CN215289712U - High-speed railway frame bridge construction forming device - Google Patents

High-speed railway frame bridge construction forming device Download PDF

Info

Publication number
CN215289712U
CN215289712U CN202120480995.1U CN202120480995U CN215289712U CN 215289712 U CN215289712 U CN 215289712U CN 202120480995 U CN202120480995 U CN 202120480995U CN 215289712 U CN215289712 U CN 215289712U
Authority
CN
China
Prior art keywords
plate
frame
frame bridge
forming device
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120480995.1U
Other languages
Chinese (zh)
Inventor
戴丽杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Anxiang Transportation Co ltd
Original Assignee
Xuzhou Anxiang Transportation Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Anxiang Transportation Co ltd filed Critical Xuzhou Anxiang Transportation Co ltd
Priority to CN202120480995.1U priority Critical patent/CN215289712U/en
Application granted granted Critical
Publication of CN215289712U publication Critical patent/CN215289712U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a high-speed railway frame bridge construction forming device, which relates to the technical field of frame bridge forming devices, and comprises two groups of bottom base plates, end face plates, a main body mold frame and support rods, wherein the two groups of bottom base plates are respectively arranged at the tops of the two groups of bottom base plates through bolts; the bottom base plate comprises a bottom plate, a base plate and a steel bar foundation frame, the base plate is connected to the middle position of the top of the bottom plate in a sliding mode, and the steel bar foundation frame is arranged on the top of the base plate at intervals; the steel bar main body can be conveniently built before the frame bridge is poured, and the efficiency of pouring the frame bridge is effectively improved; moreover, after the frame bridge is solidified, the solidified frame bridge can be conveniently moved out of the construction forming device, and the bottoms of the two sides of the moved frame bridge are not easy to wear.

Description

High-speed railway frame bridge construction forming device
Technical Field
The utility model relates to a frame bridge forming device technical field specifically says a high-speed railway frame bridge construction forming device.
Background
The frame bridge, sometimes called a subway bridge, is mainly used for overpasses of railways and highways, sometimes used between highways and highways, is mostly poured by reinforced concrete, and when the frame bridge is poured, in order to shape the frame bridge and shorten the pouring construction time, a plurality of forming template frames are used for assistance, so that a frame bridge construction forming device is favored;
however, analysis shows that the existing frame bridge construction forming device is inconvenient to build a steel bar main body before the frame bridge is poured, so that the efficiency of pouring the frame bridge is low; moreover, the existing frame bridge construction forming device is used for pouring the frame bridge, and after the frame bridge is solidified, the solidified frame bridge is inconvenient to move out of the construction forming device, and the bottoms of the two sides of the moved frame bridge are easy to wear.
SUMMERY OF THE UTILITY MODEL
Therefore, in order to solve the above disadvantages, the utility model provides a high-speed railway frame bridge construction forming device, which can conveniently build a steel bar main body before the frame bridge is poured, and effectively improve the efficiency of pouring the frame bridge; moreover, after the frame bridge is solidified, the solidified frame bridge can be conveniently moved out of the construction forming device, and the bottoms of the two sides of the moved frame bridge are not easy to wear.
The utility model discloses a realize like this, construct a high-speed railway frame bridge construction forming device, including base plate, end panel, main part framed and bracing piece, the base plate has two sets ofly, and main part framed both sides are installed in two sets of base plate tops through the bolt respectively, and the end panel passes through the bolt to be installed in main part framed both ends, and bracing piece one end articulates in main part framed lateral part, and the bracing piece other end passes through bolted connection in base plate top both ends; the bottom base plate comprises a bottom plate, a base plate and a steel bar foundation frame, the base plate is connected to the middle position of the top of the bottom plate in a sliding mode, and the steel bar foundation frame is arranged on the top of the base plate at intervals; the main part framed includes outer panel, interior plate and bottom plate board, and outer panel and interior plate have two sets ofly respectively, and two sets of outer panel bottoms are respectively through bolted connection in two sets of bottom plate top intermediate position outsides in the bottom plate, and two sets of interior plate bottoms are respectively through bolted connection in two sets of bottom plate top intermediate position inboardly in the bottom plate, and the bottom plate board passes through bolted connection between two sets of interior plates.
Further, the bottom plate comprises a groove, a sliding groove, a roller, a water outlet groove, a water seepage through hole and a threaded connecting hole, the threaded connecting hole is formed in two ends of the bottom plate, the groove is formed in the position, close to the middle, of the top of the bottom plate, the sliding groove is formed in the bottom of the groove, the roller is installed on the inner side of the groove, the water outlet groove is formed in the position, close to the middle, of the bottom plate, and the water seepage through hole is formed in the bottom of the sliding groove; carry on spacingly through the recess to the backing plate, when pouring frame bridge concrete, support frame bridge both sides concrete through the backing plate, frame bridge concrete solidifies the back, backing plate and steel bar foundation frame stay in frame bridge both sides bottom, demolish the end panel, then demolish the backing plate, screw out bracing piece other end folded plate department bolt, demolish outer panel and interior plate again, directly promote the frame bridge that will solidify through the external equipment, leave this device through gyro wheel roll-off bottom panel 1 and make the frame bridge be convenient for shift out, play the guard action to frame bridge both sides bottom through the backing plate simultaneously.
Furthermore, cross rods are arranged at the top and the middle of the steel bar foundation frame at intervals, and one side of each cross rod is provided with a limiting ring; embedding the reinforcing bar bottom with certain specification in the spacing ring, then tie reinforcing bar bottom and horizontal pole, it is fixed with the reinforcing bar, then imbed the reinforcing bar bottom in the reinforcing bar basic frame in another group's bottom base plate, then tie reinforcing bar bottom and horizontal pole through the iron wire, at this moment, this device vertical direction reinforcing bar bottom is fixed, then can be convenient with two bottom base plate vertical direction reinforcing bar tops through the direct ligature connection of reinforcing bar level, reinforcing bar major structure is just tied up this moment, through the aforesaid, make this device pour before the frame bridge, the reinforcing bar main part ligature of being convenient for.
Furthermore, the water outlet groove corresponds to the sliding groove, and the water seepage through hole is communicated with the water outlet groove and the sliding groove in an inclined manner; when the concrete is poured inside the main body mold frame of the device, redundant water in the concrete is gathered inside the groove, and the water can be guided to the water outlet groove through the water seepage through holes to flow out.
Furthermore, a folded plate is arranged at the other end of the supporting rod, and a threaded through hole is formed in the middle of the folded plate; after the bottom of a group of outer side plates or inner side plates is well installed through bolts, the supporting rods are turned down, so that the threaded through holes at the folded plate positions on the other ends of the supporting rods are aligned to the threaded connecting holes, then the bolts are screwed in to penetrate through the threaded through holes to enter the threaded connecting holes, the supporting rods can support the outer side plates or the inner side plates, and the outer side plates or the inner side plates are prevented from collapsing.
The utility model discloses a concrete advantage embodies:
the method has the advantages that: cross rods are arranged at the top and the middle of the steel bar foundation frame at intervals, and one side of each cross rod is provided with a limiting ring; embedding the reinforcing bar bottom with certain specification in the spacing ring, then tie reinforcing bar bottom and horizontal pole, it is fixed with the reinforcing bar, then imbed the reinforcing bar bottom in the reinforcing bar basic frame in another group's bottom base plate, then tie reinforcing bar bottom and horizontal pole through the iron wire, this moment, this device vertical direction reinforcing bar bottom is fixed, then can be convenient with two bottom base plate vertical direction reinforcing bar tops through the direct ligature connection of reinforcing bar level, reinforcing bar major structure is just tied up and is put up this moment, through the aforesaid, make this device pour before the frame bridge, the reinforcing bar main part ligature of being convenient for is built, the effectual frame that has improved pours bridge efficiency.
The method has the advantages that: after the frame bridge concrete solidifies, backing plate and steel bar foundation frame stay frame bridge both sides bottom, demolish the end panel, then demolish the backing plate, twist out bracing piece other end folded plate department bolt, demolish outer panel and interior plate again, direct frame bridge that will solidify through external equipment promotes, leave this device through gyro wheel roll-off subbase board and make the frame bridge be convenient for shift out, play the guard action to frame bridge both sides bottom through the backing plate simultaneously, make the frame bridge both sides bottom that shifts out difficult to produce wearing and tearing.
Drawings
FIG. 1 is a schematic structural view of the high-speed railway frame bridge construction forming device of the utility model;
fig. 2 is a top view of the present invention;
FIG. 3 is a sectional view of the main body mold frame of the present invention;
fig. 4 is an enlarged view of a portion a of fig. 3 according to the present invention;
FIG. 5 is a schematic view of the structure of the bottom substrate of the present invention;
FIG. 6 is a schematic view of the bottom plate structure of the present invention;
FIG. 7 is an enlarged view of a portion of the chute of FIG. 6 in accordance with the present invention;
fig. 8 is the utility model discloses steel bar foundation frame top view.
The figure illustrates the format: the base plate 1, the end plate 2, the main body mold frame 3, the support rod 4, the bottom plate 11, the backing plate 12, the reinforcing steel bar foundation frame 13, the groove 111, the sliding groove 112, the roller 113, the water outlet groove 114, the water seepage through hole 115, the threaded connecting hole 116, the cross bar 131, the limiting ring 132, the outer side plate 31, the inner side plate 32, the bottom supporting plate 33, the folded plate 41 and the threaded through hole 42.
Detailed Description
The present invention will be described in detail below with reference to the attached drawings, and the technical solutions in the embodiments of the present invention will be clearly and completely described. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative efforts belong to the protection scope of the present invention; furthermore, the terms "first," "second," "third," "upper, lower, left, right," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance. Meanwhile, in the description of the present invention, unless otherwise explicitly specified or limited, the terms "connected" and "connected" should be interpreted broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; the connection can be mechanical connection or electrical connection; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The utility model provides a high-speed railway frame bridge construction forming device through the improvement, as shown in the attached drawing of the specification, can be implemented as follows; the die comprises base plates 1, end plates 2, a main body die frame 3 and support rods 4, wherein the base plates 1 are divided into two groups, two sides of the main body die frame 3 are respectively arranged at the tops of the two groups of base plates 1 through bolts, the end plates 2 are arranged at two ends of the main body die frame 3 through bolts, one end of each support rod 4 is hinged to the side of the main body die frame 3, and the other end of each support rod 4 is connected to two ends of the top of each base plate 1 through bolts; the base plate 1 comprises a bottom plate 11, a backing plate 12 and a steel bar foundation frame 13, wherein the backing plate 12 is connected to the middle position of the top of the bottom plate 11 in a sliding mode, and the steel bar foundation frame 13 is arranged on the top of the backing plate 12 at intervals; the main body mold frame 3 comprises an outer side plate 31, an inner side plate 32 and a bottom supporting plate 33, the outer side plate 31 and the inner side plate 32 are respectively provided with two groups, the bottoms of the two groups of outer side plates 31 are respectively connected to the outer sides of the middle positions of the tops of the middle bottom plates 11 in the two groups of base plates 1 through bolts, the bottoms of the two groups of inner side plates 32 are respectively connected to the inner sides of the middle positions of the tops of the middle bottom plates 11 in the two groups of base plates 1 through bolts, and the bottom supporting plate 33 is connected between the two groups of inner side plates 32 through bolts.
More specifically, the bottom plate 11 includes a groove 111, a sliding groove 112, a roller 113, a water outlet groove 114, a water seepage hole 115 and a threaded connection hole 116, the threaded connection hole 116 is opened at two ends of the bottom plate 11, the groove 111 is opened at a position near the middle of the top of the bottom plate 11, the sliding groove 112 is opened at the bottom of the groove 111, the roller 113 is installed inside the groove 111, the water outlet groove 114 is opened at a position near the middle of the bottom plate 11, and the water seepage hole 115 is opened at the bottom of the sliding groove 112; carry on spacingly through recess 111 to backing plate 12, when pouring frame bridge concrete, support frame bridge both sides concrete through backing plate 12, frame bridge concrete solidifies the back, backing plate 12 and reinforcing bar basic frame 13 stay in frame bridge both sides bottom, demolish end panel 2, then demolish bottom plate 33, twist out 4 other end folded plate 41 bolts of bracing piece, demolish outer panel 31 and interior plate 32 again, directly promote the good frame bridge that will solidify through the external equipment, leave this device through 113 roll-off bottom panels 1 of gyro wheel, make the frame bridge be convenient for shift out, play the guard action to frame bridge both sides bottom through backing plate 12 simultaneously.
More specifically, cross bars 131 are arranged at intervals at the top and the middle of the steel bar foundation frame 13, and one side of each cross bar 131 is provided with a limiting ring 132; embedding the reinforcing bar bottom with certain specification in spacing ring 132, then tie reinforcing bar bottom and horizontal pole 131, it is fixed with the reinforcing bar, then imbed the reinforcing bar bottom in spacing ring 132 in reinforcing bar basic frame 13 in another group base plate 1 again, then tie reinforcing bar bottom and horizontal pole 131 through the iron wire, at this moment, this device vertical direction reinforcing bar bottom is fixed, then can be convenient with 1 vertical direction reinforcing bar tops of two base plates through the direct ligature connection of reinforcing bar level, reinforcing bar major structure is just tied up this moment, through the aforesaid, make this device pour before the frame bridge, the reinforcing bar main part ligature of being convenient for.
More specifically, the water outlet groove 114 corresponds to the sliding groove 112, and the water penetration hole 115 is inclined to communicate the water outlet groove 114 and the sliding groove 112; when concrete is poured into the main body mold frame 3 of the device, redundant water in the concrete can be guided to the water outlet groove 114 through the water seepage through holes 115 to flow out when being gathered in the groove 111.
More specifically, the other end of the support rod 4 is provided with a folded plate 41, and the middle part of the folded plate 41 is provided with a threaded through hole 42; after the bottoms of the group of outer plates 31 or the group of inner plates 32 are installed well through bolts, the supporting rod 4 is turned down, so that the threaded through hole 42 at the position where the folded plate 41 is arranged at the other end of the supporting rod 4 is aligned with the threaded connecting hole 116, and then the bolt is screwed in to penetrate through the threaded through hole 42 to enter the threaded connecting hole 116, so that the supporting rod 4 can support the outer plates 31 or the inner plates 32 to prevent the outer plates 31 or the inner plates 32 from collapsing.
The working principle of the high-speed railway frame bridge construction forming device is as follows: the bottom of the reinforcing steel bar is embedded into the limiting ring 132 in the reinforcing steel bar base frame 13 in the other group of bottom base plates 1, then the bottom of the reinforcing steel bar is tied with the cross bar 131 through the iron wire, then the bottom of the reinforcing steel bar is embedded into the limiting ring 132 in the reinforcing steel bar base frame 13 in the other group of bottom base plates 1, then the bottom of the reinforcing steel bar is tied with the cross bar 131 through the iron wire, at the moment, the bottom of the reinforcing steel bar in the vertical direction of the device is fixed, then the tops of the reinforcing steel bar in the vertical direction of the two bottom base plates 1 can be conveniently tied through the horizontal direct connection of the reinforcing steel bar, at the moment, the main structure of the reinforcing steel bar is tied up, then a group of outer side plates 31 is installed through the bolts, the support rod 4 is turned down, the threaded through hole 42 at the position of the folded plate 41 arranged at the other end of the support rod 4 is aligned with the threaded connecting hole 116, then the bolt is screwed in and penetrates through the threaded through hole 42 to enter the threaded connecting hole 116, and then the other outer side plate 31 and the inner side plate 32 are fixedly installed through the bolt in the above mode, at this moment, the device is well assembled, then concrete is poured, and when redundant water in the concrete is gathered in the groove 111, the water can be guided to the water outlet groove 114 through the water seepage through hole 115 to flow out;
after the frame bridge concrete solidifies, backing plate 12 and steel bar foundation frame 13 stay frame bridge both sides bottom, demolish end panel 2, then demolish bottom plate 33, unscrew 4 other ends of bracing piece folded plate 41 bolts, demolish outer panel 31 and inner panel 32 again, directly promote the good frame bridge that will solidify through the external equipment, leave this device through 113 roll-off bottom base plates 1 of gyro wheel.
In conclusion; compared with the existing frame bridge construction forming device, the high-speed railway frame bridge construction forming device can conveniently build a steel bar main body before a frame bridge is built, and effectively improves the efficiency of the frame bridge; moreover, after the frame bridge is solidified, the solidified frame bridge can be conveniently moved out of the construction forming device, and the bottoms of the two sides of the moved frame bridge are not easy to wear.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (5)

1. The utility model provides a high-speed railway frame bridge construction forming device which characterized in that: the die comprises base plates (1), end face plates (2), a main body die frame (3) and supporting rods (4), wherein the base plates (1) are divided into two groups, the two sides of the main body die frame (3) are respectively installed on the tops of the two groups of base plates (1) through bolts, the end face plates (2) are installed on the two ends of the main body die frame (3) through bolts, one end of each supporting rod (4) is hinged to the side part of the main body die frame (3), and the other end of each supporting rod (4) is connected to the two ends of the top of each base plate (1) through bolts; the base plate (1) comprises a bottom plate (11), a base plate (12) and a steel bar foundation frame (13), the base plate (12) is connected to the middle position of the top of the bottom plate (11) in a sliding mode, and the steel bar foundation frame (13) is arranged on the top of the base plate (12) at intervals; main part framed (3) are including outer panel (31), interior plate (32) and bottom layer board (33), outer panel (31) and interior plate (32) have two sets ofly respectively, and two sets of outer panel (31) bottoms are respectively through bolted connection in bottom plate (11) top intermediate position outside in two sets of bottom base plate (1), and two sets of interior plate (32) bottoms are respectively through bolted connection in bottom plate (11) top intermediate position inboardly in two sets of bottom base plate (1), bottom layer board (33) are through bolted connection between two sets of interior plate (32).
2. The high-speed railway frame bridge construction forming device of claim 1, wherein: bottom plate (11) are including recess (111), spout (112), gyro wheel (113), go out basin (114), infiltration through-hole (115) and threaded connection hole (116), bottom plate (11) both ends are seted up in threaded connection hole (116), bottom plate (11) top is seted up in recess (111) and is leaned on the intermediate position, recess (111) bottom is seted up in spout (112), install in recess (111) inboardly in gyro wheel (113), it leans on the middle part position to go out basin (114) to set up in bottom plate (11) bottom, infiltration through-hole (115) are seted up in spout (112) bottom.
3. The high-speed railway frame bridge construction forming device of claim 1, wherein: horizontal pole (131) are equipped with at reinforcing bar basis frame (13) top and middle part interval, horizontal pole (131) one side is equipped with spacing ring (132).
4. The high-speed railway frame bridge construction forming device of claim 2, wherein: the water outlet groove (114) corresponds to the sliding groove (112), and the water seepage through hole (115) is communicated with the water outlet groove (114) and the sliding groove (112) in an inclined manner.
5. The high-speed railway frame bridge construction forming device of claim 1, wherein: the other end of the support rod (4) is provided with a folded plate (41), and the middle part of the folded plate (41) is provided with a threaded through hole (42).
CN202120480995.1U 2021-03-05 2021-03-05 High-speed railway frame bridge construction forming device Expired - Fee Related CN215289712U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120480995.1U CN215289712U (en) 2021-03-05 2021-03-05 High-speed railway frame bridge construction forming device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120480995.1U CN215289712U (en) 2021-03-05 2021-03-05 High-speed railway frame bridge construction forming device

Publications (1)

Publication Number Publication Date
CN215289712U true CN215289712U (en) 2021-12-24

Family

ID=79533121

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120480995.1U Expired - Fee Related CN215289712U (en) 2021-03-05 2021-03-05 High-speed railway frame bridge construction forming device

Country Status (1)

Country Link
CN (1) CN215289712U (en)

Similar Documents

Publication Publication Date Title
CN207003479U (en) Cast-in-place city utility tunnel whole formwork system
CN106351180B (en) The all-hydraulic unlatching self-propelled template system of aqueduct
CN107237270A (en) A kind of construction method of girder construction
CN209040349U (en) A kind of ring muscle fastening shear wall structure being easily installed
CN215289712U (en) High-speed railway frame bridge construction forming device
CN105625573A (en) Beam-bottom medium-strength prestressed steel bar and ordinary steel bar sleeve connecting beam-column joint
CN207062771U (en) A kind of H types Pier Formwork platform integrated apparatus
CN205870817U (en) Big cross -section concrete member size control concrete module pour device
CN202164548U (en) Deck type mobile formwork bridge-building machine dedicated to double T type bridge construction
CN104746434B (en) Closure segment formwork system without dismantling outer formwork
CN208152105U (en) A kind of walls concrete horizontal construction joint steel plate for sealing water fixed structure
CN105625571B (en) The precast concrete bean column node of strength prestressed muscle in a kind of use
CN203514207U (en) Self-propelled movable formwork for double-rectangular water conservancy aqueduct construction
CN206396647U (en) Bridge overturning-preventing baffle plate template
CN110080299A (en) A kind of shallow embedding mountain tunnel open-cut engineering method
CN205591349U (en) Strong prestressing tendons's precast concrete beam post node in adoption
CN109208786A (en) A kind of ring muscle that is easily installed fastens shear wall structure and its installation method
CN109356126A (en) Double of Precast Gallery structure and gallery construction method
CN211948026U (en) Cast-in-place splayed wall template system of apron culvert
CN207348880U (en) A kind of tunnel center gutter formed molding board
CN206128445U (en) Reserve solid post of prefabrication of plug hole
CN208701705U (en) It is a kind of one concrete revetment pour mold
CN210263015U (en) Prefabricated wall unit for underground continuous wall
CN202247681U (en) Layered construction device for railway bridge piers
CN220318389U (en) Internal mold for hanging basket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211224