CN214951285U - High-speed railway settlement observation data rapid processing system - Google Patents

High-speed railway settlement observation data rapid processing system Download PDF

Info

Publication number
CN214951285U
CN214951285U CN202121206959.2U CN202121206959U CN214951285U CN 214951285 U CN214951285 U CN 214951285U CN 202121206959 U CN202121206959 U CN 202121206959U CN 214951285 U CN214951285 U CN 214951285U
Authority
CN
China
Prior art keywords
observation
speed railway
settlement
observation data
settlement observation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121206959.2U
Other languages
Chinese (zh)
Inventor
李世武
张春辉
李岩
白杰
郭李
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Hengnuosituo Surveying And Mapping Co ltd
Original Assignee
Guizhou Hengnuosituo Surveying And Mapping Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Hengnuosituo Surveying And Mapping Co ltd filed Critical Guizhou Hengnuosituo Surveying And Mapping Co ltd
Priority to CN202121206959.2U priority Critical patent/CN214951285U/en
Application granted granted Critical
Publication of CN214951285U publication Critical patent/CN214951285U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Studio Devices (AREA)

Abstract

The utility model provides a high-speed railway settlement observation data rapid processing system. The high-speed railway settlement observation data rapid processing system comprises: high-speed railway basic body and settlement observation post body for the settlement of high-speed railway basic road section detects, includes: the mounting cover is fixedly mounted on the bottom surface of the high-speed railway basic body through bolts and used for covering the outer side of the settlement observation column body; the top end of the supporting rod is fixed at the top of the inner wall of the mounting cover. The utility model provides a high-speed railway settlement observation data rapid processing system has the top of subsiding observation post body and is equipped with the observation record camera, adopts the observation record camera to gather the phenomenon and the data of subsiding observation post body record, and convenient long-range quick observation and the processing of making correspondence after gathering need not arrive and detect the place and observe to remote observation and rapid processing make the solution that corresponds for the phenomenon of subsiding.

Description

High-speed railway settlement observation data rapid processing system
Technical Field
The utility model relates to a high-speed railway subsides and observes technical field, especially relates to a high-speed railway subsides observation data rapid processing system.
Background
Along with the continuous development of national traffic, the efficiency of trip has directly been promoted in high-speed railway's construction, and high-speed railway foundation settlement observation stake is buried underground at road bed section center for measure the device that the road bed subsides, and the general condition comprises following several parts: steel bottom plate, metal measuring staff and protective case.
When the device for measuring subgrade settlement is used, a settlement observation column structure is mostly adopted to detect and observe the settlement of the high-speed rail subgrade.
In the prior art, as patent No. 202020603058.6 discloses a high-speed railway base settlement observation pile with protection device, it adopts the supporting protective structure's in observation equipment's the outside mode, increases stability and convenience that settlement observation post used, because high-speed railway base settlement detection's point is many, needs the staff to arrive every detection point position and carry out the collection of data when taking notes observation data and handling data, for making the inconvenient remote collection of observation data and processing of high-speed railway settlement observation post.
Therefore, it is necessary to provide a system for rapidly processing observed data of high-speed rail settlement to solve the above technical problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides a high-speed railway settlement observation data rapid processing system has solved the inconvenient remote acquisition of observation data and the problem handled of high-speed railway settlement observation post.
In order to solve the technical problem, the utility model provides a high-speed railway subsides observation data rapid processing system includes: high-speed railway basic body and settlement observation post body for the settlement of high-speed railway basic road section detects, includes: the mounting cover is fixedly mounted on the bottom surface of the high-speed railway basic body through bolts and used for covering the outer side of the settlement observation column body; the top end of the supporting rod is fixed at the top of the inner wall of the mounting cover; the top of the adjusting ring is fixed at the bottom end of the supporting rod, and a rotating groove is formed in the bottom of the adjusting ring; the surface of the sliding part is connected to the inner surface of the rotating groove in a sliding mode, the inner side of the sliding part is fixedly connected with a rotating motor, and the output end of the rotating motor is fixedly connected with a rotating roller; the top end of the observation record camera is rotatably connected with the bottom end of the sliding part.
Preferably, the top of the mounting cover is provided with an observation window, and the observation window is of a transparent structure and used for the incidence of sunlight.
Preferably, the section of the rotating groove is of a T-shaped structure and is used for connecting and limiting the sliding piece.
Preferably, the outer surface of the rotating roller is in rolling connection with the inner side of the adjusting ring and is used for driving the observation and recording camera on the sliding part to rotate and adjust through the rotating motor.
Preferably, the outer side of the sliding part is fixedly connected with a fixed rod, and the bottom end of the fixed rod is rotatably connected with a first telescopic part.
Preferably, the output end of the first telescopic piece is rotatably connected with the back surface of the observation recording camera and used for controlling the data monitoring direction of the observation recording camera.
Preferably, the side surface of the mounting cover is provided with a vent hole, the inner wall of the mounting cover is fixedly connected with a second telescopic piece, and the output end of the second telescopic piece is fixedly connected with an adjusting inner cover.
Preferably, the outer surface of the adjusting inner cover is slidably connected with the inner surface of the mounting cover, and the size of the adjusting inner cover is communicated with the inside of the vent hole.
Compared with the prior art, the utility model provides a high-speed railway subsides observation data rapid processing system has following beneficial effect:
the utility model provides a high-speed railway settlement observation data rapid processing system, the top of subsiding the observation post body is equipped with the observation record camera, adopts the observation record camera to gather the phenomenon and the data of subsiding the observation post body record, and convenient long-range quick observation and the processing of making correspondence after gathering need not arrive and detect the place and observe to remote observation and rapid processing make the solution that corresponds for the phenomenon of subsiding.
Drawings
Fig. 1 is a schematic structural diagram of a first embodiment of a high-speed rail settlement observation data rapid processing system provided by the present invention;
FIG. 2 is an enlarged view of portion A of FIG. 1;
FIG. 3 is a three-dimensional view of the adjustment ring shown in FIG. 1;
fig. 4 is a schematic structural diagram of a second embodiment of the system for rapidly processing high-speed rail settlement observation data provided by the present invention.
Reference numbers in the figures:
1. a high-speed railway base body;
2. a settlement observation column body;
3. mounting cover 31, observation window 301 and ventilation hole;
4. a support bar;
5. an adjusting ring 501, a rotating groove;
6. a slider 61, a rotating motor 62, a rotating roller;
7. observing and recording the camera;
8. a fixed rod 81 and a first telescopic piece;
9. a second telescopic member 91, an adjusting inner cover.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and embodiments.
The first embodiment:
please refer to fig. 1, fig. 2 and fig. 3 in combination, wherein fig. 1 is a schematic structural diagram of a high-speed rail settlement observation data fast processing system according to a first embodiment of the present invention; FIG. 2 is an enlarged view of portion A of FIG. 1; FIG. 3 is a three-dimensional view of the adjustment ring shown in FIG. 1. The utility model provides a high-speed railway settlement observation data rapid processing system includes high-speed railway basic body 1 and subsides observation post body 2 for the settlement of high-speed railway basic road section detects, includes: the mounting cover 3 is fixedly mounted on the bottom surface of the high-speed railway basic body 1 through bolts and used for covering the outer side of the settlement observation column body 2; the top end of the support rod 4 is fixed on the top of the inner wall of the mounting cover 3; the top of the adjusting ring 5 is fixed at the bottom end of the supporting rod 4, and the bottom of the adjusting ring 5 is provided with a rotating groove 501; the surface of the sliding part 6 is slidably connected with the inner surface of the rotating groove 501, the inner side of the sliding part 6 is fixedly connected with a rotating motor 61, and the output end of the rotating motor 61 is fixedly connected with a rotating roller 62; and the top end of the observation recording camera 7 is rotatably connected with the bottom end of the sliding part 6.
Recording and monitoring the phenomenon of high-speed railway subgrade settlement in a settlement observation column body 2 for detecting the settlement degree of the high-speed railway subgrade;
the installation cover 3 is arranged above the settlement observation column body 2, so that the installation cover 3 can effectively protect the settlement observation column body 2 on the inner side after being installed, and the influence of severe weather such as rain, snow, flood and the like on the installed settlement observation column body 2 is reduced;
the top of subsiding observation post body 2 is equipped with observation record camera 7, adopts observation record camera 7 to gather the phenomenon and the data of subsiding observation post body 2 record, and convenient long-range quick observation and the processing of making correspondence after gathering need not arrive and detect the place and observe to in long-range observation and quick processing make corresponding solution for the phenomenon of subsiding.
The top of installation cover 3 is provided with observation window 31, and observation window 31 is transparent structure for the penetrating of sunshine.
The observation window 31 provides support for the injection of light, and the camera 7 is observed conveniently to the shooting and the state acquisition of subsiding observation post body 2.
The cross section of the rotating groove 501 is a T-shaped structure and is used for connecting and limiting the sliding member 6.
The rotating groove 501 with the T-shaped structure provides limiting and supporting for sliding of the sliding part 6, ensures stability when the sliding part 6 is rotationally adjusted, cannot fall off from the inside of the rotating groove 501, and can stably rotate around the adjusting ring 5 when the sliding part 6 rotates.
The outer surface of the rotating roller 62 is in rolling connection with the inner side of the adjusting ring 5 and is used for driving the observation and recording camera 7 on the sliding part 6 to rotate and adjust through the rotating motor 61.
The outer surface of rotating roller 62 is in close abutment with the inner side of adjusting ring 5, and rotating roller 62 is a rubber roller, increasing the stability when the outer surface of rotating roller 62 is in contact with the inner side of adjusting ring 5.
The rotating electric machine 61 is connected to an external power source when in use.
Rotating electrical machines 61 fixed mounting is on rotatably adjustable's slider 6 for the rotatory roller 62 of rotating electrical machines 61 output can be stable when rotating roll in the inboard of adjustable ring 5, the rotating electrical machines 61 synchronous motion of drive bottom when rotatory roller 62 rolls, the slider 6 in the synchronous drive outside when rotating electrical machines 61 removes, slider 6 moves in the below around the inside of swivelling chute 501, can the synchronous drive below when slider 6 removes observe the record camera 7 and rotate, it conveniently observes and records from subsiding the different directions at observation post body 2 top when observing the record camera 7 rotation.
The outside fixedly connected with dead lever 8 of slider 6, the bottom of dead lever 8 rotates and is connected with first extensible member 81.
The output end of the first telescopic piece 81 is rotatably connected with the back of the observation recording camera 7 and used for controlling the data monitoring direction of the observation recording camera 7.
The outside of slider 6 sets up dead lever 8, and the bottom of dead lever 8 is connected through the transmission between first extensible member 81 and the observation record camera 7, conveniently adjusts observation angle to observation record camera 7 through first extensible member 81 for long-range observation scope to subsiding observation post body 2 is more extensive, obtains that data is true and more comprehensive.
First extensible member 81 can select for use electric telescopic handle, hydraulic telescoping rod, preferred electric telescopic handle according to the demand of use.
The utility model provides a high-speed railway subsides observation data rapid processing system's theory of operation as follows:
when the observation direction of the observation recording camera 7 needs to be adjusted, the rotating motor 61 is started;
after the rotating motor 61 is started, the rotating roller 62 is synchronously driven to rotate, and the rotating roller 62 rolls on the inner side of the adjusting ring 5;
the rotating roller 62 drives the rotating motor 61 to move synchronously, and the rotating motor 61 drives the sliding part 6 on the outer side to move;
slider 6 moves in the below around the inside of swivelling chute 501, and slider 6 drives the observation record camera 7 rotation of below, and convenient different directions from subsiding observation post body 2 top are observed and are recorded when observing record camera 7 rotation.
Compared with the prior art, the utility model provides a high-speed railway subsides observation data rapid processing system has following beneficial effect:
the top of subsiding observation post body 2 is equipped with observation record camera 7, adopts observation record camera 7 to gather the phenomenon and the data of subsiding observation post body 2 record, and convenient long-range quick observation and the processing of making correspondence after gathering need not arrive and detect the place and observe to in long-range observation and quick processing make corresponding solution for the phenomenon of subsiding.
Second embodiment:
referring to fig. 4, a second embodiment of the present application provides another high-speed rail settlement observation data fast processing system based on the high-speed rail settlement observation data fast processing system provided by the first embodiment of the present application. The second embodiment is only the preferred mode of the first embodiment, and the implementation of the second embodiment does not affect the implementation of the first embodiment alone.
Specifically, the difference of the high-speed railway settlement observation data rapid processing system provided by the second embodiment of the present application lies in that the high-speed railway settlement observation data rapid processing system further includes:
the side of the installation cover 3 is provided with a vent hole 301, the inner wall of the installation cover 3 is fixedly connected with a second telescopic piece 9, and the output end of the second telescopic piece 9 is fixedly connected with an adjusting inner cover 91.
The outer surface of the adjusting inner cover 91 is slidably coupled to the inner surface of the mounting cover 3, and the size of the adjusting inner cover 91 is communicated with the inside of the ventilation hole 301.
The ventilation hole 301 on the installation cover 3 not only can increase the illumination intensity inside the installation cover 3 when being opened, but also can increase the ventilation and heat dissipation inside the installation cover 3, so that the heat dissipation efficiency inside the installation cover 3 is accelerated.
The second telescopic piece 9 conveniently drives the adjusting inner cover 91 to move up and down for adjustment, and when the adjusting inner cover 91 moves down, the vent hole 301 is convenient to gradually open;
when adjusting inner cover 91 rebound, the convenience is to the closing of ventilation hole 301, uses the phenomenon of taking place to leak rain when avoiding sleet weather, provides the guarantee for the stability and the security of equipment operation.
Has the advantages that:
set up ventilation hole 301 in the side of installation cover 3 and conveniently increase the daylighting when installing 3 inside uses of cover, conveniently adjust and control installation cover 3 ventilation efficiency simultaneously, increase installation cover 3's radiating efficiency.
The above only is the embodiment of the present invention, not limiting the scope of the present invention, all the equivalent structures or equivalent processes of the present invention are used in the specification and the attached drawings, or directly or indirectly applied to other related technical fields, and the same principle is included in the protection scope of the present invention.

Claims (8)

1. The utility model provides a high-speed railway settlement observation data rapid processing system, includes high-speed railway basic body and subsides observation post body for the settlement of high-speed railway basic road section detects, its characterized in that includes:
the mounting cover is fixedly mounted on the bottom surface of the high-speed railway basic body through bolts and used for covering the outer side of the settlement observation column body;
the top end of the supporting rod is fixed at the top of the inner wall of the mounting cover;
the top of the adjusting ring is fixed at the bottom end of the supporting rod, and a rotating groove is formed in the bottom of the adjusting ring;
the surface of the sliding part is connected to the inner surface of the rotating groove in a sliding mode, the inner side of the sliding part is fixedly connected with a rotating motor, and the output end of the rotating motor is fixedly connected with a rotating roller;
the top end of the observation record camera is rotatably connected with the bottom end of the sliding part.
2. The high-speed rail settlement observation data rapid processing system according to claim 1, wherein an observation window is arranged on the top of the mounting cover, and the observation window is of a transparent structure and used for sunlight incidence.
3. The system for rapidly processing high-speed rail settlement observation data according to claim 1, wherein the cross section of the rotating groove is of a T-shaped structure and is used for connecting and limiting a sliding part.
4. The system for rapidly processing high-speed rail settlement observation data according to claim 1, wherein the outer surface of the rotating roller is in rolling connection with the inner side of the adjusting ring and is used for driving the observation and recording camera on the sliding part to rotate and adjust through a rotating motor.
5. The system for rapidly processing high-speed rail settlement observation data according to claim 1, wherein a fixed rod is fixedly connected to the outer side of the sliding member, and a first telescopic member is rotatably connected to the bottom end of the fixed rod.
6. The system for rapidly processing high-speed rail settlement observation data according to claim 5, wherein the output end of the first telescopic member is rotatably connected with the back surface of the observation and recording camera and is used for controlling the data monitoring direction of the observation and recording camera.
7. The system for rapidly processing the settlement observation data of the high-speed rail as claimed in claim 1, wherein a vent hole is formed in the side surface of the mounting cover, a second telescopic member is fixedly connected to the inner wall of the mounting cover, and an adjusting inner cover is fixedly connected to the output end of the second telescopic member.
8. The system for rapidly processing high-speed rail settlement observation data according to claim 7, wherein an outer surface of the adjusting inner cover is slidably coupled to an inner surface of the mounting cover, and the size of the adjusting inner cover is communicated with the inside of the ventilation hole.
CN202121206959.2U 2021-06-01 2021-06-01 High-speed railway settlement observation data rapid processing system Expired - Fee Related CN214951285U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121206959.2U CN214951285U (en) 2021-06-01 2021-06-01 High-speed railway settlement observation data rapid processing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121206959.2U CN214951285U (en) 2021-06-01 2021-06-01 High-speed railway settlement observation data rapid processing system

Publications (1)

Publication Number Publication Date
CN214951285U true CN214951285U (en) 2021-11-30

Family

ID=79057519

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121206959.2U Expired - Fee Related CN214951285U (en) 2021-06-01 2021-06-01 High-speed railway settlement observation data rapid processing system

Country Status (1)

Country Link
CN (1) CN214951285U (en)

Similar Documents

Publication Publication Date Title
CN213179998U (en) Hydrology water resource monitor auxiliary device
CN210016528U (en) Traffic signal monitoring device of road lighting engineering
CN113781747B (en) Mud-rock flow landslide hazard monitoring and early warning system and assessment method
CN218508184U (en) Road surface flatness detection device for road construction
CN117155236B (en) Angle-adjustable photovoltaic equipment
JPH0786628A (en) Solar-ray collecting panel mounter
CN214951285U (en) High-speed railway settlement observation data rapid processing system
CN209581382U (en) A kind of data acquisition device based on wireless communication
CN216410439U (en) Soil temperature monitoring device for embedding of buried pipe
CN215636156U (en) Data acquisition monitoring device for road construction equipment
CN213632099U (en) Hydrology water resource detection device
CN212208546U (en) Traffic information acquisition device
CN116817138A (en) Road flow monitoring and situation early warning device
CN210219177U (en) Municipal administration civil engineering survey instrument
CN213818431U (en) Outdoor intelligent meteorological early warning monitoring station of green house
CN212620385U (en) A anti-system device that is used for many rotor unmanned aerial vehicle of miniature of nuclear power station observation
CN211954479U (en) Based on AI intelligence temperature measurement data acquisition facility
CN107914999A (en) It is a kind of to be hidden in underground dustbin easy to operation
CN209084343U (en) remote observer
CN109668025B (en) Distributed photovoltaic power station monitoring device
CN222258133U (en) River slope monitoring device
CN214951359U (en) Rotation type total powerstation protection casing
CN213363785U (en) Unmanned aerial vehicle detects building information acquisition device
CN218290271U (en) Vehicle target detection device based on remote sensing image
CN219041710U (en) Bearing support of receiver detection equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211130

CF01 Termination of patent right due to non-payment of annual fee