CN214995198U - Steel construction wallboard - Google Patents
Steel construction wallboard Download PDFInfo
- Publication number
- CN214995198U CN214995198U CN202120243009.0U CN202120243009U CN214995198U CN 214995198 U CN214995198 U CN 214995198U CN 202120243009 U CN202120243009 U CN 202120243009U CN 214995198 U CN214995198 U CN 214995198U
- Authority
- CN
- China
- Prior art keywords
- wallboard
- grillage
- plate frame
- connecting rod
- bearing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Finishing Walls (AREA)
Abstract
The utility model relates to the technical field of wallboards, and discloses a steel structure wallboard, which comprises a first plate frame, a second plate frame and a wallboard, wherein the first plate frame and the second plate frame are both L-shaped, the first plate frame and the second plate frame are connected into a rectangular frame body, a first groove for the wallboard to pass through is formed in the vertical section of the second plate frame, a second groove is formed in the horizontal section of the second plate frame, and a plurality of rolling mechanisms for the wallboard to move are arranged in the second groove; through the rolling mechanism who sets up, can make the wallboard drive horizontal migration by the roll of bearing at the in-process of changing, conveniently remove the wallboard, and then reach the purpose that reduces to cause the injury to staff's health.
Description
Technical Field
The utility model relates to a wallboard technical field specifically is a steel construction wallboard.
Background
The steel structure wallboard is gradually applied by people due to the advantages of light weight, convenient installation and the like, in particular to the fields of industry, buildings and the like.
However, the steel-structured wall panel, as a metallic wall panel, is also affected by the environment in daily life, such as rusting, corrosion, etc., and thus is easily damaged, and the damaged wall panel is more troublesome in the replacement process, especially in a space with a limited working environment, and a worker needs to manually lift the wall panel to a top-placed position, which causes great physical injury to the worker.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a steel construction wallboard possesses the advantage that can make the wallboard carry out the roll on rolling mechanism at the in-process of changing, conveniently removes the wallboard, and then reaches the purpose that reduces and cause the injury to staff's health.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a steel construction wallboard, includes first grillage, second grillage and wallboard, first grillage and second grillage all are the L type, first grillage and second grillage connect into the rectangle framework, open the vertical section of second grillage has can make the first recess that the wallboard passed, open the horizontal segment of second grillage has the second recess, it can make to be equipped with a plurality of in the second recess the rolling mechanism that the wallboard removed.
Preferably, the rolling mechanism comprises a connecting rod and a bearing, the connecting rod is mounted in the second groove, the bearing is mounted on the connecting rod, and the axis of the bearing coincides with the axis of the connecting rod.
Preferably, the connecting rod is provided with a limiting ring, the axis of the limiting ring coincides with the axis of the connecting rod, and the limiting ring is positioned on two sides of the bearing.
Preferably, threaded connection has a plurality of to be used for fixing on the vertical section of second grillage the fixed establishment of wallboard, fixed establishment includes nut and screw rod, the nut is located the outside of second grillage, the screw rod passes the second grillage with the wallboard contact.
Preferably, one end of the screw rod, which is far away from the screw cap, is provided with a pressure plate, and the pressure plate is positioned in the first groove.
(III) advantageous effects
The utility model provides a steel construction wallboard possesses following beneficial effect:
this steel construction wallboard through the rolling mechanism that sets up, can make the wallboard drive horizontal migration by the roll of bearing at the in-process of changing, conveniently removes the wallboard, and then reaches the purpose that the reduction caused the injury to staff's health.
Drawings
Fig. 1 is a schematic perspective view of the middle wall panel of the present invention installed in the first panel frame and the second panel frame;
fig. 2 is a schematic perspective view of the middle wall panel of the present invention after being removed;
fig. 3 is a schematic perspective view of the rolling mechanism of the present invention;
fig. 4 is a schematic view of the sectional structure of the middle fixing mechanism when connected with the second plate frame.
In the figure: 1. a first plate frame; 2. a second plate rack; 21. a first groove; 22. a second groove; 3. a wallboard; 4. a rolling mechanism; 41. a connecting rod; 42. a bearing; 43. a limiting ring; 5. a fixing mechanism; 51. a nut; 52. a screw; 53. and (7) pressing a plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 and 2, a steel structure wall plate comprises a first plate frame 1, a second plate frame 2 and a wall plate 3, wherein the first plate frame 1 and the second plate frame 2 are both L-shaped, the first plate frame 1 and the second plate frame 2 are connected into a rectangular frame, a first groove 21 for allowing the wall plate 3 to pass through is formed in the vertical section of the second plate frame 2, a second groove 22 is formed in the horizontal section of the second plate frame 2, and a plurality of rolling mechanisms 4 for allowing the wall plate 3 to move are arranged in the second groove 22; when wallboard 3 damages and needs to be changed, manual promotion wallboard 3, wallboard 3 drives rolling mechanism 4 under the effect of external force and rotates, and then shifts out from first recess 21, and rolling mechanism 4's rotation makes wallboard 3 laborsaving convenience more at the in-process that removes, has reduced staff's working strength.
Referring to fig. 1 and 2, the rolling mechanism 4 includes a connecting rod 41 and a bearing 42, the connecting rod 41 is installed in the second groove 22, the bearing 42 is installed on the connecting rod 41, and the axis of the bearing 42 coincides with the axis of the connecting rod 41; when moving in or out of wall plate 3, wall plate 3 contacts the outer wall of bearing 42, and the rotation of bearing 42 makes it more labor-saving to move wall plate 3.
Referring to fig. 3, a limiting ring 43 is disposed on the connecting rod 41, an axis of the limiting ring 43 coincides with an axis of the connecting rod 41, and the limiting ring 43 is disposed on two sides of the bearing 42; the position of the bearing 42 can be limited by the limiting ring 43, and the bearing 42 is prevented from being displaced in the process of moving the wall plate 3, so that the moving effect is prevented from being influenced.
Referring to fig. 4, a plurality of fixing mechanisms 5 for fixing the wall plate 3 are connected to the vertical section of the second plate frame 2 through threads, each fixing mechanism 5 includes a nut 51 and a screw 52, the nut 51 is located at the outer side of the second plate frame 2, and the screw 52 penetrates through the second plate frame 2 and contacts with the wall plate 3; when wallboard 3 was put into second grillage 2 through first recess 21, rotated nut 51, nut 51 drove screw 52 and rotates, and then made screw 52 inwards stretch into, until withstanding wallboard 3 can, can prevent that wallboard 3 from removing at the in-process that uses, can increase its stability after fixing through fixed establishment 5.
Referring to fig. 4, a pressure plate 53 is disposed at an end of the screw 52 away from the nut 51, and the pressure plate 53 is disposed in the first groove 21; pressure disk 53 and wallboard 3 contact can prevent to cause the damage at fixed in-process screw rod 52 to wallboard 3, and pressure disk 53's cross sectional area is greater than screw rod 52's cross sectional area, and lifting surface increases when can making it contact with wallboard 3, and then reduces the damage to wallboard 3
The working principle is as follows: during the use, when wallboard 3 damages and needs to be changed, unscrew nut 51 and screw rod 52 in the fixed establishment 5 earlier, and then drive pressure disk 53 and wallboard 3 separation, then manual promotion wallboard 3, wallboard 3 rolls on receiving bearing 42 of exogenic action in rolling mechanism 4, and the roll of bearing 42 can make wallboard 3 laborsaving convenience more at the in-process of changing.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. The utility model provides a steel construction wallboard, includes first grillage (1), second grillage (2) and wallboard (3), its characterized in that: first grillage (1) and second grillage (2) all are the L type, first grillage (1) and second grillage (2) connect into the rectangle framework, open the vertical section of second grillage (2) has can make first recess (21) that wallboard (3) passed, open the horizontal segment of second grillage (2) has second recess (22), it can make to be equipped with a plurality of in second recess (22) the rolling mechanism (4) that wallboard (3) removed.
2. A steel structural wall panel according to claim 1, wherein: the rolling mechanism (4) comprises a connecting rod (41) and a bearing (42), the connecting rod (41) is installed in the second groove (22), the bearing (42) is installed on the connecting rod (41), and the axis of the bearing (42) is overlapped with the axis of the connecting rod (41).
3. A steel structural wall panel according to claim 2, wherein: be equipped with spacing collar (43) on connecting rod (41), the axis of spacing collar (43) with the axis coincidence of connecting rod (41), spacing collar (43) are located the both sides of bearing (42).
4. A steel structural wall panel according to claim 1, wherein: threaded connection has a plurality of to be used for fixing on the vertical section of second grillage (2) fixed establishment (5) of wallboard (3), fixed establishment (5) include nut (51) and screw rod (52), nut (51) are located the outside of second grillage (2), screw rod (52) pass second grillage (2) with wallboard (3) contact.
5. A steel structural wall panel according to claim 4, wherein: one end, far away from the screw cap (51), of the screw rod (52) is provided with a pressing plate (53), and the pressing plate (53) is located in the first groove (21).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120243009.0U CN214995198U (en) | 2021-01-28 | 2021-01-28 | Steel construction wallboard |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120243009.0U CN214995198U (en) | 2021-01-28 | 2021-01-28 | Steel construction wallboard |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214995198U true CN214995198U (en) | 2021-12-03 |
Family
ID=79144520
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120243009.0U Active CN214995198U (en) | 2021-01-28 | 2021-01-28 | Steel construction wallboard |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214995198U (en) |
-
2021
- 2021-01-28 CN CN202120243009.0U patent/CN214995198U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN214995198U (en) | Steel construction wallboard | |
CN211473330U (en) | Hanging flower basket is used in building engineering construction | |
CN214109733U (en) | Plate rapid cutting aluminum machining center with compression roller structure | |
CN214642073U (en) | Lifting bracket for steel pipe machining | |
CN216109646U (en) | Building engineering safety construction platform | |
CN211283450U (en) | Auxiliary system for rolling large-scale round tiles of thin-wall steel pipes | |
CN214614016U (en) | Special concrete pipe pile for constructional engineering | |
CN211045143U (en) | Electric wire oiling device capable of saving raw materials | |
CN219216065U (en) | Silicon steel coil storage device | |
CN216067661U (en) | Coated sucker rod coating removing equipment | |
CN219241323U (en) | Column template supporting device | |
CN215287870U (en) | Stable cargo lifting and placing device for transportation | |
CN220702970U (en) | Assembled prefabricated component superimposed sheet pile lifting device | |
CN207156453U (en) | Roller reducing motor moving-out device | |
CN219100787U (en) | Steel plate structure for hoisting and positioning assembled building wallboard | |
CN216272662U (en) | Profiled steel sheet hoisting structure | |
CN205134777U (en) | Roofing cleaning system | |
CN215862354U (en) | Device for reducing abrasion between high-pressure water pipe and pipe orifice | |
CN217474451U (en) | Cold rolling stainless steel coil plate forming positioning device | |
CN215614082U (en) | Energy-saving rolling mill for producing section steel | |
CN215797964U (en) | Fixing device for hoisting building steel structure | |
CN210701758U (en) | Electronic aluminum foil rewinder cleaning device | |
CN217025046U (en) | Large plate hanging system | |
CN215829996U (en) | Safe anti-falling device for building construction | |
CN221167447U (en) | High-altitude repair operation trolley for bridge guardrail |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |