CN215212164U - Plastering machine for building decoration - Google Patents

Plastering machine for building decoration Download PDF

Info

Publication number
CN215212164U
CN215212164U CN202121731551.7U CN202121731551U CN215212164U CN 215212164 U CN215212164 U CN 215212164U CN 202121731551 U CN202121731551 U CN 202121731551U CN 215212164 U CN215212164 U CN 215212164U
Authority
CN
China
Prior art keywords
middle section
bracing piece
pole
plastering machine
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121731551.7U
Other languages
Chinese (zh)
Inventor
时玺
张志威
洪杰
程浩
孙建勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Construction Engineering Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Tianjin Construction Engineering Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Construction Engineering Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Tianjin Construction Engineering Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202121731551.7U priority Critical patent/CN215212164U/en
Application granted granted Critical
Publication of CN215212164U publication Critical patent/CN215212164U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a plastering machine for building decoration, which comprises a vertical rod, wherein a main body which can move up and down is installed on the outer side wall of the vertical rod, a plastering plate for plastering wall is installed at one end of the main body, the vertical rod comprises a first supporting rod, a middle section replaceable rod and a second supporting rod, wherein, the bottoms of the first supporting rod and the middle section replaceable rod are both provided with alignment convex blocks, the outer sides of the alignment convex blocks are provided with limit covers, and the tops of the middle section replaceable rod and the second supporting rod are both provided with alignment holes corresponding to the alignment convex blocks; but make the pole setting be assembled through first bracing piece, middle section replacement pole and second bracing piece, through the quantity of chooseing for use different middle sections replacement poles and then realize the change of equipment back pole setting height to satisfy the construction requirement of co-altitude building, and the assembling process is simple, and stability is good simultaneously, does not have convex part, the reciprocating of the main part of being convenient for.

Description

Plastering machine for building decoration
Technical Field
The utility model relates to a mechanical float technical field especially relates to a mechanical float for building decoration.
Background
At present, wall plastering machines are used for plastering walls when a plurality of walls are decorated, the process is simple and convenient, the construction speed is high, and the integrity of the engineering structure is very good.
The existing plastering machine has no adjusting equipment, the length of the upright rod is fixed, and when a building in a higher space is constructed, the problem of insufficient height of the upright rod exists, so that a plastering plate of the plastering machine can not operate the building wall surface in the higher position, and the functionality of the plastering machine is reduced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome prior art's defect, provide a plastering machine for building decoration, can be according to the advantage of the altitude mixture control pole setting height in architectural space.
The technical scheme for realizing the purpose is as follows:
the utility model provides a plastering machine for building decoration, including the pole setting, the main part that can reciprocate is installed to the lateral wall of pole setting, the board of wiping that is used for wiping the wall is installed to the one end of main part, the pole setting includes first bracing piece, middle section replacement pole and second bracing piece, wherein first bracing piece with but the bottom of middle section replacement pole is all installed and is counterpointed protruding piece, spacing cover is installed in the outside of counterpointing protruding piece, but the middle section replacement pole with the top of second bracing piece all install with counterpoint protruding corresponding counterpoint hole of piece, first bracing piece but the middle section replacement pole with the connecting bolt is installed to the junction of second bracing piece, the connecting bolt runs through in proper order spacing cover counterpoint hole with counterpoint protruding piece.
Preferably, the outer side wall of the limiting cover is provided with a containing hole, and the end head of the connecting bolt is located in the containing hole. In order to avoid the connecting bolt protruding from the surface of the upright.
Preferably, the replaceable rod of the middle section and the outer side of the top of the second support rod are both provided with an annular groove, and the annular groove corresponds to the position of the limit cover. To avoid bulging of the cage.
Preferably, a base is installed at the bottom of the second support rod. In order to avoid the phenomenon of side turning of the vertical rod 4.
Preferably, pulleys are mounted at the bottom of the main body, and the number of the pulleys is four. In order to increase the moving function of the plastering machine.
Preferably, the top of the first supporting rod is provided with a top beam. To avoid the main body slipping out of the top of the first support bar.
Preferably, the top and the bottom of the first support bar, the middle-section replaceable bar and the second support bar are flat structures. In order to ensure that no gap is generated when the first supporting rod, the middle section replaceable rod and the second supporting rod are connected.
The utility model has the advantages that: the utility model discloses at the in-process that uses, but make the pole setting be assembled through first bracing piece, middle section replacement pole and second bracing piece, but through increasing and reduce the quantity of middle section replacement pole and then realize the change of post assembling pole setting height to satisfy the construction requirements of co-altitude building, and the assembling process is simple, and stability is good simultaneously, does not have convex part, reciprocating of the main part of being convenient for.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic view of the split structure of the vertical rod of the present invention;
FIG. 3 is a schematic view of the ground structure of the replaceable pole of FIG. 1 according to the present invention;
description of reference numerals:
1. a main body; 2. smearing the board; 3. a pulley; 4. erecting a rod; 401. a first support bar; 402. a middle section replaceable rod; 403. a second support bar; 404. a base; 405. a connecting bolt; 406. an annular groove; 407. a limiting cover; 408. a receiving hole; 409. aligning holes; 410. aligning the convex blocks; 5. and (4) a top beam.
Detailed Description
The invention will be further explained with reference to the drawings and the specific embodiments.
Referring to fig. 1 to 3, the utility model provides a plastering machine for building decoration, including pole setting 4, main part 1 that can reciprocate is installed to the lateral wall of pole setting 4, the board 2 of wiping that is used for wiping the wall is installed to the one end of main part 1, pole setting 4 includes first bracing piece 401, pole 402 and second bracing piece 403 can be replaced to the middle section, wherein counterpoint protruding piece 410 is all installed to the bottom that first bracing piece 401 and middle section can replace pole 402, spacing cover 407 is installed in the outside of counterpoint protruding piece 410, counterpoint hole 409 corresponding with counterpoint protruding piece 410 is all installed at the top that middle section can replace pole 402 and second bracing piece 403, first bracing piece 401, the junction of middle section can replace pole 402 and second bracing piece 403 installs connecting bolt 405, connecting bolt 405 runs through spacing cover 407 in proper order, counterpoint hole 409 and counterpoint protruding piece 410.
In this example, but through first bracing piece 401, middle section replacement pole 402 and second bracing piece 403 messenger pole setting 4 is the assembled, but increase and reduce the quantity of middle section replacement pole 402 under the cooperation of counterpoint protruding piece 410, counterpoint hole 409 and connecting bolt 405, through can realize the change of the post assembling pole setting 4 height like this, in order to satisfy the construction requirements of not co-altitude building, and the assembling process is simple, and stability is good simultaneously, does not have convex part, be convenient for main part 1 reciprocate.
Further, as shown in fig. 2, the outer side wall of the limiting cover 407 has a receiving hole 408, and the end of the connecting bolt 405 is located in the receiving hole 408, when the connecting bolt 405 sequentially penetrates through the limiting cover 407, the aligning hole 409 and the screw hole formed by the aligning protrusion block 410, the end of the connecting bolt 405 can be embedded into the receiving hole 408, so that the connecting bolt 405 can be prevented from protruding on the surface of the vertical rod 4.
Further, as shown in fig. 2, the top outer sides of the middle replaceable rod 402 and the second support rod 403 are both provided with an annular groove 406, and the annular groove 406 corresponds to the position of the position-limiting cover 407, so that when the alignment protrusion block 410 is embedded into the alignment hole 409, the position-limiting cover 407 is embedded into the annular groove 406, and thus the protrusion of the position-limiting cover 407 can be avoided.
Further, as shown in fig. 2, a base 404 is installed at the bottom of the second support rod 403, and the vertical rod 4 can be supported by the base 404, so that the phenomenon that the vertical rod 4 turns on one side is avoided.
Further, as shown in fig. 1, pulleys 3 are mounted at the bottom of the main body 1, and the number of the pulleys 3 is four, so that the main body 1 can travel through the pulleys 3, and the moving function of the plastering machine is increased.
Further, as shown in fig. 1, a top beam 5 is installed on the top of the first support rod 401, and the main body 1 can be prevented from slipping out of the top of the first support rod 401 by the top beam 5.
Further, as shown in fig. 2, the top and the bottom of the first supporting bar 401, the middle replaceable bar 402 and the second supporting bar 403 are flat structures, so that no gap is formed when the first supporting bar 401, the middle replaceable bar 402 and the second supporting bar 403 are connected.
The utility model discloses a theory of operation is: the utility model discloses in the in-process of using, before the use, can replace the quantity of pole 402 according to the high selection middle section of building, if the quantity that can replace pole 402 in middle section is one, can replace pole 402 in middle section and second bracing piece 403 assembles as shown in figure 2, will counterpoint protruding piece 410 insert corresponding counterpoint hole 409 in, spacing cover 407 wraps up the top of second bracing piece 403 and middle section can replace pole 402 simultaneously, adopt the mode of counterpoint protruding piece 410 and spacing cover 407 inside and outside inserting and establish, stability can be increased, then screw through connecting bolt 405 and can fix, the head of its tip is located accomodate hole 408 after connecting bolt 405 screws, avoid the head protrusion, the height of pole 4 is three meters after the equipment, then fix pole 4 between the bottom plate and the wall top of building, board 2 is located one side of wall, to the mud between board 2 and the wall, through the removal of main part 1, can plaster, if adopt two middle sections replacement pole 402, be about to two middle sections replacement pole 402 and assemble according to above-mentioned mode, then with middle section replacement pole 402 respectively with first bracing piece 401 and second bracing piece 403 fixed, the height of pole setting 4 is four meters this moment, this design adopts assembled pole setting 4, the quantity of chooseing for use different middle sections replacement pole 402 during the accessible equipment and then realize the change of 4 heights of post-assembling pole setting, in order to satisfy the construction requirement of not co-altitude building, and the assembling process is simple, and simultaneously, stability is good, there is not convex part, be convenient for reciprocate of main part 1.
The present invention has been described in detail with reference to the embodiments shown in the drawings, and those skilled in the art can make various modifications to the present invention based on the above description. Therefore, certain details of the embodiments should not be construed as limitations of the invention, which are intended to be covered by the following claims.

Claims (7)

1. The utility model provides a plastering machine for building decoration, its characterized in that, the pole setting, the main part that can reciprocate is installed to the lateral wall of pole setting, the board of wiping that is used for wiping the wall is installed to the one end of main part, the pole setting includes first bracing piece, middle section replacement pole and second bracing piece, wherein first bracing piece with but the bottom of middle section replacement pole all installs counterpoint protruding piece, spacing cover is installed in the outside of counterpoint protruding piece, but the middle section replacement pole with the top of second bracing piece all install with counterpoint protruding corresponding counterpoint hole of piece, first bracing piece but the middle section replacement pole with the connecting bolt is installed to the junction of second bracing piece, the connecting bolt runs through in proper order spacing cover counterpoint hole with counterpoint protruding piece.
2. The plastering machine for building decoration according to claim 1, wherein a receiving hole is formed on the outer side wall of the position-limiting cover, and the end of the connecting bolt is located in the receiving hole.
3. The plastering machine for building decoration as claimed in claim 1, wherein the replaceable middle bar and the second supporting bar are each provided with an annular groove on the top and outside, and the annular groove corresponds to the position of the position-limiting cover.
4. The plastering machine for building finishing of claim 1, wherein a base is installed at the bottom of the second supporting rod.
5. A plastering machine for building finishing as claimed in claim 1, wherein pulleys are installed at the bottom of the main body, and the number of the pulleys is four.
6. A plastering machine for building finishing as claimed in claim 1, wherein a top sill is installed on the top of the first supporting rod.
7. The plastering machine for building finishing of claim 1, wherein the top and bottom of said first supporting bar, said middle replaceable bar and said second supporting bar are flat structures.
CN202121731551.7U 2021-07-28 2021-07-28 Plastering machine for building decoration Active CN215212164U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121731551.7U CN215212164U (en) 2021-07-28 2021-07-28 Plastering machine for building decoration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121731551.7U CN215212164U (en) 2021-07-28 2021-07-28 Plastering machine for building decoration

Publications (1)

Publication Number Publication Date
CN215212164U true CN215212164U (en) 2021-12-17

Family

ID=79429092

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121731551.7U Active CN215212164U (en) 2021-07-28 2021-07-28 Plastering machine for building decoration

Country Status (1)

Country Link
CN (1) CN215212164U (en)

Similar Documents

Publication Publication Date Title
CN102003077A (en) Stone curtain wall construction method
CN114293652B (en) Assembled energy-conserving building based on BIM
CN215212164U (en) Plastering machine for building decoration
CN209799569U (en) Assembled enclosure
CN212641758U (en) Assembly type building bottom connecting mechanism
CN116717011A (en) Assembled building and assembling method thereof
CN216075951U (en) A metal asphalt shingle installation fixing device for sloping roof
CN214531913U (en) A template structure for dysmorphism structure is chosen board and is pour
CN210369347U (en) Quick plug-in type assembled steel construction
CN211572085U (en) A wallboard connection major structure for assembly type structure
CN210947293U (en) Leveling support piece for assembly type keel partition wall ground
CN208681922U (en) A kind of wood pulp sponge foaming device
CN219431075U (en) Positioning wallboard for assembled building
CN213653858U (en) Assembled wallboard
CN218541371U (en) Wall whitewashing device for building finishing engineering
CN208328903U (en) A kind of three axis cement mixing pile ram machine construction positioning support pedestals
CN220266916U (en) Assembled environmental protection interior wall fitment subassembly
CN109986512A (en) A kind of drilling equipment and method for the installation of piping lane wire casing bracket
CN220725677U (en) Auxiliary fixing device for tile installation
CN218894339U (en) Mounting ground groove structure of electrolytic plate
CN216105623U (en) Assembled construction elevator
CN220954132U (en) Steel construction furred ceiling
CN214725820U (en) Synthetic resin tile forming machine
CN217601492U (en) Suspended integrated house foundation
CN218973346U (en) Auxiliary device for improving flatness of excavation building base surface

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant