CN215107241U - Ready-package scaffold board - Google Patents

Ready-package scaffold board Download PDF

Info

Publication number
CN215107241U
CN215107241U CN202120375261.7U CN202120375261U CN215107241U CN 215107241 U CN215107241 U CN 215107241U CN 202120375261 U CN202120375261 U CN 202120375261U CN 215107241 U CN215107241 U CN 215107241U
Authority
CN
China
Prior art keywords
pipe
horizontal pole
footboard
connect
scaffold board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120375261.7U
Other languages
Chinese (zh)
Inventor
宁攀忠
刘良金
丛日强
王作文
杨伟
陈夏
覃健
韦惠娜
刘春�
陆积新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Construction Engineering Group Construction Machinery Manufacturing Co Ltd
Original Assignee
Guangxi Construction Engineering Group Construction Machinery Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Construction Engineering Group Construction Machinery Manufacturing Co Ltd filed Critical Guangxi Construction Engineering Group Construction Machinery Manufacturing Co Ltd
Priority to CN202120375261.7U priority Critical patent/CN215107241U/en
Application granted granted Critical
Publication of CN215107241U publication Critical patent/CN215107241U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a ready-package scaffold board belongs to building technical field. The scaffold board includes horizontal pole, end pipe, connection pipe and footboard, the horizontal pole is established to two, two horizontal pole horizontal parallel arrangement, two the both ends of horizontal pole are passed through respectively the end pipe is connected, forms the framework, be equipped with a plurality ofly in the framework connect the pipe, every connect the both ends of pipe respectively with two the connection can be dismantled to the horizontal pole, it is a plurality of connect the pipe interval to set up, two recesses that set up along footboard width direction, every are seted up to the downside of footboard the tip semicircular in shape of recess, two the recess interval sets up, the footboard passes through the recess with connect the pipe overlap joint. The utility model discloses do not need the welding, but the field assembly to raise the efficiency fast, save a large amount of labours, and the transportation is convenient, practices thrift the cost of transportation in a large number.

Description

Ready-package scaffold board
Technical Field
The utility model relates to a mechanical welding equipment technical field especially relates to a ready-package scaffold board.
Background
The scaffold boards are also called scaffold pieces and are laid on scaffolds and operation frames, so that workers can walk above the scaffold boards, transfer materials and construct construction work conveniently, and the scaffold boards are a building material which can be used for temporary turnover. The scaffold board can be made of steel, wood, bamboo, aluminum alloy, plastic and other materials, and the mass of a single scaffold board is not more than 30 KG. The scaffold boards commonly used in the construction site include stamped steel scaffold boards, wooden scaffold boards and bamboo scaffold boards (including bamboo string boards and bamboo fence boards).
At present, the current scaffold board is difficult for the split, and the equipment is troublesome, and factor of safety is not high moreover, takes place to skid easily, leads to the scaffold board to drop or constructor to fall down, and transports inconveniently, consumes a large amount of cost of transportation.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a ready-package scaffold board. According to the utility model discloses a ready-package scaffold board, the equipment is convenient, saves a large amount of labours, and factor of safety is high, and antiskid is moved, prevents falling, reduces constructor pressure, and the transportation is convenient, saves the cost of transportation, strong adaptability, simple and practical, economic environmental protection, safe and reliable, the utility model discloses a technical scheme as follows:
according to the utility model discloses an aspect provides a ready-package scaffold board, including horizontal pole, end pipe, connection pipe and footboard, the horizontal pole is established to two, two horizontal pole horizontal parallel arrangement, two the both ends of horizontal pole are passed through respectively the end pipe is connected, forms the framework, be equipped with a plurality ofly in the framework connect the pipe, every connect the both ends of pipe respectively with two the horizontal pole passes through the bolt and can dismantle the connection, it is a plurality of connect the pipe interval and set up, two recesses along footboard width direction setting, every are seted up to the downside of footboard the tip semicircular in shape of recess, two the recess interval sets up, the footboard passes through the recess with connect the pipe overlap joint.
Preferably, the diameter of the groove is larger than that of the connecting circular tube.
Preferably, the pedal is provided with anti-skid lines.
Preferably, the distance between any two connecting circular tubes is 350-450 mm.
Preferably, the distance between the two grooves is 350-450 mm.
Preferably, a slot is formed in the upper side of the cross rod, a limiting plate is arranged in the slot, and the lower end of the limiting plate is inserted into the slot and is abutted to the cross rod.
The above technical scheme of the utility model, have as follows and show the effect:
the utility model discloses a scaffold board includes the horizontal pole, the end pipe, connect pipe and footboard, the horizontal pole is established to two, the horizontal pole level parallel arrangement of two horizontal poles, the both ends of two horizontal poles are connected through the end pipe respectively, form the framework, be equipped with a plurality of connection pipes in the framework, every both ends of connecting the pipe can be dismantled with two horizontal poles respectively and be connected, a plurality of pipe intervals of connecting set up, two recesses that set up along footboard width direction are seted up to the downside of footboard, the tip of every recess is semi-circular, two recess intervals set up, the footboard passes through the recess and is connected the pipe overlap joint, the utility model discloses do not need the welding, but field assembly to raise the efficiency fast, save a large amount of labours, the connection between each subassembly is reliable, has set up anti-skidding structure, and factor of safety is high, and the transportation is convenient, practices thrift the cost of transportation in a large number.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
fig. 2 is a schematic structural view of the pedal of the present invention.
The device comprises a cross rod 1, a circular tube 2 at the end, a connecting circular tube 3, a pedal 4, a groove 5, a slot 6 and a limiting plate 7.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be described in further detail below with reference to the accompanying drawings and by referring to preferred embodiments. It should be understood, however, that the numerous specific details set forth in the specification are merely set forth to provide a thorough understanding of one or more aspects of the present invention, which may be practiced without these specific details.
As shown in fig. 1, according to the utility model discloses a ready-package scaffold board, scaffold board include horizontal pole 1, end pipe 2, connect pipe 3 and footboard 4, horizontal pole 1 is established to two, two horizontal pole 1 horizontal parallel arrangement, two the both ends of horizontal pole 1 are passed through respectively end pipe 2 is connected, forms the framework, be equipped with a plurality ofly in the framework connect pipe 3, every connect the both ends of pipe 3 respectively with two the horizontal pole 1 passes through the bolt can dismantle the connection, and is a plurality of connect 3 interval settings of pipe, arbitrary two connect the distance of pipe 3 and be 400 mm. Two grooves 5 arranged along the width direction of the pedal 4 are formed in the lower side of the pedal 4, the end portion of each groove 5 is semicircular, the two grooves 5 are arranged at intervals, and the distance between the two grooves 5 is 400 mm. The diameter of the groove 5 is larger than that of the connecting circular tube 3. The pedal 4 is in lap joint with the connecting circular tube 3 through the groove 5. Footboard 4 passes through 5 cards of recess on two connect pipe 3 for footboard 4 can not appear sliding in the horizontal direction, increases footboard 4's stability, improves constructor's security, reduces constructor's psychological burden.
The anti-slip thread is arranged on the pedal 4, so that the friction between the footsteps of the constructors and the pedal 4 is increased, and the constructors are prevented from slipping when walking on the pedal 4.
A slot 6 is formed in the upper side of the cross rod 1, a limiting plate 7 is arranged in the slot 6, and the lower end of the limiting plate 7 is inserted into the slot 6 and is abutted to the cross rod 1. The limiting plate 7 is additionally arranged to limit the pedal 4 from being separated from the frame body, and the safety is further improved.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.

Claims (6)

1. A ready-package scaffold board which is characterized in that: including horizontal pole, end pipe, connection pipe and footboard, the horizontal pole is established to two, two horizontal pole horizontal parallel arrangement, two the both ends of horizontal pole are passed through respectively the end pipe is connected, forms the framework, be equipped with a plurality ofly in the framework connect the pipe, every connect the both ends of pipe respectively with two the horizontal pole passes through the bolt can dismantle the connection, and is a plurality of connect the pipe interval and set up, two recesses that set up along footboard width direction, every are seted up to the downside of footboard the tip semicircular in shape of recess, two the recess interval sets up, the footboard passes through the recess with connect the pipe overlap joint.
2. A ready-to-assemble scaffold board according to claim 1, characterised in that: the diameter of the groove is larger than that of the connecting circular tube.
3. A ready-to-assemble scaffold board according to claim 1, characterised in that: the pedal is provided with anti-skid lines.
4. A ready-to-assemble scaffold board according to claim 2, characterised in that: the distance between any two connecting circular tubes is 350 mm and 450 mm.
5. A ready-to-assemble scaffold board according to claim 1, characterised in that: the distance between the two grooves is 350-450 mm.
6. A ready-to-assemble scaffold board according to claim 1, characterised in that: the upper side of the cross rod is provided with a slot, a limiting plate is arranged in the slot, and the lower end of the limiting plate is inserted into the slot and is abutted to the cross rod.
CN202120375261.7U 2021-02-18 2021-02-18 Ready-package scaffold board Active CN215107241U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120375261.7U CN215107241U (en) 2021-02-18 2021-02-18 Ready-package scaffold board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120375261.7U CN215107241U (en) 2021-02-18 2021-02-18 Ready-package scaffold board

Publications (1)

Publication Number Publication Date
CN215107241U true CN215107241U (en) 2021-12-10

Family

ID=79335344

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120375261.7U Active CN215107241U (en) 2021-02-18 2021-02-18 Ready-package scaffold board

Country Status (1)

Country Link
CN (1) CN215107241U (en)

Similar Documents

Publication Publication Date Title
CN206309129U (en) A kind of novel portable safety warning fence for ocean engineering
CN215107241U (en) Ready-package scaffold board
CN208454342U (en) A kind of safety of tower crane platform and standard knot install conjoined device
CN202248844U (en) Quick connect module for stand
CN207079900U (en) A kind of construction resists suspension device stubbornly with scaffold soft drawn
CN204174915U (en) Scaffold
CN209761310U (en) Portable cat ladder for overhaul of equipment
CN202055509U (en) Upright rod installation structure of directly-inserted scaffold
CN204023409U (en) Bananas type bridge construction safety climbing ladder
CN206220649U (en) Construction guard fender
CN203488077U (en) Ladder for building workers
CN206801072U (en) A kind of foundation ditch temporary guard rail
CN207003970U (en) A kind of building scaffold being easily installed
CN204876814U (en) Building construction safety rail guard
CN214615326U (en) Scaffold for building engineering construction
CN205840303U (en) A kind of button bar adaptor
CN104372935A (en) Scaffold
CN210439961U (en) Plug-in type cat ladder of installation in ground well
CN203188601U (en) Anti-upwarp clamp for scaffold board
CN203008409U (en) Safe and practical tread board for realizing simple and convenient disassembly and assembly of temporary staircase in construction site
CN204781871U (en) Scaffold
CN222478597U (en) Steel ladder for construction site
CN211080984U (en) Scaffold frame stabilising arrangement of pre-buried formula
CN205742795U (en) A kind of security civilization standardized construction balustrade
CN204174919U (en) Scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant