CN215107241U - Ready-package scaffold board - Google Patents
Ready-package scaffold board Download PDFInfo
- Publication number
- CN215107241U CN215107241U CN202120375261.7U CN202120375261U CN215107241U CN 215107241 U CN215107241 U CN 215107241U CN 202120375261 U CN202120375261 U CN 202120375261U CN 215107241 U CN215107241 U CN 215107241U
- Authority
- CN
- China
- Prior art keywords
- pipe
- horizontal pole
- footboard
- connect
- scaffold board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Ladders (AREA)
Abstract
The utility model discloses a ready-package scaffold board belongs to building technical field. The scaffold board includes horizontal pole, end pipe, connection pipe and footboard, the horizontal pole is established to two, two horizontal pole horizontal parallel arrangement, two the both ends of horizontal pole are passed through respectively the end pipe is connected, forms the framework, be equipped with a plurality ofly in the framework connect the pipe, every connect the both ends of pipe respectively with two the connection can be dismantled to the horizontal pole, it is a plurality of connect the pipe interval to set up, two recesses that set up along footboard width direction, every are seted up to the downside of footboard the tip semicircular in shape of recess, two the recess interval sets up, the footboard passes through the recess with connect the pipe overlap joint. The utility model discloses do not need the welding, but the field assembly to raise the efficiency fast, save a large amount of labours, and the transportation is convenient, practices thrift the cost of transportation in a large number.
Description
Technical Field
The utility model relates to a mechanical welding equipment technical field especially relates to a ready-package scaffold board.
Background
The scaffold boards are also called scaffold pieces and are laid on scaffolds and operation frames, so that workers can walk above the scaffold boards, transfer materials and construct construction work conveniently, and the scaffold boards are a building material which can be used for temporary turnover. The scaffold board can be made of steel, wood, bamboo, aluminum alloy, plastic and other materials, and the mass of a single scaffold board is not more than 30 KG. The scaffold boards commonly used in the construction site include stamped steel scaffold boards, wooden scaffold boards and bamboo scaffold boards (including bamboo string boards and bamboo fence boards).
At present, the current scaffold board is difficult for the split, and the equipment is troublesome, and factor of safety is not high moreover, takes place to skid easily, leads to the scaffold board to drop or constructor to fall down, and transports inconveniently, consumes a large amount of cost of transportation.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a ready-package scaffold board. According to the utility model discloses a ready-package scaffold board, the equipment is convenient, saves a large amount of labours, and factor of safety is high, and antiskid is moved, prevents falling, reduces constructor pressure, and the transportation is convenient, saves the cost of transportation, strong adaptability, simple and practical, economic environmental protection, safe and reliable, the utility model discloses a technical scheme as follows:
according to the utility model discloses an aspect provides a ready-package scaffold board, including horizontal pole, end pipe, connection pipe and footboard, the horizontal pole is established to two, two horizontal pole horizontal parallel arrangement, two the both ends of horizontal pole are passed through respectively the end pipe is connected, forms the framework, be equipped with a plurality ofly in the framework connect the pipe, every connect the both ends of pipe respectively with two the horizontal pole passes through the bolt and can dismantle the connection, it is a plurality of connect the pipe interval and set up, two recesses along footboard width direction setting, every are seted up to the downside of footboard the tip semicircular in shape of recess, two the recess interval sets up, the footboard passes through the recess with connect the pipe overlap joint.
Preferably, the diameter of the groove is larger than that of the connecting circular tube.
Preferably, the pedal is provided with anti-skid lines.
Preferably, the distance between any two connecting circular tubes is 350-450 mm.
Preferably, the distance between the two grooves is 350-450 mm.
Preferably, a slot is formed in the upper side of the cross rod, a limiting plate is arranged in the slot, and the lower end of the limiting plate is inserted into the slot and is abutted to the cross rod.
The above technical scheme of the utility model, have as follows and show the effect:
the utility model discloses a scaffold board includes the horizontal pole, the end pipe, connect pipe and footboard, the horizontal pole is established to two, the horizontal pole level parallel arrangement of two horizontal poles, the both ends of two horizontal poles are connected through the end pipe respectively, form the framework, be equipped with a plurality of connection pipes in the framework, every both ends of connecting the pipe can be dismantled with two horizontal poles respectively and be connected, a plurality of pipe intervals of connecting set up, two recesses that set up along footboard width direction are seted up to the downside of footboard, the tip of every recess is semi-circular, two recess intervals set up, the footboard passes through the recess and is connected the pipe overlap joint, the utility model discloses do not need the welding, but field assembly to raise the efficiency fast, save a large amount of labours, the connection between each subassembly is reliable, has set up anti-skidding structure, and factor of safety is high, and the transportation is convenient, practices thrift the cost of transportation in a large number.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
fig. 2 is a schematic structural view of the pedal of the present invention.
The device comprises a cross rod 1, a circular tube 2 at the end, a connecting circular tube 3, a pedal 4, a groove 5, a slot 6 and a limiting plate 7.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be described in further detail below with reference to the accompanying drawings and by referring to preferred embodiments. It should be understood, however, that the numerous specific details set forth in the specification are merely set forth to provide a thorough understanding of one or more aspects of the present invention, which may be practiced without these specific details.
As shown in fig. 1, according to the utility model discloses a ready-package scaffold board, scaffold board include horizontal pole 1, end pipe 2, connect pipe 3 and footboard 4, horizontal pole 1 is established to two, two horizontal pole 1 horizontal parallel arrangement, two the both ends of horizontal pole 1 are passed through respectively end pipe 2 is connected, forms the framework, be equipped with a plurality ofly in the framework connect pipe 3, every connect the both ends of pipe 3 respectively with two the horizontal pole 1 passes through the bolt can dismantle the connection, and is a plurality of connect 3 interval settings of pipe, arbitrary two connect the distance of pipe 3 and be 400 mm. Two grooves 5 arranged along the width direction of the pedal 4 are formed in the lower side of the pedal 4, the end portion of each groove 5 is semicircular, the two grooves 5 are arranged at intervals, and the distance between the two grooves 5 is 400 mm. The diameter of the groove 5 is larger than that of the connecting circular tube 3. The pedal 4 is in lap joint with the connecting circular tube 3 through the groove 5. Footboard 4 passes through 5 cards of recess on two connect pipe 3 for footboard 4 can not appear sliding in the horizontal direction, increases footboard 4's stability, improves constructor's security, reduces constructor's psychological burden.
The anti-slip thread is arranged on the pedal 4, so that the friction between the footsteps of the constructors and the pedal 4 is increased, and the constructors are prevented from slipping when walking on the pedal 4.
A slot 6 is formed in the upper side of the cross rod 1, a limiting plate 7 is arranged in the slot 6, and the lower end of the limiting plate 7 is inserted into the slot 6 and is abutted to the cross rod 1. The limiting plate 7 is additionally arranged to limit the pedal 4 from being separated from the frame body, and the safety is further improved.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.
Claims (6)
1. A ready-package scaffold board which is characterized in that: including horizontal pole, end pipe, connection pipe and footboard, the horizontal pole is established to two, two horizontal pole horizontal parallel arrangement, two the both ends of horizontal pole are passed through respectively the end pipe is connected, forms the framework, be equipped with a plurality ofly in the framework connect the pipe, every connect the both ends of pipe respectively with two the horizontal pole passes through the bolt can dismantle the connection, and is a plurality of connect the pipe interval and set up, two recesses that set up along footboard width direction, every are seted up to the downside of footboard the tip semicircular in shape of recess, two the recess interval sets up, the footboard passes through the recess with connect the pipe overlap joint.
2. A ready-to-assemble scaffold board according to claim 1, characterised in that: the diameter of the groove is larger than that of the connecting circular tube.
3. A ready-to-assemble scaffold board according to claim 1, characterised in that: the pedal is provided with anti-skid lines.
4. A ready-to-assemble scaffold board according to claim 2, characterised in that: the distance between any two connecting circular tubes is 350 mm and 450 mm.
5. A ready-to-assemble scaffold board according to claim 1, characterised in that: the distance between the two grooves is 350-450 mm.
6. A ready-to-assemble scaffold board according to claim 1, characterised in that: the upper side of the cross rod is provided with a slot, a limiting plate is arranged in the slot, and the lower end of the limiting plate is inserted into the slot and is abutted to the cross rod.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202120375261.7U CN215107241U (en) | 2021-02-18 | 2021-02-18 | Ready-package scaffold board |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202120375261.7U CN215107241U (en) | 2021-02-18 | 2021-02-18 | Ready-package scaffold board |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN215107241U true CN215107241U (en) | 2021-12-10 |
Family
ID=79335344
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202120375261.7U Active CN215107241U (en) | 2021-02-18 | 2021-02-18 | Ready-package scaffold board |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN215107241U (en) |
-
2021
- 2021-02-18 CN CN202120375261.7U patent/CN215107241U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206309129U (en) | A kind of novel portable safety warning fence for ocean engineering | |
| CN215107241U (en) | Ready-package scaffold board | |
| CN208454342U (en) | A kind of safety of tower crane platform and standard knot install conjoined device | |
| CN202248844U (en) | Quick connect module for stand | |
| CN207079900U (en) | A kind of construction resists suspension device stubbornly with scaffold soft drawn | |
| CN204174915U (en) | Scaffold | |
| CN209761310U (en) | Portable cat ladder for overhaul of equipment | |
| CN202055509U (en) | Upright rod installation structure of directly-inserted scaffold | |
| CN204023409U (en) | Bananas type bridge construction safety climbing ladder | |
| CN206220649U (en) | Construction guard fender | |
| CN203488077U (en) | Ladder for building workers | |
| CN206801072U (en) | A kind of foundation ditch temporary guard rail | |
| CN207003970U (en) | A kind of building scaffold being easily installed | |
| CN204876814U (en) | Building construction safety rail guard | |
| CN214615326U (en) | Scaffold for building engineering construction | |
| CN205840303U (en) | A kind of button bar adaptor | |
| CN104372935A (en) | Scaffold | |
| CN210439961U (en) | Plug-in type cat ladder of installation in ground well | |
| CN203188601U (en) | Anti-upwarp clamp for scaffold board | |
| CN203008409U (en) | Safe and practical tread board for realizing simple and convenient disassembly and assembly of temporary staircase in construction site | |
| CN204781871U (en) | Scaffold | |
| CN222478597U (en) | Steel ladder for construction site | |
| CN211080984U (en) | Scaffold frame stabilising arrangement of pre-buried formula | |
| CN205742795U (en) | A kind of security civilization standardized construction balustrade | |
| CN204174919U (en) | Scaffold |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |