CN215368608U - High-rise flower frame beam veneer installation operation platform - Google Patents

High-rise flower frame beam veneer installation operation platform Download PDF

Info

Publication number
CN215368608U
CN215368608U CN202121876108.9U CN202121876108U CN215368608U CN 215368608 U CN215368608 U CN 215368608U CN 202121876108 U CN202121876108 U CN 202121876108U CN 215368608 U CN215368608 U CN 215368608U
Authority
CN
China
Prior art keywords
operation platform
installation
rise
beam veneer
flower shelf
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121876108.9U
Other languages
Chinese (zh)
Inventor
庞德军
卜文君
于海宁
王云峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN202121876108.9U priority Critical patent/CN215368608U/en
Application granted granted Critical
Publication of CN215368608U publication Critical patent/CN215368608U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to high-rise flower shelf beam veneer installation, in particular to a high-rise flower shelf beam veneer installation operating platform with low cost and high efficiency. The operation platform comprises a pipe frame and a wood springboard paved on the pipe frame, one part of the bottom surface of the operation platform is arranged on the bottom frame, and the other part of the bottom surface of the operation platform is in a cantilever state. According to the flower shelf beam veneer installation device, due to the fact that the operating platform is cantilevered, an operator can stand on the operating platform to install the flower shelf beam veneer, construction cost, time cost and labor cost consumed by installation and erection of a scaffold are avoided, the problem of fund consumption is solved, meanwhile, installation time of the flower shelf beam veneer is shortened, the device is moved integrally through the wheels, the device is conveniently moved to a construction position, waste caused by erection of overlong scaffolds is avoided, and the flower shelf beam veneer installation device is convenient to operate, time-saving, labor-saving, simple in structure, convenient to manufacture and low in cost.

Description

High-rise flower frame beam veneer installation operation platform
Technical Field
The utility model relates to high-rise flower shelf beam veneer installation, in particular to a high-rise flower shelf beam veneer installation operating platform with low cost and high efficiency.
Background
At present, along with building crowd's continuous expansion, high-rise building is more and more, in high-rise building construction process, there is the condition of pergola roof beam finish coat installation in the building on organic house layer, there is the high-rise building on machine room layer mostly, the installation on peripheral pergola roof beam finish coat all needs the assistance of hanging flower basket, there is huge difficulty in the decorative board installation of hanging flower shelf roof beam after the hanging flower basket is dismantled, if take the mode of encorbelment scaffold frame to need pre-buried at the floor, and still need the installation of I-steel, later set up the scaffold frame in setting up, still need demolish behind the installation decorative board. And energy and time are consumed while construction economy is increased.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the problems, and provides a high-rise flower stand beam veneer installation operating platform with low cost and high efficiency.
The utility model solves the problems and adopts the technical scheme that:
the utility model provides a high-rise flower frame roof beam decorative board installation operation platform, includes operation platform and chassis, is provided with the wheel that is the symmetry form and arranges below the chassis, and operation platform includes the pipe support and lays the wooden springboard on the pipe support, and the partly setting of operation platform bottom surface is on the chassis, and another part of operation platform bottom surface is the state of encorbelmenting.
Compared with the prior art, the utility model adopting the technical scheme has the outstanding characteristics that:
the operating platform is cantilevered, so that an operator can stand on the operating platform to install the flower shelf beam veneer, construction cost, time cost and labor cost consumed by installing and erecting a scaffold are avoided, and installation time of the flower shelf beam veneer is shortened while the problem of fund consumption is solved.
The whole device is moved through the wheels, so that the device is conveniently moved to a construction position, waste caused by building a overlong scaffold is avoided, and the device is convenient to operate, time-saving and labor-saving.
The device has simple structure, convenient manufacture and low cost.
Preferably, the further technical scheme of the utility model is as follows:
a guardrail is arranged around the operating platform; prevent that operating personnel from falling down, guarantee construction safety.
A balancing weight is arranged inside the underframe; the balance of the whole device is ensured.
Drawings
FIG. 1 is a schematic front view of an embodiment of the present invention;
FIG. 2 is a schematic top view of an embodiment of the present invention;
FIG. 3 is a schematic side view of an embodiment of the present invention.
In the figure: a guardrail 1; an operating platform 2; a balancing weight 3; a chassis 4; and (5) wheels.
The specific implementation mode is as follows:
the utility model will be further illustrated by the following examples, which are intended only for a better understanding of the present invention and therefore do not limit the scope of the utility model.
Referring to fig. 1 to 3, an operating platform for installing a decorative panel of a high-rise truss beam comprises an operating platform 2 and an underframe 4, wherein the operating platform 2 comprises four parallel square tubes and two 3000mm long 100 x 5 square tubes welded on the four long square tubes, the distance between the four square tubes is 1100mm, the height of the four vertical square tubes of the underframe 4 is 800mm, four symmetrical wheels 5 with brakes are arranged below the underframe 4, two balancing weights 3 are arranged inside the underframe 4 to ensure the overall balance of the device, one part of the bottom surface of the operating platform 2 is anchored on the underframe 4, the other part of the bottom surface of the operating platform 2 is in an overhanging state, the length of the anchoring part is 1800mm, the length of the overhanging part is 1200mm, guard rails 1 are arranged around the overhanging area of the operating platform 2, the guard rails 1 are welded 1060mm by the interval between the 60 x 3 square tubes with the length mm, and prevent operators from falling down, the construction safety is ensured, and the overhanging area of the operating platform 2 is paved with a wood springboard.
When the device is used, the device is pushed to a position to be constructed, and an operator stands on the operating platform 2 for construction.
According to the utility model, the operation platform 2 is cantilevered, so that an operator can stand on the operation platform to install the flower shelf beam veneer, the construction cost, the time cost and the labor cost for installing and erecting a scaffold are avoided, the problem of fund consumption is solved, the installation time of the flower shelf beam veneer is accelerated, the device is integrally moved through the wheels 5, the device is conveniently moved to a construction position, the waste caused by erecting an overlong scaffold is avoided, the operation is convenient, the time and the labor are saved, the device structure is simple, the manufacture is convenient, and the cost is low.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the scope of the present invention, which is defined in the appended claims.

Claims (3)

1. The utility model provides a high-rise flower frame roof beam decorative board installation operation platform which characterized in that: the operation platform comprises a pipe frame and a wood springboard paved on the pipe frame, one part of the bottom surface of the operation platform is arranged on the bottom frame, and the other part of the bottom surface of the operation platform is in a cantilever state.
2. The high-rise flower-frame beam veneer installation and operation platform as claimed in claim 1, wherein: and a guardrail is arranged around the operating platform.
3. The high-rise flower-frame beam veneer installation and operation platform as claimed in claim 1, wherein: the inside of chassis is provided with the balancing weight.
CN202121876108.9U 2021-08-12 2021-08-12 High-rise flower frame beam veneer installation operation platform Active CN215368608U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121876108.9U CN215368608U (en) 2021-08-12 2021-08-12 High-rise flower frame beam veneer installation operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121876108.9U CN215368608U (en) 2021-08-12 2021-08-12 High-rise flower frame beam veneer installation operation platform

Publications (1)

Publication Number Publication Date
CN215368608U true CN215368608U (en) 2021-12-31

Family

ID=79618171

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121876108.9U Active CN215368608U (en) 2021-08-12 2021-08-12 High-rise flower frame beam veneer installation operation platform

Country Status (1)

Country Link
CN (1) CN215368608U (en)

Similar Documents

Publication Publication Date Title
CN201261942Y (en) Stand platform for cantilevered concrete structure construction
CN201158933Y (en) High-rise maintaining scaffold device with extruding structure
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN215368608U (en) High-rise flower frame beam veneer installation operation platform
CN213329955U (en) Flower basket diagonal rod type overhanging scaffold
CN203034777U (en) Rail-mounted mobile tall operation platform
CN205713096U (en) A kind of roofing cantilevered structure form bracing system
CN204754150U (en) Dish -type node formula scaffold
CN209568688U (en) A kind of elevating construction platform
CN210659228U (en) Movable single-side formwork system for subway construction
CN204059901U (en) A kind of high-altitude construction operation platform
CN110185247A (en) Mobile outrigger platform
CN109944430A (en) A kind of electric lifting platform construction method for special-shaped exterior walls of buildings operation
CN212957538U (en) Roof flower frame beam and outer wall decoration construction movable operation platform
CN203961239U (en) High-altitude overhanging awning construction operation platform
CN212926981U (en) I-steel support of encorbelmenting bears hanging flower basket device
CN204081433U (en) Steel structural roof liner profiled sheet construction Special-purpose hanger basket support
CN215717033U (en) A operation platform that is used for indoor large-span to face limit entrance to a cave fitment construction
CN211548713U (en) A suspension type scaffold frame for square chimney
CN2263161Y (en) Self-lifting scaffold
CN216810887U (en) Suspension operation platform and hydraulic climbing formwork system
CN212336763U (en) Curtain wall installation guide rail device fixed on roof flower frame beam
CN205259622U (en) A operation platform for installing rack
CN210918167U (en) Triangular section steel construction device for overhanging scaffold
CN207003972U (en) A kind of portable construction operation platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant