens motor switch, and then the motor rotates and drives the threaded rod and rotate, and then the bracing piece drives workstation rebound at threaded rod rebound to the staff of being convenient for is under construction on higher building engineering, and operation method is simple, and it is convenient to bring for the staff.

Description

Construction engineering site operation platform
Technical Field
The utility model relates to the technical field of construction platforms, in particular to a construction platform for a construction engineering site.
Background
The construction engineering major is mainly responsible for teaching and management of the civil engineering major construction engineering direction. The basic theory and the basic knowledge of engineering mechanics, soil mechanics, surveying, building construction and structural engineering subjects are mainly developed and mastered. It is a general term for various buildings and engineering facilities providing material and technical foundation for human life and production.
The building engineering site construction platform that discloses in chinese utility model patent application laid-open specification CN211974239U, though the railing removes and drives the plectane and removes, the plectane removes and makes the fixture block remove and pass inside the square groove gets into the circular slot, user of service counter-rotation T type pole, T type pole rotates and the magnetic path separation, under the effect of reset plate spring torsion, T type pole rotates and drives the kelly and rotate and get into inside the circular slot, and laminate mutually with the circular slot inner wall, and then accomplish the fixed mounting of plectane, accomplish the installation of railing, the convenient installation mechanism of railing has been solved and has lacked, cause inconvenient dismouting to the railing, it gets from platform main part side to be inconvenient to get article, the problem of platform main part practicality has been reduced.
However, in the existing construction process of the construction engineering, the heights of some buildings are higher, so that a construction platform is needed to support construction workers for facilitating construction operation of the workers, and the workers need to be fixed to a certain extent during construction.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Aiming at the defects of the prior art, the utility model provides a construction engineering field construction platform, which solves the problems in the background technology.
(II) technical scheme
In order to achieve the purpose, the utility model is realized by the following technical scheme: a construction engineering site construction platform comprises a base, wherein a rectangular rod is fixedly connected to the upper surface of the base, a motor is mounted at the top of the rectangular rod, an output end of the motor is in splined connection with a transmission rod, a threaded rod is fixedly connected to the bottom of the transmission rod, a rotating shaft is fixedly connected to the bottom of the threaded rod, a supporting rod is in threaded connection with the surface of the threaded rod, a workbench is fixedly connected to one side of the supporting rod, a box door is hinged to one side of the workbench, a belt is fixedly connected to the inner side wall of the workbench, a rectangular block is fixedly connected to one side of the belt, a spring is fixedly connected to the surface of the rectangular block, a bolt is fixedly connected to one side of the spring, an inserting plate is fixedly connected to the inside of the rectangular block, a second inserting hole is formed in the inserting plate, a protective guard is fixedly connected to the upper surface of the base, the top of the guard rail is fixedly connected with a long plate, and one side of the long plate is fixedly connected with the rectangular rod.
Optionally, the four corners of the bottom of the base are fixedly connected with universal wheels, and brake pads are arranged on the surfaces of the universal wheels.
Optionally, a warning mark is pasted on the surface of the workbench, and a groove is formed in the box door.
Optionally, an insert block is inserted into the groove, and a first jack is formed in the corresponding inner portion of the workbench and the insert block.
Optionally, the surface of the workbench is fixedly connected with a handle, and the surface of the handle is sleeved with an anti-slip sleeve.
Optionally, the two ends of the waistband are fixedly connected with a first elastic rope and a second elastic rope, and one side of the first elastic rope and one side of the second elastic rope are respectively connected with a hook surface magic tape and a cotton wool magic tape in a sewing mode.
(III) advantageous effects
The utility model provides a construction engineering site construction platform, which has the following beneficial effects:
1. this building engineering site construction platform sets up through the cooperation of motor, threaded rod, bracing piece and workstation, during the use, and the staff opens motor switch, and then the motor rotates and drives the threaded rod and rotate, and then the bracing piece drives workstation rebound at threaded rod rebound to the staff of being convenient for is under construction on higher building engineering, and operation method is simple, and it is convenient to bring for the staff.
2. This building engineering site operation platform sets up through the cooperation of waistband, spring, bolt, rectangular block, picture peg and second jack, during the use, and the staff advances the waist with the waistband cover, and then injects the picture peg into the rectangular block, then the bolt passes through in the elasticity bullet of spring advances the second jack to can avoid the staff to meet accident in high altitude construction, the waistband has elasticity, and the staff can move about wantonly on the workstation.
Drawings
FIG. 1 is an exploded view of the present invention;
FIG. 2 is a perspective view of the structure of the present invention;
FIG. 3 is a perspective view of the structural waistband and a second elastic cord of the present invention;
fig. 4 is a perspective view of the insert and groove of the present invention.
In the figure: 1. a base; 2. a rectangular bar; 3. a motor; 4. a threaded rod; 5. a support bar; 6. a work table; 7. a box door; 8. a waistband; 9. a spring; 10. a universal wheel; 11. a groove; 12. inserting a block; 13. a first jack; 14. a first elastic cord; 15. a second elastic cord.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1 to 4, the present invention provides a technical solution: a construction engineering site construction platform comprises a base 1, wherein a rectangular rod 2 is fixedly connected to the upper surface of the base 1, a motor 3 is mounted at the top of the rectangular rod 2, an output end of the motor 3 is in splined connection with a transmission rod, a threaded rod 4 is fixedly connected to the bottom of the transmission rod, a rotating shaft is fixedly connected to the bottom of the threaded rod 4, a support rod 5 is in threaded connection with the surface of the threaded rod 4, and a workbench 6 is fixedly connected to one side of the support rod 5;
in order to facilitate construction of workers on higher constructional engineering, the operation method is simple, and convenience is brought to the workers, the construction platform on the construction engineering site is characterized in that the motors 3, the threaded rods 4, the support rods 5 and the workbench 6 are arranged in a matched mode, when the construction platform is used, the workers turn on the switches of the motors 3, then the motors 3 rotate to drive the threaded rods 4 to rotate, and then the support rods 5 move upwards on the threaded rods 4 to drive the workbench 6 to move upwards;
a box door 7 is hinged to one side of the workbench 6, a waistband 8 is fixedly connected to the inner side wall of the workbench 6, a rectangular block is fixedly connected to one side of the waistband 8, a spring 9 is fixedly connected to the surface of the rectangular block, a bolt is fixedly connected to one side of the spring 9, an inserting plate is fixedly connected to the inside of the rectangular block, a second inserting hole is formed in the inserting plate, a protective guard is fixedly connected to the upper surface of the base 1, a long plate is fixedly connected to the top of the protective guard, and one side of the long plate is fixedly connected with the rectangular rod 2;
in order to avoid accidents of workers in high-altitude operation, the waistband 8 has elasticity, and the workers can move freely on the workbench, the construction platform in the construction engineering field is arranged by matching the waistband 8, the spring 9, the bolt, the rectangular block, the plug board and the second jack, when in use, the workers sleeve the waistband 8 into the waist, further insert the plug board into the rectangular block, and then the bolt is popped into the second jack through the elasticity of the spring 9;
the four corners fixedly connected with universal wheel 10 of base 1's bottom, the surface of universal wheel 10 is provided with the brake block, warning sign has been pasted on the surface of workstation 6, recess 11 has been seted up to the inside of chamber door 7, it has inserted block 12 to peg graft in recess 11's inside, first jack 13 has been seted up with the corresponding inside of inserted block 12 to workstation 6, the fixed surface of workstation 6 is connected with the handle, the antiskid cover has been cup jointed on the surface of handle, the equal first stretch cord 14 of fixedly connected with in both ends and second stretch cord 15 of waistband 8, one side of first stretch cord 14 and second stretch cord 15 is sewed up respectively and is connected with hook face magic subsides and cotton wool magic subsides.
In the utility model, the working steps of the device are as follows:
1. the motor 3, the threaded rod 4, the support rod 5 and the workbench 6 are matched for use, when the multifunctional building block is used, a worker turns on a switch of the motor 3, then the motor 3 rotates to drive the threaded rod 4 to rotate, and then the support rod 5 moves upwards on the threaded rod 4 to drive the workbench 6 to move upwards, so that the worker can construct on a higher building project conveniently, the operation method is simple, and convenience is brought to the worker;
2. waistband 8, spring 9, bolt, rectangular block, picture peg and the collocation of second jack are used, and during the use, the staff advances the waist with 8 cover of waistband, and then injects the picture peg into the rectangular block, then the bolt passes through spring 9's elasticity bullet in the second jack to can avoid the staff to meet accident in high altitude construction, waistband 8 has elasticity, and the staff can move about wantonly on the workstation.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a building engineering site construction platform, includes base (1), its characterized in that: the upper surface of the base (1) is fixedly connected with a rectangular rod (2), a motor (3) is installed at the top of the rectangular rod (2), an output end spline of the motor (3) is connected with a transmission rod, the bottom of the transmission rod is fixedly connected with a threaded rod (4), the bottom of the threaded rod (4) is fixedly connected with a rotating shaft, the surface of the threaded rod (4) is in threaded connection with a supporting rod (5), one side of the supporting rod (5) is fixedly connected with a workbench (6), one side of the workbench (6) is hinged with a box door (7), the inner side wall of the workbench (6) is fixedly connected with a waistband (8), one side of the waistband (8) is fixedly connected with a rectangular block, the surface of the rectangular block is fixedly connected with a spring (9), one side of the spring (9) is fixedly connected with a bolt, and the inner part of the rectangular block is fixedly connected with a plugboard, the plug board is characterized in that a second jack is formed in the plug board, a guard rail is fixedly connected to the upper surface of the base (1), a long board is fixedly connected to the top of the guard rail, and one side of the long board is fixedly connected with the rectangular rod (2).
2. The construction engineering on-site construction platform according to claim 1, wherein: the four corners department fixedly connected with universal wheel (10) of the bottom of base (1), the surface of universal wheel (10) is provided with the brake block.
3. The construction engineering on-site construction platform according to claim 1, wherein: the surface of the workbench (6) is adhered with a warning sign, and the interior of the box door (7) is provided with a groove (11).
4. A construction work site platform according to claim 3, wherein: an inserting block (12) is inserted into the groove (11), and a first inserting hole (13) is formed in the corresponding inner portion of the workbench (6) and the inserting block (12).
5. The construction engineering on-site construction platform according to claim 1, wherein: the surface of the workbench (6) is fixedly connected with a handle, and the surface of the handle is sleeved with an anti-slip sleeve.
6. The construction engineering on-site construction platform according to claim 1, wherein: the two ends of the waistband (8) are fixedly connected with a first elastic rope (14) and a second elastic rope (15), and one side of the first elastic rope (14) and one side of the second elastic rope (15) are respectively connected with a hook surface magic tape and a cotton wool magic tape in a sewing mode.
CN202122016585.4U 2021-08-25 2021-08-25 Construction engineering site operation platform Expired - Fee Related CN215631469U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122016585.4U CN215631469U (en) 2021-08-25 2021-08-25 Construction engineering site operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122016585.4U CN215631469U (en) 2021-08-25 2021-08-25 Construction engineering site operation platform

Publications (1)

Publication Number Publication Date
CN215631469U true CN215631469U (en) 2022-01-25

Family

ID=79902172

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122016585.4U Expired - Fee Related CN215631469U (en) 2021-08-25 2021-08-25 Construction engineering site operation platform

Country Status (1)

Country Link
CN (1) CN215631469U (en)

Similar Documents

Publication Publication Date Title
CN211798639U (en) A combined pole climbing device for electric construction
CN215631469U (en) Construction engineering site operation platform
CN211257889U (en) High-rise building construction safety protection net
CN210122464U (en) Portable heavy object solid support
CN113548124B (en) Automatic pole climbing robot for electric power construction
CN112922445A (en) Building safety is with rail guard of convenient removal
CN114075920B (en) Folding ladder for outdoor power supply maintenance in rainy days
CN213509479U (en) Construction platform convenient to remove
CN212867122U (en) Rail guard convenient to adjusting position for electric power communication engineering
CN215331322U (en) Civil construction is indoor with scaffold
CN115387594A (en) Prevent old house of empting scaffold frame for transformation
CN210041024U (en) Intelligent integrated power distribution control box
CN206855400U (en) A kind of architectural engineering maintenance work frame
CN114024225B (en) A fixed component for electrical equipment that is convenient for maintenance
CN214693194U (en) Combined climbing rod device for electric power construction
CN212982410U (en) Building electrical construction equipment
CN220928931U (en) Protective bracket for building engineering
CN114241878A (en) Conference room that conveniently demonstrates is with portable city planning demonstration sand table
CN217400510U (en) Multifunctional switching electric pole for high-voltage distribution line
CN216690329U (en) Building engineering building climbing frame
CN219773825U (en) Detachable interchange garage fence
CN220223492U (en) Lifting protection device for building installation engineering
CN219904484U (en) Maintenance equipment for electric power communications
CN221008566U (en) Be used for stage show face mounting structure
CN221332570U (en) Fire extinguisher storage equipment convenient for replacing and taking fire extinguisher

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220125

CF01 Termination of patent right due to non-payment of annual fee