CN215104362U - A prefabricated walkway system - Google Patents

A prefabricated walkway system Download PDF

Info

Publication number
CN215104362U
CN215104362U CN202120667172.XU CN202120667172U CN215104362U CN 215104362 U CN215104362 U CN 215104362U CN 202120667172 U CN202120667172 U CN 202120667172U CN 215104362 U CN215104362 U CN 215104362U
Authority
CN
China
Prior art keywords
bricks
support
prefabricated
brick
overlapping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120667172.XU
Other languages
Chinese (zh)
Inventor
张剑
康亦军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Broad Homes Industrial Shanghai Co ltd
Original Assignee
Broad Homes Industrial Shanghai Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Broad Homes Industrial Shanghai Co ltd filed Critical Broad Homes Industrial Shanghai Co ltd
Priority to CN202120667172.XU priority Critical patent/CN215104362U/en
Application granted granted Critical
Publication of CN215104362U publication Critical patent/CN215104362U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00—Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108—Rainwater harvesting

Landscapes

  • Road Paving Structures (AREA)

Abstract

本实用新型公开了一种预制人行道系统,其包括路基和预制道砖,所述预制道砖包括支座砖和覆盖砖,所述支座砖上设置搭接台,所述覆盖砖的底面设置搭接部,多个所述支座砖间隔铺贴在所述路基上,且相邻所述支座砖之间形成导水通道,所述覆盖砖通过其搭接部搭接在相邻的所述支座砖的搭接台上,并在所述导水通道的上方架空设置。本实用新型的预制道砖可预制标准化生产,且施工方便高效,外观图案美观,平整,承载力强,排水性能高,并可结合道路雨水收集系统回收利用雨水,维修方便。

Figure 202120667172

The utility model discloses a prefabricated sidewalk system, which comprises a road base and prefabricated road bricks. The prefabricated road bricks include support bricks and cover bricks. A lap joint is arranged on the support bricks, and the bottom surface of the cover bricks is provided with In the overlapping part, a plurality of the support bricks are laid on the roadbed at intervals, and a water guide channel is formed between the adjacent support bricks, and the covering bricks are overlapped on the adjacent ones through their overlapping parts. It is placed on the overlapping platform of the support brick and is set overhead above the water guiding channel. The prefabricated road brick of the utility model can be prefabricated and standardized for production, and has the advantages of convenient and efficient construction, beautiful appearance pattern, smoothness, strong bearing capacity, high drainage performance, and can be combined with the road rainwater collection system to recycle rainwater, and the maintenance is convenient.

Figure 202120667172

Description

Prefabricated sidewalk system
Technical Field
The utility model relates to a prefabricated pavement system.
Background
The existing sidewalk system is generally realized by paving a layer of solid road bricks on dry and hard mortar. The solid road bricks of the sidewalk system are easy to tilt up due to treading, so that a low-lying area appears on the surface of the sidewalk, accumulated water is easy to generate, and walking is not facilitated. In addition, the existing solid road bricks are generally water permeable bricks, but the water permeability of the existing solid road bricks is limited, and the water permeable gaps of the existing solid road bricks are easy to block and lose efficacy and are difficult to maintain.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that to the easy perk that current pavement system exists, permeate water not smooth phenomenon, provide a bearing capacity is stronger, and the higher prefabricated pavement system of drainage ability.
For solving the technical problem, the utility model provides a prefabricated pavement system, it includes road bed and prefabricated road brick, prefabricated road brick includes support brick and cover brick, set up the overlap joint platform on the support brick, the bottom surface of cover brick sets up overlap joint portion, and is a plurality of support brick interval is laid and is pasted on the road bed, and adjacent form the water guide passageway between the support brick, the cover brick is adjacent through its overlap joint portion the overlap joint bench of support brick, and the overhead setting in top of water guide passageway.
The utility model discloses a design support brick and cover brick, form the water guide passageway simultaneously between adjacent support brick, cover the brick and make somebody a mere figurehead through its built on stilts setting of overlap joint portion on the overlap joint bench of adjacent support brick, make the water can discharge into the water guide passageway rapidly high-efficiently through the gap between support brick and the cover brick, the surface on pavement is not ponding, makes things convenient for the pedestrian to walk.
In order to ensure that the support brick and the covering brick are firmly lapped, the lapping table is clamped with the lapping part through a concave-convex structure, and the support brick and the covering brick are locked through the action of gravity. During specific implementation, the lapping table is set as a first inclined plane, the lapping part is set as a second inclined plane, and the concave-convex structure is formed by grooves and convex ribs which are arranged on the first inclined plane and the second inclined plane and are clamped with each other.
In order to facilitate the water body to enter the water guide channel, permeable seams are respectively arranged between two adjacent covering bricks and between the adjacent support brick and the covering brick.
For the walking travelling comfort of guaranteeing the pavement, the top central authorities of support brick set up the boss, the overlap joint platform sets up around the boss, works as the overlap joint portion overlap joint of covering brick is in when the overlap joint bench of support brick, the top surface of boss with the top surface of covering brick flushes, makes the surfacing of pavement, the feel is better during the walking. During specific implementation, dry and hard mortar can be further paved on the roadbed, and the support brick is paved on the dry and hard mortar. In order to further improve the water permeability of the sidewalk, the water guide channel is communicated with a road rainwater collecting system.
In a specific embodiment, the supporting brick and the covering brick are both square, the four corners of the top of the supporting brick are respectively provided with the lapping table, the four corners of the bottom of the covering brick are respectively provided with the lapping parts, the periphery of the supporting brick is respectively provided with the water guide channel, and the four lapping parts of the covering brick are respectively lapped on the lapping table of one supporting brick.
Compared with the prior art, the beneficial effects of the utility model are that:
1) the sidewalk system of the utility model adopts the concrete precast road bricks, has strong bearing capacity, and after the covering bricks and the support bricks are clamped through the concave-convex structure, the covering bricks and the support bricks are locked through the action of gravity, so that the paving system is not easy to tilt when being trampled;
2) the covering brick of the utility model is directly lapped on the support brick, so that the maintenance is convenient;
3) the utility model is provided with a special water guide channel, and can be communicated with a road rainwater collecting system, so that the water discharging capability is strong;
4) the top surfaces of the support brick and the covering brick of the utility model can be provided with beautiful patterns, thus improving the beauty of the sidewalk;
5) the utility model discloses a prefabricated road brick can be prefabricated in batches, and accommodation is wide.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic top plan view of the paving state of the prefabricated sidewalk system of the present invention.
Fig. 2 is a schematic view of the state of the covering brick of the present invention overlapping on the support brick.
FIG. 3 is a schematic sectional view A-A of FIG. 2.
Fig. 4 is a side view structure diagram of the covering brick of the present invention.
Fig. 5 is a bottom view of the covering brick of the present invention.
Fig. 6 is a sectional view B-B of fig. 5.
Fig. 7 is a side view structure diagram of the support brick of the present invention.
Fig. 8 is a top view structural diagram of the support brick of the present invention.
Fig. 9 is a cross-sectional view C-C of fig. 8.
Detailed Description
The invention is further described below with reference to specific preferred embodiments, without thereby limiting the scope of protection of the invention.
For convenience of description, the relative positional relationship of the components, such as: the descriptions of the upper, lower, left, right, etc. are described with reference to the layout directions of the drawings in the specification, and do not limit the structure of the present patent.
As shown in fig. 1-9, an embodiment of the prefabricated sidewalk system of the present invention includes a roadbed 7 and prefabricated road bricks, which include support bricks 1 and cover bricks 2. The support brick 1 and the covering brick 2 are both square. The top central authorities of brick cup 1 set up boss 12, set up overlap joint platform 11 on every side (four angles) of boss 12 respectively, set up overlap joint portion 21 on four angles of bottom of brick cup 2 respectively, form water guide channel 3 around brick cup 1 respectively, lay dry and hard mortar 4 on roadbed 7, brick cup 1 lays and pastes on dry and hard mortar 4, four overlap joint portions 21 of brick cup 2 overlap joint respectively on the overlap joint platform 11 of brick cup 1, just brick cup 2 is in the built on stilts setting in top of water guide channel 3, adjacent two cover between the brick cup 2, and brick cup 1 with cover and set up the width respectively and be 6 mm's permeable seam 5 between the brick cup 2.
For making the overlap joint of support brick 1 and cover brick 2 firm to make things convenient for the water to get into water guide channel 3 in, overlap joint platform 11 sets up to first inclined plane, overlap joint portion 21 sets up to the second inclined plane, just first inclined plane with set up the tongue and groove that the width is 5mm on the second inclined plane respectively, the first inclined plane warp of overlap joint platform 11 the tongue and groove with the mutual block of second inclined plane of overlap joint portion 21.
To ensure the walking comfort of the sidewalk, the top surface of the boss 12 of the support brick 1 is flush with the top surface of the covering brick 2.
In order to further improve the water permeability of the sidewalk, a road rainwater collecting system 6 is arranged below the water guide channel 3.
The above description is only for the preferred embodiment of the present application and should not be taken as limiting the present application in any way, and although the present application has been disclosed in the preferred embodiment, it is not intended to limit the present application, and those skilled in the art should understand that they can make various changes and modifications within the technical scope of the present application without departing from the scope of the present application, and therefore all the changes and modifications can be made within the technical scope of the present application.

Claims (9)

1.一种预制人行道系统,包括路基和预制道砖,其特征在于,所述预制道砖包括支座砖和覆盖砖,所述支座砖上设置搭接台,所述覆盖砖的底面设置搭接部,多个所述支座砖间隔铺贴在所述路基上,且相邻所述支座砖之间形成导水通道,所述覆盖砖通过其搭接部搭接在相邻的所述支座砖的搭接台上,并在所述导水通道的上方架空设置。1. A prefabricated sidewalk system, comprising roadbed and prefabricated road bricks, is characterized in that, described prefabricated road bricks comprise support bricks and cover bricks, and a lap joint is arranged on the support bricks, and the bottom surface of the cover bricks is provided with In the overlapping part, a plurality of the support bricks are laid on the roadbed at intervals, and a water guide channel is formed between the adjacent support bricks, and the covering bricks are overlapped on the adjacent ones through their overlapping parts. It is placed on the overlapping platform of the support brick and is set overhead above the water guiding channel. 2.根据权利要求1所述的预制人行道系统,其特征在于,所述搭接台与所述搭接部通过凹凸结构卡接。2 . The prefabricated walkway system according to claim 1 , wherein, the overlapping platform and the overlapping portion are snap-connected through a concave-convex structure. 3 . 3.根据权利要求2所述的预制人行道系统,其特征在于,所述搭接台设置为第一斜面,所述搭接部设置为第二斜面,所述凹凸结构设置在所述第一斜面和所述第二斜面上。3 . The prefabricated sidewalk system according to claim 2 , wherein the overlapping platform is configured as a first inclined surface, the overlapping portion is configured as a second inclined surface, and the concave-convex structure is configured on the first inclined surface. 4 . and the second slope. 4.根据权利要求3所述的预制人行道系统,其特征在于,所述凹凸结构为沿所述第一斜面和所述第二斜面设置的相互卡合的凹槽和凸肋。4 . The prefabricated sidewalk system according to claim 3 , wherein the concave-convex structure is a groove and a convex rib that engage with each other and are provided along the first inclined plane and the second inclined plane. 5 . 5.根据权利要求1所述的预制人行道系统,其特征在于,所述支座砖的顶部中央设置凸台,所述搭接台设置在所述凸台的周围,当所述覆盖砖的搭接部搭接在所述支座砖的搭接台上时,所述凸台的顶面与所述覆盖砖的顶面齐平。5 . The prefabricated sidewalk system according to claim 1 , wherein a boss is arranged in the center of the top of the support brick, and the overlapping platform is arranged around the boss. When the connecting portion is overlapped on the overlapping platform of the support brick, the top surface of the boss is flush with the top surface of the covering brick. 6.根据权利要求1所述的预制人行道系统,其特征在于,所述导水通道与道路雨水收集系统连通。6 . The prefabricated sidewalk system according to claim 1 , wherein the water guiding channel is communicated with a road rainwater collection system. 7 . 7.根据权利要求1所述的预制人行道系统,其特征在于,相邻的两个所述覆盖砖之间,及相邻的所述支座砖和覆盖砖之间分别设置透水缝。7 . The prefabricated sidewalk system according to claim 1 , wherein water permeable joints are respectively provided between two adjacent covering bricks, and between adjacent supporting bricks and covering bricks. 8 . 8.根据权利要求1所述的预制人行道系统,其特征在于,所述路基上铺设干硬性砂浆,所述支座砖铺贴在所述干硬性砂浆上。8 . The prefabricated sidewalk system according to claim 1 , wherein dry-hard mortar is laid on the roadbed, and the support bricks are laid on the dry-hard mortar. 9 . 9.根据权利要求1所述的预制人行道系统,其特征在于,所述支座砖和所述覆盖砖都为方型,且所述支座砖的顶部四个角上分别设置所述搭接台,所述覆盖砖的底部四个角上分别设置所述搭接部,所述支座砖的四周分别形成所述导水通道,所述覆盖砖的四个搭接部分别搭接在一所述支座砖的搭接台上。9 . The prefabricated walkway system according to claim 1 , wherein the support bricks and the covering bricks are all square, and the lap joints are respectively provided on the top four corners of the support bricks. 10 . The four corners of the bottom of the cover bricks are respectively provided with the overlapping parts, the water guide channels are formed around the support bricks, and the four overlapping parts of the cover bricks are respectively overlapped with one another. on the overlapping platform of the support brick.
CN202120667172.XU 2021-03-31 2021-03-31 A prefabricated walkway system Active CN215104362U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120667172.XU CN215104362U (en) 2021-03-31 2021-03-31 A prefabricated walkway system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120667172.XU CN215104362U (en) 2021-03-31 2021-03-31 A prefabricated walkway system

Publications (1)

Publication Number Publication Date
CN215104362U true CN215104362U (en) 2021-12-10

Family

ID=79346583

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120667172.XU Active CN215104362U (en) 2021-03-31 2021-03-31 A prefabricated walkway system

Country Status (1)

Country Link
CN (1) CN215104362U (en)

Similar Documents

Publication Publication Date Title
JP2002522675A (en) Paving stone
CN105401500A (en) Permeable gap brick convenient for draining
CN209602912U (en) A kind of asphalt pavement road surface
KR101619285B1 (en) Sidewalk block with multi-function
CN206090217U (en) Brick of mating formation
CN202194048U (en) Pavement structure for joining part of new and old roads
CN210975426U (en) Prefabricated assembled type oval-shaped groove blind drain ditch system
KR102140338B1 (en) Water permeable block
CN215887818U (en) Type that permeates water concrete ecological garden road
KR100757453B1 (en) Detachable drainage plate for easy connection and installation and road construction method in apartment complex using the same
CN211227905U (en) Double-channel slow running diameter
CN210621367U (en) A kind of green environmental protection interlocking block brick
CN214992775U (en) Municipal paving brick
CN206721600U (en) One kind contraposition lock stitch gap permeable pavement brick
CN115652720A (en) Combined permeable brick and its laying method
CN217175495U (en) Dry-wet area ground laying structure
CN218059753U (en) Scenic spot drainage antiskid footpath with blind sidewalk
JP2012062713A (en) Pavement block and pavement structure
CN223176524U (en) Park road structure of mating formation that permeates water
CN206736666U (en) A kind of base course suitable for porous pavement and the basic road surface using the brick
CN207498769U (en) A kind of road structure
CN219972839U (en) Pavement floor tile
CN206233054U (en) A kind of draining floor tile
CN219508295U (en) Landscape pavement rapid drainage pavement structure
CN223074551U (en) Municipal road drainage structures

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right

Effective date of registration: 20250905

Granted publication date: 20211210

PP01 Preservation of patent right
PD01 Discharge of preservation of patent

Date of cancellation: 20251015

Granted publication date: 20211210

PD01 Discharge of preservation of patent