CN215517507U - Automatic ash discharging system for dust removing device of blast furnace of iron works - Google Patents

Automatic ash discharging system for dust removing device of blast furnace of iron works Download PDF

Info

Publication number
CN215517507U
CN215517507U CN202121367066.6U CN202121367066U CN215517507U CN 215517507 U CN215517507 U CN 215517507U CN 202121367066 U CN202121367066 U CN 202121367066U CN 215517507 U CN215517507 U CN 215517507U
Authority
CN
China
Prior art keywords
module
control module
blast furnace
dust removal
alarm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121367066.6U
Other languages
Chinese (zh)
Inventor
张建国
白强
关军强
曹梁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shougang Changzhi Iron and Steel Co Ltd
Original Assignee
Shougang Changzhi Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shougang Changzhi Iron and Steel Co Ltd filed Critical Shougang Changzhi Iron and Steel Co Ltd
Priority to CN202121367066.6U priority Critical patent/CN215517507U/en
Application granted granted Critical
Publication of CN215517507U publication Critical patent/CN215517507U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to the technical field of metallurgy dust removal, and particularly relates to an automatic ash discharge system for a dust removal device of a blast furnace in an iron-making plant. Aims to solve the technical problem that the bag-type dust collector needs manual on-site standing point dust discharging. The technical scheme is as follows: the device comprises a main control module, a timing module, a delay setting module, an interlocking control module and an alarm module; the main control module is electrically connected with the timing module, the delay setting module, the interlocking control module and the alarm module respectively, the output end of the interlocking control module is electrically connected with the input end of the alarm module, displacement sensors are arranged on a front-stage scraper and a rear-stage scraper of the blast furnace dust removal device and on a bucket elevator, a rotary sensor is arranged on the ash discharge valve, and the displacement sensor and the rotary sensor are electrically connected with the main control module, the timing module, the delay setting module, the interlocking control module and the alarm module respectively. The utility model can greatly reduce the investment of personnel, lighten the working strength of the personnel and improve the production efficiency.

Description

Automatic ash discharging system for dust removing device of blast furnace of iron works
Technical Field
The utility model belongs to the technical field of metallurgy dust removal, and particularly relates to an automatic ash discharge system for a dust removal device of a blast furnace in an iron-making plant.
Background
At present, a bag-type dust collector is adopted for dust removal of a blast furnace cast house of an iron plant, the bag-type dust collector has a plurality of ash bins and a long and narrow box body, and a material measuring instrument is difficult to install, so that long-term manual site standing point ash discharge is caused.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that a bag-type dust remover needs manual on-site standing point dust discharging, and provides an automatic dust discharging system for a blast furnace dust removing device of an iron-making plant.
In order to solve the technical problems, the utility model adopts the technical scheme that:
an automatic ash discharging system for a dust removing device of a blast furnace in an iron-making plant comprises a main control module, a timing module, a delay setting module, an interlocking control module and an alarm module;
the main control module is used for controlling the start and stop of a front-stage scraper conveyor and a rear-stage scraper conveyor of the blast furnace dust removal device, a bucket elevator and an ash discharge valve;
the timing module is used for monitoring the operation starting time of each component of the blast furnace dust removal device;
the delay setting module is used for monitoring and controlling the continuous operation time of each component of the blast furnace dust removal device;
the interlocking control module is used for monitoring and feeding back the operation states of the front-stage and rear-stage components of the blast furnace dust removal device;
the alarm module is used for sending out an alarm signal in time when a fault signal is received or a signal cannot be received within a set time;
the main control module is electrically connected with the timing module, the delay setting module, the interlocking control module and the alarm module respectively, the output end of the interlocking control module is electrically connected with the input end of the alarm module, displacement sensors are arranged on a front-stage scraper and a rear-stage scraper of the blast furnace dust removal device and on a bucket elevator, a rotary sensor is arranged on an ash discharge valve, and the displacement sensors and the rotary sensor are electrically connected with the main control module, the timing module, the delay setting module, the interlocking control module and the alarm module respectively.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, the control module and the detection module are arranged on the existing dust removal device, and the automatic operation of each component is realized through the main control module, so that the investment of personnel can be greatly reduced, the working intensity of the personnel is reduced, and the production efficiency is improved;
2. the interlocking control module and the detection module are arranged to monitor each component in an interlocking manner, and when the rear-stage component fails, the front-stage component stops in time, so that serious production accidents are avoided.
Drawings
FIG. 1 is a schematic view of a connection structure according to the present invention;
in the figure: the system comprises a main control module 1, a timing module 2, a delay setting module 3, a interlocking control module 4 and an alarm module 5.
Detailed Description
The utility model is further illustrated by the following figures and examples.
As shown in fig. 1, an automatic ash discharge system for a dust removal device of a blast furnace in an iron works comprises a main control module 1, a timing module 2, a delay setting module 3, a linkage control module 4 and an alarm module 5;
the main control module 1 is used for controlling the start and stop of a front-stage scraper conveyor and a rear-stage scraper conveyor of a blast furnace dust removal device, a bucket elevator and an ash discharge valve;
the timing module 2 is used for monitoring the operation starting time of each component of the blast furnace dust removal device;
the delay setting module 3 is used for monitoring and controlling the continuous operation time of each component of the blast furnace dust removal device;
the interlocking control module 4 is used for monitoring and feeding back the operation state of the front-stage and rear-stage components of the blast furnace dust removal device;
the alarm module 5 is used for sending out an alarm signal in time when a fault signal is received or a signal cannot be received within a set time;
the main control module 1 is respectively electrically connected with the timing module 2, the delay setting module 3, the interlocking control module 4 and the alarm module 5, the output end of the interlocking control module 4 is electrically connected with the input end of the alarm module 5, displacement sensors are arranged on the front-stage and rear-stage scraper conveyor and the bucket elevator of the blast furnace dust removal device, a rotary sensor is arranged on the ash discharge valve, and the displacement sensors and the rotary sensor are respectively electrically connected with the main control module 1, the timing module 2, the delay setting module 3, the interlocking control module 4 and the alarm module 5.
The working principle of the utility model is as follows:
when the dust removal device is used, firstly, the time for starting operation of each component is set on a human-computer interface of the timing module 2, when the set time is reached, the main control module 1 controls each component of the dust removal device to start operation, in the operation process, the displacement sensors on the front-stage scraper and the rear-stage scraper and the bucket elevator, and the rotation sensor on the ash discharge valve collects the operation data of the components and uploads the operation data to the timing module 2, the delay setting module 3, the interlocking control module 4 and the alarm module 5, and in the operation of the dust removal device, the flow of materials changes at any time and the operation duration of each component changes accordingly, so that the operation time of each component set by the delay setting module 3 is adjusted in time according to the operation change of the materials at any time;
when a rear-stage scraper conveyor or a bucket elevator breaks down in the operation process, the corresponding sensors upload data to the interlocking control module 4, the interlocking control module 4 transmits the data to the alarm module 5 to send out an alarm, meanwhile, the interlocking control module 4 transmits the data to the main control module 1, and the main control module 1 controls the ash discharge valve and the scraper conveyor at the front stage to stop operating, so that a large production accident is prevented;
when the alarm module 5 has no signal within the set time or has a fault of a part, the alarm module alarms in time and rings to inform a person on duty to process.

Claims (1)

1. The utility model provides an automatic ash discharging system for dust collector of blast furnace of iron works which characterized in that: the device comprises a main control module (1), a timing module (2), a delay setting module (3), an interlocking control module (4) and an alarm module (5);
the main control module (1) is used for controlling the start and stop of a front-stage scraper conveyor and a rear-stage scraper conveyor of the blast furnace dust removal device, a bucket elevator and an ash discharge valve;
the timing module (2) is used for monitoring the operation starting time of each component of the blast furnace dust removal device;
the delay setting module (3) is used for monitoring and controlling the continuous operation time of each component of the blast furnace dust removal device;
the interlocking control module (4) is used for monitoring and feeding back the running state of the front-stage and rear-stage components of the blast furnace dust removal device;
the alarm module (5) is used for sending out an alarm signal in time when a fault signal is received or a signal cannot be received within a set time;
the main control module (1) is respectively electrically connected with the timing module (2), the time delay setting module (3), the interlocking control module (4) and the alarm module (5), the output end of the interlocking control module (4) is electrically connected with the input end of the alarm module (5), displacement sensors are arranged on a front-stage scraper machine and a rear-stage scraper machine of the blast furnace dust removal device and on a bucket elevator, a rotary sensor is arranged on an ash discharge valve, and the displacement sensors and the rotary sensor are respectively electrically connected with the main control module (1), the timing module (2), the time delay setting module (3), the interlocking control module (4) and the alarm module (5).
CN202121367066.6U 2021-06-18 2021-06-18 Automatic ash discharging system for dust removing device of blast furnace of iron works Active CN215517507U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121367066.6U CN215517507U (en) 2021-06-18 2021-06-18 Automatic ash discharging system for dust removing device of blast furnace of iron works

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121367066.6U CN215517507U (en) 2021-06-18 2021-06-18 Automatic ash discharging system for dust removing device of blast furnace of iron works

Publications (1)

Publication Number Publication Date
CN215517507U true CN215517507U (en) 2022-01-14

Family

ID=79809198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121367066.6U Active CN215517507U (en) 2021-06-18 2021-06-18 Automatic ash discharging system for dust removing device of blast furnace of iron works

Country Status (1)

Country Link
CN (1) CN215517507U (en)

Similar Documents

Publication Publication Date Title
CN201658910U (en) Electric integrated control system of dust-cleaning apparatus
CN102151596B (en) Intelligent ball feeder
CN102000627A (en) Device and method for automatically controlling choke feed of conical crusher
CN206128187U (en) Intelligence monitoring device of urban water supply system based on GPRS communication
CN215517507U (en) Automatic ash discharging system for dust removing device of blast furnace of iron works
CN100578405C (en) Cam system with mold database
CN103368495A (en) One-driven-two control method and control system of high voltage frequency converter
CN102399935B (en) A kind of device and method improving OG method recovery coal gas of converter effect
CN210557995U (en) Intelligent ash conveying control system based on DCS
CN101787969B (en) Numerical control system of minimum flow valve of governing feedwater pump and minimum flow control method thereof
CN202778623U (en) Quantitative and energy-saving ball dismounting device without ball clamping and ball blocking
CN205507566U (en) Opencut coal mine pump house water level monitoring system based on PLC
CN203350708U (en) High-voltage frequency converter "one-driving-two" control system
CN201943074U (en) Automatic monitoring equipment for grouting
CN210854167U (en) Alarm stopping device for bucket elevator
CN211401304U (en) Fully-mechanized coal mining face electromechanical equipment cooling monitoring device
CN103723646B (en) Endless rope winch control method
CN207331145U (en) A kind of air pressure cotton box control device applied to nonwoven industry
CN201969438U (en) Chambered pulse back-flushing bag type dust collector
CN216004211U (en) Automatic coal chute coal blockage early warning device based on mechanical sampling
CN215026746U (en) Concentrate dehydration automation control system of concentrating mill
CN101265674A (en) Intelligence control pressure screen
CN113895988A (en) Funnel chute blockage dredger
CN2648066Y (en) Data collecting, energy saving controlling apparatus for sucking oil machine
CN201765501U (en) Voice shutting switch

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant