CN215094516U - Concrete pipe pile pouring and manufacturing mold - Google Patents
Concrete pipe pile pouring and manufacturing mold Download PDFInfo
- Publication number
- CN215094516U CN215094516U CN202120837391.8U CN202120837391U CN215094516U CN 215094516 U CN215094516 U CN 215094516U CN 202120837391 U CN202120837391 U CN 202120837391U CN 215094516 U CN215094516 U CN 215094516U
- Authority
- CN
- China
- Prior art keywords
- rod
- concrete pipe
- rods
- pipe pile
- rotating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004567 concrete Substances 0.000 title claims abstract description 30
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 16
- 239000007787 solid Substances 0.000 claims description 10
- 238000005266 casting Methods 0.000 claims description 5
- 238000002360 preparation method Methods 0.000 claims description 4
- 238000000034 method Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005272 metallurgy Methods 0.000 description 1
- 239000011513 prestressed concrete Substances 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Images
Landscapes
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Abstract
The utility model belongs to the technical field of concrete pipe piles, in particular to a concrete pipe pile pouring and manufacturing mould, which aims at the problem that the existing concrete pipe piles are inconvenient to disassemble and install, the following proposal is provided, the mould comprises two moulds, three fixing rings which are arranged at equal intervals are fixedly arranged on the two moulds, a cavity is arranged on each fixing ring, an arc-shaped rod is fixedly arranged on one side of each fixing ring, a rotating shaft is rotatably connected on the inner wall of the cavity, the top end of the rotating shaft is fixedly connected with a rotating rod, a torsion spring is sleeved on the rotating shaft, the top end of the torsion spring is rotatably connected with the bottom of the rotating rod, the two moulds are fixed by the meshing of the arc-shaped rod and a matching rod, the positioning rod is hammered downwards when being fixed, the positioning rod can push the matching rod upwards, and the matching rod further pulls the arc-shaped rod, making the fixation between the two molds tighter.
Description
Technical Field
The utility model relates to a concrete pipe pile technical field especially relates to a preparation mould is pour to concrete pipe pile.
Background
The prestressed concrete pipe pile is a common component in the building industry, is more and more widely applied in the fields of railway systems, industrial and civil buildings, municipal administration, metallurgy, ports, highways and the like, and is a hollow cylindrical elongated concrete prefabricated component manufactured by adopting a pretensioning method prestressing process and a centrifugal forming method, and mainly comprises a cylindrical pile body, an end plate and a steel ferrule.
In the tubular pile production process, the mode production of pouring concrete into the mould is adopted mostly, the mould that here adopted is the key factor of guaranteeing product quality, cohesion and density between the concrete still must be guaranteed in the pouring, especially avoid the emergence of having the bubble phenomenon in the tubular pile, current mould adopts the design of tube-shape mould usually, mould after fixing is put on centrifuge and is carried out centrifugal rotation, eliminate the bubble in the concrete on the one hand, on the other hand makes the concrete in the mould can the homodisperse to the mould inner wall on, thereby form hollow tubulose, current mould generally adopts the bolt formula to fix when using, it is not very convenient when dismantling and installing, therefore, we propose a concrete tubular pile and pour preparation mould.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem that the concrete pipe pile in the prior art is not convenient to disassemble and install, and providing a concrete pipe pile pouring and manufacturing mold.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a concrete pipe pile pouring and manufacturing die comprises two dies, wherein three fixing rings which are arranged at equal intervals are fixedly arranged on the two dies, a cavity is formed in each fixing ring, an arc-shaped rod is fixedly arranged on one side of each fixing ring, a rotating shaft is rotatably connected on the inner wall of the cavity, the top end of the rotating shaft is fixedly connected with a rotating rod, a torsion spring is sleeved on the rotating shaft, the top end of the torsion spring is rotatably connected with the bottom of the rotating rod, the bottom end of the torsion spring is fixedly connected with the inner wall of the cavity, a matching rod is slidably connected to one side of the rotating rod, two symmetrically arranged return springs are fixedly arranged on one side of the bottom of the matching rod, the bottom ends of the two return springs are fixedly arranged on the rotating rod, the arc-shaped rods are matched with the matching rod, and a control mechanism is arranged on each fixing ring positioned above the arc-shaped rod, the control mechanism is matched with the rotating rod.
Preferably, control mechanism includes seesaw, lift stake, locating lever, cushion and rotating turret, the quantity of seesaw, lift stake, locating lever and rotating turret is two, the quantity of cushion is four, and six solid fixed rings are run through respectively to two locating levers, two rotating turrets respectively with two solid fixed ring fixed connection of top position, two rotating turrets rotate with two seesaw respectively and are connected, two solid fixed rings of top position cooperate with two lift stakes respectively, the both ends of seesaw respectively with lift stake and locating lever swing joint, four cushions respectively with the top fixed connection of two lift stakes and two locating levers, control mechanism is used for spuring the arc pole for two moulds carry out the degree of depth fixed, still can control two moulds and unblock.
Preferably, the bottom one side fixed mounting of arc pole has three hornblocks, the triangle-shaped recess has been seted up at one side top of cooperation pole, three hornblocks and the inner wall sliding contact of triangle-shaped recess for the cooperation pole can fix a position the arc pole, has just also fixed a position two moulds.
Preferably, all seted up the through-hole on the both ends of two seesaws, the equal fixed mounting in one side of two lift stake and two locating levers has the cylinder, four columniform outsides respectively with the inner wall sliding connection of four through-holes for lift stake or locating lever can be with another perk when pounded down again.
Preferably, a sliding rod is fixedly mounted on one side of each of the two positioning rods, the two sliding rods are respectively connected with the inner walls of the six chambers in a sliding mode, and the six fixing rings and the two positioning rods can be positioned.
Preferably, three meshing grooves which are arranged at equal intervals are formed in the two positioning rods, and the six meshing grooves are respectively connected with the six rotating rods in a sliding mode, so that the positioning rods can be pushed to the matching rods and the rotating rods to be deeply meshed when being smashed down.
Has the advantages that:
the six fixing rings are butted, the six arc-shaped rods are respectively inserted into the six cavities, the six triangular blocks are driven to slide on the tops of the six matching rods and the six rotating rods, when the triangular blocks slide to be in contact with the triangular grooves, the triangular grooves are in a half-meshing state with the triangular blocks, and the two dies are preliminarily fixed;
the positioning rod is knocked down, the positioning rod pushes the rotating rod and the matching rod forwards through the inclined surface of the meshing groove, the matching rod is deeply meshed with the triangular block through the triangular groove, and then the arc-shaped rod is pulled to further fix the two dies;
the lifting pile is knocked down, one end of the seesaw rod is pressed downwards by the lifting pile, the positioning rod is reset by the other end of the seesaw rod, the rotating rod is reset through the torsion spring to drive the matching rod to be separated from the arc-shaped rod, and the two dies can be detached and separated and can be reused;
the utility model discloses an arc pole comes to fix two moulds with the meshing of cooperation pole, pounces the locating lever downwards again when fixed, and the locating lever will upwards promote the cooperation pole, and further pulling arc pole is again gone forward to the cooperation pole for it is tighter to fix between two moulds.
Drawings
Fig. 1 is a structural three-dimensional view of a concrete pipe pile casting manufacturing mold provided by the utility model;
fig. 2 is a front view of a concrete pipe pile casting mold according to the present invention;
fig. 3 is a structural plan view of the concrete pipe pile casting mold provided by the present invention;
fig. 4 is a side view of a structural positioning rod of the concrete pipe pile pouring manufacturing mold provided by the utility model;
fig. 5 is a side view of a structural matching rod and a rotating rod of the concrete pipe pile pouring manufacturing mold according to the present invention;
fig. 6 is the utility model provides a concrete pipe pile pours structure A of preparation mould and enlarges the schematic diagram.
In the figure: the device comprises a die 1, a fixing ring 2, a seesaw rod 3, a lifting pile 4, a positioning rod 5, a rotating rod 6, an arc rod 7, a triangular block 8, a matching rod 9, a return spring 10, a torsion spring 11, a cushion block 12, a rotating frame 13, a rotating shaft 14, a cavity 15 and a sliding rod 16.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-6, a concrete pipe pile pouring manufacturing mold comprises molds 1, the number of the molds 1 is two, two molds 1 are fixedly provided with three fixing rings 2 arranged at equal intervals, three fixing rings 2 are provided with cavities 15, one sides of the three fixing rings 2 are fixedly provided with arc-shaped rods 7, the inner wall of the cavity 15 is rotatably connected with a rotating shaft 14, the top end of the rotating shaft 14 is fixedly connected with a rotating rod 6, the rotating shaft 14 is sleeved with a torsion spring 11, the top end of the torsion spring 11 is rotatably connected with the bottom of the rotating rod 6, the bottom end of the torsion spring 11 is fixedly connected with the inner wall of the cavity 15, one side of the rotating rod 6 is slidably connected with a matching rod 9, one side of the bottom of the matching rod 9 is fixedly provided with two reset springs 10 which are symmetrically arranged, the bottom ends of the two reset springs 10 are fixedly arranged on the rotating rod 6, the arc-shaped rods 7 are matched with the matching rod 9, two fixing rings 2 positioned at the upper position are respectively provided with a control mechanism, the control mechanism is matched with a rotating rod 6, the control mechanism comprises a seesaw rod 3, lifting piles 4, positioning rods 5, cushion blocks 12 and rotating frames 13, the number of the seesaw rod 3, the number of the lifting piles 4, the number of the positioning rods 5 and the rotating frames 13 is two, the number of the cushion blocks 12 is four, the two positioning rods 5 respectively penetrate through the six fixing rings 2, the two rotating frames 13 are respectively and fixedly connected with the two fixing rings 2 at the upper position, the two rotating frames 13 are respectively and rotatably connected with the two seesaw rods 3, the two fixing rings 2 at the upper position are respectively matched with the two lifting piles 4, two ends of the seesaw rod 3 are respectively and movably connected with the lifting piles 4 and the positioning rods 5, the four cushion blocks 12 are respectively and fixedly connected with the top ends of the two lifting piles 4 and the two positioning rods 5, the control mechanism is used for pulling the arc-shaped rods 7 to ensure that the two molds 1 are fixed in depth, the two molds 1 can be controlled to be unlocked, a triangular block 8 is fixedly arranged on one side of the bottom of the arc-shaped rod 7, a triangular groove is formed in the top of one side of the matching rod 9, the triangular block 8 is in sliding contact with the inner wall of the triangular groove, so that the matching rod 9 can position the arc-shaped rod 7, the two molds 1 are also positioned, through holes are formed in two ends of the two seesaw rods 3, cylinders are fixedly arranged on one sides of the two lifting piles 4 and the two positioning rods 5, the outer sides of the four cylinders are respectively in sliding connection with the inner walls of the four through holes, so that the lifting piles 4 or the positioning rods 5 can tilt up when being hammered down, sliding rods 16 are fixedly arranged on one sides of the two positioning rods 5, the two sliding rods 16 are respectively in sliding connection with the inner walls of the six cavities 15, the six fixing rings 2 and the two positioning rods 5 can be positioned, three meshing grooves which are arranged at equal intervals are formed in the two positioning rods 5, six meshing grooves are respectively with six dwang 6 sliding connection for locating lever 5 can carry out the degree of depth meshing to one side impetus cooperation pole 9 and dwang 6 when being pounded down.
The working principle is as follows: when two molds 1 need to be fixed, firstly, three fixing rings 2 at one side position are butted with three fixing rings 2 at the other position, after the butting, six arc-shaped rods 7 are respectively inserted into six cavities 15, six triangular blocks 8 are driven to slide at the tops of six matching rods 9 and six rotating rods 6, when the triangular blocks 8 slide to be contacted with the triangular grooves, the triangular grooves are half-meshed with the triangular blocks 8, then the two molds 1 finish primary fixing, then the positioning rod 5 is hammered down, the positioning rod 5 pushes the rotating rods 6 and the matching rods 9 forwards through the inclined surfaces of the meshing grooves, the matching rods 9 are deeply meshed with the triangular blocks 8 through the triangular grooves, then the arc-shaped rods 7 are pulled, the two molds 1 are further fixed, when the lifting pile 4 needs to be dismounted and hammered downwards, the lifting pile 4 presses one end of the lifting rod 3 downwards, the other end of the lifting rod 3 resets the positioning rod 5, dwang 6 rethread torsion spring 11 resets and drives cooperation pole 9 and arc pole 7 and break away from, and two moulds 1 just can demolish the separation this moment, still repeatedly usable, easy operation, convenient to use.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. The utility model provides a preparation mould is pour to concrete pipe pile, includes mould (1), its characterized in that, the quantity of mould (1) is two, and equal fixed mounting has equidistant three solid fixed ring (2) of arranging on two moulds (1), all sets up cavity (15) on three solid fixed ring (2), and the equal fixed mounting in one side of three solid fixed ring (2) has arc pole (7), it is connected with pivot (14) to rotate on the inner wall of cavity (15), the top and dwang (6) fixed connection of pivot (14), the cover is equipped with torsion spring (11) on pivot (14), the top of torsion spring (11) is connected with the bottom of dwang (6) is rotated, the bottom of torsion spring (11) and the inner wall fixed connection of cavity (15), one side sliding connection of dwang (6) has cooperation pole (9), bottom one side fixed mounting of cooperation pole (9) has two reset spring (10) that the symmetry set up, the equal fixed mounting in bottom of two reset spring (10) is on dwang (6), arc pole (7) cooperate with cooperation pole (9), all are equipped with control mechanism on two solid fixed ring (2) that are located the top position, control mechanism cooperatees with dwang (6).
2. The concrete pipe pile casting manufacturing mold according to claim 1, the control mechanism comprises a seesaw rod (3), a lifting pile (4), a positioning rod (5), a cushion block (12) and a rotating frame (13), the number of the seesaw rods (3), the lifting piles (4), the positioning rods (5) and the rotating frames (13) is two, the quantity of cushion (12) is four, six solid fixed ring (2) are run through respectively in two locating lever (5), two rotating turret (13) respectively with two solid fixed ring (2) fixed connection of top position, two rotating turret (13) rotate with two seesaw (3) respectively and are connected, two solid fixed ring (2) of top position cooperate with two lift stake (4) respectively, the both ends of seesaw (3) respectively with lift stake (4) and locating lever (5) swing joint, four cushion (12) respectively with the top fixed connection of two lift stake (4) and two locating lever (5).
3. The concrete pipe pile pouring manufacturing mold according to claim 1, wherein a triangular block (8) is fixedly installed on one side of the bottom of the arc-shaped rod (7), a triangular groove is formed in the top of one side of the matching rod (9), and the triangular block (8) is in sliding contact with the inner wall of the triangular groove.
4. The concrete pipe pile pouring and manufacturing mold according to claim 2, wherein through holes are formed in two ends of each of the two seesaw rods (3), cylinders are fixedly mounted on one sides of the two lifting piles (4) and the two positioning rods (5), and the outer sides of the four cylinders are respectively in sliding connection with the inner walls of the four through holes.
5. The concrete pipe pile pouring manufacturing mold according to claim 2, wherein a sliding rod (16) is fixedly installed on one side of each of the two positioning rods (5), and the two sliding rods (16) are respectively connected with the inner walls of the six chambers (15) in a sliding manner.
6. The concrete pipe pile casting manufacturing mold according to claim 2, wherein three meshing grooves are formed in each of the two positioning rods (5) and are arranged at equal intervals, and the six meshing grooves are respectively connected with the six rotating rods (6) in a sliding mode.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202120837391.8U CN215094516U (en) | 2021-04-22 | 2021-04-22 | Concrete pipe pile pouring and manufacturing mold |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202120837391.8U CN215094516U (en) | 2021-04-22 | 2021-04-22 | Concrete pipe pile pouring and manufacturing mold |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN215094516U true CN215094516U (en) | 2021-12-10 |
Family
ID=79271008
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202120837391.8U Active CN215094516U (en) | 2021-04-22 | 2021-04-22 | Concrete pipe pile pouring and manufacturing mold |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN215094516U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114517474A (en) * | 2022-03-24 | 2022-05-20 | 山东华威建筑科技有限公司 | Non-autoclaved concrete precast tubular pile without residual slurry |
| CN118906223A (en) * | 2024-10-11 | 2024-11-08 | 中交三航局第四工程有限公司 | Centrifugal, exciting and rolling composite forming equipment for prestressed concrete large pipe pile pipe joint |
-
2021
- 2021-04-22 CN CN202120837391.8U patent/CN215094516U/en active Active
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114517474A (en) * | 2022-03-24 | 2022-05-20 | 山东华威建筑科技有限公司 | Non-autoclaved concrete precast tubular pile without residual slurry |
| CN118906223A (en) * | 2024-10-11 | 2024-11-08 | 中交三航局第四工程有限公司 | Centrifugal, exciting and rolling composite forming equipment for prestressed concrete large pipe pile pipe joint |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN218255766U (en) | Bearing bridge concrete prefabricated part forming die | |
| CN215094516U (en) | Concrete pipe pile pouring and manufacturing mold | |
| CN111185994A (en) | Road construction barrier prefabricating device and method | |
| CN215358993U (en) | Prefabricated floor slab universality mould | |
| CN111645185B (en) | Manufacturing process of prefabricated wallboard of assembly type building | |
| CN113021563A (en) | Forming method of high-strength bridge concrete prefabricated part | |
| CN221186942U (en) | Concrete prefabricated component mould convenient to drawing of patterns | |
| CN111409169B (en) | Wall panel forming die system | |
| CN211566365U (en) | Cement pipe forming die | |
| CN223013475U (en) | A building concrete prefabricated block template | |
| CN115977317B (en) | A modular steel tube concrete column connection structure | |
| CN106564121A (en) | Hydraulic de-molding mechanism of precast concrete component mold | |
| CN112677310A (en) | Prefabricated well of assembled concrete pours forming die | |
| CN114248337A (en) | Horizontal stair mould | |
| CN217072769U (en) | Forming die of hard shoulder | |
| CN212554387U (en) | Concrete tubular pile cast molding auxiliary device | |
| CN223339661U (en) | Precast shear wall grouting mold capable of being filled in multiple points | |
| CN220451409U (en) | Reinforcing structure at expansion joint of shear wall template | |
| CN208277133U (en) | Prefabricated waffle board mold | |
| CN119910763B (en) | Prefabricated pile production and pouring equipment | |
| CN214819442U (en) | Recycled concrete precast pile forming die | |
| CN218990671U (en) | Concrete convex column | |
| CN206999248U (en) | A kind of prefabricated stringer type stairway and its particular manufacturing craft | |
| CN201399832Y (en) | Novel prefabricated door panel casting die | |
| CN217573344U (en) | A mold for producing concrete bricks that is easy to demould |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |