CN215406137U - Basement precipitation vacuum deep well structure - Google Patents
Basement precipitation vacuum deep well structure Download PDFInfo
- Publication number
- CN215406137U CN215406137U CN202120457892.3U CN202120457892U CN215406137U CN 215406137 U CN215406137 U CN 215406137U CN 202120457892 U CN202120457892 U CN 202120457892U CN 215406137 U CN215406137 U CN 215406137U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- pipe
- leakage hole
- steel plate
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000001556 precipitation Methods 0.000 title claims abstract description 12
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 92
- 239000010959 steel Substances 0.000 claims abstract description 92
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 26
- 239000000463 material Substances 0.000 claims abstract description 10
- 238000005086 pumping Methods 0.000 claims abstract description 5
- 239000004568 cement Substances 0.000 abstract description 5
- 229920002635 polyurethane Polymers 0.000 abstract description 4
- 239000004814 polyurethane Substances 0.000 abstract description 4
- 230000000694 effects Effects 0.000 abstract description 3
- 239000011440 grout Substances 0.000 description 5
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000001914 filtration Methods 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Images
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
The utility model relates to a basement precipitation vacuum deep well structure which comprises a leakage hole steel pipe and a water suction pump, wherein the leakage hole steel pipe is inserted below a basement bottom plate, the outer wall of the leakage hole steel pipe is sleeved with a steel mesh, an sandstone filling layer, a rapid-hardening cement layer and a polyurethane grouting layer are sequentially arranged in the leakage hole steel pipe from bottom to top, an upper steel pipe is coaxially arranged at the top end of the leakage hole steel pipe, and the upper steel pipe is inserted in the leakage hole steel pipe; the upper steel pipe is buried in a basement bottom plate layer, a first steel plate is welded at the middle upper part in the upper steel pipe, a second steel plate is welded at the top end of the upper steel pipe, grouting materials are filled below the first steel plate in the upper steel pipe, and micro-expansion concrete is filled between the first steel plate and the second steel plate; the water pumping pipe of the water pump penetrates through the upper steel pipe and the leak hole steel plate and is inserted into the sandstone material filling layer. The technical scheme has good plugging effect, is suitable for occasions with large underground water pressure, can recycle the upper steel pipe, and saves cost.
Description
Technical Field
The utility model relates to the field of building construction, in particular to a basement dewatering vacuum deep well structure.
Background
At present, a deep foundation pit dewatering well generally adopts a sand-free cement pipe deep well for dewatering, and has the advantages of rapid construction, large drainage quantity, deep dewatering, good drainage effect, large well spacing and the like. The deep foundation pit dewatering well is buried in the foundation pit, and the shutoff of well head becomes difficult problem. The conventional plugging device is easy to leak in the plugging process or after plugging, the treatment is time-consuming and labor-consuming, and the plugging is not thorough. After precipitation is finished, great difficulty is brought to plugging of a wellhead, and the well becomes a weak link of deep well precipitation. If the plugging of the wellhead of the deep well is not good, the phenomena of serious slurry leakage and cavities of concrete are easy to occur, the strength and the durability of the structure are influenced, the water leakage of the concrete is also caused, and the normal use of the engineering is seriously influenced.
Disclosure of Invention
The utility model aims to solve the technical problem of deep well precipitation plugging in the prior art and provides a basement precipitation vacuum deep well structure.
In order to achieve the purposes, the technology adopted by the utility model is as follows:
a basement precipitation vacuum deep well structure comprises a leakage hole steel pipe and a water suction pump, wherein the leakage hole steel pipe is inserted below a basement bottom plate, the outer wall of the leakage hole steel pipe is sleeved with a steel mesh, an aggregate filling layer, a rapid hardening cement layer and a polyurethane grouting layer are sequentially arranged in the leakage hole steel pipe from bottom to top, an upper steel pipe is coaxially arranged at the top end of the leakage hole steel pipe, and the upper steel pipe is inserted in the leakage hole steel pipe; the upper steel pipe is buried in a basement bottom plate layer, a first steel plate is welded at the middle upper part in the upper steel pipe, a second steel plate is welded at the top end of the upper steel pipe, grouting materials are filled below the first steel plate in the upper steel pipe, and micro-expansion concrete is filled between the first steel plate and the second steel plate; and a water pumping pipe of the water pump penetrates through the upper steel pipe and the leak hole steel plate and is inserted into the sandstone material filling layer.
Furthermore, a grouting pipe is installed in the middle of the first steel plate, external threads are arranged outside the grouting pipe, and a plug is installed on the grouting pipe through threads.
And furthermore, a water stop ring is welded on the outer wall of the upper steel pipe.
After the technical scheme is adopted, the utility model has the beneficial effects that: and a plurality of filling layers are arranged in the leak hole steel pipe, so that the upward leakage of the underground water is avoided. The top of the steel pipe with the leakage hole is additionally provided with an upper steel pipe, and the upper steel pipe is further plugged by two plugging steel plates and a filling layer to prevent high-pressure underground water from leaking. And a pipe plug is arranged on one of the steel pipes, so that the steel pipes can be plugged in time after grouting. The technical scheme has good plugging effect, is suitable for occasions with large underground water pressure, can recycle the upper steel pipe, and saves cost.
Drawings
FIG. 1 is a schematic structural diagram of the present invention.
Detailed Description
The following detailed description of embodiments of the utility model is provided in conjunction with the accompanying drawings:
as shown in the figure, the basement precipitation vacuum deep well structure comprises a leak hole steel pipe 1, an upper steel pipe 2 and a water suction pump 3, wherein the leak hole steel pipe 1 is inserted below a basement bottom plate 4, and a lower water stop ring 5 is arranged between the leak hole steel pipe 1 and the basement bottom plate. The diameter of the steel pipe 1 with the leakage holes is 350mm, the thickness of the steel pipe is 4mm, the steel pipe 1 with the leakage holes is evenly distributed, and the outer wall of the steel pipe is sleeved with a steel mesh for filtering. The inside of the steel pipe 1 with the leak holes is sequentially provided with a sand-gravel material filling layer 5, a rapid-hardening cement layer 6 and a polyurethane grouting layer 7 from bottom to top, and the sand-gravel material filling layer, the rapid-hardening cement layer and the polyurethane grouting layer are used for preventing upwelling of high-pressure underground water.
The upper steel pipe 2 is coaxially installed at the top end of the leak hole steel pipe 1 in an inserting way and is welded and fixed; go up steel pipe 2 and bury in 4 layers of basement bottom plate, the well upper portion welded mounting in last steel pipe 2 has first steel sheet 8, and 8 mid-mounting of first steel sheet have grout pipe 12, and the grout pipe outside is equipped with the external screw thread, and plug 13 is installed through the external screw thread at grout pipe top, seals the grout pipe through the plug after accomplishing the grout or accomplishing to draw water, prevents that groundwater from gushing. The top end of the upper steel pipe 2 is welded with a second steel plate 9, H50 grouting material 10 is filled below the first steel plate 8 in the upper steel pipe 2, and micro-expansion concrete 11 is filled between the first steel plate 8 and the second steel plate 9; the water pumping pipe 14 of the water pump 3 passes through the upper steel pipe 2 and the leak hole steel pipe 1 and is inserted into the sandstone material filling layer 5. Water is pumped by the water pump 3 in the pipe to form vacuum negative pressure in the water pumping pipe 14, and the water in the mucky soil is discharged.
Claims (3)
1. A basement precipitation vacuum deep well structure comprises a leakage hole steel pipe and a water suction pump, wherein the leakage hole steel pipe is inserted below a basement bottom plate, and the outer wall of the leakage hole steel pipe is sleeved with a steel mesh; the upper steel pipe is buried in a basement bottom plate layer, a first steel plate is welded at the middle upper part in the upper steel pipe, a second steel plate is welded at the top end of the upper steel pipe, grouting materials are filled below the first steel plate in the upper steel pipe, and micro-expansion concrete is filled between the first steel plate and the second steel plate; and a water pumping pipe of the water pump penetrates through the upper steel pipe and the leak hole steel plate and is inserted into the sandstone material filling layer.
2. The basement precipitation vacuum deep well structure of claim 1, wherein a grouting pipe is installed in the middle of the first steel plate, external threads are arranged outside the grouting pipe, and a plug is installed on the grouting pipe through threads.
3. The basement precipitation vacuum deep well structure of claim 1, wherein a water stop ring is welded to the outer wall of the upper steel pipe.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202120457892.3U CN215406137U (en) | 2021-03-03 | 2021-03-03 | Basement precipitation vacuum deep well structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202120457892.3U CN215406137U (en) | 2021-03-03 | 2021-03-03 | Basement precipitation vacuum deep well structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN215406137U true CN215406137U (en) | 2022-01-04 |
Family
ID=79667862
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202120457892.3U Expired - Fee Related CN215406137U (en) | 2021-03-03 | 2021-03-03 | Basement precipitation vacuum deep well structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN215406137U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114561970A (en) * | 2022-03-02 | 2022-05-31 | 四川童燊防水工程有限公司 | Construction method and structure for pit type waterproof plugging |
-
2021
- 2021-03-03 CN CN202120457892.3U patent/CN215406137U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114561970A (en) * | 2022-03-02 | 2022-05-31 | 四川童燊防水工程有限公司 | Construction method and structure for pit type waterproof plugging |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109736340B (en) | Dewatering device and method for guaranteeing integrity of cushion layer by reserving dewatering well on foundation slab | |
| CN108999195B (en) | It is a kind of block the larger water burst of deep-foundation side wall stratum in the safe grouting construction process of step heap weir formula | |
| CN101215833A (en) | Air Injection Vacuum Dewatering Method | |
| CN106761835A (en) | A kind of Karst Tunnel leak segmenting slip casting construction method | |
| CN102011591A (en) | Grouting process for working surface of deep well | |
| CN115787693A (en) | Water stopping method for water gushing in deep foundation pit under riverside slow-dip interbed | |
| CN114370275B (en) | Bedrock anchor grouting impervious support structure and construction method thereof | |
| CN114457790A (en) | Cast-in-place pile forming device and method suitable for karst area | |
| CN102296617A (en) | Post-grouting reinforcement construction method of flexible joints of diaphragm walls | |
| CN203514333U (en) | Basement soleplate precipitation well mouth blocking sleeve | |
| CN104389634A (en) | Mine vertical shaft/sieve shaft well wall structure and controllable dewatering method thereof | |
| CN215406137U (en) | Basement precipitation vacuum deep well structure | |
| CN110144918A (en) | Construction method of anti-seepage and plugging of underground building dewatering well | |
| CN115992525A (en) | Precipitation structure and precipitation method of deep foundation pit penetrating through pebble mudstone interface | |
| CN115324090A (en) | Underground engineering pit-in-pit dewatering and well sealing construction method | |
| CN213088001U (en) | Double-layer well wall lining structure of pressure pipeline shaft | |
| CN204371386U (en) | The inside and outside two note formula prestressed anchor Cable Structure of a kind of roadway floor | |
| CN217949109U (en) | Plugging device for dewatering well | |
| CN203891785U (en) | Special joint pipe assembly for throwing of gravels in pipe of hydrogeological water well | |
| CN106948320A (en) | A kind of powerhouse of hydropower station connecting plate underlying group hole rockfill grouting technique | |
| CN202787289U (en) | Shut-in dewatering device for tube well | |
| CN217758891U (en) | Basement precipitation well shutoff waterproof decompression device | |
| CN110700284B (en) | A shallow buried cave treatment structure | |
| CN108518241A (en) | A kind of heavy method of harnessing the river of water rock joint slip casting filling stope control | |
| CN210946855U (en) | Plugging device for dewatering well |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |