CN215167883U - A multi-layer all-steel climbing frame structure attached to a building wall - Google Patents

A multi-layer all-steel climbing frame structure attached to a building wall Download PDF

Info

Publication number
CN215167883U
CN215167883U CN202120735504.3U CN202120735504U CN215167883U CN 215167883 U CN215167883 U CN 215167883U CN 202120735504 U CN202120735504 U CN 202120735504U CN 215167883 U CN215167883 U CN 215167883U
Authority
CN
China
Prior art keywords
climbing frame
layer
steel
frame
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120735504.3U
Other languages
Chinese (zh)
Inventor
向俊华
余磊
李洪元
付锡井
韩鹏宇
卢胜金
朱文兵
李皇旗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 9 Co Ltd
Original Assignee
Sinohydro Bureau 9 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 9 Co Ltd filed Critical Sinohydro Bureau 9 Co Ltd
Priority to CN202120735504.3U priority Critical patent/CN215167883U/en
Application granted granted Critical
Publication of CN215167883U publication Critical patent/CN215167883U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model relates to a building attaches full steel of wall multilayer and climbs frame structure, including climbing the frame, hauler and a pair of track truss, climb the frame and hang on the wire rope of hauler, climb the frame and include the multilayer plywood of equidistant range along the vertical direction of top-down, adjacent two-layer plywood passes through the supporting rod and connects, the gyro wheel is installed respectively to every layer of plywood left and right sides, the track truss is including inserting the subaerial track stand of standing in, gyro wheel and the cooperation of track stand surface rolling friction, installation speed limiter on the hauler, climb the frame rear side and the left and right sides and cover and have the protection network, climb and subaerial the buffering subassembly that is equipped with under the frame. Adopt the technical scheme of the institute, can prevent through setting up the protection network from climbing the interior object that falls of frame, through first channel-section steel and second channel-section steel mutually support, install the overspeed governor on the hauler, climb the frame below and set up buffering subassembly, can prevent to climb the unexpected loss that falls and reduce because of climbing the frame and fall the loss or the injury that causes, promoted the security.

Description

Wall-attached multi-layer all-steel climbing frame structure of building
Technical Field
The utility model belongs to the technical field of the building, especially, relate to a building attaches wall multilayer all-steel and climbs frame structure.
Background
The climbing frame, also called lifting frame, can be divided into several main types such as hydraulic type, electrodynamic type, manual pull type and the like according to the power source, is a novel scaffold system developed in recent years, is mainly applied to high-rise shear wall type floors, and can ascend or descend along buildings. This system makes the scaffold technology completely improved: firstly, the frame does not need to be turned over; and secondly, the dismounting and mounting process of the scaffold is eliminated, namely the scaffold is used until the construction is finished after one-time assembly, and is not limited by the height of a building, so that the manpower and the materials are greatly saved. For example, publication numbers are: the patent document of "CN 203559571U" discloses a climbing frame used in building construction, which comprises a base, a column rail and a main frame outer column, wherein the column rail and the main frame outer column are vertically fixed on the base, and the upper end and the lower end of the column rail are respectively connected through a first connecting piece and a second connecting piece; and a horizontal truss is arranged between the upright post track and the outer upright post of the main frame, and a laminate assembly is laid at the corresponding position. The technical scheme described in the patent document has the advantages of convenience in installation, simplicity in operation and the like, and has good social and economic benefits, however, accidents occur on the construction site for many times in the existing lifting type climbing frame, and major casualty accidents are caused by overloading of goods loading on the climbing frame and high-speed falling on the ground due to the fact that the climbing frame cannot be reliably locked or is not high, and therefore the existing climbing frame safety protection means are few.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a building attaches wall multilayer all-steel and climbs frame structure.
The utility model provides a building attaches full steel of wall multilayer and climbs frame structure, including climbing the frame, installing the hauler at the building top and a pair of track truss that sets up along the building outer wall, climb the frame and hang on the wire rope of hauler and climb the frame and set up between this pair of track truss, climb the frame and include along the equidistant multilayer plywood of arranging of the vertical direction of top-down, adjacent two-layer plywood links together to the supporting rod through intercrossing articulated many together, and the gyro wheel is installed respectively to every layer of plywood left and right sides, the track truss is including inserting the subaerial track stand of standing in, gyro wheel and track stand surface rolling friction fit, install speed limiter on the hauler, climb the frame rear side and left and right sides and cover and have the protection network, climb the subaerial buffering subassembly that is provided with in the frame below.
The buffer assembly comprises a pressure-resistant plate, a buffer cushion, a bearing plate and a load box with an opening at the upper end, the bearing plate is connected into the load box through an elastic piece, and the pressure-resistant plate and the buffer cushion are both accommodated in the load box and sequentially paved on the bearing plate from top to bottom.
The elastic piece is a cylindrical spiral compression spring.
The protective net is made of plastic woven cloth.
The cushion pad is made of natural rubber, butadiene rubber or isoprene rubber.
A foam cushion layer is further arranged in the load box and arranged between the cushion pad and the bearing plate.
The number of the laminated plate assemblies is 4 to 5, and the interlayer spacing between two adjacent layers of the laminated plate assemblies is consistent with the interlayer spacing of a multi-storey building.
The rail upright post is made of No. 12 channel steel.
The building wall-attached multilayer all-steel climbing frame structure further comprises an attached plate fixed on the outer wall of the building through expansion bolts, a first channel steel is fixedly connected onto the attached plate, slide rails and a support plate are fixedly connected to the left side and the right side of the attached plate, a second channel steel is sleeved on the slide rails, the width of the first channel steel is larger than that of the second channel steel, a rack is fixedly connected onto the second channel steel, and a gear is mounted on the support plate and is meshed with the rack.
Reinforcing rib plates are further welded between the upper side and the lower side of the first channel steel and the wall attaching plate.
The beneficial effects of the utility model reside in that: adopt the technical scheme of the utility model, can prevent to follow the interior construction tool or raw and other materials that fall of climbing frame through covering the protection network in climbing frame rear side and left and right sides, protect ground constructor's safety, when will climbing frame lift to the floor corresponding with the building, accessible rotating gear makes the second channel-section steel stretch out the registrate in first channel-section steel, prevent to climb the frame tenesmus, guarantee the safety of the interior personnel of climbing frame, through installing the overspeed governor on the hauler, can prevent that the climbing frame from appearing falling rapidly, make the climbing frame steadily go up and down, further guarantee the safety of the interior personnel of climbing frame, when the climbing frame appears unusually to fall, blotter, foam cushion and elastic component all play the effect of buffering and absorption impact to the falling rapidly of climbing frame, can prevent that the interior personnel of climbing frame from receiving great impact in the falling rapidly in-process, prevent that the climbing frame from falling and collide and lead to the ground and cause the crush, The secondary accident that striking or vibration caused has protected and has climbed the inside and outside personnel's of frame safety, the utility model discloses a take multiple safety protection means, promoted the security of climbing the frame.
Drawings
Fig. 1 is a front view of the present invention;
FIG. 2 is a schematic structural view of the cushion assembly of the present invention;
fig. 3 is a schematic view of the connection structure of the first channel steel and the second channel steel of the present invention.
In the figure: 1-climbing frame, 2-traction machine, 3-track truss, 4-steel wire rope, 5-laminate, 6-supporting rod, 7-roller, 8-track upright post, 9-speed limiter, 10-protective net, 11-buffer component, 12-pressure-resistant plate, 13-buffer pad, 14-bearing plate, 15-elastic piece, 16-load box, 17-foam cushion layer, 18-steel wire rope dewatering and rust-preventing device, 19-expansion bolt, 20-wall-attached plate, 21-first channel steel, 22-sliding rail, 23-bearing plate, 24-second channel steel, 25-rack, 26-gear, 27-handle and 28-reinforcing rib plate.
Detailed Description
The technical solution of the present invention is further explained with reference to the accompanying drawings, but the claimed protection scope is not limited to the above;
the utility model provides a wall-attached multi-layer all-steel climbing frame structure of a building, which comprises a climbing frame 1 as shown in figures 1, 2 and 3, install hauler 2 at the building top and a pair of track truss 3 that sets up along the building outer wall, climb frame 1 and hang on hauler 2's wire rope 4 and climb frame 1 and set up between this pair of track truss 3, climb frame 1 and include the multilayer plywood 5 of arranging along the vertical direction of top-down equidistance, adjacent two-layer plywood 5 links together through intercrossing articulated many pairs of supporting rod 6 together, gyro wheel 7 is installed respectively to every layer of plywood 5 left and right sides, track truss 3 is including inserting the rail stand 8 that stands on ground, gyro wheel 7 and the cooperation of rail stand 8 surface rolling friction, install overspeed governor 9 on the hauler 2, it has protection network 10 to climb frame 1 rear side and left and right sides cover, climb and be provided with buffer unit 11 on the ground under frame 1.
In addition, the buffer assembly 11 includes a pressure-resistant plate 12, a buffer pad 13, a bearing plate 14 and a load box 16 with an opening at the upper end, the bearing plate 14 is connected in the load box 16 through an elastic member 15, and the pressure-resistant plate 12 and the buffer pad 13 are both accommodated in the load box 16 and sequentially laid on the bearing plate 14 from top to bottom. Preferably, the elastic member 15 is a cylindrical helical compression spring. The material of the protection net 10 is plastic woven cloth. The cushion pad 13 is made of natural rubber, butadiene rubber or isoprene rubber. A foam cushion layer 17 is further arranged in the load box 16, and the foam cushion layer 17 is arranged between the cushion pad 13 and the bearing plate 14. The support rod 6 is made of a steel pipe with a nominal diameter of not less than 80 mm.
In addition, the number of the ply 5 components is 4 to 5, and the inter-storey distance of two adjacent ply 5 components is identical to the inter-storey distance of a multi-storey building. The rail upright post 8 is made of No. 12 channel steel. The steel wire rope 4 on the tractor 2 adopts a waterproof steel wire, and a steel wire rope dewatering and rust preventing device 18 is arranged at the top of the building.
Further, the building attaches wall multilayer all-steel and climbs frame structure and still includes and is fixed in the outer wall of building through expansion bolts 19 and attaches wallboard 20, attaches first channel-section steel 21 of fixedly connected with on wallboard 20, 5 left and right sides of plywood still fixedly connected with slide rail 22 and bearing plate 23, the second channel-section steel 24 of registrates on the slide rail 22, first channel-section steel 21 width is greater than the 24 width of second channel-section steel, fixedly connected with rack 25 on the second channel-section steel 24, install gear 26 on the bearing plate 23, gear 26 and rack 25 intermeshing. A handle 27 is also fixedly mounted on the gear 26. Reinforcing rib plates 28 are welded between the upper and lower sides of the first channel steel 21 and the wall attaching plate 20.
Adopt the technical scheme of the utility model, can prevent to follow the interior construction tool or raw and other materials that fall of climbing frame through covering the protection network in climbing frame rear side and left and right sides, protect ground constructor's safety, when will climbing frame lift to the floor corresponding with the building, accessible rolling gear makes the second channel-section steel stretch out the registrate in first channel-section steel, prevent to climb the frame tenesmus, guarantee the safety of personnel in climbing frame, through installing the overspeed governor on the hauler, can prevent to climb the frame and appear falling down rapidly, make the climbing frame steadily go up and down, further guarantee the safety of personnel in climbing frame, when the climbing frame appears unusually falling down, blotter, foam cushion layer and elastic component all play the effect of buffering and absorption impact to the quick tenesmus of climbing frame, can prevent that personnel in climbing frame from receiving great impact in the quick tenesmus in-process, prevent that climbing frame tenesmus and collide ground and cause the crush, The secondary accident that striking or vibration caused has protected and has climbed the inside and outside personnel's of frame safety, the utility model discloses a take multiple safety protection means, promoted the security of climbing the frame.

Claims (10)

1.一种建筑物附墙多层全钢爬架结构,其特征在于:包括爬架(1)、安装在建筑物顶部的曳引机(2)和沿着建筑物外墙设置的一对轨道桁架(3),所述爬架(1)吊挂在所述曳引机(2)的钢丝绳(4)上并且所述爬架(1)设置于该对轨道桁架(3)之间,所述爬架(1)包括沿着自上而下竖直方向等间距排列的多层层板(5),相邻两层层板(5)通过相互交叉铰接在一起的多对支承杆(6)连接在一起,每层层板(5)左右两侧分别安装有滚轮(7),所述轨道桁架(3)包括插立于地面上的轨道立柱(8),所述滚轮(7)与轨道立柱(8)外表面滚动摩擦配合,所述曳引机(2)上安装有限速器(9),所述爬架(1)后侧及左右两侧覆盖有防护网(10),所述爬架(1)正下方地面上设置有缓冲组件(11)。1. a multi-layer all-steel climbing frame structure with a wall attached to a building, is characterized in that: comprising a climbing frame (1), a traction machine (2) installed on the top of the building and a pair of set along the outer wall of the building a track truss (3), the climbing frame (1) is hung on the wire rope (4) of the traction machine (2) and the climbing frame (1) is arranged between the pair of track trusses (3), The climbing frame (1) comprises multi-layer boards (5) arranged at equal intervals along the vertical direction from top to bottom, and two adjacent layers (5) are hinged together by a plurality of pairs of support rods ( 6) Connected together, rollers (7) are respectively installed on the left and right sides of each layer of the laminate (5), and the track truss (3) includes a track column (8) inserted on the ground. The rollers (7) Fitted with rolling friction on the outer surface of the track column (8), a speed limiter (9) is installed on the traction machine (2), and the rear side and the left and right sides of the climbing frame (1) are covered with protective nets (10), A buffer assembly (11) is arranged on the ground directly below the climbing frame (1). 2.如权利要求1所述的建筑物附墙多层全钢爬架结构,其特征在于:所述缓冲组件(11)包括耐压板(12)、缓冲垫(13)、承载板(14)和上端开口的负载箱(16),所述承载板(14)通过弹性件(15)连接于负载箱(16)内,所述耐压板(12)和缓冲垫(13)均容纳于所述负载箱(16)内并且按照自上而下的顺序依次铺装在所述承载板(14)上。2. The multi-layer all-steel climbing frame structure for building attached walls according to claim 1, wherein the buffer assembly (11) comprises a pressure-resistant plate (12), a buffer pad (13), a bearing plate (14) ) and a load box (16) with an open upper end, the bearing plate (14) is connected to the load box (16) through an elastic member (15), and the pressure-resistant plate (12) and the buffer pad (13) are both accommodated in the load box (16). The load box (16) is paved on the carrier plate (14) in sequence from top to bottom. 3.如权利要求2所述的建筑物附墙多层全钢爬架结构,其特征在于:所述弹性件(15)为圆柱螺旋压缩弹簧。3 . The multi-layer all-steel climbing frame structure for building attached walls according to claim 2 , wherein the elastic member ( 15 ) is a cylindrical helical compression spring. 4 . 4.如权利要求1所述的建筑物附墙多层全钢爬架结构,其特征在于:所述防护网(10)的材质是塑料编织布。4. The multi-layer all-steel climbing frame structure for building attached walls according to claim 1, characterized in that: the material of the protective net (10) is a plastic woven cloth. 5.如权利要求2所述的建筑物附墙多层全钢爬架结构,其特征在于:所述缓冲垫(13)的材质是天然橡胶、顺丁橡胶或异戊橡胶。5. The multi-layer all-steel climbing frame structure for building attached walls according to claim 2, characterized in that: the material of the buffer pad (13) is natural rubber, butadiene rubber or isoprene rubber. 6.如权利要求2所述的建筑物附墙多层全钢爬架结构,其特征在于:所述负载箱(16)内还设置有泡沫垫层(17),泡沫垫层(17)设置于所述缓冲垫(13)与承载板(14)之间。6. The multi-layer all-steel climbing frame structure for building attached walls according to claim 2, characterized in that: the load box (16) is also provided with a foam cushion (17), and the foam cushion (17) is provided with between the buffer pad (13) and the carrier plate (14). 7.如权利要求1所述的建筑物附墙多层全钢爬架结构,其特征在于:所述层板(5)组件数量为4层至5层,并且相邻两层层板(5)组件层间距与多层建筑物的层间距一致。7. The multi-layer all-steel climbing frame structure for building attached walls as claimed in claim 1, characterized in that: the number of said laminate (5) components is 4 to 5 layers, and the adjacent two layers of laminates (5 ) The component floor spacing is consistent with the floor spacing of multi-storey buildings. 8.如权利要求1所述的建筑物附墙多层全钢爬架结构,其特征在于:所述轨道立柱(8)采用12号槽钢制成。8 . The multi-layer all-steel climbing frame structure for building attached walls as claimed in claim 1 , characterized in that: the rail column ( 8 ) is made of No. 12 channel steel. 9 . 9.如权利要求1所述的建筑物附墙多层全钢爬架结构,其特征在于:所述建筑物附墙多层全钢爬架结构还包括通过膨胀螺栓(19)固定于建筑物外墙上的附墙板(20),附墙板(20)上固定连接有第一槽钢(21),所述层板(5)左右两侧还固定连接有滑轨(22)和支承板(23),所述滑轨(22)上套合有第二槽钢(24),所述第一槽钢(21)宽度大于第二槽钢(24)宽度,第二槽钢(24)上固定连接有齿条(25),所述支承板(23)上安装有齿轮(26),齿轮(26)与齿条(25)相互啮合。9. The multi-layer all-steel climbing frame structure for building attached walls as claimed in claim 1, characterized in that: the multi-layer all-steel climbing frame structure for attaching walls to buildings also includes being fixed to the building by means of expansion bolts (19). The wall-attaching plate (20) on the outer wall, the first channel steel (21) is fixedly connected to the wall-attaching plate (20), and the left and right sides of the layer plate (5) are also fixedly connected with slide rails (22) and supports A plate (23), a second channel steel (24) is sleeved on the slide rail (22), the width of the first channel steel (21) is greater than the width of the second channel steel (24), and the second channel steel (24) ) is fixedly connected with a rack (25), a gear (26) is mounted on the support plate (23), and the gear (26) and the rack (25) are engaged with each other. 10.如权利要求9所述的建筑物附墙多层全钢爬架结构,其特征在于:所述第一槽钢(21)上下两侧与所述附墙板(20)之间还焊接有加强筋板(28)。10. The multi-layer all-steel climbing frame structure for building attached walls as claimed in claim 9, characterized in that: the upper and lower sides of the first channel steel (21) are also welded between the upper and lower sides of the attached wall plate (20). There are stiffener plates (28).
CN202120735504.3U 2021-04-12 2021-04-12 A multi-layer all-steel climbing frame structure attached to a building wall Expired - Fee Related CN215167883U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120735504.3U CN215167883U (en) 2021-04-12 2021-04-12 A multi-layer all-steel climbing frame structure attached to a building wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120735504.3U CN215167883U (en) 2021-04-12 2021-04-12 A multi-layer all-steel climbing frame structure attached to a building wall

Publications (1)

Publication Number Publication Date
CN215167883U true CN215167883U (en) 2021-12-14

Family

ID=79356396

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120735504.3U Expired - Fee Related CN215167883U (en) 2021-04-12 2021-04-12 A multi-layer all-steel climbing frame structure attached to a building wall

Country Status (1)

Country Link
CN (1) CN215167883U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112982943A (en) * 2021-04-12 2021-06-18 中国水利水电第九工程局有限公司 Wall-attached multi-layer all-steel climbing frame structure of building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112982943A (en) * 2021-04-12 2021-06-18 中国水利水电第九工程局有限公司 Wall-attached multi-layer all-steel climbing frame structure of building

Similar Documents

Publication Publication Date Title
CN214495317U (en) Lifting equipment for transporting people in the elevator shaft during the construction of the main structure
CN115627916B (en) Lifting scaffold for building construction
CN110424270B (en) Anti-falling device for urban bridge construction
CN112982943A (en) Wall-attached multi-layer all-steel climbing frame structure of building
CN215167883U (en) A multi-layer all-steel climbing frame structure attached to a building wall
CN208039787U (en) High-altitude edge-facing operation assembly operation platform
CN112794180B (en) Elevator for constructing elevator shaft and construction scheme
CN215167898U (en) A safe and intelligent climbing frame for high-rise building construction
CN106088564A (en) Track climbing type monolithic architecture construction scaffolding
CN221680735U (en) Lifting platform for constructional engineering
CN218117177U (en) Climb guide rail type protector for frame
CN112982948A (en) A safe intelligence is climbed for high-rise building construction
CN219622220U (en) Elevator installation auxiliary device
CN215055143U (en) Double-hanging basket for super high-rise subsection construction
CN212269370U (en) A alternately from climbing formula platform for installation of elevator guide rail
CN116411696A (en) A fully enclosed sound barrier internal operating platform
CN212395625U (en) Super high-rise construction escape system
CN211776313U (en) Electric power iron tower with prevent weighing down function
CN210914864U (en) Foundation-pit-free elevator anti-seismic connecting device
CN208749068U (en) A kind of moveable exterior wall auxiliary finishing cage ladder of reversely hung Yong
CN204703544U (en) A kind of safe and practical high rise elevator well construction guard system
CN222770426U (en) A gantry combined guide frame type aerial disaster escape system
CN113882701A (en) Hydraulic climbing protective screen device
CN223175562U (en) Rigid-flexible combined elevator shaft protection device
CN206636176U (en) Possesses the scaffold of expenditure installation net pocket frame protection

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211214