CN215558580U - Super high-rise curtain wall hoisting device - Google Patents

Super high-rise curtain wall hoisting device Download PDF

Info

Publication number
CN215558580U
CN215558580U CN202122266737.6U CN202122266737U CN215558580U CN 215558580 U CN215558580 U CN 215558580U CN 202122266737 U CN202122266737 U CN 202122266737U CN 215558580 U CN215558580 U CN 215558580U
Authority
CN
China
Prior art keywords
cross bar
curtain wall
elastic
electric hoist
hoisting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122266737.6U
Other languages
Chinese (zh)
Inventor
梁小平
赵鑫
张兴其
周荣
简典
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction New Science And Technology Construction Development Co ltd
Original Assignee
Cscec Xinke Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cscec Xinke Decoration Engineering Co ltd filed Critical Cscec Xinke Decoration Engineering Co ltd
Priority to CN202122266737.6U priority Critical patent/CN215558580U/en
Application granted granted Critical
Publication of CN215558580U publication Critical patent/CN215558580U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Curtains And Furnishings For Windows Or Doors (AREA)

Abstract

The utility model discloses a super high-rise curtain wall hoisting device, which comprises: one end of the bracket is connected with the wall; the top of the annular frame is connected with the other end of the bracket through a plurality of pull rods; the inner rail and the outer rail are both annular and are respectively arranged along the inner side and the outer side of the annular frame, a first walking vehicle and a second walking vehicle are respectively arranged on the inner rail and the outer rail in a sliding mode, and the bottoms of the first walking vehicle and the second walking vehicle are respectively connected with a first electric hoist and a second electric hoist; the hanging basket is connected with a steel wire rope of the first electric hoist; and the hoisting piece is connected with the steel wire rope of the second electric hoist and used for hoisting the curtain wall. The utility model can provide more convenient and safe installation conditions for operators.

Description

Super high-rise curtain wall hoisting device
Technical Field
The present invention relates to the field of construction tools or construction aids. More specifically, the utility model relates to a hoisting device for a super high-rise curtain wall.
Background
The curtain wall is used as an enclosure structure of a building, has the advantages of attractive appearance, good wind resistance and shock resistance, quick construction period and the like, and is widely applied. The installation of the super high-rise curtain wall belongs to outdoor high-altitude operation, the operation difficulty is high, the safety risk is high, and a commonly used frame building method obviously cannot be applied to super high-rise buildings. Therefore, it is desirable to design a technical solution that can overcome the above-mentioned drawbacks to a certain extent.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a super high-rise curtain wall hoisting device which can provide more convenient and safer installation conditions for operators.
To achieve these objects and other advantages and in accordance with the purpose of the utility model, as embodied and broadly described herein, there is provided a superelevation curtain wall hoist apparatus comprising: one end of the bracket is connected with the wall; the top of the annular frame is connected with the other end of the bracket through a plurality of pull rods; the inner rail and the outer rail are both annular and are respectively arranged along the inner side and the outer side of the annular frame, a first walking vehicle and a second walking vehicle are respectively arranged on the inner rail and the outer rail in a sliding mode, and the bottoms of the first walking vehicle and the second walking vehicle are respectively connected with a first electric hoist and a second electric hoist; the hanging basket is connected with a steel wire rope of the first electric hoist; and the hoisting piece is connected with the steel wire rope of the second electric hoist and used for hoisting the curtain wall.
Furthermore, the other end of the support is also connected with one end of a pull rope, and the other end of the pull rope is connected to the area, located above the support, of the wall body.
Furthermore, a pre-buried wall connecting piece is arranged at the position where the wall is connected with the support and the pull rope.
Further, the section of the annular frame is in an inverted T shape and is connected with the pull rod through a vertical part.
Further, the cross sections of the inner rail and the outer rail are both in an inverted T shape and are connected with the annular frame through vertical parts.
Further, the first and second traveling vehicles each include a pair of rollers supported by the two horizontal portions of the inner and outer rails, respectively.
Further, hanging flower basket one side is provided with two first telescopic links and two second telescopic links, and the end connection of every first telescopic link has first elastic rod, and the end connection of every first elastic rod has the rubber universal wheel, and the tip of every second telescopic link is provided with the sucking disc, and every sucking disc passes through a hose and communicates with the vacuum pump, and every vacuum pump setting is in the hanging flower basket.
Further, hoist and mount piece includes parallel arrangement's last horizontal pole, sheer pole, many second elastic rod and many third elastic rod, the last horizontal pole with the wire rope of second electric hoist is connected, go up the horizontal pole with the relative one side of sheer pole is provided with anchor clamps, and the both ends of every second elastic rod are connected respectively the last horizontal pole with the relative one side of sheer pole, every third elastic rod is connected go up the horizontal pole or on the sheer pole, and the perpendicular to go up the horizontal pole down the plane at sheer pole, many second elastic rod places, and the end connection of every third elastic rod has the rubber universal wheel.
The utility model at least comprises the following beneficial effects:
according to the utility model, the inner rail and the outer rail are respectively connected with the hanging basket and the hoisting piece, so that an operator and the curtain wall can synchronously ascend and descend at intervals, the construction is more accurate, the vibration is small, the noise is low, the environment is more environment-friendly, the position of the operator relative to the curtain wall can be changed according to the requirement on the inner rail, the construction is more convenient and efficient, and the operator can construct in the hanging basket more safely.
Additional advantages, objects, and features of the utility model will be set forth in part in the description which follows and in part will become apparent to those having ordinary skill in the art upon examination of the following or may be learned from practice of the utility model.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural diagram of the hanging basket of the present invention;
figure 3 is a front view of the sling according to the utility model;
figure 4 is a left side view of the sling according to the utility model.
Detailed Description
The present invention is further described in detail below with reference to the attached drawings so that those skilled in the art can implement the utility model by referring to the description text.
It will be understood that terms such as "having," "including," and "comprising," as used herein, do not preclude the presence or addition of one or more other elements or groups thereof.
As shown in fig. 1 and 2, an embodiment of the present application provides a superelevation curtain wall hoisting device, including: one end of the bracket 2 is connected with the wall body 1; the top of the annular frame is connected with the other end of the bracket 2 through a plurality of pull rods 303; the inner rail 301 and the outer rail 302 are both annular and are respectively arranged along the inner side and the outer side of the annular frame, the inner rail 301 and the outer rail 302 are respectively provided with a first travelling vehicle 5 and a second travelling vehicle 4 in a sliding manner, and the bottoms of the first travelling vehicle 5 and the second travelling vehicle 4 are respectively connected with a first electric hoist 7 and a second electric hoist 6; the hanging basket 8 is connected with a steel wire rope of the first electric hoist 7; and the hoisting piece 9 is connected with the steel wire rope of the second electric hoist 6 and used for hoisting the curtain wall.
In the above embodiment, the bracket 2 is horizontally connected to the wall 1, the ring frame is preferably circular, and the inner rail 301 and the outer rail 302 are preferably circular and concentric. The first traveling vehicle 5 and the second traveling vehicle 4 are both electric, and the prior art can be adopted, and the first electric hoist 7 and the second electric hoist 6 are respectively connected with the bottoms of the first traveling vehicle 5 and the second traveling vehicle 4, so that the first electric hoist 7 and the second electric hoist 6 can move around the inner track 301 and the outer track 302. The steel wire ropes of the first electric hoist 7 and the second electric hoist 6 are respectively connected with a hanging basket 8 and a hoisting piece 9, the hanging basket 8 is taken by an operator, and the hoisting piece 9 is used for hoisting a curtain wall. During the use, first electric hoist 7 promotes hanging flower basket 8, and operating personnel takes hanging flower basket 8 to rise to the construction height, and second electric hoist 6 promotes hoist and mount 9 also to the construction height, and second walking car 4 drives hoist and mount 9 to the construction position, and according to operating personnel needs, first walking car 5 drives hanging flower basket 8 and operating personnel and removes in curtain one side, installs the curtain, and the height of adjustment hanging flower basket 8 continues to install the curtain, and the installation finishes until the installation. It can be seen that, this embodiment adopts interior track 301 and outer track 302 to connect hanging flower basket 8 and hoist and mount piece 9 respectively, and operating personnel can rise and descend with the curtain in synchronous interval, and the construction is more accurate, and the vibration is little, the noise is low, and is more environmental protection, and operating personnel can change as required for the position of curtain including track 301, and the construction is more convenient high-efficient, and operating personnel is under construction in hanging flower basket 8, comparatively safety.
In other embodiments, the other end of the bracket 2 is further connected with one end of a pull rope 201, and the other end of the pull rope 201 is connected to the area of the wall body 1 above the bracket 2, so that the installation stability of the bracket 2 is improved through the pull rope 201.
In other embodiments, an embedded wall connecting member is disposed at a position where the wall 1 connects the bracket 2 and the pull rope 201, and the embedded wall connecting member facilitates installation of the pull rope 201 and the bracket 2.
In other embodiments, a preferred ring frame structure is provided, which has an inverted T-shape in cross-section and is connected to the tie rods 303 by vertical portions.
In other embodiments, a preferred inner rail 301 and outer rail 302 structure is provided, and the inner rail 301 and the outer rail 302 are each in an inverted T-shape in cross section and are connected to the ring frame by vertical portions.
In other embodiments, the first and second traveling vehicles 5 and 4 each include a pair of rollers supported by both horizontal portions of the inner and outer rails 301 and 302, respectively, so that the first and second traveling vehicles 5 and 4 can be stably supported.
In other embodiments, two first telescopic rods 802 and two second telescopic rods 801 are arranged on one side of the basket 8, a first elastic rod 803 is connected to the end of each first telescopic rod 802, a rubber universal wheel is connected to the end of each first elastic rod 803, a suction cup 805 is arranged at the end of each second telescopic rod 801, each suction cup 805 is communicated with a vacuum pump through a hose, and each vacuum pump is arranged in the basket 8. In the process of lifting the hanging basket 8, in order to avoid collision between the hanging basket 8 and the wall body 1 caused by wind power, a first telescopic rod 802 is connected to one side of the hanging basket 8, the end part of the first telescopic rod 802 is connected with a first elastic rod 803 and a rubber universal wheel 804, when the hanging basket 8 is used, the first elastic rod 803 and the rubber universal wheel 804 extend out, when the hanging basket 8 collides against the wall body 1, the first elastic rod 803 and the rubber universal wheel can buffer the impact force of the hanging basket 8, and the rubber universal wheel can reduce the friction force with the wall body through rolling, reduce noise and improve environmental protection; in the curtain construction process, in order to further guarantee construction accuracy and security, at 8 one sides of hanging flower basket second telescopic link 801, the end connection sucking disc 805 of second telescopic link 801, set up the suction hole on the sucking disc 805, the suction hole passes through the hose connection vacuum pump, in the work progress, stretches out second telescopic link 801 to the vacuum pump is through breathing in to sucking disc 805, with the position relatively fixed of hanging flower basket 8 and wall body 1, convenient accurate construction.
In other embodiments, as shown in fig. 3 and 4, the lifting member 9 includes an upper cross bar 901, a lower cross bar 902, a plurality of second elastic bars 903 and a plurality of third elastic bars 905, which are arranged in parallel, the second elastic bars are preferably elastic telescopic bars, so that the upper cross bar and the lower cross bar can clamp the curtain wall conveniently, the first elastic bars and the third elastic bars are preferably rubber elastic bars, and have a certain buffering force, the upper cross bar is connected with a steel wire rope of the second electric hoist 6, a clamp 904 is arranged on one side of the upper cross bar opposite to the lower cross bar, two ends of each second elastic rod 903 are respectively connected with one side of the upper cross bar opposite to the lower cross bar, each third elastic rod 905 is connected with the upper cross bar or the lower cross bar, and is perpendicular to the plane where the upper cross bar, the lower cross bar and the plurality of second elastic bars are located, and the end of each third elastic bar is connected with a rubber universal wheel 906. In the lifting process of the hoisting piece 9, in order to avoid collision between the curtain wall and the wall body 1 caused by wind power, one side of the hoisting piece 9 is connected with a third elastic rod, the third elastic rod is connected with a rubber universal wheel, when the hoisting piece 9 collides against the wall body 1, the third elastic rod and the rubber universal wheel can buffer the impact force of the curtain wall, and the rubber universal wheel can reduce the friction force when the curtain wall rises through rolling, reduce noise and improve environmental protection; go up horizontal pole, sheer pole, anchor clamps, many second elastic rods then are used for the fixed of curtain and centre gripping, go up horizontal pole and sheer pole and pull open can the centre gripping curtain, and anchor clamps are fixed again.
The number of apparatuses and the scale of the process described herein are intended to simplify the description of the present invention. Applications, modifications and variations of the superelevation curtain wall hoist apparatus of the present invention will be apparent to those skilled in the art.
While embodiments of the utility model have been described above, it is not limited to the applications set forth in the description and the embodiments, which are fully applicable in various fields of endeavor to which the utility model pertains, and further modifications may readily be made by those skilled in the art, it being understood that the utility model is not limited to the details shown and described herein without departing from the general concept defined by the appended claims and their equivalents.

Claims (8)

1. Superelevation layer curtain hoist device, its characterized in that includes:
one end of the bracket is connected with the wall;
the top of the annular frame is connected with the other end of the bracket through a plurality of pull rods;
the inner rail and the outer rail are both annular and are respectively arranged along the inner side and the outer side of the annular frame, a first walking vehicle and a second walking vehicle are respectively arranged on the inner rail and the outer rail in a sliding mode, and the bottoms of the first walking vehicle and the second walking vehicle are respectively connected with a first electric hoist and a second electric hoist;
the hanging basket is connected with a steel wire rope of the first electric hoist;
and the hoisting piece is connected with the steel wire rope of the second electric hoist and used for hoisting the curtain wall.
2. The curtain wall hoist device of superelevation layer of claim 1, characterized in that, the other end of the support is still connected with one end of the stay cord, and the other end of the stay cord is connected to the area of the wall body above the support.
3. The hoisting device for the ultra-high curtain wall as claimed in claim 2, wherein pre-embedded wall connecting pieces are arranged at the positions where the wall is connected with the brackets and the pull ropes.
4. The curtain wall hoist device of superelevation layer of claim 2, characterized in that, the cross-section of the ring frame is in the shape of an inverted T and is connected with the pull rod through a vertical portion.
5. The curtain wall hoist device of superelevation layer of claim 4, characterized in that, the cross-section of inner track and outer track is the shape of an inverted T, and is connected with the ring frame through vertical portion.
6. The curtain wall hoists device of claim 5, wherein the first and second carriages each include a pair of rollers supported by the two horizontal portions of the inner and outer rails, respectively.
7. The hoisting device for the ultra-high curtain wall as claimed in claim 1, wherein two first telescopic rods and two second telescopic rods are arranged on one side of the hanging basket, a first elastic rod is connected to the end of each first telescopic rod, a rubber universal wheel is connected to the end of each first elastic rod, a suction cup is arranged at the end of each second telescopic rod, each suction cup is communicated with a vacuum pump through a hose, and each vacuum pump is arranged in the hanging basket.
8. The hoisting device for the ultra-high curtain wall as claimed in claim 1, wherein the hoisting member comprises an upper cross bar, a lower cross bar, a plurality of second elastic bars and a plurality of third elastic bars which are arranged in parallel, the upper cross bar is connected with the steel wire rope of the second electric hoist, a clamp is arranged on one side of the upper cross bar opposite to the lower cross bar, two ends of each second elastic bar are respectively connected to one side of the upper cross bar opposite to the lower cross bar, each third elastic bar is connected to the upper cross bar or the lower cross bar and is perpendicular to the plane where the upper cross bar, the lower cross bar and the plurality of second elastic bars are located, and the end of each third elastic bar is connected with a rubber universal wheel.
CN202122266737.6U 2021-09-18 2021-09-18 Super high-rise curtain wall hoisting device Active CN215558580U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122266737.6U CN215558580U (en) 2021-09-18 2021-09-18 Super high-rise curtain wall hoisting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122266737.6U CN215558580U (en) 2021-09-18 2021-09-18 Super high-rise curtain wall hoisting device

Publications (1)

Publication Number Publication Date
CN215558580U true CN215558580U (en) 2022-01-18

Family

ID=79851305

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122266737.6U Active CN215558580U (en) 2021-09-18 2021-09-18 Super high-rise curtain wall hoisting device

Country Status (1)

Country Link
CN (1) CN215558580U (en)

Similar Documents

Publication Publication Date Title
CN205953370U (en) Perpendicular transport means of unitized curtain wall
CN207348429U (en) The rotating platform built for tower
CN106499167B (en) A kind of ready-package attached type lifting scaffold inclining anti-fall device
CN102973202A (en) Extension type hanging basket
CN203244340U (en) Telescopic hanging basket
CN207974504U (en) Climbing type hanging basket system for tilting decoration of exterior wall construction
CN108643539A (en) A kind of safety protection device for building construction
CN205527199U (en) Inorganic tenant ladder sedan -chair frame
CN215558580U (en) Super high-rise curtain wall hoisting device
CN104291222A (en) Rigid protection and crane integration system inside super high-rise building core tube
CN212561175U (en) Road and bridge construction platform with stable structure
CN112897277A (en) Cage protection device on civil engineering construction site
CN107522075A (en) A kind of automatic opening-closing for construction elevator door
CN104444873A (en) High-efficiency safety tower crane and manufacturing method thereof
CN214498345U (en) High altitude hanging flower basket for construction
CN217201855U (en) Pipeline elevating gear of building electromechanical installation usefulness
CN205653140U (en) Lifting device for building
CN206859639U (en) Attachment type raise scaffold wall-attached supporting seat
CN215666760U (en) Sliding type horizontal wall-attached device for construction elevator
CN213141328U (en) Hanging basket for mounting safety type outdoor high-rise building electrical appliances
CN211338595U (en) Motor hoist and mount overhauls device
CN213681716U (en) Bridge construction hanging flower basket that can walk
CN212562424U (en) Attached lifting operation protection device
CN207243277U (en) A kind of unit switchs hoisting tool special
CN2578461Y (en) Liftable scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: No. 1-A669, Guoxing Third Street, South District, Economic Development Zone, Tongzhou District, Beijing, 100176

Patentee after: China Construction New Science and Technology Construction Development Co.,Ltd.

Country or region after: China

Address before: 100176 1901, 19th floor, building 1, yard 22, Ronghua Middle Road, Beijing Economic and Technological Development Zone, Daxing District, Beijing

Patentee before: CSCEC Xinke Decoration Engineering Co.,Ltd.

Country or region before: China

CP03 Change of name, title or address