CN215592440U - Tower crane assembled attaches wall spare - Google Patents
Tower crane assembled attaches wall spare Download PDFInfo
- Publication number
- CN215592440U CN215592440U CN202121555453.2U CN202121555453U CN215592440U CN 215592440 U CN215592440 U CN 215592440U CN 202121555453 U CN202121555453 U CN 202121555453U CN 215592440 U CN215592440 U CN 215592440U
- Authority
- CN
- China
- Prior art keywords
- plate
- tower crane
- screw rod
- internal thread
- embedded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000009194 climbing Effects 0.000 claims abstract description 40
- 238000004873 anchoring Methods 0.000 claims abstract description 22
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 5
- 239000004567 concrete Substances 0.000 claims description 12
- 229910000831 Steel Inorganic materials 0.000 claims description 8
- 239000010959 steel Substances 0.000 claims description 8
- 239000002390 adhesive tape Substances 0.000 claims description 4
- 235000014121 butter Nutrition 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 8
- 238000009434 installation Methods 0.000 abstract description 7
- 239000000463 material Substances 0.000 description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 230000006978 adaptation Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000004519 grease Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Images
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model provides a tower crane assembled wall-attached part which comprises a connecting plate and an embedded part, wherein the connecting plate is fixed on the embedded part through a bolt, the connecting plate comprises an ear plate and an anchoring plate, the ear plate is fixedly arranged on the anchoring plate, a plurality of reserved holes are formed in the anchoring plate, the embedded part comprises an embedded part plate, a screw rod and a climbing cone, the anchoring plate is fixed on the climbing cone through the bolt, the embedded part plate is embedded in reinforced concrete, one end of the screw rod is fixedly connected to the embedded plate, and the other end of the screw rod is in threaded connection with the climbing cone. Use this kind to attach the wall spare can be applicable to the attached rod of different tower crane models for the suitability is stronger, can standardize simultaneously, the installation of assemblization, can have enough to meet the need the use, has improved the efficiency of construction.
Description
Technical Field
The utility model relates to the technical field of building construction tools, in particular to a tower crane assembly type wall-attached piece.
Background
The tower crane is a relatively extensive hoisting device applied in engineering construction, and after the tower crane exceeds the independent height, in order to ensure that the slenderness ratio of a tower body steel structure can stabilize the balance of the steel structure of the tower body and prevent instability, a constraint is required to be added to the tower body, the stability of the slenderness ratio is increased, and the constraint is attachment.
The tower crane wall attaching piece is an attached important stressed component of the tower crane, and transmits the force to a structure one by one through the tower crane attaching frame, the attaching rod and the wall attaching piece, so that the use safety of the tower crane is ensured.
The steel sheet of taking the anchor bar of pre-buried taking usually adopts among the prior art to attach the wall spare as the tower crane on the structure surface, then links to each other at steel sheet surface welding otic placode and adheres to pole, attached to the frame and stabilize the tower crane. This kind of attach wall spare can not be applicable to the attached rod of different tower crane models, can not have enough to meet the need the use one to one, and the suitability is not strong.
SUMMERY OF THE UTILITY MODEL
In view of the above, the utility model provides a tower crane fabricated wall-attached part, which can be applied to attachment rods of different tower crane models, so that the tower crane fabricated wall-attached part has stronger applicability, can be mounted in a standardized and assembled manner, can be used in a circulating manner, and improves the construction efficiency.
The utility model solves the technical problems by the following technical means: the utility model provides a tower crane assembled wall-attached part which comprises a connecting plate and an embedded part, wherein the connecting plate is fixed on the embedded part through a bolt, the connecting plate comprises an ear plate and an anchoring plate, the ear plate is fixedly arranged on the anchoring plate, a plurality of reserved holes are formed in the anchoring plate, the embedded part comprises an embedded part plate, a screw rod and a climbing cone, the anchoring plate is fixed on the climbing cone through the bolt, the embedded part plate is embedded in reinforced concrete, one end of the screw rod is fixedly connected to the embedded plate, and the other end of the screw rod is in threaded connection with the climbing cone.
Furthermore, the embedded plate and one end of the screw rod, which is close to the embedded plate, are integrally welded on the steel bar group in the concrete.
Further, the surface that climbs the awl sets up to the conical, the one end that the diameter is little that climbs the awl is close to pre-buried board, the both ends that climb the awl are provided with respectively with screw rod and first internal thread hole of bolt assorted and second internal thread hole, first internal thread hole and screw rod phase-match, first internal thread hole is located the one end that the excircle diameter is little that climbs the awl.
Further, the first internal thread hole is communicated with the second internal thread hole, the diameter of the first internal thread hole is smaller than that of the second internal thread hole, and a third internal thread hole matched with the screw rod is arranged on the bolt.
Furthermore, the length of the external thread on the screw rod close to one end of the climbing cone is smaller than or equal to the length of the climbing cone and larger than the length of the first internal thread hole.
Furthermore, a layer of butter layer and an adhesive tape layer are sequentially arranged on the outer surface of the creeping cone from inside to outside.
Further, the ear plates are arranged to be double ear plates or single ear plates, and the ear plates incline along with the inclination angle of the concrete structure, so that the ear plates are connected in a horizontal state.
Furthermore, the preformed hole corresponds to the embedded plate, the screw and the bolt one to one.
According to the technical scheme, the utility model has the beneficial effects that: the utility model provides a tower crane assembled wall-attached part which comprises a connecting plate and an embedded part, wherein the connecting plate is fixed on the embedded part through a bolt, the connecting plate comprises an ear plate and an anchoring plate, the ear plate is fixedly arranged on the anchoring plate, a plurality of reserved holes are formed in the anchoring plate, the embedded part comprises an embedded part plate, a screw rod and a climbing cone, the anchoring plate is fixed on the climbing cone through the bolt, the embedded part plate is embedded in reinforced concrete, one end of the screw rod is fixedly connected to the embedded plate, and the other end of the screw rod is in threaded connection with the climbing cone. Use this kind to attach the wall spare can be applicable to the attached rod of different tower crane models for the suitability is stronger, can standardize simultaneously, the installation of assemblization, can have enough to meet the need the use, has improved the efficiency of construction.
Drawings
In order to more clearly illustrate the detailed description of the utility model or the technical solutions in the prior art, the drawings that are needed in the detailed description of the utility model or the prior art will be briefly described below. Throughout the drawings, like elements or portions are generally identified by like reference numerals. In the drawings, elements or portions are not necessarily drawn to scale.
FIG. 1 is a schematic view of a tower crane fabricated wall-attached part provided by the utility model;
FIG. 2 is a schematic view of the disassembly of the tower crane fabricated wall-attached component provided by the utility model;
FIG. 3 is a cross-sectional view of a climbing cone of a tower crane fabricated wall-attached part provided by the utility model;
FIG. 4 is a schematic view of a bolt of the tower crane fabricated wall-attached part provided by the utility model;
FIG. 5 is a schematic diagram of the assembled wall-attached part of the tower crane provided by the utility model after installation;
reference numerals: 1-ear plate; 2-an anchor plate; 21-preparing a hole; 3-a component embedding plate; 4-screw rod; 5-climbing a cone; 6-bolt; 7-reinforcing steel bar group; 8-concrete; 51-a first internally threaded bore; 52-a second internally threaded bore; 61-a third internally threaded bore; 9-wall-attached rod.
Detailed Description
Embodiments of the present invention will be described in detail below with reference to the accompanying drawings. The following examples are only for illustrating the technical solutions of the present invention more clearly, and therefore are only examples, and the protection scope of the present invention is not limited thereby.
Referring to fig. 1-5, the utility model provides a tower crane assembled wall-attached part, which comprises a connecting plate and an embedded part, wherein the connecting plate is fixed on the embedded part through a bolt 6, the connecting plate comprises an ear plate 1 and an anchoring plate 2, the ear plate 1 is fixedly arranged on the anchoring plate 2, a plurality of preformed holes 21 are formed in the anchoring plate 2, the embedded part comprises an embedded part plate 3, a screw rod 4 and a climbing cone 5, the anchoring plate 2 is fixed on the climbing cone 5 through the bolt 6, the embedded part plate 3 is embedded in reinforced concrete 8, one end of the screw rod 4 is fixedly connected to the embedded plate, and the other end of the screw rod is in threaded connection with the climbing cone 5. Use this kind to attach the wall spare can be applicable to the attached rod of different tower crane models for the suitability is stronger, can standardize simultaneously, the installation of assemblization, can have enough to meet the need the use, has improved the efficiency of construction.
As a further improvement of the technical scheme, one end of the embedded plate and one end of the screw rod 4, which are close to the embedded plate, are integrally welded on a steel bar group 7 in the concrete 8. And the embedded plates and the screw rods 4 are welded on the steel bar group 7 in the concrete 8 to increase the stress strength of the concrete.
As a further improvement to the above technical scheme, the surface of climbing awl 5 sets up to conical, the one end that the diameter of climbing awl 5 is little is close to pre-buried board, the both ends of climbing awl 5 are provided with respectively with screw rod 4 and 6 assorted first internal thread holes of bolt and second internal thread hole, first internal thread hole and screw rod 4 phase-match, first internal thread hole is located the one end that the excircle diameter of climbing awl 5 is little. When the climbing cone is installed, the small-diameter end of the climbing cone 5 is inserted into the concrete 8, so that the climbing cone 5 can be conveniently detached and recycled after the use is finished, and materials are saved.
As a further improvement to the above technical solution, the first female screw hole communicates with the second female screw hole, the diameter of the first female screw hole 51 is smaller than the diameter of the second female screw hole 52, and the bolt 6 is provided with a third female screw hole 61 that matches the screw rod 4. With first internal thread hole and second internal thread hole intercommunication, set up third internal thread hole 61 simultaneously on bolt 6, will climb awl 5 and install the back on screw rod 4, then twist bolt 6 soon to climb and make bolt 6 can twist simultaneously and increase joint strength on screwing up screw rod 4 when on awl 5.
As a further improvement to the technical scheme, the length of the external thread on one end of the screw rod 4 close to the climbing cone 5 is less than or equal to the length of the climbing cone 5 and is greater than the length of the first internal thread hole. The length of the external thread on the screw rod 4 close to one end of the climbing cone 5 is set to be less than or equal to that of the climbing cone 5, so that one end of the screw rod 4 does not penetrate through the end surface of the climbing cone 5 to obstruct the installation of the bolt 6 when the climbing cone 5 is installed on the screw rod 4. The length of the external thread on the screw rod 4 close to one end of the climbing cone 5 is set to be larger than that of the first internal thread hole, so that the screw rod 4 can be inserted into the second internal thread hole and then connected with the third internal thread hole 61 in the bolt 6, and the connection strength is increased.
As a further improvement of the technical scheme, a layer of butter layer and a layer of adhesive tape are sequentially arranged on the outer surface of the creeping cone 5 from inside to outside. Set up the butter layer on the surface of climbing awl 5 and then make when carrying out concrete 8 and pouring in outer winding adhesive tape layer again, climb awl 5 and can not solidify on concrete 8, be convenient for climb the dismantlement of awl 5 and reuse. Meanwhile, grease needs to be filled in the threaded hole of the climbing cone 5 during installation.
As a further improvement to the above technical solution, the ear plate 1 is set as a double ear plate 1 or a single ear plate 1, the ear plate 1 is inclined along with the inclination angle of the concrete 8 structure, so that the ear plate 1 is connected in a horizontal state, and the preformed holes 21 are in one-to-one correspondence with the embedded plate 3, the screws 4 and the bolts 6. The otic placode 1 is along with the inclination of structure thing surely to one side the back, adheres to pole and otic placode 1 and all is connected to horizontal attitude, is provided with two with otic placode 1 simultaneously, and the double shear section atress is better, and two otic placodes 1 also can all incline, the inclination engineering of more adaptation special structures thing. The preformed holes 21 correspond to the embedded plate 3, the screw rods 4 and the bolts 6 one by one, and the anchoring plates 2 are better fixed. Meanwhile, the number of the preformed holes 21 of the anchoring plate 2 is set according to the stress condition of the wall attaching piece, so that the wall attaching piece can bear stress and save the use of the embedded piece plate 3, materials are saved, and the construction efficiency is improved. When the installation and construction are carried out, the embedded position of the wall attaching piece and the tower crane attaching frame need to correspond to the elevation position, the wall attaching piece can use a moving error angle, and the ear plate 1 can be rotated by a certain angle to ensure that the stress direction of the wall attaching piece is consistent with that of the rod piece. The applicability is stronger, and meanwhile, the device can be installed in a standardized and assembled manner, so that the construction efficiency is improved.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; while the utility model has been described in detail and with reference to the foregoing embodiments, it will be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention, and they should be construed as being included in the following claims and description.
Claims (8)
1. The utility model provides a tower crane assembled attaches wall spare which characterized in that: the connecting plate is fixed on the embedded part through a bolt (6), the connecting plate comprises an ear plate (1) and an anchoring plate (2), the ear plate (1) is fixedly arranged on the anchoring plate (2), a plurality of preformed holes (21) are formed in the anchoring plate (2), the embedded part comprises an embedded part plate (3), a screw rod (4) and a climbing cone (5), the anchoring plate (2) is fixed on the climbing cone (5) through the bolt (6), the embedded part plate (3) is embedded in reinforced concrete (8), one end of the screw rod (4) is fixedly connected onto the embedded plate, and the other end of the screw rod is in threaded connection with the climbing cone (5).
2. The tower crane fabricated wall-attached member of claim 1, wherein: and the embedded plate and one end of the screw rod (4) close to the embedded plate are integrally welded on a steel bar group (7) in the concrete.
3. The tower crane fabricated wall-attached member of claim 2, wherein: the surface of climbing awl (5) sets up to the conical shape, the one end that the diameter is little of climbing awl (5) is close to pre-buried board, the both ends of climbing awl (5) are provided with respectively with screw rod (4) and bolt (6) assorted first internal thread hole and second internal thread hole, first internal thread hole and screw rod (4) phase-match, first internal thread hole is located the one end that the excircle diameter is little of climbing awl (5).
4. The tower crane fabricated wall-attached member of claim 3, wherein: the first internal thread hole is communicated with the second internal thread hole, the diameter of the first internal thread hole (51) is smaller than that of the second internal thread hole (52), and a third internal thread hole (61) matched with the screw rod (4) is arranged on the bolt (6).
5. The tower crane fabricated wall-attached member of claim 4, wherein: the length of the external thread on one end of the screw rod (4) close to the climbing cone (5) is less than or equal to the length of the climbing cone (5) and is greater than the length of the first internal thread hole.
6. The tower crane fabricated wall-attached member of claim 1, wherein: the outer surface of the creeping cone (5) is also sequentially provided with a layer of butter layer and an adhesive tape layer from inside to outside.
7. The tower crane fabricated wall-attached member of claim 1, wherein: the ear plate (1) is set to be a double ear plate (1) or a single ear plate (1), and the ear plate (1) is inclined along with the inclination angle of the concrete (8) structure, so that the ear plate (1) is connected in a horizontal state.
8. The tower crane fabricated wall-attached member of claim 1, wherein: the preformed holes (21) correspond to the embedded plate (3), the screw rods (4) and the bolts (6) one by one.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202121555453.2U CN215592440U (en) | 2021-07-09 | 2021-07-09 | Tower crane assembled attaches wall spare |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202121555453.2U CN215592440U (en) | 2021-07-09 | 2021-07-09 | Tower crane assembled attaches wall spare |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN215592440U true CN215592440U (en) | 2022-01-21 |
Family
ID=79877841
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202121555453.2U Active CN215592440U (en) | 2021-07-09 | 2021-07-09 | Tower crane assembled attaches wall spare |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN215592440U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115095133A (en) * | 2022-07-06 | 2022-09-23 | 中建三局集团有限公司 | Arc-shaped cone-shaped embedded part capable of being taken out and assembly thereof |
-
2021
- 2021-07-09 CN CN202121555453.2U patent/CN215592440U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115095133A (en) * | 2022-07-06 | 2022-09-23 | 中建三局集团有限公司 | Arc-shaped cone-shaped embedded part capable of being taken out and assembly thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110820545B (en) | Assembled concrete pier | |
| CN101851965A (en) | Reinforced concrete sway wall, sway wall assembly and production method thereof | |
| CN108691358B (en) | Combined anchor plate, buckling restrained brace connecting node and installation method thereof | |
| CN212376021U (en) | Steel corbel and support-free installation connecting node comprising same | |
| CN102953344B (en) | Climbing cone type triangular cantilever bracket | |
| CN214061962U (en) | Building assembly structure connecting rod and special tool thereof | |
| CN212462676U (en) | Combined upright post for cable bridge | |
| CN211621988U (en) | Wall type shear damper embedded part | |
| CN113981820A (en) | Clamping piece type extruded inhaul cable anchorage device of FRP (fiber reinforced Plastic) rib material and anchoring method | |
| CN210710456U (en) | Bearing structure of inner climbing frame of super high-rise tower crane | |
| CN214834052U (en) | Column base system convenient for hoisting and fixing steel column | |
| CN215925950U (en) | Pressure-bearing type uplift pile precast pile connecting structure | |
| CN110468830B (en) | Quick anchor pile and construction method | |
| CN113666279B (en) | Wall-attached embedded part of external climbing tower crane | |
| CN214737393U (en) | Articulated formula is detained tower and is assembled interim locking and straightness micromatic setting that hangs down | |
| CN210395735U (en) | Installation and construction assembly of prefabricated shear wall | |
| CN111550010B (en) | A non-standard attachment connection structure for a construction hoist | |
| CN210439143U (en) | Bridge inhaul cable with fork lug type structure | |
| CN218320433U (en) | A climbing cone tower crane attached pre-buried connection structure | |
| CN205206100U (en) | One -way steel cable point of superelevation supporting ARC unit glass curtain wall | |
| CN117904986B (en) | A bridge correction and repositioning system and construction method based on the pier top index pullback method | |
| CN223048842U (en) | Dual-purpose type quick installation anchor rope structure | |
| CN223867634U (en) | Supporting structure for construction of ring beam structure of concrete filled steel tubular column | |
| CN219753929U (en) | Adjustable wall connecting piece | |
| CN220565064U (en) | A ladder cage and pier attachment structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |