CN215549655U - Pouring device is used in production of cement pole - Google Patents

Pouring device is used in production of cement pole Download PDF

Info

Publication number
CN215549655U
CN215549655U CN202120174575.0U CN202120174575U CN215549655U CN 215549655 U CN215549655 U CN 215549655U CN 202120174575 U CN202120174575 U CN 202120174575U CN 215549655 U CN215549655 U CN 215549655U
Authority
CN
China
Prior art keywords
mold
base
electric pole
cement
producing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120174575.0U
Other languages
Chinese (zh)
Inventor
陆炎舟
陆高峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gaoyou City Hongtai Pole Co ltd
Original Assignee
Gaoyou City Hongtai Pole Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gaoyou City Hongtai Pole Co ltd filed Critical Gaoyou City Hongtai Pole Co ltd
Priority to CN202120174575.0U priority Critical patent/CN215549655U/en
Application granted granted Critical
Publication of CN215549655U publication Critical patent/CN215549655U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to the technical field of cement electric pole production, and discloses a pouring device for cement electric pole production, which comprises a base, wherein a groove is formed in the upper end of the base, an alignment assembly is arranged in the groove, a support is arranged at the upper end of the base, a mold is arranged at the upper end of the support, plugs are arranged at two ends of the mold, a first threaded hole is formed in the side end of each plug, each plug is connected with the mold through a fixing screw, a pouring assembly is arranged at the side end of the base and comprises a mounting seat, a mounting block is arranged at the upper end of the mounting seat, a fixing block is arranged on the side surface of the mounting block, a feeding funnel is arranged at the upper end of the fixing block, a feeding pipeline is arranged below the feeding funnel, and penetrates through the fixing block. Compared with the prior art, the manual filling is time-consuming and labor-consuming, the cement consumption cannot be controlled, and the alignment process is time-consuming. The utility model has the following beneficial effects: the assembly is poured to conveniently carry out cement pouring and flow control, and the alignment is more convenient through the alignment assembly, so that the processing efficiency is improved, and the assembly has higher popularization and use values.

Description

Pouring device is used in production of cement pole
Technical Field
The utility model relates to the technical field of cement electric pole production, in particular to a pouring device for cement electric pole production.
Background
The utility pole is a pole for erecting cables, is used for high-low voltage power transformation and communication cable erection of power, communication and urban network rural power grids, is one of important infrastructures for power supply and communication, and is generally used for line erection of national power grids, mobile companies, communication companies and the like.
At present, current cement pole majority is made through casting mold, this casting mold generally includes mould and lower mould, through fixing the lower mould, pour into cement into the lower mould and carry out work, but at present most fill into for the manual work, the manual work is filled and is made workman's work load big, waste time and energy and can not control the cement quantity, make the precision of cement pole lower, after casting cement is full, the lifting hook that hangs through the balance will go up touch and transfer to the lower mould upper end, because the lower mould is fixed, need to go up mould fixed alignment with it, consequently, need hang through the balance and carry out adjustment direction and distance, but the alignment technology does not set up the subassembly of supplementary alignment this moment, make alignment process long consuming time, machining efficiency is low.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a pouring device for producing a cement electric pole, which aims to solve the problems that most existing cement electric poles in the prior art are manufactured through a pouring die, the pouring die generally comprises an upper die and a lower die, the lower die is fixed, cement is injected into the lower die to work, most existing cement electric poles are filled manually, the workload of workers is large, time and labor are wasted, the cement amount cannot be controlled, the precision of the cement electric pole is low, when the cement is fully poured, the upper die is adjusted to the upper end of the lower die through a lifting hook of a balance crane, the upper die needs to be fixedly aligned with the lower die due to the fact that the lower die is fixed, the direction and the distance need to be adjusted through the balance crane, and at the moment, an alignment process does not have an alignment assisting component, so that the alignment process consumes long time, and the processing efficiency is low.
In order to achieve the purpose, the utility model provides the following technical scheme: a pouring device for producing cement electric poles comprises a base, wherein a groove is formed in the upper end of the base, an alignment assembly is arranged inside the groove and comprises a limiting baffle, one end of a screw rod is arranged at the side end of the limiting baffle and penetrates through the base, the other end of the screw rod is connected with a knob, a support is arranged at the upper end of the base, a mold is arranged at the upper end of the support, plugs are arranged at two ends of the mold, a first threaded hole is formed in the side end of each plug, second threaded holes are formed in two sides of the mold and are connected with the mold through fixing screws, the mold comprises an upper mold and a lower mold, connecting blocks are arranged at the side ends of the upper mold and the lower mold, a pouring assembly is arranged at the side end of the base and comprises a mounting seat, a mounting block is arranged at the upper end of the mounting seat, a fixing block is arranged on the side face of the mounting block, and a feeding hopper is arranged at the upper end of the fixing block, the feeding hopper is provided with a feeding pipeline below, the feeding pipeline penetrates through the fixed block, a feeding valve and a flowmeter are arranged at the upper end of the feeding pipeline, and the flowmeter is located at the lower end of the feeding valve.
Preferably, the lower end of the mounting seat is provided with a roller.
Preferably, the flow meter is a volumetric flow meter.
Preferably, the external thread of the fixing screw is matched with the internal threads of the first threaded hole and the second threaded hole.
Preferably, the connecting block penetrates through the fixing hole and is connected with the bolt through a nut.
Preferably, the alignment assemblies are symmetrically arranged.
Compared with the prior art, the utility model has the beneficial effects that:
(1) the utility model relates to a pouring device for producing a cement electric pole, which is provided with a limiting assembly, wherein a knob is screwed when the pouring device is used, a threaded rod is driven to rotate, a limiting baffle is moved, the limiting baffle is moved to two sides of a lower die, and the upper die is conveniently aligned.
(2) The utility model relates to a pouring device for producing a cement electric pole, which is provided with a pouring assembly, so that the pouring is time-saving and labor-saving through the movement of a roller, and the pouring is more uniform.
(3) The utility model relates to a pouring device for producing a cement electric pole, which is provided with a flowmeter, wherein the flowmeter continuously measures the total volume of fluid by utilizing a standard volume space formed by a movable element and a shell when in use, and cement passing through a feeding pipeline is monitored by the arrangement of the flowmeter, so that the cement electric pole is more finely produced.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is an enlarged view of the construction of the pouring assembly of the present invention;
FIG. 3 is a schematic view of the mold assembly structure of the present invention.
In the reference symbols: 1. a base; 2. a support; 3. a groove; 4. a screw; 5. a knob; 6. a limit baffle; 7. a mold; 71. an upper die; 72. a lower die; 8. a plug; 9. connecting blocks; 10. a fixing hole; 11. a nut; 12. a bolt; 13. a first threaded hole; 14. fixing screws; 15. a second threaded hole; 16. mounting blocks; 17. a fixed block; 18. a mounting seat; 19. a feeding pipeline; 20. a feeding valve; 21. a flow meter; 22. a feeding funnel; 23. and a roller.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Examples
Referring to fig. 1-3, the present invention provides a pouring device for producing concrete poles, which comprises: the device comprises a base 1, a groove 3 is formed in the upper end of the base 1, an alignment assembly is arranged in the groove 3 and comprises a limiting baffle 6, one end of a screw rod 4 is arranged at the side end of the limiting baffle 6, the screw rod 4 penetrates through the base 1, the other end of the screw rod 4 is connected with a knob 5, a support 2 is arranged at the upper end of the base 1, a mold 7 is arranged at the upper end of the support 2, plugs 8 are arranged at the two ends of the mold 7, a first threaded hole 13 is arranged at the side end of each plug 8, second threaded holes 15 are arranged at the two sides of the mold 7, each plug 8 is connected with the mold 7 through a fixing screw 14, the mold 7 comprises an upper mold 71 and a lower mold 72, connecting blocks 9 are arranged at the side ends of the upper mold 71 and the lower mold 72, a pouring assembly is arranged at the side end of the base 1 and comprises a mounting seat 18, a mounting block 16 is arranged at the upper end of the mounting seat 18, a fixing block 17 is provided with a fixing block 17, a feeding funnel 22 is arranged at the upper end of the fixing block 17, a feeding pipeline 19 is arranged below the feeding funnel 22, the feeding pipeline 19 penetrates through the fixed block 17, a feeding valve 20 and a flow meter 21 are arranged at the upper end of the feeding pipeline 19, and the flow meter 21 is positioned at the lower end of the feeding valve 20.
Further, the lower end of the mounting seat 18 is provided with a roller 23.
In this embodiment, the gyro wheel 23 conveniently removes pouring components for cement pouring is more convenient and fast.
Further, the flow meter 21 is a volumetric flow meter 21.
In the present embodiment, the volumetric flowmeter 21 continuously measures the total fluid volume using the standard volumetric space formed by the movable element and the casing, and the cement passing through the feed pipe 19 is monitored by the installation of the flowmeter 21, so that the cement pole production is more precise.
Further, the external threads of the set screw 14 match the internal threads of the first and second threaded holes 13 and 15.
In the embodiment, the fixing screw 14 passes through the first threaded hole 13 of the plug 8 and is rotatably connected with the second threaded hole 15 at the side end of the mold 7, so that the plug 8 is connected with the mold 7, and the subsequent procedures are convenient to perform.
Further, the connecting block 9 penetrates through the fixing hole 10, and the connecting block 9 is connected with the bolt 12 through the nut 11.
In the present embodiment, the upper die 71 and the lower die 72 are fixedly connected by nuts 11 fitted to the bolts 12 through the fixing holes 10 of the die 7 side end connecting block 9.
Further, the alignment assemblies are symmetrically arranged.
In this embodiment, the knobs 5 at both ends can drive the screw rod 4 to rotate, so that the limit baffle 6 can move, and the upper die 71 and the lower die 72 can be conveniently aligned.
Specifically, the working principle and the using process of the utility model are as follows: after the cement electric pole is installed, a lower die 72 is placed at the upper end of a support 2 through a balance crane, a mounting seat 18 is moved to the side of a base 1 through a roller 23, a feeding pipeline 19 is positioned at the upper end of the lower die 72, a cement electric pole framework is placed at the upper end of the lower die 72 at the moment, through holes at two ends of the lower die 72 are blocked through arc-shaped plates, cement is prevented from flowing outwards in the pouring process, cement is added into a feeding funnel 22, a feeding valve 20 is opened, the cement falls down through the feeding pipeline 19 and is received by the lower die 72, an installation block 16 is moved through the roller 23, the feeding funnel 22 is driven to move through a fixing block 17, the cement is metered through a flowmeter 21, the cement electric pole is more accurately produced, the roller 23 is moved, the lower die 72 is uniformly covered by the cement, the feeding valve 20 is closed, a pouring assembly is moved away through the roller 23, the knob 5 is screwed at the moment, the knob 5 drives a screw rod 4 to rotate in a groove 3, make limit baffle 6 remove, remove limit baffle 6 to lower mould 72 both ends, hang through the balance and remove last mould 71, owing to set up limit baffle 6, make the alignment technology more swift, after last mould 71 aligns with lower mould 72, pass the fixed orifices 10 and the bolt 12 of mould 7 side connecting block 9 through nut 11 and cooperate, make and go up mould 71, lower mould 72 fixed connection, take out the arc, pass first screw hole 13 of end cap 8 and the 15 swivelling joint of second screw hole of mould 7 side through set screw 14, make end cap 8 be connected with mould 7, conveniently place and carry out the even subsides of later stage high-speed rotation with cement around mould 7 inner wall on the centrifuge, make the cement pole become hollow structure, until accomplishing whole work order.
In the description of the present invention, it is to be understood that the terms "coaxial", "bottom", "one end", "top", "middle", "other end", "upper", "one side", "top", "inner", "front", "center", "both ends", and the like, indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the referenced device or element must have a particular orientation, be constructed and operated in a particular orientation, and thus, are not to be construed as limiting the present invention.
In the present invention, unless otherwise expressly specified or limited, the terms "mounted," "disposed," "connected," "secured," "screwed" and the like are to be construed broadly, e.g., as meaning fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; the terms may be directly connected or indirectly connected through an intermediate, and may be communication between two elements or interaction relationship between two elements, unless otherwise specifically limited, and the specific meaning of the terms in the present invention will be understood by those skilled in the art according to specific situations.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The pouring device for producing the cement electric pole comprises a base (1) and is characterized in that a groove (3) is formed in the upper end of the base (1), an alignment assembly is arranged inside the groove (3) and comprises a limit baffle (6), one end of a screw rod (4) is arranged at the side end of the limit baffle (6), the screw rod (4) penetrates through the base (1), the other end of the screw rod (4) is connected with a knob (5), a support (2) is arranged at the upper end of the base (1), a mold (7) is arranged at the upper end of the support (2), plugs (8) are arranged at two ends of the mold (7), first threaded holes (13) are formed in the side end of each plug (8), second threaded holes (15) are formed in two sides of the mold (7), the plugs (8) are connected with the mold (7) through fixing screws (14), and the mold (7) comprises an upper mold (71) and a lower mold (72), go up mould (71) and lower mould (72) side and all be equipped with connecting block (9), base (1) side is equipped with pours the subassembly, it includes mount pad (18) to pour the subassembly, mount pad (18) upper end is equipped with installation piece (16), installation piece (16) side is equipped with fixed block (17), fixed block (17) upper end is equipped with pan feeding funnel (22), pan feeding funnel (22) below is equipped with material inlet pipe way (19), material inlet pipe way (19) run through fixed block (17), material inlet pipe way (19) upper end is provided with material inlet valve (20) and flowmeter (21), flowmeter (21) are located material inlet valve (20) lower extreme.
2. The casting device for producing the concrete electric pole as recited in claim 1, characterized in that: and the lower end of the mounting seat (18) is provided with a roller (23).
3. The casting device for producing the concrete electric pole as recited in claim 1, characterized in that: the flow meter (21) is a volumetric flow meter (21).
4. The casting device for producing the concrete electric pole as recited in claim 1, characterized in that: the external thread of the fixing screw (14) is matched with the internal thread of the first threaded hole (13) and the second threaded hole (15).
5. The casting device for producing the concrete electric pole as recited in claim 1, characterized in that: the connecting block (9) penetrates through the fixing hole (10), and the connecting block (9) is connected with the bolt (12) through the nut (11).
6. The casting device for producing the concrete electric pole as recited in claim 1, characterized in that: the alignment assemblies are symmetrically arranged.
CN202120174575.0U 2021-01-22 2021-01-22 Pouring device is used in production of cement pole Expired - Fee Related CN215549655U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120174575.0U CN215549655U (en) 2021-01-22 2021-01-22 Pouring device is used in production of cement pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120174575.0U CN215549655U (en) 2021-01-22 2021-01-22 Pouring device is used in production of cement pole

Publications (1)

Publication Number Publication Date
CN215549655U true CN215549655U (en) 2022-01-18

Family

ID=79837329

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120174575.0U Expired - Fee Related CN215549655U (en) 2021-01-22 2021-01-22 Pouring device is used in production of cement pole

Country Status (1)

Country Link
CN (1) CN215549655U (en)

Similar Documents

Publication Publication Date Title
CN110778023A (en) Mounting device and mounting method for assembled combined prefabricated column
CN206987422U (en) A kind of filling device of filling concrete base contraction-free grouting concrete
CN215549655U (en) Pouring device is used in production of cement pole
CN111395787A (en) Auxiliary device for installing prefabricated building wallboard
CN213806632U (en) Rotary concrete pouring equipment
CN216109742U (en) Support frame for assembly type building
CN212832395U (en) Culvert pipe lifting device that municipal construction used
CN114892891A (en) Grouting-free steel bar connecting device
CN210766881U (en) Internal mold supporting device
CN210368869U (en) Portable gate hoist with quick assembly disassembly function for diversion floodgate
CN207878467U (en) A kind of concreting mold
CN217967529U (en) Cement pouring template for hydraulic engineering construction
CN216914256U (en) A mould for prefabricating chemical industry pipe corridor frame
CN211596774U (en) Adjustable steel mould for gravity dam pouring
CN214168676U (en) Building concrete pouring compaction machine
CN217897263U (en) Template is pour in construction
CN219808701U (en) Pre-buried device of cast in situ concrete wall body water supply pipe groove
CN219902643U (en) Quick replacement formula measurement system
CN213774537U (en) Flexible connection's assembled wall body
CN217602075U (en) Waterproof construction hangs mould
CN215331469U (en) High formwork frame column concrete placement device
CN217268777U (en) Box culvert pouring temporary supporting device
CN209053130U (en) A kind of municipal administration stainless steel manhole cover
CN213113203U (en) Modified asphalt foaming device
CN217870587U (en) Embedded device capable of adjusting perpendicularity of foundation bolt of tower crane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220118

CF01 Termination of patent right due to non-payment of annual fee