Prefabricated sidewalk system
Technical Field
The utility model relates to a prefabricated pavement system.
Background
The existing sidewalk system is generally realized by paving a layer of solid road bricks on dry and hard mortar. The solid road bricks of the sidewalk system are easy to tilt up due to treading, so that a low-lying area appears on the surface of the sidewalk, accumulated water is easy to generate, and walking is not facilitated. In addition, the existing solid road bricks are generally water permeable bricks, but the water permeability of the existing solid road bricks is limited, and the water permeable gaps of the existing solid road bricks are easy to block and lose efficacy and are difficult to maintain.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that to the easy perk that current pavement system exists, permeate water not smooth phenomenon, provide a bearing capacity is stronger, and the higher prefabricated pavement system of drainage ability.
For solving the technical problem, the utility model provides a prefabricated pavement system, it includes road bed and prefabricated road brick, prefabricated road brick includes support brick and cover brick, set up the overlap joint platform on the support brick, the bottom surface of cover brick sets up overlap joint portion, and is a plurality of support brick interval is laid and is pasted on the road bed, and adjacent form the water guide passageway between the support brick, the cover brick is adjacent through its overlap joint portion the overlap joint bench of support brick, and the overhead setting in top of water guide passageway.
The utility model discloses a design support brick and cover brick, form the water guide passageway simultaneously between adjacent support brick, cover the brick and make somebody a mere figurehead through its built on stilts setting of overlap joint portion on the overlap joint bench of adjacent support brick, make the water can discharge into the water guide passageway rapidly high-efficiently through the gap between support brick and the cover brick, the surface on pavement is not ponding, makes things convenient for the pedestrian to walk.
In order to ensure that the support brick and the covering brick are firmly lapped, the lapping table is clamped with the lapping part through a concave-convex structure, and the support brick and the covering brick are locked through the action of gravity. During specific implementation, the lapping table is set as a first inclined plane, the lapping part is set as a second inclined plane, and the concave-convex structure is formed by grooves and convex ribs which are arranged on the first inclined plane and the second inclined plane and are clamped with each other.
In order to facilitate the water body to enter the water guide channel, permeable seams are respectively arranged between two adjacent covering bricks and between the adjacent support brick and the covering brick.
For the walking travelling comfort of guaranteeing the pavement, the top central authorities of support brick set up the boss, the overlap joint platform sets up around the boss, works as the overlap joint portion overlap joint of covering brick is in when the overlap joint bench of support brick, the top surface of boss with the top surface of covering brick flushes, makes the surfacing of pavement, the feel is better during the walking. During specific implementation, dry and hard mortar can be further paved on the roadbed, and the support brick is paved on the dry and hard mortar. In order to further improve the water permeability of the sidewalk, the water guide channel is communicated with a road rainwater collecting system.
In a specific embodiment, the supporting brick and the covering brick are both square, the four corners of the top of the supporting brick are respectively provided with the lapping table, the four corners of the bottom of the covering brick are respectively provided with the lapping parts, the periphery of the supporting brick is respectively provided with the water guide channel, and the four lapping parts of the covering brick are respectively lapped on the lapping table of one supporting brick.
Compared with the prior art, the beneficial effects of the utility model are that:
1) the sidewalk system of the utility model adopts the concrete precast road bricks, has strong bearing capacity, and after the covering bricks and the support bricks are clamped through the concave-convex structure, the covering bricks and the support bricks are locked through the action of gravity, so that the paving system is not easy to tilt when being trampled;
2) the covering brick of the utility model is directly lapped on the support brick, so that the maintenance is convenient;
3) the utility model is provided with a special water guide channel, and can be communicated with a road rainwater collecting system, so that the water discharging capability is strong;
4) the top surfaces of the support brick and the covering brick of the utility model can be provided with beautiful patterns, thus improving the beauty of the sidewalk;
5) the utility model discloses a prefabricated road brick can be prefabricated in batches, and accommodation is wide.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic top plan view of the paving state of the prefabricated sidewalk system of the present invention.
Fig. 2 is a schematic view of the state of the covering brick of the present invention overlapping on the support brick.
FIG. 3 is a schematic sectional view A-A of FIG. 2.
Fig. 4 is a side view structure diagram of the covering brick of the present invention.
Fig. 5 is a bottom view of the covering brick of the present invention.
Fig. 6 is a sectional view B-B of fig. 5.
Fig. 7 is a side view structure diagram of the support brick of the present invention.
Fig. 8 is a top view structural diagram of the support brick of the present invention.
Fig. 9 is a cross-sectional view C-C of fig. 8.
Detailed Description
The invention is further described below with reference to specific preferred embodiments, without thereby limiting the scope of protection of the invention.
For convenience of description, the relative positional relationship of the components, such as: the descriptions of the upper, lower, left, right, etc. are described with reference to the layout directions of the drawings in the specification, and do not limit the structure of the present patent.
As shown in fig. 1-9, an embodiment of the prefabricated sidewalk system of the present invention includes a roadbed 7 and prefabricated road bricks, which include support bricks 1 and cover bricks 2. The support brick 1 and the covering brick 2 are both square. The top central authorities of brick cup 1 set up boss 12, set up overlap joint platform 11 on every side (four angles) of boss 12 respectively, set up overlap joint portion 21 on four angles of bottom of brick cup 2 respectively, form water guide channel 3 around brick cup 1 respectively, lay dry and hard mortar 4 on roadbed 7, brick cup 1 lays and pastes on dry and hard mortar 4, four overlap joint portions 21 of brick cup 2 overlap joint respectively on the overlap joint platform 11 of brick cup 1, just brick cup 2 is in the built on stilts setting in top of water guide channel 3, adjacent two cover between the brick cup 2, and brick cup 1 with cover and set up the width respectively and be 6 mm's permeable seam 5 between the brick cup 2.
For making the overlap joint of support brick 1 and cover brick 2 firm to make things convenient for the water to get into water guide channel 3 in, overlap joint platform 11 sets up to first inclined plane, overlap joint portion 21 sets up to the second inclined plane, just first inclined plane with set up the tongue and groove that the width is 5mm on the second inclined plane respectively, the first inclined plane warp of overlap joint platform 11 the tongue and groove with the mutual block of second inclined plane of overlap joint portion 21.
To ensure the walking comfort of the sidewalk, the top surface of the boss 12 of the support brick 1 is flush with the top surface of the covering brick 2.
In order to further improve the water permeability of the sidewalk, a road rainwater collecting system 6 is arranged below the water guide channel 3.
The above description is only for the preferred embodiment of the present application and should not be taken as limiting the present application in any way, and although the present application has been disclosed in the preferred embodiment, it is not intended to limit the present application, and those skilled in the art should understand that they can make various changes and modifications within the technical scope of the present application without departing from the scope of the present application, and therefore all the changes and modifications can be made within the technical scope of the present application.