CN215413883U - Gas monitoring structure for gas pipeline engineering - Google Patents

Gas monitoring structure for gas pipeline engineering Download PDF

Info

Publication number
CN215413883U
CN215413883U CN202120537407.3U CN202120537407U CN215413883U CN 215413883 U CN215413883 U CN 215413883U CN 202120537407 U CN202120537407 U CN 202120537407U CN 215413883 U CN215413883 U CN 215413883U
Authority
CN
China
Prior art keywords
gas
sealing plug
lag
cuff
gas circuit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120537407.3U
Other languages
Chinese (zh)
Inventor
罗杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Taixinte Experimental Equipment Technology Co ltd
Original Assignee
Guangzhou Taixinte Experimental Equipment Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Taixinte Experimental Equipment Technology Co ltd filed Critical Guangzhou Taixinte Experimental Equipment Technology Co ltd
Priority to CN202120537407.3U priority Critical patent/CN215413883U/en
Application granted granted Critical
Publication of CN215413883U publication Critical patent/CN215413883U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Measuring Volume Flow (AREA)

Abstract

The utility model discloses a gas monitoring structure for gas pipeline engineering, which comprises a gas flowmeter body, wherein the gas flowmeter body comprises a gas path inlet pipe and a gas path outlet pipe, this gas monitoring structure for gas pipeline engineering still includes first lag, the second lag, the connecting band, first sealing plug and second sealing plug, first lag cooperatees with the gas circuit inlet tube, first lag contains first cuff, the second lag contains the second cuff, first lag is established through first cuff and is used for protecting the gas circuit inlet tube on the gas circuit inlet tube, the second lag is established through the second cuff and is used for protecting the gas circuit outlet pipe on the gas circuit outlet pipe, the outside portion of the one end fixed connection gas circuit inlet tube of connecting band, the outside portion of the other end fixed connection gas circuit outlet pipe of connecting band, fixed setting and first cuff matched with first sealing plug and fixed setting and second cuff matched with second sealing plug on the connecting band.

Description

Gas monitoring structure for gas pipeline engineering
Technical Field
The utility model relates to a gas monitoring structure for gas pipeline engineering, and belongs to the technical field of gas pipeline engineering.
Background
Brand name is Siargo Ltd, the model is MF 5706-10's gas flowmeter, including the gas flowmeter body, the gas flowmeter body contains gas circuit inlet tube and gas circuit outlet pipe, among the prior art, for realizing protecting gas circuit inlet tube and gas circuit outlet pipe to the gas flowmeter body, the first lag and the second lag that adopt independent existence establish respectively at gas circuit inlet tube and gas circuit outlet pipe protection and protect usually, under this kind of mode, can not reach first lag and the linkage complex result of use of second lag, can not avoid accomodating and take up the condition that can not form the integral type structure that the use needs to be respectively taken up among the prior art, and simultaneously, can not reach the result of use that the sealed protection of blocking was accomodate, can not realize reaching better result of use respectively under different scenes. Therefore, there is a need for a gas monitoring structure for gas pipeline engineering to solve the problem in the prior art.
In order to solve the technical problems, a new technical scheme is especially provided.
SUMMERY OF THE UTILITY MODEL
The present invention is directed to a gas monitoring structure for gas pipeline engineering, so as to solve the problems in the background art.
In order to achieve the purpose, the utility model provides the following technical scheme: a gas monitoring structure for gas pipeline engineering comprises a gas flowmeter body, the gas flowmeter body comprises a gas path inlet pipe and a gas path outlet pipe, this gas monitoring structure for gas pipeline engineering still includes first lag, the second lag, the connecting band, first sealing plug and second sealing plug, first lag cooperatees with the gas circuit inlet tube, first lag contains first cuff, the second lag contains the second cuff, first lag is established through first cuff and is used for protecting the gas circuit inlet tube on the gas circuit inlet tube, the second lag is established through the second cuff and is used for protecting the gas circuit outlet pipe on the gas circuit outlet pipe, the outside portion of the one end fixed connection gas circuit inlet tube of connecting band, the outside portion of the other end fixed connection gas circuit outlet pipe of connecting band, fixed setting and first cuff matched with first sealing plug and fixed setting and second cuff matched with second sealing plug on the connecting band.
Preferably, the first protection sleeve, the second protection sleeve, the connecting band, the first sealing plug and the second sealing plug are of an integrated structure.
Preferably, each corner of the first protective sleeve, the second protective sleeve, the connecting band, the first sealing plug and the second sealing plug is provided with an arc transition.
Preferably, the first protection sleeve, the second protection sleeve, the connecting band, the first sealing plug and the second sealing plug are respectively made of rubber materials.
Compared with the prior art, the utility model has the beneficial effects that: avoid first lag and the second lag that generally adopts the independent existence to establish respectively that the cover is established and is protected at gas circuit inlet tube and gas circuit outlet pipe, reach first lag and second lag coordinated result of use that can link, can avoid accomodating among the prior art and take up the condition that can not form the integral type structure that the use needs to be taken up respectively, simultaneously, reach the sealed result of use that protects and accomodate of shutoff, can realize reaching better result of use respectively under different scenes.
Drawings
Fig. 1 is a schematic structural view in a partial sectional view.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The present invention has been made in an effort to solve the problems occurring in the related art, and the present invention has been disclosed to provide a concept that solves the technical problems occurring in the related art, so that those skilled in the art should appreciate that the technical solutions of the present invention have been disclosed to the extent that they can completely solve the problems occurring in the related art. Therefore, if a person skilled in the art encounters new technical problems while implementing the technical solution, the person skilled in the art should understand that a directional problem of continuing development for two or three times and the like can be made on the basis of the present invention, and should not understand that the disclosure of the present invention is insufficient or cannot be implemented by newly proposing a problem, which belongs to a manner obvious to the person skilled in the art. If the present invention describes a part of the prior art referred to in the description of the embodiment, such a part not specifically described refers to the prior art, and it is natural that those skilled in the art can understand the prior art.
And, it should be noted in advance that, on the basis of solving the problem of realizing this basis and providing more choices for users, other achieved technical effects are only that the user sees the kernel and the wisdom concept, for example, if the technical effect described in this application part is considered not to be realized or achieved, it can be understood that the exaggerated beneficial effect which cannot be realized or achieved belongs to the error part, and the omission or deletion process can be performed, and at the same time, since there is a condition that this kind of condition belongs to the error part, at the time of deletion, it should not be understood that the modification is beyond the range recorded in the original specification.
Referring to the attached drawings of the specification, the utility model provides a technical scheme that: a gas monitoring structure for gas pipeline engineering comprises a gas flowmeter body 1, wherein the gas flowmeter body 1 comprises a gas path inlet pipe 2 and a gas path outlet pipe 3, the gas monitoring structure for gas pipeline engineering further comprises a first protecting sleeve 4, a second protecting sleeve 5, a connecting belt 6, a first sealing plug 7 and a second sealing plug 8, the first protecting sleeve 4 is matched with the gas path inlet pipe 2, the first protecting sleeve 4 comprises a first sleeve opening 9, the second protecting sleeve 5 comprises a second sleeve opening 10, the first protecting sleeve 4 is sleeved on the gas path inlet pipe 2 through the first sleeve opening 9 and used for protecting the gas path inlet pipe 2, the second protecting sleeve 5 is sleeved on the gas path outlet pipe 3 through the second sleeve opening 10 and used for protecting the outlet pipe gas path 3, one end of the connecting belt 6 is fixedly connected with the outer side part of the gas path inlet pipe 2, the other end of the connecting belt 6 is fixedly connected with the outer side part of the gas path outlet pipe 3, the connecting band 6 is fixedly provided with a first sealing plug 7 matched with the first sleeve opening 9 and a second sealing plug 8 matched with the second sleeve opening 10, and the utility model is based on the condition that no product is provided, so that the utility model has advantages and disadvantages, and is only used for specific environments in the background art, such as scenes mentioned in the background art, if a user considers inconvenient use factors in some cases, the user does not recommend purchasing the application in the case, and the product is only used for and recommends users who need to mention scenes in the background art and can accept and ignore other negative factors at the same time, and belongs to the implementation mode known by a person skilled in the art.
Preferably, the first protection sleeve 4, the second protection sleeve 5, the connecting band 6, the first sealing plug 7 and the second sealing plug 8 are of an integrated structure, each corner of the first protection sleeve 4, the second protection sleeve 5, the connecting band 6, the first sealing plug 7 and the second sealing plug 8 is respectively provided with an arc transition, the first protection sleeve 4, the second protection sleeve 5, the connecting band 6, the first sealing plug 7 and the second sealing plug 8 are respectively made of a rubber material, and the use effect of convenient sleeving is achieved by utilizing the deformable characteristic of the rubber material known by a person skilled in the art in the prior art, meanwhile, the technical scheme of the present invention as a preferred embodiment should not be understood as a limitation to the present application, such as horizontal or vertical or other, and in the existing industrial production process, some errors are inevitably generated, such errors are inevitable in the industrial production and are anticipated and known by those skilled in the art to be understood as prior art, and in the description of the utility model, the language or scheme used is only one of the best modes of execution with respect to the drawings, and those skilled in the art can flexibly select a specific mode of execution on the basis of the scheme of the utility model, and all the modes of execution will be known to those skilled in the art. And, some of the preferred ways to implement the solutions of the present invention in the present invention are better, some of them are not the best, and even some of them may have new problems, such as anyone who has proposed new technical problems not mentioned in the background of the present application according to the present invention, can understand that the directional problems of the continued development can be made on the basis of the present invention, and on the basis that it has been stated that the directional problems are not the technical problems to be solved by the present invention, the technical solutions of the present invention should be understood as those skilled in the art can clearly implement the technical solutions of the present invention.
When in use, the parts of the present invention not specifically described can be implemented as embodiments known to those skilled in the art, for example, the gas flowmeter body 1 can be understood as a gas flowmeter known to those skilled in the art, such as a gas flowmeter with model number MF5706-10, which includes a gas flowmeter body 1, the gas flowmeter body 1 includes a gas path inlet pipe 2 and a gas path outlet pipe 3, and all belong to the embodiments known to those skilled in the art, the present invention adopts, on the basis of the prior art, a first protection cover 4, a second protection cover 5, a connecting belt 6, a first sealing plug 7 and a second sealing plug 8, as shown in fig. 1, the first protection cover 4 is matched with the gas path inlet pipe 2, the first protection cover 4 includes a first sleeve opening 9, the second protection cover 5 includes a second sleeve opening 10, by adopting the mode, the first protective sleeve 4 is sleeved on the gas path inlet pipe 2 through the first sleeve opening 9 for protecting the gas path inlet pipe 2, the second protective sleeve 5 is sleeved on the gas path outlet pipe 3 through the second sleeve opening 10 for protecting the gas path outlet pipe 3, one end of the connecting belt 6 is fixedly connected with the outer side part of the gas path inlet pipe 2, the other end of the connecting belt 6 is fixedly connected with the outer side part of the gas path outlet pipe 3, the using effect that the first protective sleeve 4 and the second protective sleeve 5 can be in linkage fit is achieved, the situation that the gas path inlet pipe 2 and the gas path outlet pipe 3 of the gas flowmeter body 1 are protected in order to realize protection in the prior art, sundries are prevented from entering the gas path inlet pipe 2 and the gas path outlet pipe 3 and only can adopt the first protective sleeve 4 and the second protective sleeve 5 which are respectively and independently existed, and the situation that the integrated structure cannot be formed due to the need to be respectively taken up for storage and use is avoided, meanwhile, a first sealing plug 7 matched with the first sleeve opening 9 and a second sealing plug 8 matched with the second sleeve opening 10 are fixedly arranged on the connecting belt 6, when the first protective sleeve 4 and the second protective sleeve 5 are respectively sleeved on the air path inlet pipe 2 and the air path outlet pipe 3 in a cancelling mode, the first sleeve opening 9 of the first protective sleeve 4 and the second sleeve opening 10 of the second protective sleeve 5 can be respectively sealed, protected and stored through the first sealing plug 7 and the second sealing plug 8, and better using effects can be achieved under different scenes.
Meanwhile, the model and/or size of each component of the present invention should be understood as being matched and matched with each other, which belongs to the implementation mode known by those skilled in the art, and the matching tightness of each component of the present invention, which is known by those skilled in the art, belongs to the part that those skilled in the art can implement as required by adopting the mode known by those skilled in the art, and specifically, on the basis of the scheme of the present invention, those skilled in the art can make up some deficiencies in the details of the present invention through logical analysis and/or reasoning, so that the technical scheme of the present invention is more perfect and optimized. And, if the present invention is concerned with a problem not addressed by the present invention, any means known to those of ordinary skill in the art may be used to solve the problem, and all the means known to those of ordinary skill in the art are included in the embodiments known to those of ordinary skill in the art. For example, the present invention is also intended to protect the principle, not the specific data, and also in view of the fact that the size, data, etc. are not the object protected by the utility model patent, and therefore are not elaborated, and those skilled in the art can understand any embodiment known to those skilled in the art based on the present invention in combination with the prior art, and the present invention may have the drawbacks mentioned in the background, and this drawback may be the inexhaustible drawback of the utility model, but in the development of a technology, it is difficult to develop a technology without any drawbacks, the solution of this drawback can be understood as the prior art, and the people using the present invention are limited to the users who need the environment mentioned in the background and can continue to select the use by ignoring this drawback. Based on this, what is claimed in the present application is only a part of the principle of the solution corresponding to the problem of the background art, and other parts, for example, how to implement the technical solution of the present application more optimally on the basis of the principle of the present application, obviously, the technical solution of the present application with clear description is not completely implemented through one development and one patent application, so the technical solution of the present application is only limited to the technical problem to be solved in the corresponding background art, and other parts can be completed in another development and patent application, or be continuously improved on the technology of the solution of the present application by other technical personnel in the art, and apply a patent to achieve the optimal using effect, all of which belong to the known ways in the art.
The design to be explained is: the control circuit involved in the present design is a conventional technique for controlling the operation of each component and the corresponding control program. The drawings are only for purposes of illustrating the principles of the utility model as will be readily understood by those of ordinary skill in the art. Because of the limitation of the page size of the patent application document, in order to clearly show the principle, the proportional size between each component in the drawings may be inconsistent with the actual product, so it can be understood by those skilled in the art that, for example, the structural principle of a certain part in the drawings is highlighted, the part is intentionally drawn to be larger, and another part appears to be smaller, so it can be understood that, based on the principle of the present invention, the smaller, more practical and more understandable each component based on the present invention can be naturally made by using the more reasonable industrial design, and the way that those skilled in the art can know is the more compact and more practical, and in the application process, if the parts of the patent application, such as the claims, the description and the unclear description in the drawings, the unclear part based on the description is the part that those skilled in the art can not understand and implement, that is, it is not understood in which scope the unclear description portion is, therefore, it is not reasonable to consider that the modifications beyond the scope described in the original specification and claims are obvious if it is not known which scope, and therefore, it should be understood that the unclear description portion is deleted in the present application in order to overcome the existing disadvantages and the unclear description portion is deleted without exceeding the scope described in the original specification and claims.
And that the practice of the utility model will be extended to any embodiment known to those skilled in the art, given the compliance with the national laws and regulations and the associated safety precautions.
In the description of the present invention, it is to be understood that the terms "coaxial", "bottom", "one end", "top", "middle", "other end", "upper", "one side", "top", "inner", "front", "center", "two ends", etc., indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the referenced device or element must have a particular orientation, be constructed and operated in a particular orientation, and thus, are not to be construed as limiting the present invention; and those skilled in the art will appreciate that the benefits to be achieved by the present invention are only better than those achieved by current embodiments of the prior art under certain circumstances, rather than the best use directly in the industry.
In the present invention, unless otherwise expressly specified or limited, the terms "mounted," "disposed," "connected," "secured," "screwed" and the like are to be construed broadly, e.g., as meaning fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; the terms may be directly connected or indirectly connected through an intermediate, and may be communication between two elements or interaction relationship between two elements, unless otherwise specifically limited, and the specific meaning of the terms in the present invention will be understood by those skilled in the art according to specific situations.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (4)

1. The utility model provides a gas monitoring structure for gas pipeline engineering, includes the gas flowmeter body, and the gas flowmeter body contains gas circuit inlet pipe and gas circuit outlet pipe, its characterized in that: this gas monitoring structure for gas pipeline engineering still includes first lag, the second lag, the connecting band, first sealing plug and second sealing plug, first lag cooperatees with the gas circuit inlet tube, first lag contains first cuff, the second lag contains the second cuff, first lag is established through first cuff and is used for protecting the gas circuit inlet tube on the gas circuit inlet tube, the second lag is established through the second cuff and is used for protecting the gas circuit outlet pipe on the gas circuit outlet pipe, the outside portion of the one end fixed connection gas circuit inlet tube of connecting band, the outside portion of the other end fixed connection gas circuit outlet pipe of connecting band, fixed setting and first cuff matched with first sealing plug and fixed setting and second cuff matched with second sealing plug on the connecting band.
2. The gas monitoring structure for gas piping engineering according to claim 1, wherein: the first protection sleeve, the second protection sleeve, the connecting band, the first sealing plug and the second sealing plug are of an integrated structure.
3. The gas monitoring structure for gas piping engineering according to claim 1, wherein: and arc transition is respectively arranged at each corner of the first protective sleeve, the second protective sleeve, the connecting band, the first sealing plug and the second sealing plug.
4. The gas monitoring structure for gas piping engineering according to claim 3, wherein: the first protection sleeve, the second protection sleeve, the connecting band, the first sealing plug and the second sealing plug are made of rubber materials respectively.
CN202120537407.3U 2021-03-15 2021-03-15 Gas monitoring structure for gas pipeline engineering Expired - Fee Related CN215413883U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120537407.3U CN215413883U (en) 2021-03-15 2021-03-15 Gas monitoring structure for gas pipeline engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120537407.3U CN215413883U (en) 2021-03-15 2021-03-15 Gas monitoring structure for gas pipeline engineering

Publications (1)

Publication Number Publication Date
CN215413883U true CN215413883U (en) 2022-01-04

Family

ID=79668437

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120537407.3U Expired - Fee Related CN215413883U (en) 2021-03-15 2021-03-15 Gas monitoring structure for gas pipeline engineering

Country Status (1)

Country Link
CN (1) CN215413883U (en)

Similar Documents

Publication Publication Date Title
CN215413883U (en) Gas monitoring structure for gas pipeline engineering
CN215372009U (en) Cold-resistant PVC structure of resistance to compression
CN215418881U (en) Fast charging data line capable of freely extending and retracting in length
CN215445396U (en) Novel silicone tube
CN216283572U (en) Robot sensor structure
CN206920494U (en) A kind of attachment structure of intelligent electric energy meter and communication head
CN216103162U (en) Box sealing structure
CN215437800U (en) Pressure test structure with strong anti-interference capability
CN213991385U (en) A waterproof construction and demonstrator for demonstrator
CN215372010U (en) Long-life PVC tubular product structure
CN215369433U (en) Window for building that air tightness performance is good
CN216843645U (en) Refrigerating system pipeline structure with good shock resistance
CN215508149U (en) Multifunctional cleaning device for digital products
CN215937202U (en) Vacuum cleaner
CN208859150U (en) A kind of double flange water outlet devices of reservoir
CN216649943U (en) Double-label noise reduction device for sports headset
CN208831704U (en) A kind of buckle-type ellipsoidal head
CN215567887U (en) High-quality sealing element structure
CN215444405U (en) Improved generation screw vacuum pump
CN216707526U (en) Intelligent control structure of robot
CN105417498B (en) Chlorine dioxide generator
CN214096374U (en) Purple infrared composite flame detector
CN216016953U (en) Depth camera with AI sensor
CN215410808U (en) An anti-corrosion structure that is beneficial to the safety of construction projects
CN216380896U (en) Door and window accessory structure with high stability

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220104