CN215407821U CN202121485694.4U CN202121485694U CN215407821U CN 215407821 U CN215407821 U CN 215407821U CN 202121485694 U CN202121485694 U CN 202121485694U CN 215407821 U CN215407821 U CN 215407821U
Authority
CN
China
Prior art keywords
horizontal pole
cross rod
rail
rod
welded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121485694.4U
Other languages
Chinese (zh)
Inventor
左阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Zhonglu Construction Engineering Co ltd
Original Assignee
Anhui Zhonglu Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Zhonglu Construction Engineering Co ltd filed Critical Anhui Zhonglu Construction Engineering Co ltd
Priority to CN202121485694.4U priority Critical patent/CN215407821U/en
Application granted granted Critical
Publication of CN215407821U publication Critical patent/CN215407821U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fencing (AREA)

Abstract

The utility model relates to the technical field of municipal engineering fences, and discloses an assembled fence for municipal engineering, which comprises: first rail stand and second rail stand, the equal fixed mounting in top of first rail stand and second rail stand has the fixed block, the connection frame has all been welded to the side of first rail stand and second rail stand, the spread groove has been seted up at the top of fixed block. This assembled rail for municipal works, through setting up first horizontal pole, the second horizontal pole, the fixed block, montant and first threaded rod, the concatenation equipment between first horizontal pole and second horizontal pole and the rail stand, thereby be convenient for splice the equipment to the rail, loop bar and montant joint increase the joint strength of rail, first threaded rod and loop bar pass through the internal thread cover and connect the joint that makes between first horizontal pole and the third horizontal pole and be connected more firm, thereby increase the structural strength of rail, thereby make being connected with sufficient structural strength between the rail.

Description

Assembled rail for municipal works
Technical Field
The utility model relates to the technical field of municipal engineering fences, in particular to an assembled fence for municipal engineering.
Background
Municipal works refer to municipal facility construction works, such as common urban roads, bridges and subways, such as various pipelines, rainwater, sewage, electric power, telecommunication, gas and the like closely related to life, and the construction of squares, urban landscaping and the like, and belong to the municipal works.
Among the prior art, common municipal works rail is when using at present, and the rail is generally placed side by a plurality of free rails and is installed together, and rail joint strength is more weak, easily leads to the rail separation when receiving the striking, and current rail when the installation, builds for the straight line mostly, and the angle between the adjacent rail unit is difficult for adjusting.
SUMMERY OF THE UTILITY MODEL
Aiming at the defects of the prior art, the utility model provides an assembled fence for municipal engineering, which has the advantages of firm assembly and connection and convenience in lap joint angle adjustment, and solves the problems that the fence is formed by arranging and installing a plurality of single fences side by side, the connection strength of the fence is weak, the fence is easy to separate when being impacted, most of the fences are built in a straight line when being installed, and the angle between adjacent fence units is not easy to adjust.
The utility model provides the following technical scheme: an assembled fence for municipal works, comprising: first rail stand and second rail stand, the equal fixed mounting in top of first rail stand and second rail stand has the fixed block, the carriage has all been welded to the side of first rail stand and second rail stand, the spread groove has been seted up at the top of fixed block, the spread groove is equipped with first horizontal pole and second horizontal pole respectively through the bolt, the montant has all been welded to the bottom of first horizontal pole and second horizontal pole, one side welding that first horizontal pole bottom is close to the second horizontal pole has first threaded rod, the inside of carriage has third horizontal pole and fourth horizontal pole through the bolt assembly, the loop bar has all been welded at the top of third horizontal pole and fourth horizontal pole, one side welding that third horizontal pole top is close to the fourth horizontal pole has the second threaded rod.
Preferably, the square groove has all been seted up at the top of first horizontal pole and second horizontal pole, logical groove has all been seted up to the bottom of first horizontal pole and second horizontal pole, the inside in square groove is provided with the connecting plate, the inside that leads to the groove is provided with fixing bolt, the connecting plate passes through fixing bolt fixed mounting in the inside in square groove, the side welding of first horizontal pole has the connecting piece, first horizontal pole passes through connecting piece and second horizontal pole swing joint, third horizontal pole and fourth horizontal pole pass through connecting piece swing joint.
Preferably, the connecting piece comprises a first connecting block, a fixing column and a second connecting block, the first connecting block is welded on the side face of the first cross rod, the fixing column is welded on the side face of the second cross rod, and the fixing column is sleeved on the surface of the second connecting block.
Preferably, the joint groove has been seted up at the top of loop bar, the bottom joint on the inner wall in joint groove and montant surface, the bottom of first threaded rod corresponds with the top of second threaded rod, the surperficial threaded connection of second threaded rod has the internal thread cover, the surface of first threaded rod and second threaded rod all with the internal thread of internal thread cover be connected.
Preferably, the one end of first horizontal pole and the one end swing joint of second horizontal pole, the one end of third horizontal pole and the one end swing joint of fourth horizontal pole, the one end welding that first horizontal pole and second horizontal pole are close to the fixed block has the fixture block, fixture block and the inside round hole joint of spread groove.
Preferably, the connecting plate is located the top of first horizontal pole and second horizontal pole, the inside in logical groove is linked together with the inside in square groove.
Compared with the prior art, the utility model has the following beneficial effects:
1. this assembled rail for municipal works, through setting up first horizontal pole, the second horizontal pole, the fixed block, montant and first threaded rod, the concatenation equipment between first horizontal pole and second horizontal pole and the rail stand, thereby be convenient for splice the equipment to the rail, loop bar and montant joint increase the joint strength of rail, first threaded rod and loop bar pass through the internal thread cover and connect the joint that makes between first horizontal pole and the third horizontal pole and be connected more firm, thereby increase the structural strength of rail, thereby make being connected with sufficient structural strength between the rail.
2. This assembled rail for municipal works, through connecting piece and connecting plate, first horizontal pole and second horizontal pole all overturn through the position department of connecting piece with third horizontal pole and fourth horizontal pole when turning over a book, the biggest angle of upset can make first rail stand and second rail stand coincidence, the connecting plate will turn over the angle of rolling over a back rail through fixing bolt and fix, avoid the rail to build the change that takes place the angle after, thereby can be the same with the scope of construction that the rail encloses when using.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic front sectional view of the present invention;
fig. 3 is a schematic cross-sectional view of the connector of fig. 1 according to the present invention.
In the figure: 1. a first fence post; 2. a first fence post; 3. a fixed block; 4. a connecting frame; 5. connecting grooves; 6. a first cross bar; 7. a connecting member; 71. a first connection block; 72. fixing a column; 73. a second connecting block; 8. a second cross bar; 9. an internal thread sleeve; 10. a square groove; 11. a through groove; 12. a connecting plate; 13. fixing the bolt; 14. a vertical rod; 15. a first threaded rod; 16. a clamping groove; 17. a clamping block; 18. a third cross bar; 19. a fourth cross bar; 20. a loop bar; 21. a second threaded rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-3, an assembled enclosure for municipal works includes: first rail stand 1 and second rail stand 2, the equal fixed mounting in top of first rail stand 1 and second rail stand 2 has fixed block 3, the connection frame 4 has all been welded to the side of first rail stand 1 and second rail stand 2, spread groove 5 has been seted up at the top of fixed block 3, spread groove 5 is equipped with first horizontal pole 6 and second horizontal pole 8 respectively through the bolt, montant 14 has all been welded to the bottom of first horizontal pole 6 and second horizontal pole 8, the welding of one side that first horizontal pole 6 bottom is close to second horizontal pole 8 has first threaded rod 15, the inside of connection frame 4 is equipped with third horizontal pole 18 and fourth horizontal pole 19 through the bolt, loop bar 20 has all been welded at the top of third horizontal pole 18 and fourth horizontal pole 19, the welding of one side that third horizontal pole 18 top is close to fourth horizontal pole 19 has second threaded rod 21.
Wherein; square groove 10 has all been seted up at the top of first horizontal pole 6 and second horizontal pole 8, logical groove 11 has all been seted up to the bottom of first horizontal pole 6 and second horizontal pole 8, the inside of square groove 10 is provided with connecting plate 12, the inside that leads to groove 11 is provided with fixing bolt 13, connecting plate 12 passes through fixing bolt 13 fixed mounting in the inside of square groove 10, the side welding of first horizontal pole 6 has connecting piece 7, first horizontal pole 6 passes through connecting piece 7 and 8 swing joint of second horizontal pole, third horizontal pole 18 and fourth horizontal pole 19 pass through connecting piece 7 swing joint, first horizontal pole 6 and second horizontal pole 8 and third horizontal pole 18 and fourth horizontal pole 19 all overturn through the position department of connecting piece 7 when rolling over, the biggest angle of upset can make first rail stand 1 coincide with second rail stand 2, connecting plate 12 will turn over the angle after rolling over through fixing bolt 13 and fix, avoid taking place the change of angle after the rail is built.
Wherein; connecting piece 7 includes first connecting block 71, fixed column 72 and second connecting block 73, first connecting block 71 welds the side at first horizontal pole 6, fixed column 72 welds the side at second horizontal pole 8, fixed column 72 cup joints the surface at second connecting block 73, connecting piece 7 is used for the regulation of angle between the rail, first horizontal pole 6 and second horizontal pole 8 all are provided with connecting piece 7 with the hookup location department of third horizontal pole 18 and fourth horizontal pole 19, thereby be convenient for adjust the angle that the rail was built.
Wherein; joint groove 16 has been seted up at loop bar 20's top, joint groove 16's inner wall and the bottom joint on montant 14 surface, the bottom of first threaded rod 15 corresponds with the top of second threaded rod 21, the surface threaded connection of second threaded rod 21 has internal thread cover 9, the surface of first threaded rod 15 and second threaded rod 21 all with the internal thread cover 9's internal thread connection, loop bar 20 and the 14 joint of montant increase the joint strength of rail, first threaded rod 15 and loop bar 20 are connected through internal thread cover 9 and are made being connected between first horizontal pole 6 and the third horizontal pole 18 more firm, thereby increase the structural strength of rail.
Wherein; the one end of first horizontal pole 6 and the one end swing joint of second horizontal pole 8, the one end of third horizontal pole 18 and the one end swing joint of fourth horizontal pole 19, the one end welding that first horizontal pole 6 and second horizontal pole 8 are close to fixed block 3 has fixture block 17, fixture block 17 and the inside round hole joint of spread groove 5, fix a position first horizontal pole 6 and the position of second horizontal pole 8 to be convenient for assemble the rail.
Wherein; the connecting plate 12 is positioned on the top of the first cross bar 6 and the second cross bar 8, and the inside of the through groove 11 is communicated with the inside of the square groove 10.
The theory of operation, when using, pass through the bolt with the tip of third horizontal pole 18 and fourth horizontal pole 19 and be connected fixedly with carriage 4, with the inside of montant 14 card income joint groove 16, the junction of montant 14 and loop bar 20 can set up bolted connection, make the bottom of first threaded rod 15 correspond with the top of second threaded rod 21, it links together first threaded rod 15 and second threaded rod 21 to rotate internal thread cover 9, connecting plate 12 passes through fixing bolt 13 to be fixed in the inside of square groove 10, avoid first horizontal pole 6 and second horizontal pole 8 to turn over when using, when the angle of needs adjustment rail, rotate fixing bolt 13, it is not hard up with fixing bolt 13 and connecting plate 12's connection, carry out the regulation of angle with the rail through connecting piece 7, it is fixed to screw up fixing bolt 13 after the regulation is accomplished.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides an assembled rail for municipal works which characterized in that includes: the fence comprises a first fence upright post (1) and a second fence upright post (2), wherein fixed blocks (3) are fixedly mounted at the tops of the first fence upright post (1) and the second fence upright post (2), connecting frames (4) are welded on the side faces of the first fence upright post (1) and the second fence upright post (2), connecting grooves (5) are formed in the tops of the fixed blocks (3), the connecting grooves (5) are respectively assembled with a first cross rod (6) and a second cross rod (8) through bolts, vertical rods (14) are welded at the bottoms of the first cross rod (6) and the second cross rod (8), a first threaded rod (15) is welded at one side, close to the second cross rod (8), of the bottom of the first cross rod (6), a third cross rod (18) and a fourth cross rod (19) are assembled in the connecting frame (4) through bolts, sleeve rods (20) are welded at the tops of the third cross rod (18) and the fourth cross rod (19), and a second threaded rod (21) is welded on one side, close to the fourth cross rod (19), of the top of the third cross rod (18).
2. The assembled fence for municipal engineering according to claim 1, wherein square grooves (10) are formed in the tops of the first cross rod (6) and the second cross rod (8), through grooves (11) are formed in the bottoms of the first cross rod (6) and the second cross rod (8), connecting plates (12) are arranged inside the square grooves (10), fixing bolts (13) are arranged inside the through grooves (11), the connecting plates (12) are fixedly installed inside the square grooves (10) through the fixing bolts (13), connecting pieces (7) are welded on the side faces of the first cross rod (6), the first cross rod (6) is movably connected with the second cross rod (8) through the connecting pieces (7), and the third cross rod (18) and the fourth cross rod (19) are movably connected through the connecting pieces (7).
3. The assembled fence for municipal engineering according to claim 2, wherein the connecting piece (7) comprises a first connecting block (71), a fixing post (72) and a second connecting block (73), the first connecting block (71) is welded on the side of the first cross bar (6), the fixing post (72) is welded on the side of the second cross bar (8), and the fixing post (72) is sleeved on the surface of the second connecting block (73).
4. The assembled fence for municipal engineering according to claim 1, wherein a clamping groove (16) is formed in the top of the sleeve rod (20), the inner wall of the clamping groove (16) is clamped with the bottom of the surface of the vertical rod (14), the bottom of the first threaded rod (15) corresponds to the top of the second threaded rod (21), an internal threaded sleeve (9) is connected to the surface of the second threaded rod (21) in a threaded manner, and the surfaces of the first threaded rod (15) and the second threaded rod (21) are both connected with the internal threads of the internal threaded sleeve (9).
5. The assembled fence for municipal engineering according to claim 1, wherein one end of the first cross bar (6) is movably connected with one end of the second cross bar (8), one end of the third cross bar (18) is movably connected with one end of the fourth cross bar (19), one ends of the first cross bar (6) and the second cross bar (8) close to the fixing block (3) are welded with the fixture blocks (17), and the fixture blocks (17) are clamped with the round holes inside the connecting grooves (5).
6. An assembled railing for civil engineering according to claim 2, characterised in that the connecting plate (12) is located on top of the first and second crosspieces (6, 8), the inside of the through slot (11) communicating with the inside of the square groove (10).
CN202121485694.4U 2021-07-01 2021-07-01 Assembled rail for municipal works Expired - Fee Related CN215407821U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121485694.4U CN215407821U (en) 2021-07-01 2021-07-01 Assembled rail for municipal works

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121485694.4U CN215407821U (en) 2021-07-01 2021-07-01 Assembled rail for municipal works

Publications (1)

Publication Number Publication Date
CN215407821U true CN215407821U (en) 2022-01-04

Family

ID=79644059

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121485694.4U Expired - Fee Related CN215407821U (en) 2021-07-01 2021-07-01 Assembled rail for municipal works

Country Status (1)

Country Link
CN (1) CN215407821U (en)

Similar Documents

Publication Publication Date Title
CN112112274B (en) Assembly type steel structure building assembly and assembly method
CN215407821U (en) Assembled rail for municipal works
CN201598785U (en) Guardrail
CN113668772A (en) Method for building space-crossing large-span cantilever truss ground assembly jig frame
CN203640390U (en) Hard safety rail capable of being quickly assembled and disassembled
CN101806124A (en) Guardrail
CN215104658U (en) Adjustable structure system of steel trestle guardrail
CN217760322U (en) Exempt from modularization wisdom of flange and synthesize pole cover binding structure
CN212078912U (en) Foldable guardrail is used in municipal administration
CN209823693U (en) Roof photovoltaic support that can install fast
CN211973115U (en) Fixing device for road and bridge acoustic celotex board
CN111395855A (en) Wire pole auxiliary stay device
CN220014749U (en) Safety protection fence
CN218932957U (en) Beijing type road guardrail convenient to splice and install
CN219690379U (en) Combined type protective guardrail convenient to install
CN220705379U (en) Building engineering construction rail
CN218324237U (en) Engineering protective fence
CN222025257U (en) Node connection structure for assembling steel structure house
CN222962598U (en) Composite fence clamp
CN218952983U (en) Polymer composite material type protective fence
CN112274878B (en) Multifunctional climbing device for distribution network of power supply company, assembling method and using method
CN216406391U (en) Be convenient for fixed municipal works and use afforestation isolated column
CN223227179U (en) A water conservancy guardrail that is easy to repair and replace
CN217174819U (en) Building foundation pit maintains uses interim strutting arrangement
CN218815368U (en) Can install guardrail bar of preventing of baseboard fast

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220104