CN214996072U CN202120756840.6U CN202120756840U CN214996072U CN 214996072 U CN214996072 U CN 214996072U CN 202120756840 U CN202120756840 U CN 202120756840U CN 214996072 U CN214996072 U CN 214996072U
Authority
CN
China
Prior art keywords
supporting
fixing
mud jacking
jacking pipe
operation platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120756840.6U
Other languages
Chinese (zh)
Inventor
朱建平
杨逸超
李京跃
许家豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Civil Engineering Co Ltd
Original Assignee
China Construction Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Civil Engineering Co Ltd filed Critical China Construction Civil Engineering Co Ltd
Priority to CN202120756840.6U priority Critical patent/CN214996072U/en
Application granted granted Critical
Publication of CN214996072U publication Critical patent/CN214996072U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a fixed operation platform of portable mud jacking pipe, include: a supporting frame, a fixing frame and an armrest part. The bottom of the supporting frame is provided with a roller part, and the top of the supporting frame is provided with a supporting table surface. The fixed frame is connected on the support mesa, set up the fixed part that is used for fixed mud jacking pipe on the fixed frame, handrail portion connects on support mesa or the fixed frame, just handrail portion is located support the mesa on with one side that the fixed frame is relative. The utility model provides a portable mud jacking pipe fixed operation platform sets up the convenient removal of roller portion, shortens the engineering time, and sets up the mount on the portable mud jacking pipe fixed operation platform, can fix the mud jacking pipe, prevents that the mud jacking pipe from popping out, very big improvement the efficiency of construction.

Description

Movable type mud jacking pipe fixing operation platform
Technical Field
The utility model relates to a construction technical field, specific theory relates to a portable mud jacking pipe fixed operation platform.
Background
In the building engineering, the grouting of the concrete simply supported beam can be constructed only by erecting an operation platform. In the construction process, the erected operation platform can only be used in a fixed place and cannot be moved, so that the construction efficiency cannot be obviously improved. In addition, the existing operation platform cannot fix the grouting pipe, so that certain potential safety hazards exist, and the grouting pipe is easy to pop up, so that the working difficulty is increased.
In view of this, the present invention is especially provided.
SUMMERY OF THE UTILITY MODEL
The utility model provides a portable mud jacking pipe fixed operation platform can conveniently remove, has improved the efficiency of construction, and can fix the mud jacking pipe, improves the construction security.
In order to realize the purpose of the utility model, the utility model provides a following technical scheme:
a movable type mud jacking pipe fixing operation platform comprises:
the supporting frame is provided with a roller part at the bottom and a supporting table top at the top;
the fixing frame is connected to the supporting table surface, and a fixing part for fixing the grouting pipe is arranged on the fixing frame;
the handrail part is connected on the supporting table board or the fixing frame, and the handrail part is positioned on the supporting table board and on one side opposite to the fixing frame.
Optionally, the fixing frame comprises a longitudinal beam and a cross beam, the longitudinal beam is connected to the supporting table surface, the cross beam is connected to the longitudinal beam, and the fixing portion is arranged on the cross beam.
Optionally, the cross beam is provided with at least two fixing parts along the length direction.
Optionally, the support table board is rectangular, the longitudinal beam is connected to the middle position of one edge of the support table board, the cross beam is connected to the longitudinal beam, the cross beam is provided with a first section and a second section which are located on two sides of the longitudinal beam, and the first section and the second section are provided with the fixing portions.
Optionally, the fixing part comprises a limiting hole formed in the cross beam, and the grouting pipe penetrates through the limiting hole.
Optionally, a plurality of first connecting portions are arranged on the longitudinal beam at intervals along the length direction, the cross beam is provided with a second connecting portion, and the second connecting portion can be selectively connected to any one of the first connecting portions.
Optionally, the first connecting portion includes a first connecting hole formed in the longitudinal beam, the second connecting portion includes a second connecting hole formed in the cross beam, and the fastener penetrates through the first connecting hole and the second connecting hole, so that the cross beam and the longitudinal beam are fixedly connected.
Optionally, the support frame includes two first vertical columns and two second vertical columns, and each vertical column is connected to four corners of the support table top respectively;
the second stand has and is located the lower support portion of support mesa bottom and being located support mesa upper portion's last supporting part, handrail portion both ends are connected respectively on the last supporting part.
Optionally, a plurality of first cross bars are connected between the first upright column and the lower supporting portion, and each first cross bar is sequentially arranged along the length direction of the first upright column.
Optionally, a second cross rod and a first diagonal rod are connected between the first upright columns, and a third cross rod and a second diagonal rod are connected between the two lower supporting portions.
By adopting the technical scheme, make the utility model discloses following beneficial effect has:
the utility model provides a portable mud jacking pipe fixed operation platform sets up the convenient removal of roller portion, shortens the engineering time, and sets up the mount on the portable mud jacking pipe fixed operation platform, can fix the mud jacking pipe, prevents that the mud jacking pipe from popping out, very big improvement the efficiency of construction.
The following describes embodiments of the present invention in further detail with reference to the accompanying drawings.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this application, illustrate embodiments of the invention and, together with the description, serve to explain the invention without limitation. It is obvious that the drawings in the following description are only some embodiments, and that for a person skilled in the art, other drawings can be derived from them without inventive effort. In the drawings:
fig. 1 is a schematic perspective view of a mobile grouting pipe fixing operation platform according to an embodiment of the present application.
In the figure, 1, a roller part; 2. supporting the table top; 3. a mud jacking pipe; 4. an armrest portion; 5. a fixed mount; 51. a cross beam; 511. a fixed part; 52. a stringer; 521. a first connection portion; 53. a fastener; 7. a first upright post; 8. a second upright post; 81. an upper support section; 82. a lower support section; 9. a first cross bar; 10. a second cross bar; 11. a third cross bar; 12. a first diagonal member; 13. a second diagonal member.
It should be noted that the drawings and the description are not intended to limit the scope of the inventive concept in any way, but to illustrate the inventive concept by those skilled in the art with reference to specific embodiments.
Detailed Description
To make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the drawings in the embodiments of the present invention are combined below to clearly and completely describe the technical solutions in the embodiments, and the following embodiments are used for illustrating the present invention, but do not limit the scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device referred to has a specific orientation, is constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted" and "connected" are to be interpreted broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1, an embodiment of the present application provides a mobile mud jacking pipe fixing operation platform, including: a support frame, a fixing frame 5 and an armrest part 4. The bottom of the supporting frame is provided with a roller part 1, and the top of the supporting frame is provided with a supporting table surface 2. The mount 5 is connected support on the mesa 2, set up the fixed part 511 that is used for fixed mud jacking pipe 3 on the mount 5, handrail portion 4 is connected support on mesa 2 or the mount 5, just handrail portion 4 is located the opposite side of mount 5 is relative. The utility model provides a portable mud jacking pipe fixed operation platform sets up the convenient removal of roller portion 1, shortens the engineering time, and sets up mount 5 on the portable mud jacking pipe fixed operation platform, can fix mud jacking pipe 3, prevents that mud jacking pipe 3 from popping out, very big improvement the efficiency of construction.
Wherein, the roller part 1 can be a universal wheel, and the moving direction of the movable mud jacking pipe 3 is convenient to adjust. The idler wheel can comprise a wheel frame, a wheel body and a stud, wherein the wheel body is connected to the wheel frame, the stud is connected to the wheel frame, and the stud is in threaded connection with the supporting frame. Furthermore, a pedal brake is further arranged on the wheel carrier, and the pedal brake can lock the wheel body, fix the position of the operating platform and prevent the operating platform from shifting.
In a possible embodiment, the fixing frame 5 comprises a longitudinal beam 52 and a transverse beam 51, wherein the longitudinal beam 52 is connected to the supporting platform 2, the transverse beam 51 is connected to the longitudinal beam 52, and the fixing portion 511 is arranged on the transverse beam 51. This mount 5 simple structure, structural stability is good, is convenient for fix the mud jacking pipe 3 through set up fixed part 511 on crossbeam 51, reduces constructor's working strength.
The beam 51 is provided with at least two fixing parts 511 along the length direction, so that the constructors can conveniently select the fixing position of the grouting pipe 3 according to the actual situation.
In a possible embodiment, the supporting platform 2 is rectangular, the longitudinal beam is connected to the middle of one side of the supporting platform 2, the cross beam 51 is connected to the longitudinal beam, the cross beam 51 has a first section and a second section which are located on two sides of the longitudinal beam, and the fixing portion 511 is arranged on each of the first section and the second section. By connecting the longitudinal beam to the middle of one side of the supporting platform 2, the transverse beam 51 has a suitable length on both sides of the longitudinal beam, and a sufficient accommodating space is reserved for the grouting pipe 3.
Specifically, the fixing portion 511 includes a limiting hole formed in the cross beam 51, and the grouting pipe 3 penetrates through the limiting hole. The spacing hole has good supporting stability to the mud jacking pipe 3.
In a possible embodiment, a plurality of first connecting portions 521 are arranged on the longitudinal beam 52 at intervals along the length direction, and the transverse beam 51 has a second connecting portion which can be selectively connected to any one of the first connecting portions 521. By providing a plurality of first connecting portions 521 on the longitudinal beams, the constructor can fix the cross beam 51 on the corresponding first connecting portions 521 according to the actual situation to adjust the height of the cross beam 51.
Preferably, the first connecting portion 521 includes a first connecting hole formed in the longitudinal beam, the second connecting portion includes a second connecting hole formed in the cross beam 51, and the fastening member 53 penetrates through the first connecting hole and the second connecting hole to fix the cross beam 51 and the longitudinal beam. The fastening member 53 may be a bolt, a screw of which passes through the first and second coupling holes, and a nut coupled to the screw to lock the cross member 51 and the longitudinal member. When the height of the cross beam 51 needs to be adjusted, the screw can be screwed out, the cross beam 51 can be disassembled, and then the cross beam 51 can be fixed at other positions through bolts.
In a possible embodiment, the support frame comprises two first uprights 7 and two second uprights 8, each of which is connected to one of the four corners of the support table 2. The second upright post 8 is provided with a lower supporting part 82 positioned at the bottom of the supporting table top 2 and an upper supporting part 81 positioned at the upper part of the supporting table top 2, and two ends of the armrest part 4 are respectively connected on the upper supporting part 81. Through setting up four stands, strengthened operation platform stability and structural strength, and through setting up 8 length on the second stand and being longer than first stand 7, made things convenient for the installation of handrail portion 4, simplified assembly structure, improved production efficiency.
A plurality of first cross bars 9 are connected between the first upright post 7 and the lower support part 82, and the first cross bars 9 are sequentially arranged along the length direction of the first upright post 7. Through the arrangement of the first cross rods 9, an operator can conveniently climb.
A second cross rod 10 and a first inclined rod 12 are connected between the first upright posts 7, and a third cross rod 11 and a second inclined rod 13 are connected between the two lower supporting parts 82. The cross rod and the diagonal rod are matched to form a triangular stable structure, so that the structural strength of the supporting frame is improved, and the service life of the product is prolonged.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention in any way, and although the present invention has been disclosed in the above description in terms of preferred embodiments, it is not intended to limit the present invention, and any person skilled in the art can make modifications or changes to equivalent embodiments using the above teachings without departing from the scope of the present invention, but all the modifications, equivalent changes and modifications made by the technical spirit of the present invention to the above embodiments are within the scope of the present invention.

Claims (10)

1. The utility model provides a fixed operation platform of portable mud jacking pipe which characterized in that includes:
the supporting frame is provided with a roller part at the bottom and a supporting table top at the top;
the fixing frame is connected to the supporting table surface, and a fixing part for fixing the grouting pipe is arranged on the fixing frame;
the handrail part is connected on the supporting table board or the fixing frame, and the handrail part is positioned on the supporting table board and on one side opposite to the fixing frame.
2. The mobile grouting pipe fixing operation platform of claim 1, wherein the fixing frame comprises a longitudinal beam and a transverse beam, the longitudinal beam is connected to the supporting platform surface, the transverse beam is connected to the longitudinal beam, and the fixing part is arranged on the transverse beam.
3. The mobile mud jacking pipe fixing operation platform as claimed in claim 2, wherein said beam is provided with at least two said fixing parts along the length direction.
4. The mobile grouting pipe fixing operation platform of claim 3, wherein the supporting platform is rectangular, the longitudinal beam is connected to a middle position of one edge of the supporting platform, the cross beam is connected to the longitudinal beam, the cross beam is provided with a first section and a second section which are positioned at two sides of the longitudinal beam, and the fixing part is arranged on each of the first section and the second section.
5. The mobile grouting pipe fixing operation platform of claim 2, wherein the fixing part comprises a limiting hole formed in the cross beam, and the grouting pipe is arranged through the limiting hole.
6. The mobile type mud jacking pipe fixing and operating platform as claimed in claim 2, wherein a plurality of first connecting parts are arranged on the longitudinal beams at intervals along the length direction, the cross beam is provided with a second connecting part, and the second connecting part can be selectively connected to any one of the first connecting parts.
7. The mobile mud jacking pipe fixing operation platform as claimed in claim 6, wherein the first connecting portion comprises a first connecting hole formed in the longitudinal beam, the second connecting portion comprises a second connecting hole formed in the cross beam, and a fastener is disposed through the first connecting hole and the second connecting hole to fixedly connect the cross beam and the longitudinal beam.
8. The mobile fixed operating platform for grouting pipes of claim 1, wherein the supporting frame comprises two first vertical columns and two second vertical columns, and each vertical column is connected to four corners of the supporting platform;
the second stand has and is located the lower support portion of support mesa bottom and being located support mesa upper portion's last supporting part, handrail portion both ends are connected respectively on the last supporting part.
9. The movable type mud jacking pipe fixing and operating platform as claimed in claim 8, wherein a plurality of first cross bars are connected between the first upright post and the lower supporting part, and the first cross bars are sequentially arranged along the length direction of the first upright post.
10. The mobile fixed operating platform for grouting pipes of claim 8, wherein a second cross bar and a first diagonal bar are connected between the two first upright columns, and a third cross bar and a second diagonal bar are connected between the two lower supporting parts.
CN202120756840.6U 2021-04-14 2021-04-14 Movable type mud jacking pipe fixing operation platform Expired - Fee Related CN214996072U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120756840.6U CN214996072U (en) 2021-04-14 2021-04-14 Movable type mud jacking pipe fixing operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120756840.6U CN214996072U (en) 2021-04-14 2021-04-14 Movable type mud jacking pipe fixing operation platform

Publications (1)

Publication Number Publication Date
CN214996072U true CN214996072U (en) 2021-12-03

Family

ID=79136603

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120756840.6U Expired - Fee Related CN214996072U (en) 2021-04-14 2021-04-14 Movable type mud jacking pipe fixing operation platform

Country Status (1)

Country Link
CN (1) CN214996072U (en)

Similar Documents

Publication Publication Date Title
CN216713950U (en) Steel construction assembled supports bed-jig
CN113107176B (en) Method for erecting slope operation platform with various gradients
CN214996072U (en) Movable type mud jacking pipe fixing operation platform
CN211257740U (en) Small-span operation platform suitable for high-altitude construction
CN218623231U (en) Attached lifting scaffold operation platform
CN212613656U (en) An elevator shaft bracket
CN203531134U (en) Steel structure frame of stereo garage
CN220151000U (en) Ladder cage convenient to connect
CN113187209B (en) Slope operation platform
CN222745592U (en) Operation frame
CN216380562U (en) Indoor telescopic scaffold
CN220300083U (en) Elevator well and stand column structure thereof
CN221343670U (en) Wall-attached auxiliary device of construction lifter
CN219909319U (en) Assembled steel construction building strutting arrangement
CN214090901U (en) Adjustable turnover type elevator shaft operating platform
CN220133977U (en) Rack is used in tunnel vault construction
CN216499515U (en) Full-assembly steel structure experiment platform
CN211421976U (en) Steel structure corridor type platform for train loading operation
CN220377933U (en) Jig frame unit assembly and jig frame
CN217782577U (en) Suspension type combined beam structure
CN214575611U (en) Anti-falling device for steel structure engineering construction and fixing support thereof
CN216426418U (en) Aluminum profile elevator derrick
CN211597841U (en) Heavy support system
CN218714895U (en) Steel structure device suitable for assembling on construction site
CN214620144U (en) Swing mechanism for photovoltaic support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211203