Water supply and drainage engineering construction device for building construction Download PDFInfo
- Publication number
- CN215568421U CN215568421U CN202122103993.3U CN202122103993U CN215568421U CN 215568421 U CN215568421 U CN 215568421U CN 202122103993 U CN202122103993 U CN 202122103993U CN 215568421 U CN215568421 U CN 215568421U
- Authority
- CN
- China
- Prior art keywords
- base
- water supply
- fixedly connected
- lead screw
- belt pulley
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Sink And Installation For Waste Water (AREA)
Abstract
The utility model discloses a construction device for water supply and drainage engineering in building construction, which comprises a base, wherein a first groove is formed in the top of the base, a lead screw is rotationally connected in the first groove, two second belt pulleys are fixedly connected to the outer surface of the lead screw, four second grooves are formed in the bottom of the base, rollers are arranged in the four second grooves, the top of each roller is fixedly connected with a worm, two rotating rods are rotationally connected in the base, the first belt pulley and two worm gears are fixedly connected to the outer surfaces of the two rotating rods, a rotating shaft is rotationally connected to the base, and a conical gear is fixedly connected to one end of each rotating shaft and one end of the lead screw. The device is convenient for increase the stability when using and the flexibility when removing, and the device removes more easily to reduce staff's working strength, and the device is difficult for removing during the use, makes the support effect of pipeline better.
Description
Technical Field
The utility model relates to the technical field of building construction, in particular to a water supply and drainage engineering construction device for building construction.
Background
In the construction process of building, water supply and drainage is indispensable, it is mainly used for carrying and distributing industrial water supply and domestic drinking water and collecting, transporting and discharging industrial waste water, domestic water and rainwater, need interconnect a plurality of pipelines in the construction process of water supply and drainage engineering to form a complete pipeline route, and water supply and drainage pipeline need be located unified horizontal plane when connecting, again carry out concrete placement to the pipeline and fix and support, consequently need carry out preliminary bracing and location to water supply and drainage pipeline.
Just need add the pipeline to the other end of adjacent pipeline after a pipeline accomplishes the fixed stay, just need to withdraw strutting arrangement before this moment, and estimate the length of pipeline, remove strutting arrangement to corresponding position again and support the pipeline, and the pipeline of plumbing is installed in the ditch inslot dug in advance again mostly, and for the stability of device, the area of contact of the base of device and ground can be bigger, make the device be difficult to nimble length removal according to the pipeline in the ditch inslot, it is more troublesome to operate.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the defects of the prior art related to the background art, and provides a construction device for building construction water supply and drainage engineering.
In order to achieve the purpose, the utility model adopts the following technical scheme:
the utility model provides a building construction is for drainage engineering construction equipment, includes the base, the top of base is equipped with a recess, the recess internal rotation is connected with the lead screw No. one, two belt pulleys of two of surface fixed connection of lead screw, the bottom of base is equipped with four recesses No. two, four all be equipped with the gyro wheel in the recess No. two, the top fixedly connected with worm of gyro wheel, the base internal rotation is connected with two bull sticks, two the equal fixed connection belt pulley of surface and two worm wheels of bull stick, it is connected with the pivot to rotate on the base, the one end fixedly connected with conical gear of pivot and lead screw.
Preferably, the surface threaded connection of lead screw has two sliders, two the top of slider all articulates there is the bracing piece, the top of bracing piece articulates there is the connecting plate.
Preferably, the top of the connecting plate is fixedly connected with two fixing columns, and the tops of the two fixing columns are fixedly connected with a supporting plate.
Preferably, the top of the base is fixedly connected with an installation box, and the top of the rotating shaft penetrates through the base and the installation box respectively and extends out of one part.
Preferably, the tops of the four worms all penetrate through the base and extend out of the base, and the worms are in threaded connection with the base.
Preferably, the four worms correspond to a worm wheel respectively, the worms are meshed with the worm wheel, the two conical gears correspond to each other, and the two conical gears are meshed with each other.
Preferably, two No. two belt pulleys correspond a belt pulley respectively, and pass through belt transmission connection between a belt pulley and the No. two belt pulleys.
The utility model has at least the following beneficial effects:
the utility model provides a building construction is for drainage engineering construction equipment, the transmission structure has been set up, gyro wheel and No. two recesses, be convenient for increase the stability when device uses and the flexibility when removing, when rotating the pivot, under transmission structure's drive, lead screw and bull stick can rotate simultaneously, the lead screw rotates and can drives the slider and remove to centre or both sides simultaneously, and the bull stick rotates and can drive the gyro wheel and move downwards or rebound, thereby make the gyro wheel shift out or withdraw in No. two recesses, when the gyro wheel shifts out, mobile device can be lighter under the help of gyro wheel, when the gyro wheel withdraws, the base can directly contact with ground, and make the device more stable, difficult removal, the supporting effect is better.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings needed to be used in the description of the embodiments are briefly introduced below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings based on these drawings without creative efforts.
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a side view of the present invention;
FIG. 3 is a cross-sectional view of the present invention;
FIG. 4 is a schematic structural view of a lead screw according to the present invention;
fig. 5 is a sectional view of the roller according to the present invention.
In the figure: 1. a base; 2. a first groove; 3. a screw rod; 4. a slider; 5. a support bar; 6. a connecting plate; 7. fixing a column; 8. a support plate; 9. installing a box; 10. a second groove; 11. a worm; 12. a roller; 13. a rotating rod; 14. a first belt pulley; 15. a second belt pulley; 16. a belt; 17. a worm gear; 18. a rotating shaft; 19. a bevel gear.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the utility model and are not intended to limit the utility model.
Referring to fig. 1-5, a construction device for water supply and drainage engineering in building construction comprises a base 1, a pushing handle is arranged on the base 1, the handle is not marked in the drawing, a first groove 2 is arranged at the top of the base 1, a screw rod 3 is connected in the first groove 2 in a rotating manner, symmetrical and opposite threads are arranged on the screw rod 3, two belt pulleys 15 are fixedly connected to the outer surface of the screw rod 3, four grooves 10 are arranged at the bottom of the base 1, the rollers 12 can be just completely accommodated in the grooves 10, the rollers 12 are arranged in the grooves 10, the rollers 12 are universal wheels, a worm 11 is fixedly connected to the top of each roller 12, two rotating rods 13 are connected in the base 1 in a rotating manner, a first belt pulley 14 and two worm wheels 17 are fixedly connected to the outer surfaces of the two rotating rods 13, a rotating shaft 18 is rotatably connected to the base 1, and a conical gear 19 is fixedly connected to one end of the rotating shaft 18 and one end of the screw rod 3.
Further, refer to fig. 3 and learn that the surface threaded connection of lead screw 3 has two sliders 4, and the top of two sliders 4 all articulates there is bracing piece 5, and bracing piece 5 not only can play the supporting role, can also change the height of connecting plate 6, and the top of bracing piece 5 articulates there is connecting plate 6, and connecting plate 6 is located install bin 9, and contacts with the side of install bin 9.
Further, as can be known by referring to fig. 3, the top of the connecting plate 6 is fixedly connected with two fixing columns 7, the top of the two fixing columns 7 is fixedly connected with a supporting plate 8, the supporting plate 8 is located right above the installation box 9, and the supporting plate 8 supports the pipeline.
Further, as can be known by referring to fig. 3, the top fixedly connected with install bin 9 of base 1, the setting of install bin 9 can prevent that connecting plate 6 from rocking to lead to layer board 8 unstability, base 1 and install bin 9 are run through respectively and extend partly in the top of pivot 18.
Further, as can be known by referring to fig. 4 and 5, the tops of the four worms 11 all penetrate through the base 1 and extend out of a part, the worms 11 are in threaded connection with the base 1, the four worms 11 respectively correspond to one worm wheel 17, the worms 11 are meshed with the worm wheel 17, the two bevel gears 19 correspond to each other, the two bevel gears 19 are meshed with each other, the two second belt wheels 15 respectively correspond to one first belt wheel 14, the first belt wheel 14 is in transmission connection with the second belt wheel 15 through a belt 16, and the worms 11 and the worm wheels 17, the belt wheels, the belt 16 and the bevel gears 19 are all in transmission structures, so that only one power device is needed to drive the structures to rotate.
The scheme has the following working processes: the device is put into the groove in advance, then the pipeline is put on the supporting plate 8, then the rotating shaft 18 is rotated, the screw rod 3 rotates under the drive of the bevel gear 19, the slide block 4 moves towards two sides when the screw rod 3 rotates, the slide block 4 moves to drive one end of the supporting rod 5 to move, thereby the height of the vertical direction of the supporting rod 5 is changed, the supporting rod 5 enables the connecting plate 6 to be pushed upwards by the supporting rod 5, the connecting plate 6 moves upwards to push the fixed column 7 and the supporting plate 8 upwards, thereby the pipeline is lifted until the pipeline is flush with other pipelines, meanwhile, under the drive of the belt 16, the screw rod 3 drives the rotating rod 13 to rotate, the rotating rod 13 drives the worm wheel 17 to rotate, the worm wheel 17 rotates to drive the worm 11 to rotate, because the worm 11 is in threaded connection with the base 1, the worm 11 moves upwards, thereby the roller 12 is pulled upwards, and the roller 12 is completely submerged into the groove 10 No. two, the device is more stable when supporting the pipeline like this, can not move at will.
After the pipeline is fixed, the rotating shaft 18 is rotated, the rotating shaft 18 can drive the screw rod 3 and the rotating rod 13 to rotate, the screw rod 3 rotates to drive the two sliding blocks 4 to move towards the middle simultaneously, so that the supporting plate 8 is pulled downwards, the supporting plate 8 is separated from the pipeline, the rotating rod 13 can drive the worm 11 to rotate, the worm 11 moves downwards to drive the roller 12 to move downwards and leave the second groove 10, and then the handle is pulled to freely move the device left and right.
The foregoing shows and describes the general principles, essential features, and advantages of the utility model. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are merely illustrative of the principles of the utility model, but that various changes and modifications may be made without departing from the spirit and scope of the utility model, which fall within the scope of the utility model as claimed. The scope of the utility model is defined by the appended claims and equivalents thereof.
Claims (7)
1. The utility model provides a water supply and drainage engineering construction equipment is built to building, includes base (1), its characterized in that: the top of base (1) is equipped with recess (2) No. one, recess (2) internal rotation is connected with lead screw (3), two belt pulley (15) of surface fixed connection of lead screw (3), the bottom of base (1) is equipped with four recess (10) No. two, four all be equipped with gyro wheel (12) in No. two recess (10), the top fixedly connected with worm (11) of gyro wheel (12), base (1) internal rotation is connected with two bull stick (13), two belt pulley (14) and two worm wheel (17) of the equal fixed connection of surface of bull stick (13), rotate on base (1) and be connected with pivot (18), the one end fixedly connected with conical gear (19) of pivot (18) and lead screw (3).
2. The construction apparatus for building construction water supply and drainage works of claim 1, wherein: the outer surface threaded connection of lead screw (3) has two sliders (4), two the top of slider (4) all articulates there is bracing piece (5), the top of bracing piece (5) articulates there is connecting plate (6).
3. The construction apparatus for building construction water supply and drainage works of claim 2, wherein: the top of the connecting plate (6) is fixedly connected with two fixing columns (7), and the top of the two fixing columns (7) is fixedly connected with a supporting plate (8).
4. The construction apparatus for building construction water supply and drainage works of claim 1, wherein: the top fixedly connected with install bin (9) of base (1), the top of pivot (18) runs through base (1) and install bin (9) respectively and extends partly.
5. The construction apparatus for building construction water supply and drainage works of claim 1, wherein: the tops of the four worms (11) penetrate through the base (1) and extend out of one part, and the worms (11) are in threaded connection with the base (1).
6. The construction apparatus for building construction water supply and drainage works of claim 1, wherein: the four worms (11) respectively correspond to a worm wheel (17), the worms (11) are meshed with the worm wheels (17), the two conical gears (19) correspond to each other, and the two conical gears (19) are meshed with each other.
7. The construction apparatus for building construction water supply and drainage works of claim 1, wherein: two No. two belt pulley (15) correspond a belt pulley (14) respectively, and pass through belt (16) transmission connection between belt pulley (14) and No. two belt pulley (15).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122103993.3U CN215568421U (en) | 2021-09-02 | 2021-09-02 | Water supply and drainage engineering construction device for building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122103993.3U CN215568421U (en) | 2021-09-02 | 2021-09-02 | Water supply and drainage engineering construction device for building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215568421U true CN215568421U (en) | 2022-01-18 |
Family
ID=79845941
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122103993.3U Active CN215568421U (en) | 2021-09-02 | 2021-09-02 | Water supply and drainage engineering construction device for building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215568421U (en) |
-
2021
- 2021-09-02 CN CN202122103993.3U patent/CN215568421U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN215568421U (en) | Water supply and drainage engineering construction device for building construction | |
CN114923034A (en) | Pipeline installing support for hydraulic engineering convenient to installation and regulation | |
CN210088169U (en) | Soft foundation reinforcing structure for pipeline laying | |
CN218990199U (en) | Track traffic piping lane foundation ditch supporting device | |
CN209443474U (en) | A kind of shallow foundation hole stull suspension device | |
CN217108508U (en) | Pipe burying and line fixing device for water conservancy construction | |
CN111119501A (en) | Environment-friendly assembled wall installation device | |
CN212054567U (en) | Anti-floating anchor rod drilling construction mud collection device | |
CN211473488U (en) | Support column for building reinforcement | |
CN213923830U (en) | Pipe burying device for hydraulic and hydroelectric engineering | |
CN213293927U (en) | Cement pipe fitting transfer device capable of automatically pushing cement pipe fittings | |
CN212405392U (en) | Municipal drainage pipe convenient to clean | |
CN221545766U (en) | River dredging device for hydraulic engineering | |
CN111395982A (en) | Anti-floating anchor rod drilling construction mud collection device | |
CN207484237U (en) | A kind of concrete paving and leveling machine of pavement construction with cleaning mechanism | |
CN206619609U (en) | A kind of etching groove support | |
CN216692419U (en) | Supporting device for pipeline connection | |
CN219079317U (en) | Portable movable septic tank | |
CN211172778U (en) | Prefabricated assembled concrete stair | |
CN220789756U (en) | Ultra-deep bored pile slag remover | |
CN116025195B (en) | Inclined ladder device for high slope protection and ultra-deep foundation pit in collapsible loess area | |
CN217234646U (en) | Auxiliary installation device suitable for mine drainage pipeline | |
CN214263113U (en) | Municipal administration plumbing exempts from to excavate inner wall belt cleaning device | |
CN114134902B (en) | Reinforced concrete supporting structure for soft soil deep foundation pit and construction process of reinforced concrete supporting structure | |
CN215562922U (en) | Environment-friendly sewage treatment dredging device for municipal road engineering construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230529 Address after: No. 1-38 Tangli, Xuzhai Village, Huashui Town, Dongyang City, Jinhua City, Zhejiang Province, 321000 (first floor) Patentee after: Zhejiang Zhongce Municipal Engineering Co.,Ltd. Address before: 054000 floor 6 and 7, building 2, No. 205, Gangtie North Road, Qiaoxi District, Xingtai City, Hebei Province Patentee before: Jia Cuixia |